Operational Transition of Gridded NUCAPS to NOAA NWS and Emerging Applications
No abstract available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
No abstract available
Explore the source record for details and available documents.
When electrified transit systems make grid aware choices, improved social welfare is achieved by reducing grid stress, reducing system loss, and minimizing power quality issues. Electrifying transit fleet has numerous challenges like non availability of buses during charging, varying charging costs and so on, that are related the electric grid behavior. However, transit systems do not have access to the information about the co-evolution of the grid's power flow and therefore cannot account for the power grid's needs in its day-to-day operation. In this paper we propose a framework of transportation-grid co-simulation, analyzing the spatio-temporal interaction between the transit operations with electric buses and the power distribution grid. Real-world data for a day's traffic from Chattanooga city's transit system is simulated in SUMO and integrated with a realistic distribution grid simulation (using GridLAB-D) to understand the grid impact due to transit electrification. Charging information is obtained from the transportation simulation to feed into grid simulation to assess the impact of charging. We also discuss the impact to the grid with higher degree of transit electrification that further necessitates such an integrated transportation-grid co-simulation to operate the integrated system optimally. Our future work includes extending the platform for optimizing the charging and trip assignment operations.
Standardized experimental testing protocols for grid forming (GFM) inverters to ensure expected operation under both normal and contingency conditions do not exist. Such protocols increase the confidence of system owner/operators that an inverter deployed in a proposed system will engage in typical behaviors to ensure interoperability with other units and ancillary equipment (e.g. protection equipment). This paper presents systematic and comprehensive test protocols to evaluate the performance of GFM inverters under the following operational configurations: islanded operation, heterogeneous islanded operation (parallel with a synchronous generator), grid-connected operation, and transition operation. A commercial GFM inverter is used to verify the test protocols and to understand the inverter's performance and functionalities. In particular, required configuration and tuning of the inverter will be explained in the full paper to enrich the testing protocol.
Explore the source record for details and available documents.
There is a strong interest in low-energy RHIC collisions in the energy range below present RHIC transition energy. These collisions win help to answer one of the key questions in the field of QCD about the existence and location of a critical point on the QCD phase diagram. For such low-energy RHIC operation, particle losses from the RF bucket are of particular concern since the longitudinal beam size is comparable to the existing RF bucket at low energies. In this paper, we explore an Intrabeam Scattering (IBS) feature below transition energy that drives the transverse and longitudinal beam temperatures towards equilibrium to see whether we can minimize longitudinal diffusion due to IBS and predict some luminosity improvement for the low-energy RHIC project.
Herein this paper describes a system-level view of a fully automated transit system comprising a fleet of automated vehicles (AVs) in driverless operation, each with an SAE level 4 Automated Driving System, along with its related safety infrastructure and other system equipment. This AV system-level control is compared to the automatic train control system used in automated guideway transit technology, particularly that of communications-based train control (CBTC). Drawing from the safety principles, analysis methods, and risk assessments of CBTC systems, comparable functional subsystem definitions are proposed for AV fleets in driverless operation. With the prospect of multiple AV fleets operating within a single automated mobility district, the criticality of protecting roadway junctions requires an approach like that of automated fixed-guideway transit systems, in which a guideway switch zone "interlocking" at each junction location deconflicts railway traffic, affirming safe passage. The analogous AV protection safety subsystem is defined as fail-safe equipment that monitors roadway intersections and junctions, communicates traffic signal status, perceives and communicates alerts and signals to AV connected vehicles concerning potential unsafe conditions, and performs related primary safety functions. Conclusions are drawn that the AV protection roadway intersection functions must be performed by local roadside equipment dedicated to protecting each roadway intersection and junction. Further, it is concluded that the communications technology connecting the infrastructure with the vehicle to perform this vital, fail-safe protection should meet specific functional and performance criteria.
