Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Electromagnetic Transient Simulation Algorithms for Evaluation of Large-Scale Extreme Fast Charging Systems (Distribution Grid Models)

The distribution and transmission grids are observing an increased penetration of power electronics in loads and generations. For example, there is increasing interest in integrating in extreme fast charging (XFC) systems for fast charging of electrical vehicles. As these systems are integrated, developing high-fidelity electromagnetic transient model of XFC systems in distribution grids and evaluating their interactions with the power grid would be of significant interest. This model will be utilized for design of XFC systems, to identify upgrades in distribution and/or transmission grids, for planning purposes by transmission planners or operators or owners, among others. It can also be utilized in operations for improved reliable performance of the grid and/or XFC station. The challenge with simulating these models is the high computational complexity introduced by the large number of states present in the system and the time-step needed to simulate the system. In this paper, advanced simulations algorithms are applied to reduce the computational complexity of simulating large-scale XFC systems. The algorithms include numerical stiffness-based segregation, time constant-based segregation, clustering and aggregation on differential algebraic equations (DAEs), and multi-order integration approaches. While the first three algorithms split the matrix that needs to be inverted from a large matrix to much smaller matrices, the final algorithm reduces the computational burden of applying higher-order integration approaches in the complete system. The comparison made in the previous sentence is with respect to use of homogeneous integration approaches used in conventional electromagnetic transient simulators like power systems computer aided design (PSCAD). The approaches mentioned here have resulted in speed-up of 36x in the simulation of a single distribution system with 15 XFCs.

Debnath, Suman↗

Interregional Transmission Operational Coordination

This presentation will discuss challenges and opportunities on interregional coordination in the areas of interchange transaction, congestion management, reserve sharing and deliverability across multi-stage operational processes. It will then provide an overview of the interregional transmission operational coordination (IRTOC) project that currently focuses on congestion management, including Inter-regional transmission coordination in real time operations and operational planning, HVDC optimization (intra- and interregional), ancillary service deliverability (intra- and interregional). In addition, it will discuss the Sienna-Decomposition tool development to systematically study interregional coordination methods.

congestion management↗

Methods to Incorporate Energy Efficiency in Electricity System Planning and Markets

Electric utilities, independent system operators and regional transmission operators have acquired significant levels of energy efficiency over several decades. The predominant approach utilities use to consider energy efficiency in electricity system planning and ISO/RTOs use in wholesale electricity markets is to reduce load forecasts to account for estimated impacts of relevant policies and programs. But an increasing number of states and utilities are interested in improved analysis of energy efficiency in electricity system planning and wholesale electricity markets. This report describes how to consider energy efficiency as a potential resource for the future by allowing it to compete with all other electricity system resources. Increasing levels of wind and solar, growth in peak demand, and electrification of transportation and other new loads have increased the need for a more flexible and responsive electricity system. Considering energy efficiency as a resource option can support these and other electricity system objectives, including grid reliability, reduced electricity costs, energy efficiency targets, and lower air pollutant emissions. The October 2019 slides were presented at the American Council for an Energy Efficient Economy Energy Efficiency as a Resource conference and provide an overview of the report. Portions of the report were included in the American Council for an Energy Efficient Economy Energy Efficiency 2020 Summer Study paper, Planning for the Grid of Tomorrow: Energy Efficiency as a Resource in Utility Resource Plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Scalable Transmission Expansion Under Uncertainty Using Three-Stage Stochastic Optimization

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and uncertain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty.

multi-stage stochastic optimization↗

Scalable Stochastic Transmission Expansion: A Use Case for ExaSGD

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and un- certain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty. This is an example of a possible use of the ExaSGD security constrained AC optimal power flow solver.

