Space environment simulator test program. Volume 2 - Unmanned thermal performance evaluation of a Gemini extravehicular space suit Test report, May 1965
Temperature data plots of Gemini Bravo series space suit tests
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Temperature data plots of Gemini Bravo series space suit tests
Thermal shock testing of coextruded and brazed tubular joints of stainless steel and tantalum for SNAP-8 application
Test program on deflection characteristics of thin walled stem tubes perforated with random spiral hole pattern to produce equal absorption of radiant power on front and rear surface
Performance characteristics of the Nuclear Thermal Rocket can be enhanced through the use of unconventional nozzles as part of the propulsion system. The Nuclear Thermal Rocket nozzle testing and evaluation program being conducted at the NASA Lewis is outlined and the advantages of a plug nozzle are described. A facility description, experimental designs and schematics are given. Results of pretest performance analyses show that high nozzle performance can be attained despite substantial nozzle length reduction through the use of plug nozzles as compared to a convergent-divergent nozzle. Pretest measurement uncertainty analyses indicate that specific impulse values are expected to be within + or - 1.17 pct.
Resource Prospector Integrated Thermal Vacuum Test Program A series of ground based dirty thermal vacuum tests are being conducted to better understand the subsurface sampling operations for RP Volatiles loss during sampling operations Hardware performance Sample removal and transfer Concept of operationsInstrumentation5 test campaigns over 5 years have been conducted with RP hardware with advancing hardware designs and additional RP subsystems Volatiles sampling 4 years Using flight-forward regolith sampling hardware, empirically determine volatile retention at lunar-relevant conditions Use data to improve theoretical predictions Determine driving variables for retention Bound water loss potential to define measurement uncertainties. The main goal of this talk is to introduce you to our approach to characterizing volatiles loss for RP. Introduce the facility and its capabilities Overview of the RP hardware used in integrated testing (most recent iteration) Summarize the test variables used thus farReview a sample of the results.
An approach for developing a general thermal vacuum test program philosophy is discussed. Guidelines are established that will assist the project engineer in relating the risk associated with flying any spacecraft to its test program. Computerized techniques can be used to help ascertain these guidelines, which relate the risk to the level of test (component, subsystem, etc), as well as to the type of test (development, qualification, etc). The interrelationship between the test program and the analytical effort is also discussed. The Skylab Apollo telescope mount general thermal vacuum test program, including test schedules, instrumentation, and test results is also discussed.
The accomplishments, current status, and future plans of the thermal test bed program for Space Station thermal management are discussed. This program is intended to support the design and development of the thermal control systems for the Space Station. The topics discussed include heat pipe radiator evaluation, modular panel tests, two-phase heat transport, and testing of thermal buses using ammonia as the working fluid.
Completed thermal-mechanical and mechanical load testing: a) 6 re-entry heating tests (3 with loading to 50% DLL), 3 hypersonic cruise tests with loading to 50% DLL and 4 high-temperature modal survey tests. b) 9 tests to 100% DLL. High-temperature modal survey results were inconclusive due to exceeding capability of some accelerometers. Overall good correlation between analysis and measured results for windward and leeward surface temperatures. Generally poor correlation between analysis and measured results for spindle area temperatures. Excellent test-to-test repeatability in strain and deflection data for 100% DLL testing. In-situ thermography images taken before and after thermal testing showed only minor changes in initial defects. Final detailed thermography tests scheduled for completion in Oct 09. In process of completing test documentation and test data analysis. Final reports complete by Dec 09. All analysis, test data, test plans, reports, photos, etc. will be made available to the technical community via the CMC Wiki.
This report describes the continuation and conclusion of a thermal cycling test program designed to evaluate a family of passively actuated material surveillance test articles. Additionally, the report details a preliminary study of bimetallic welding between 316 stainless steel and TZM (tungsten-zirconium-molybdenum) alloy. The test program was ultimately successful in demonstrating the basic viability of the passively actuated test article concept as well as specifically validating the procedures developed to size specimens to mimic the mechanical response of operating components. The report discusses and summarizes the results of the complete test program which tested samples for more than 1,000 controlled thermal cycles. The weld development program included both stir friction and electron beam joining. The stir friction welding was ultimately successful, while the electron beam welding would require additional development. Ultimately, these test programs pave the way for implementing a materials surveillance program in future molten salt reactors (MSRs). The report conclusions outline a plan for transforming the research and developed described here into a definite set of practices and procedures for a surveillance program at a future operating reactor.
An evaluation process to determine the accuracy of a computer program for thermal network correction is discussed. The evaluation is required since factors such as inaccuracies of temperatures, insufficient number of temperature points over a specified time period, lack of one-to-one correlation between temperature sensor and nodal locations, and incomplete temperature measurements are not present in the computer-generated information. The mathematical models used in the evaluation are those that describe a physical system composed of both a conventional and a heat pipe platform. A description of the models used, the results of the evaluation of the thermal network correction, and input instructions for the thermal network correction program are presented.
The results of a thermal-structural test program to verify the performance of a metallic/radiative Thermal Protection System (TPS) under reentry conditions are presented. This TPS panel is suitable for multiple reentry, high L/D space vehicles, such as the NASA space shuttle, having surface temperatures up to 1200 C (2200 F). The TPS panel tested consists of a corrugation-stiffened, beaded-skin TD Ni-20Cr metallic heat shield backed by a flexible fibrous quartz and radiative shield insulative system. Test conditions simulated the critical heating and aerodynamic pressure environments expected during 100 repeated missions of a reentry vehicle. Temperatures were measured during each reentry cycle; heat-shield flatness surveys to measure permanent set of the metallic components were made every 10 cycles. The TPS panel, in spite of localized surface failures, performed its designated function.