A state machine is proposed as the solution for an automated microgrid energy management system (EMS) to improve transient performance during transition operations. It characterizes microgrid operation by seven states that cover all the operating modes: two for steady-state operation (grid-connected and islanded), four for transition operation (preparing for disconnection, transitioning to islanding, preparing for reconnection, and transitioning to grid-connected), and one for emergency operation (black-start operation). A unique dispatch algorithm is developed for each state to achieve the control objective, and the transition function is implemented in the state machine as control logics to transition the system from one state to the next. The feasibility and effectiveness of the developed state machine is validated by simulation in MATLAB with an example microgrid, and the test results show excellent performance of the state machine to achieve the target control objective in each state and to improve the system's transient performance during transition operation.
This paper compares two control schemes in the application control layer of a non-PLL grid-forming (GFM) inverter to gain the insights and understanding of how the two schemes affect the dynamic responses of the GFM inverters and the transition operation of microgrids. Both schemes can achieve smooth microgrid transition operation and power tracking, however, the first scheme expects to exhibit more transients due to the feedforward of the inverse dynamic model of the output filter. Simulation results show that both control schemes achieve successful transition operation with smooth transients, and the second control scheme exhibits slightly better transients in the system frequency during islanding operation and the first one has slightly superior transients in the system frequency during reconnection operation. The power tracking performance in the grid-connected mode is evaluated, which shows that the first scheme has better active power tracking and the second one has better reactive power tracking. The analysis and results are useful to develop reliable control schemes for non-PLL GFM inverters because more and more inverters will work as non-PLL grid-forming sources in the future grids due to better stability and reliability.
In this contribution, we introduce a method for simulating dissipative, ultrafast many-electron dynamics in intense laser fields. The method is based on the norm-conserving stochastic unraveling of the dissipative Liouville-von Neumann equation in its Lindblad form. The N-electron wave functions sampling the density matrix are represented in the basis of singly excited configuration state functions. The interaction with an external laser field is treated variationally and the response of the electronic density is included to all orders in this basis. The coupling to an external environment is included via relaxation operators inducing transition between the configuration state functions. Single electron ionization is represented by irreversible transition operators from the ionizing states to an auxiliary continuum state. The method finds its efficiency in the representation of the operators in the interaction picture, where the resolution-of-identity is used to reduce the size of the Hamiltonian eigenstate basis. The zeroth-order eigenstates can be obtained either at the configuration interaction singles level or from a time-dependent density functional theory reference calculation. The latter offers an alternative to explicitly time-dependent density functional theory which has the advantage of remaining strictly valid for strong field excitations while improving the description of the correlation as compared to configuration interaction singles. The method is tested on a well-characterized toy system, the excitation of the low-lying charge transfer state in LiCN.
A brief overview is provided of NASA LaRC satellite research, development and transition to operations relevant for aviation weather
This paper develops and compares two control schemes in the application control layer of a non-phase-locked loop (non-PLL) grid-forming (GFM) inverter to gain insight and understanding into how the two schemes affect the dynamic responses of GFM inverters and the transition operation of microgrids. The first scheme adopts power tracking based on an outer current loop in grid-connected mode and droop control in islanded mode, and the second uses droop control in both grid-connected and islanded modes. Analytical study is developed to compare the performance of these two strategies from various aspects, including fundamental differences, transition operation, power tracking, and P-Q capability with low point-of-common-coupling (PCC) voltages. Extensive simulation testing is carried out to validate the control performance of these two control strategies, and the simulation testing confirms the findings of the analytic study. Finally, the second strategy is recommended because of its superior control performance and ease of implementation. The analysis and results are useful in developing reliable control schemes for non-PLL GFM inverters because increasing numbers of inverters will work as non-PLL grid-forming sources in future grids because of their improved stability and reliability.
The Community Coordinated Modeling Center (CCMC) is a multi-agency partnership, which aims at the creation of next generation space weather models. The goal of the CCMC is to support the research and developmental work necessary to substantially increase the present-day modeling capability for space weather purposes, and to provide models for transition to the rapid prototyping centers at the space weather forecast centers. This goal requires close collaborations with and substantial involvement of the research community. The physical regions to be addressed by CCMC-related activities range from the solar atmosphere to the Earth's upper atmosphere. The CCMC is an integral part of the National Space Weather Program Implementation Plan, of NASA's Living With a Star (LWS) initiative, and of the Department of Defense Space Weather Transition Plan. CCMC includes a facility at NASA Goddard Space Flight Center, as well as distributed computing facilities provided by the US Air Force. CCMC also provides, to the research community, access to state-of-the-art space research models. This paper will focus on a status report on CCMC activities in support of model transition to operations at US space weather forecasting centers. In particular, an update will be given on past and present transition activities, on developments that address operational needs, and on future opportunities for transition-to-operations support.