Exascale Computing Project↗

Emergency Asset Positioning for Resilient Transmission Grid Operation

In this paper we study a problem of hurricane emergency preparedness via placement of emergency generation assets prior to its strike. We present a two-stage stochastic model for choosing locations and quantities of emergency storage to help support the power grid through a hurricane event. The expectation of losses in our two-stage model is estimated using the sample average approximation. We construct damage scenarios for sample average approximation using WIND Toolkit meteorological data and fragility curves of various electric grid components. We demonstrate the efficacy of our two-stage planning model by simulating operations during Hurricane Dolly on the 2000-bus transmission test system. Our model, coupled with our scenario selection strategy, is effective at mitigating loss of load when compared to a model without emergency generation assets placed prior to an extreme event.

emergency preparedness↗

Statistical Steady-State Stability Analysis for Transmission System Planning for Offshore Wind Power Plant Integration

This paper presents a statistical steady-state stability analysis for transmission system planning studies in order to identify operational issues inherent in the integration of offshore wind power plants. It includes normal and contingency operation. This study considers the integration of a 1000-MW offshore wind power plant into the FirstEnergy/PJM service territory in the U.S. Great Lakes region as a case study and uses a realistic computer model of the U.S. Eastern Interconnection, a 63,000-bus test system. The results show the utility of this statistical analysis tool and its effectiveness in identification of the operational impacts as a result of the integration of offshore wind power plant.

Sajadi, Amirhossein↗

Alaska Meteorology, Energy, and Transmission (MET) Toolkit

The Alaska MET (Meteorology, Energy, and Transmission) Toolkit is the National Laboratory of the Rockies' (NLR) new flagship atmospheric dataset, designed to support comprehensive long-term planning and operations across the entire power sector. Serving as the regional counterpart to CONUS-wide HRRR MET Toolkit, this dataset provides a comprehensive, high-fidelity meteorological record covering Alaska.The Alaska MET Toolkit is delivered at an hourly resolution on a standardized 2-km horizontal grid. This dataset is repackaged from the National Oceanic and Atmospheric Administration's (NOAA) operational High-Resolution Rapid Refresh for Alaska (HRRR-AK) forecasts. Spanning from 2019 to 2025, it overcomes the technical barriers of native weather models by providing spatial regridding from the native 3-km HRRR-AK horizontal resolution to a 2-km grid, temporal gap-filling, and vertical interpolation at key energy-relevant heights. By delivering highly accurate, validation-backed data across a comprehensive suite of atmospheric variables - including temperature, pressure, humidity, and wind characteristics - the Alaska MET Toolkit provides a highly accessible and strictly standardized foundation for modern power system modeling.

17 WIND ENERGY↗

An RTDS-Based Testbed for Investigating the Impacts of Transmission-Level Disturbances on Solar PV Operation

The increasing penetration of renewable energy resources such as solar and wind via power electronic inverters is challenging grid dynamics, as well as grid planning, operation, and protection. Recently, the North American Electric Reliability Corporation (NERC) has reported a series of similar events of the unintended loss of solar generation in Southern California over a large geographic area following the transmission-level disturbances. These events highlight the importance of understanding the characteristics of the transmission-side disturbances propagating into the distribution systems and their impacts on the operation of inverter-based resources. In this paper, a real-time electromagnetic simulation testbed is constructed for real-time electromagnetic simulations to generate realistic transmission-level disturbances and investigate their impacts on the solar PV operation under different fault types and locations, solar penetration levels, and loading levels. Through the simulation analysis and grid strength assessment, it is found that the grid strength at points of integration (POIs) of solar PVs significantly affects the transient stability of solar generators. Particularly, undesirable transient stability events are more likely to occur at the weak POIs following the transmission-level disturbances. Moreover, undesirable transient stability events become severer when the transmission-level disturbance is closer to the weak POIs or the disturbances become more serious. Additionally, the impact of the transmission-level disturbances on the solar PVs at the weak POIs exacerbate with the increasing solar penetration levels and loading levels. Thus, it is important to study and develop new technologies for grid planning, operation, and protection in weak grid conditions to address the emerging issues of integrating the high penetration of solar PVs and other IBRs.

14 SOLAR ENERGY↗

What Is Power System Curtailment?

