Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC

The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Machine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]↗

Economic Impact of Permitting Timelines on Geothermal Power in California, Nevada, and Utah

The United States has great geothermal power potential; however, only a small fraction of this resource has been utilized for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to the lower penetration of geothermal energy into the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This document provides an assessment of the potential economic impact of permitting costs and timelines on geothermal power in California, Nevada, and Utah. Development of geothermal resources requires multi-layered regulatory permitting by local, state, and federal agencies. In this study, we collected and reviewed permit timelines and associated cost data for several existing geothermal power plants as well as for geothermal projects currently undergoing permitting processes for exploration and development activities in California, Nevada, and Utah. We interviewed several geothermal developers and staff from multiple permitting agencies to obtain insight from both sides (i.e., people applying for permits and people processing those applications for California Environmental Quality Act [CEQA] and National Environmental Policy Act [NEPA] reviews and other regulatory compliance). The intent of this project was also to identify informative pathways for the geothermal stakeholder community by which the permitting process could be streamlined.

15 GEOTHERMAL ENERGY↗

Approach and Model Used to Represent a Timeline Analysis for Security Design Enhancements

Next-generation reactors will be able to use risk to inform and performance base the licensing of many aspects of the reactor, facility, and site design, including attributes of physical security. There are several factors related to security, including site topography, reactor design, and physical protection system components, to consider when designing the physical protection system into the overall facility design and plan of operation. With the versatility of advanced reactors, especially micro reactors, methods are needed to simplify and quickly evaluate potential timelines for designing a site configuration. This report describes an approach to generate qualitative and quantitative insights using a risk-informed simulation. The modeling process is described in detail, focusing on three aspects: (1) the facility mission time (the time required to control the plant until safe), (2) the attacker timeline (the time to potential sabotage), and (3) the response timeline (the time to counter the facility attack). The modeling capabilities also are extended to include facility physical phenomena such as thermal-hydraulics and heat transfer to capture realistic representation of dynamic changes to a facility. While the plant models and examples are hypothetical and do not represent a real facility, these modeling approaches could be used for future security-by-design engineering in advanced reactors. The outputs and insights from the modeling approach may be used to modify and optimize the security posture of a facility by efficiently making modifications to the model and seeing the overall impact from the modification. Lastly, use of the approach described in this report can also provide the technical basis for a physical protection program, describing how the facility and security strategy will cope with off-normal events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Residential and Small Commercial Solar Photovoltaic and Storage Permitting, Inspection, and Interconnection Timelines: A Retrospective Review (2017-2023)

This report is part of the ongoing Solar Time-Based Residential Analytics and Cycle Time Estimator (SolarTRACE) project, led by the National Renewable Energy Laboratory (NREL). The SolarTRACE project utilizes time-stamped project-level data provided by installer-partners to assess nationwide and AHJ- and utility-level PI&I and other solar PV adoption timelines since 2017. Our dataset now covers 22% of residential solar and 33% of residential storage installs in the U.S. since 2017. This report provides an update to our previous 2022 report (Cruce et al., 2022b) and includes: updated 2017 2023 project timelines for residential rooftop solar PV up to 20kW; updated tracking of permitting process changes at nearly 4,000 AHJs nationwide; and first-ever reporting of timelines for residential PV+storage projects up to 20kW.

14 SOLAR ENERGY↗

Performance Report: A timeline for the synchrotron calibration of AXAF

Presented herein are the known elements of the timeline for synchrotron reflectance calibrations of HRMA witness samples (Section 2). In Section 3, lists of measurements to be done on each witness flat are developed. The elements are then arranged into timelines for the three beamlines we expect to employ in covering the full 50-12,000 eV energy range (Section 4). Although the required AXAF operational range is only 0.1-10 keV, we must calibrate the extent to which radiation just outside this band may contaminate our in-band response. In Section 5, we describe the working relationships which exist with each of the beamlines, and estimate the time available for AXAF measurements on each. From the timelines and the available time, we calculate the number of flats which could be measured in full detail over the duration of the program for each beamline. A suggestion is made regarding a minimum required baselines of witness flats from each element coating run or qualification run to be used in the calibration. We intend that this suggestion open discussion of the issue of witness flat deployment.

Tananbaum, H. D.↗

Electronic collection system for spacelab mission timeline requirements

This paper describes the Functional Objective Requirements Collection System (FORCS) software tool that has been developed for use by Principal Investigators (PI's) and Payload Element Developers (PED's) on their own personal computers to develop on-orbit timelining requirements for their payloads. The FORCS tool can be used either in a totally stand-alone mode, storing the information in a local file on the user's personal computer hard disk or in a remote mode where the user's computer is linked to a host computer containing the integrated database of the timeline requirements for all of the payloads on a mission. There are a number of features incorporated in the FORCS software to assist the user. The user may move freely back and forth between the various forms for inputting the data. Several methods are used to input the information, depending on the type of the information. These methods range from filling in text boxes, using check boxes and radio buttons, to inputting information into a spreadsheet format. There are automated features provided to assist in developing the proper format for the data, ranging from limit checking on some of the parameters to automatic conversion of different formats of time data inputs to the one standard format used for the timeline scheduling software.

Lindberg, James P.↗

Human Factors Operability Timeline Analysis to Improve the Processing Flow of the Orion Spacecraft

This slide presentation reviews the use of Human factors and timeline analysis to have a more efficient and effective processing flow. The solution involved developing a written timeline of events that included each activity within each functional flow block. Each activity had computer animation videos and pictures of the people involved and the hardware. The Human Factors Engineering Analysis Tool (HFEAT) was improved by modifying it to include the timeline of events. The HFEAT was used to define the human factors requirements and design solutions were developed for these requirements. An example of a functional flow block diagram is shown, and a view from one of the animations (i.e., short stack pallet) is shown and explained.