This paper describes the development of the Boresight Adjustment Mechanism (BAM) for the Geoscience Laser Altimeter System (GLAS) Instrument. The BAM was developed late in the integration and test phase of the GLAS instrument flight program. Thermal vacuum tests of the GLAS instrument indicated that the instrument-boresight alignment stability over temperature may be marginal. To reduce the risk that GLAS may not be able to meet the boresight alignment requirements an intensive effort was started to develop a BAM. Observatory-level testing and further evaluation of the boresight alignment data indicated that sufficient margin could be obtained utilizing existing instrument resources and therefore the BAM was never integrated onto the GLAS Instrument. However, the BAM was designed fabricated and fully qualified over a 4 month timeframe to be capable of precisely steering (less than 2 arcsec over plus or minus 300 arcsec) the output of three independent lasers to ensure the alignment between the transmit and receive paths of the GLAS instrument. The short timeline for the development of the mechanism resulted in several interesting design solutions. This paper discusses the requirement definition design, and testing processes of the BAM development effort how the design was affected by the extremely tight development schedule and the lessons learned throughout the process.
This paper describes the development of the Boresight Adjustment Mechanism (BAM) for the Geoscience Laser Altimeter System (GLAS) Instrument. The BAM was developed late in the integration and test phase of the GLAS instrument flight program. Thermal vacuum tests of the GLAS instrument indicated that the instrument boresight alignment stability over temperature may be marginal. To reduce the risk that GLAS may not be able to meet the boresight alignment requirements, an intensive effort was started to develop a BAM. Observatory-level testing and further evaluation of the boresight alignment data indicated that sufficient margin could be obtained utilizing existing instrument resources and therefore the BAM was never integrated onto the GLAS Instrument. However, the BAM was designed fabricated and fully qualified over a 4 month timeframe to be capable of precisely steering (< 1 arcsec over 300 arcsec) the output of three independent lasers to ensure the alignment between the transmit and receive paths of the GLAS instrument. The short timeline for the development of the mechanism resulted in several interesting design solutions. This paper discusses the requirement definition, design, and testing processes of the BAM development effort, how the design was affected by the extremely tight development schedule, and the lessons learned throughout the process.
The Cassini spacecraft, NASA's mission to investigate the Saturn system, has undergone a system-level thermal balance test program to permit verification of the science instrument thermal designs in the simulated worst-case environments.
Results of outdoor test program evaluating thermal performance of liquid solar collector are presented in report. Test article used is flatplate collector with antifreeze solution as working fluid.
The Explorer Platform (EP) has been designed to accommodate on-orbit payload and bus module changeout via Space Transportation System (STS) servicing. Such a versatile spacecraft platform designed to experience widely different environmental exposures and operational conditions, coupled with program constraints on schedule and budget, presented a challenge to implementing a technically sound thermal vacuum/thermal balance test program. This paper discusses thermal performance tests implemented at the subsystem and system levels, and the risks accepted resulting from test sequence, configuration. and tests omitted from the program. No thermal cycling or thermal balance tests were performed on the integrated spacecraft level, although both the Payload (EUVE) and Platform (EP) received independent testing. The decision to take this approach is discussed with respect to the thermal design and the associated risks taken to maintain budget and schedule.
Both Rovers have celebrated 3-year anniversaries on surface of Mars: a) More than ten times design life; b) Planned and implemented rigorous assembly and system level test programs; c) Demonstrated robust thermal margins; d)Tested both in vacuum and Mars atmosphere; e) Planned and implemented thermal cycling life qualification program; f) Demonstrated survival in deep thermal diurnal cycling and seasonal temperature variations; and g) Both Rovers continue to explore and return valuable science data
A noise characterization of the Landsat-7 Enhanced Thematic Mapper Plus (ETM+) instrument was performed as part of a near-real time performance assessment and health monitoring program. Perl'ormance data for the integrated Landsat-7 spacecraft and ETM+ were collected before, during, and after the spacecraft thermal vacuum testing program at the Lockheed Martin Missiles and Space (LMMS) facilities in Valley Forge, PA. The Landsat-7 spacecraft and ETM+ instrument were successfully launched on April 15, 1999. The spacecraft and ETM+ are now nearing the end of the on orbit engineering checkout phase, and Landsat-7 is expected to be declared operational on or about July 15, 1999. A preliminary post-launch noise characterization was performed and compared with the pre-launch characterization. In general the overall noise levels in the ETM+ are at or below the specification levels. Coherent noise is seen in most bands, but is only operationally significant when imaging in (he panchromatic band (band 8). This coherent noise has an amplitude as high as approximately 3 DN (peak-to-peak, high gain) at the Nyquist rate of 104 kHz, and causes the noise levels in panchromatic band images at times to exceed the total noise specification by up to approximately 10%. However, this 104 kHz noise is now much weaker than it was prior to the successful repair of the ETM+ power supplies that was completed in May 1998. Weak and stable coherent noise at approximately 5 kHz is seen in all bands in the prime focal plane (bands 1-4 and 8) with the prime (side A) electronics. Very strong coherent noise at approximately 20 kHz is seen in a few detectors of bands 1 and 8, but this noise is almost entirely in the turn-around region between scans when the ETM+ is not imaging the Earth. Strong coherent noise was seen in 2 detectors of band 5 during some of the pre-launch testing; however, this noise seems to be temperature dependent, and has not been seen in the current on orbit environment. Strong 91 kHz coherent noise was observed in the redundant (side B) panchromatic band data after the completion of spacecraft thermal vacuum testing. The cause of this coherent noise was identified as a failed capacitor that was replaced prior to launch, and this noise has not been seen on orbit.