Curtailment is the intentional reduction of instantaneous power from non- dispatchable variable renewable energy (VRE) resources like wind and solar photovoltaics relative to what would naturally be available from the wind and the sun. This curtailed energy is the difference between the total available energy and actual production. This fact sheet provides a summary of curtailment in power systems and presents selected insights into specific ways in which curtailment is implemented by a selection of System Operators.

curtailment↗

Accelerating Transitions to Zero Carbon Power Systems

As power systems evolve, becoming increasingly renewable, distributed, dynamic, and digital, managing them becomes ever more challenging and complex. System operators serve as the "air traffic controllers" for electricity grids, working to balance supply and demand, manage evolving electricity markets, and ensure the safety and reliability of electricity systems. To adapt to the rapidly changing energy landscape and support the transition to modern, zero carbon power systems, system operators must develop and adopt new technologies, approaches, and frameworks. The Global Power System Transformation (G-PST) Consortium is a network of system operators, research institutions, and industry partners working to accelerate and scale the technical solutions required to transform our world's power systems. By developing and sharing robust models and tools, research and demonstration results, knowledge, and innovation, the G-PST Consortium is empowering system operators to transition to 100% renewable energy while ensuring the reliability, safety, and cost-effectiveness of grid operations.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Emergency Asset Positioning for Resilient Transmission Grid Operation

In this paper we study a problem of hurricane emergency preparedness via placement of emergency storage assets prior to its strike. We present a two-stage stochastic model for choosing locations and quantities of emergency storage to help support the power grid through a hurricane event. The expectation of losses in our two-stage model is estimated using the sample average approximation. We construct damage scenarios for sample average approximation using WIND Toolkit meteorological data and fragility curves of various electric grid components. We demonstrate the efficacy of our two-stage planning model by simulating operations during Hurricane Dolly on the 2000-bus transmission test system. Our model, coupled with our scenario selection strategy, is effective at mitigating loss of load when compared to a model without emergency storage assets placed prior to an extreme event.

emergency preparedness↗

Emergency Generation Asset Positioning for Resilient Transmission Grid Operation: Preprint

In this paper we study a problem of hurricane emergency preparedness via placement of emergency generation assets prior to its strike. We present a two-stage stochastic model for choosing locations and quantities of emergency storage to help support the power grid through a hurricane event. The expectation of losses in our two-stage model is estimated using the sample average approximation. We construct damage scenarios for sample average approximation using WIND Toolkit meteorological data and fragility curves of various electric grid components. We demonstrate the efficacy of our two-stage planning model by simulating operations during Hurricane Dolly on the 2000-bus transmission test system. Our model, coupled with our scenario selection strategy, is effective at mitigating loss of load when compared to a model without emergency generation assets placed prior to an extreme event.

emergency preparedness↗

Nuclear's Role in the U.S. Electricity System: A Multi-Model Inter-Comparison Analysis

Multiple capacity expansion models (CEMs) for the U.S. power system represent the balance of options among generation, transmission, and storage assets that can satisfy electric loads, operating and planning reserves, and policy requirements. These models are typically set up to find the least-cost portfolio of assets that meet specified requirements, and model decisions can include both investments in new, and retirement of existing, resources. The scenarios explored by CEMs can help inform strategies for meeting future electricity and energy needs under a range of future conditions. However, projections can differ between models, sometimes dramatically, for a seemingly similar scenario. Differences in model coverage, structure, and input assumptions contribute to the range of model outcomes. Understanding what drives the biggest differences in model outputs improves model insights and provides context for interpreting results. This summary presents analysis that was performed through a forum of analysts who own, update, and apply CEMs, as well as nuclear experts from national laboratories, industry, and the research community. The following sections describe methods, results, and findings from an original, innovative inter-model comparison that provides insights into what drives the greatest differences in nuclear retirement and deployment projections across models and a range of technology, market, and policy conditions.

capacity expansion model↗

Two-stage Stochastic Generalized Disjunctive Programming (GDP) Model for Proactive Planning and Reactive Operations of Resilient Power Systems under Disruptions

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.