Stambolian, Damon B.↗

Timeline as Unifying Concept for Spacecraft Operations

The notion of Timeline has been used informally in spacecraft operations software for some time, but it has not heretofore been formalized and unified either syntactically or semantically. We have formalized and unified the Timeline so that the commonality can be exploited to reduce the cost of developing and using spacecraft operations software. The Timeline can then be used as the common data structure for storage and communications between spacecraft planning and operations software elements.

decision making↗

HLS Mission Planning Using the STEDe Applications Suite of Timeline Evaluation and Development environments (STEDe)

STEDe applications work together to emulate the official HLS mission timeline and provide insight into potential mission constraints. They ingest HLS Program inputs such as ground rules and assumptions, requirements, and activity durations, informed by experts, to ensure that crew activities and critical vehicle events can transpire without conflicts and mission goals can be achieved. The STEDe applications provide timely assessments of what-if changes to the timeline with respect to different parameters and improve on the trial-and-error mission timeline development process.

Levi Gosdin↗

Risk Informed Timelines (RIT) v.1.0

Risk Informed Timelines (RIT) is a more modern and holistic method for understanding how access delay timelines are developed and utilized in physical security system evaluations. The software utilizes Bayesian methods to combine subject matter expert judgement and small performance test datasets in a consistent and defensible way. It allows a more holistic view of delay performance that provides distributions of task times and task success probabilities to account for tasks that, if failed, would result in failure of the attack. The RIT methodology is meant to enable security risk managers to begin the transition into more comprehensive delay timeline analysis. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525. SAND2021-8294 O

Noel, ToddG.↗

Economic Impact of Permitting Timelines on Produced Geothermal Power

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive.

15 GEOTHERMAL ENERGY↗

A Generalized Timeline Representation, Services, and Interface for Automating Space Mission Operations

Most use a timeline based representation for operations modeling. Most model a core set of state, resource types. Most provide similar capabilities on this modeling to enable (semi) automated schedule generation. In this paper we explore the commonality of : representation and services for these timelines. These commonalities offer potential to be harmonized to enable interoperability, re-use.

timeline-based systems↗

Integrating Mission Timelines and Procedures to Enhance Situational Awareness in Human Spaceflight Operations

Future human spaceflight missions to the Moon, Mars, and beyond will have significant transmission delays and reduced communications bandwidth compared to operations in Low Earth Orbit, requiring increased crew autonomy due to the limited availability of real-time support from Mission Control Center (MCC). In this paper, we argue for the development of technology to enhance situational awareness (SA) for a remote MCC and astronauts onboard the vehicle, describe a usability study conducted towards this aim, and identify key usability features for the design of future integrated timeline tools. By tightly integrating timelines and procedures, future crew systems can predict future constraint violations, suggest resolutions to these violations, and ultimately support more successful missions.

User experience↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydropower Licensing Timeline and Cost Dataset

This dataset provides timeline dates, lengths, project characteristics, license characteristics, and costs of hydropower licensing and relicensing for 107 randomly selected hydropower projects that have been issued licenses since 1 October 2005. Projects included in this dataset were licensed but not necessarily constructed. These data were analyzed and presented in Chapters 3 (timeline data) and 5 (cost data) of the Levine et al. (2021) report

13 HYDRO ENERGY↗

Human Factors Operability Timeline Analysis to Improve the Processing Flow of the Orion Spacecraft

The Constellation Program (CxP) Orion vehicle goes through several areas and stages of processing before its launched at the Kennedy Space Center. In order to have efficient and effective processing, all of the activities need to be analyzed. This was accomplished by first developing a timeline of events that included each activity, and then each activity was analyzed by operability experts and human factors experts with spacecraft processing experience. This papers focus is to explain the results and the process for developing this human factors operability timeline analysis to improve the processing flow of Orion.

Schlierf, Roland↗

Timeline-Based Mission Operations Architecture: An Overview

Some of the challenges in developing a mission operations system and operating a mission can be traced back to the challenge of integrating a mission operations system from its many components and to the challenge of maintaining consistent and accountable information throughout the operations processes. An important contributing factor to both of these challenges is the file-centric nature of today's systems. In this paper, we provide an overview of these challenges and argue the need to move toward an information-centric mission operations system. We propose an information representation called Timeline as an approach to enable such a move, and we provide an overview of a Timeline-based Mission Operations System architecture.

Chung, Seung H.↗

Innovative Development of a Cross-Center Timeline Planning Tool

The Payload Operations Integration Center (POIC) at Marshall Space Flight Center (MSFC) is the United States focal point to support operations controllers and payload developers conducting payload science operations for the National Aeronautics and Space Administration (NASA) aboard the International Space Station (ISS). Some of the key functions are planning, coordination and scheduling of science activities. This effort occurs in coordination with other NASA centers, international partners, and payload developers. The ability to efficiently plan and re-plan in response to change is critical to the flight planning teams. Additionally, in Fall 2017, NASA will increase its ability to perform payload science operations aboard the ISS with a fourth crew member. In order to support this, there will be an increasing need to quickly plan and schedule more activities. In the past, it was cumbersome and time-consuming to consolidate copious amounts of planning and change request data from various sources. Planners would summarize information from the Johnson Space Center (JSC) Operations Planning Timeline Integration System (OPTIMIS) and manually integrate it with other data in order to produce a Timeline Planning Summary (TPS). This lengthy process of updating static documents while planning and re-planning was cumbersome, introduced human error, and was inflexible to last minute changes. There was a need for a dynamic, more efficient, less erroneous, and more concise way of building a report that could be readily updated as fast as payload science plans change.

Pedoto, Ramon W.↗