Search NASA⌕ Search

SEARCH · Search NASA

Results for “tradeoffs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

The elusive tradeoff - Speed vs accuracy in visual discrimination tasks.

Explicit payoffs were used to control pressures for speed and accuracy in experiments seeking tradeoffs for difficult visual discrimination tasks. The experiments involved stimuli on a cathode ray tube display controlled by a PDP-1 computer, with the subjects performing increasingly complex discrimination tasks and their earnings increasing with their performance. Models for discrimination under time pressure are proposed on the basis of the results.

Swensson, R. G.↗

Tracking and data relay satellite system configuration and tradeoff study. Volume 1: Study summary

A study was conducted to determine the configuration and tradeoffs of a tracking and data relay satellite. The study emphasized the design of a three axis stabilized satellite and a telecommunications system optimized for support of low and medium data rate user spacecraft. Telecommunications support to low and high, or low medium, and high data rate users, considering launches with the Delta 2914, the Atlas/Centaur, and the space shuttle was also considered. The following subjects are presented: (1) launch and deployment profile, (2) spacecraft mechanical and structural design, (3) attitude stabilization and control subsystem, and (4) reliability analysis.

Hill, T. E.↗

Design tradeoff study for reflector antenna systems for the shuttle imaging microwave system

A general tradeoff is made of the symmetric Cassegrain antenna with regard to the possibility of meeting a 90% beam efficiency. The effects of aperture taper and blockage are calculated using an adjustable sidelobe circular distribution. Numerical integration is used. For the feed spillover calculation, a low sidelobe symmetric feed pattern is used with the equivalent parabola and numerical integration. Reflector cross polarization is calculated using double numerical integration. Reflector back lobes are estimated from radiation pattern envelopes of commercial common carrier dish antennas. The curves allow a range of f/D to be determined for a specified edge taper and blockage diameter ratio, and with a table of Cassegrain parameters, a range of possible designs that meet the 90% beam efficiency is obtained. It is shown that the feed and reflector design and implementation must be carefully done.

Hansen, R. C.↗

Earth Observatory Satellite system definition study. Report no. 1: Orbit/launch vehicle tradeoff studies and recommendations

A study was conducted to determine the recommended orbit for the Earth Observatory Satellite (EOS) Land Resources Mission. It was determined that a promising sun synchronous orbit is 366 nautical miles when using an instrument with a 100 nautical mile swath width. The orbit has a 17 day repeat cycle and a 14 nautical mile swath overlap. Payloads were developed for each mission, EOS A through F. For each mission, the lowest cost booster that was capable of lifting the payload to the EOS orbit was selected. The launch vehicles selected for the missions are identified on the basis of tradeoff studies and recommendations. The reliability aspects of the launch vehicles are analyzed.

Source record↗

Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies

The key issues in the Earth Observatory Satellite (EOS) program which are subject to configuration study and tradeoff are identified. The issue of a combined operational and research and development program is considered. It is stated that cost and spacecraft weight are the key design variables and design options are proposed in terms of these parameters. A cost analysis of the EOS program is provided. Diagrams of the satellite configuration and subsystem components are included.

Source record↗

Laser space rendezvous and docking tradeoff

A spaceborne laser radar (LADAR) was configured to meet the requirements for rendezvous and docking with a cooperative object in synchronous orbit. The LADAR, configurated using existing pulsed CO2 laser technology and a 1980 system technology baseline, is well suited for the envisioned space tug missions. The performance of a family of candidate LADARS was analyzed. Tradeoff studies as a function of size, weight, and power consumption were carried out for maximum ranges of 50, 100, 200, and 300 nautical miles. The investigation supports the original contention that a rendezvous and docking LADAR can be constructed to offer a cost effective and reliable solution to the envisioned space missions. In fact, the CO2 ladar system offers distinct advantages over other candidate systems.

Adelman, S.↗

Power transistor performance tradeoffs

Recent advances in the understanding of bipolar device physics permit the derivation of a number of quantitative relationships which are useful for improving existing designs and also for assessing the feasibility of proposed devices. This paper describes three important tradeoffs which apply to the design and performance of high-voltage transistors in inverter circuits.

Hower, P. L.↗

Scanning system tradeoffs for remote optical sensing from geosynchronous orbit

The scanning and telescope field of view requirements for making Earth Resources (ER) and Meteorological (MET) phenomena observations from a Synchronous Earth Observation Satellite (SEOS) have been defined. The equations relating spacecraft scan capability to user scan field of view requirements are given and evaluated using four different telescope fields of view. The tradeoffs between telescope field-of-view and user scan fields of view requirements are shown, and it was determined that a 0.6 degree by 1.2 degree telescope FOV is optimum for the SEOS telescope. It was shown that an internal scan as well as external scan is required to satisfy both ER and MET users.

Young, P. J.↗

Mars surface sample return tradeoff studies

Results of tradeoff studies concerning the Mars Surface Sample Return (MSSR) mission are presented. Factors considered include: Mars mission opportunities in the 1980-1990 time frame; design features of the hardware systems used to return the sample; minimization of probability of back contamination; direct entry of the returning sample capsule at earth vs. orbital capture of the capsule for recovery by the shuttle; and possibility of increasing the landed weight at Mars to support MSSR mission modes involving heavier systems.

Source record↗