Mission planners, systems engineers, and clinicians that support crew health and performance face very difficult choices on upcoming exploration missions. Given that there will be a heavily constrained mass and volume allocation for a medical system on these missions, what medical capability should be manifested to minimize both medical risk and mission risk? Given that not all promising research and technology proposals can be funded, how can proposals be prioritized so that those funded research investments produce the maximum benefit in reducing overall medical risk? The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project seeks to answer these kinds of questions and others to support upcoming exploration missions. IMPACT enables risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This presentation will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include an updated medical database, consisting of an Evidence Library for medical conditions and a medical item database (MedID) for medical resources, dynamic Probabilistic Risk Assessment (PRA) capabilities, System Modeling Language (SysML) models, and contextual data visualizations of output data. IMPACT is the result of a multi-center collaborative effort. The trade space analyses performed by IMPACT can directly inform mission, vehicle, and habitat development by quantifying medical risk, given a design reference mission, crew attributes and a set of medical capabilities. This presentation will update the audience on the development status of the IMPACT tool suite as it comes out of its System Acceptance Review (SAR) and nears Transition to Operations (TTO). It will review IMPACT’s constituent parts, briefly discuss typical outputs, and outline the plans for transitioning to operations, currently scheduled for later in FY24. Recent development successes on the IMPACT project include the integration of the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) v2.0 to accommodate segmented missions with multiple carriers and medical systems, full onboarding of the IMPACT Medical Database (IMPACT-MD), clustering medical resources and skills into medical capabilities and mutually-dependent bundles, verification of IMPACT-MD, and the ability to perform trade analyses on different medical sets, different design reference missions (DRM), with different crew complements and extra-vehicular activity (EVA) schedules.
We present the latest result of a community-wide space weather model validation effort coordinated among the Community Coordinated Modeling Center (CCMC), NOAA Space Weather Prediction Center (SWPC), model developers, and the broader science community. Validation of geospace models is a critical activity for both building confidence in the science results produced by the models and in assessing the suitability of the models for transition to operations. Indeed, a primary motivation of this work is supporting NOAA/SWPCs effort to select a model or models to be transitioned into operations. Our validation efforts focus on the ability of the models to reproduce a regional index of geomagnetic disturbance, the local K-index. Our analysis includes six events representing a range of geomagnetic activity conditions and six geomagnetic observatories representing midlatitude and high-latitude locations. Contingency tables, skill scores, and distribution metrics are used for the quantitative analysis of model performance. We consider model performance on an event-by-event basis, aggregated over events, at specific station locations, and separated into high-latitude and midlatitude domains. A summary of results is presented in this report, and an online tool for detailed analysis is available at the CCMC.
Usually the transition period is supposed to last around 5 years and to cover the eventual defueling of the reactor and the reactor cooling pool, completion of the characterization survey and preparation of all necessary documents to start the decommissioning activities in accordance with the decommissioning strategy chosen and the decommissioning plan approved. It was not the case for the Chernobyl NPP due to a number of reasons and obstacles, including delayed defueling due to unavailability of the storage capacities, lack of preparatory work due to prescheduled decommissioning, luck of experience of RBMK-type reactors decommissioning, influence of the destroyed Chernobyl-4 Unit and related works on site. All these factors not only delayed the completion of the characterization survey, but added complications to development of the decommissioning strategy and the decommissioning plan. De facto the issue of end state is still open as the end state for the destroyed Chernobyl-4 as well as the prospects of the exclusion zone transformation need further clarifications and justifications. As a result, the need to reconsider the standard concept of transition period was recognized already by the end of 2000, when Chernobyl-1 and Chernobyl-2 were out of operation for a few years. It was clear that the personnel had generally a bad perception of the prescheduled permanent shutdown decision and a low motivation to change and to learn. The first signs of organizational degradation were visible and the framework of the operational license did not fit well to prevent it. So it was decided to start the legal and organizational transformation into the decommissioning mode without waiting for polishing of the decommissioning strategy and decommissioning plan as in this case both documents seemed to need further adjustments anyway. The transition period (or the termination of operation as it called in the national nuclear safety regulations) was considered as the first phase of decommissioning to be covered by the decommissioning license. The detailed plan of activities for the transition period with proper safety justification documents was the main part of the relevant license application. Human resource management plan and adoption of the management system were important constituents as well. It was also considered reasonable to start some dismantling works already at this phase to avoid further delays and degradation, the works being carefully justified. Eventually such approach added to streamlining the decommissioning process and to avoid further organizational and technical degradation. Flexibility in transition from operation to decommissioning seems necessary in cases of prescheduled or post-accidental decommissioning but may be also beneficial for a scheduled decommissioning case. (authors)
A wide range of key activities are necessary after permanent shutdown of a nuclear power plant and before active dismantlement of the plant can begin. This period between permanent shutdown and the start of active dismantlement is typically referred to as the transition period (or the post-operational phase). In some cases, these transition activities may be prescribed by regulation or performed in the absence of regulations, while in other cases they may be more practically driven or even optional. In either case, it is often unclear what activities are needed and when/how those activities should be conducted to most efficiently transition from operational to decommissioning status while maintaining radiological safety and the protection of the public. The Electric Power Research Institute has prepared a report that presents experiences and guidance for transitioning from an operational to decommissioning status based on US and international decommissioning regulations and plant experiences. Regulations and experiences in a number of countries were considered, including US, Germany, France, Spain, and Switzerland. Best practices and lessons learned related to transitioning to decommissioning are identified, and guidance is presented for developing a plan to transition from normal operations to decommissioning for several scenarios, including: - Transition to DECON (immediate dismantling) for a planned shutdown; - Transition to SAFSTOR (deferred dismantling) for a planned shutdown; - Transition to DECON (immediate dismantling) for an unplanned shutdown; - Transition to SAFSTOR (deferred dismantling) for an unplanned shutdown. Further, the EPRI report contains guidance for currently operating plants that do not anticipate permanent shutdown in the near future to help minimize the cost and impact of an unexpected permanent shutdown if such a scenario were to occur. (authors)
Mission planners, systems engineers, and clinicians that support crew health and performance face very difficult choices on upcoming exploration missions. Given that there will be a heavily constrained mass and volume allocation for a medical system on these missions, what medical capability should be manifested to minimize both medical risk and mission risk? Given that not all promising research and technology proposals can be funded, how can proposals be prioritized so that those funded research investments produce the maximum benefit in reducing overall medical risk? The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project seeks to answer these kinds of questions and others to support upcoming exploration missions. IMPACT enables risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This presentation will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include an updated medical database, consisting of an Evidence Library for medical conditions and a medical item database (MedID) for medical resources, dynamic Probabilistic Risk Assessment (PRA) capabilities, System Modeling Language (SysML) models, and contextual data visualizations of output data. IMPACT is the result of a multi-center collaborative effort. The trade space analyses performed by IMPACT can directly inform mission, vehicle, and habitat development by quantifying medical risk, given a design reference mission, crew attributes and a set of medical capabilities. This presentation will update the audience on the development status of the IMPACT tool suite as it comes out of its System Acceptance Review (SAR) and nears Transition to Operations (TTO). It will review IMPACT’s constituent parts, briefly discuss typical outputs, and outline the plans for transitioning to operations, currently scheduled for later in FY24. Recent development successes on the IMPACT project include the integration of the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) v2.0 to accommodate segmented missions with multiple carriers and medical systems, full onboarding of the IMPACT Medical Database (IMPACT-MD), clustering medical resources and skills into medical capabilities and mutually-dependent bundles, verification of IMPACT-MD, and the ability to perform trade analyses on different medical sets, different design reference missions (DRM), with different crew complements and extra-vehicular activity (EVA) schedules.