Wilson Corners SWMU 001 2014 Annual Long Term Monitoring Report Kennedy Space Center, Florida

This document presents the findings of the 2014 Long Term Monitoring (LTM) that was completed at the Wilson Corners site, located at the National Aeronautics and Space Administration (NASA) John F. Kennedy Space Center (KSC), Florida. The goals of the 2014 annual LTM event were to evaluate the groundwater flow direction and gradient and to monitor the vertical and downgradient horizontal extent of the volatile organic compounds (VOCs) in groundwater at the site. The LTM activities consisted of an annual groundwater sampling event in December 2014, which included the collection of water levels from the LTM wells. During the annual groundwater sampling event, depth to groundwater was measured and VOC samples were collected using passive diffusion bags (PDBs) from 30 monitoring wells. In addition to the LTM sampling, additional assessment sampling was performed at the site using low-flow techniques based on previous LTM results and assessment activities. Assessment of monitoring well MW0052DD was performed by collecting VOC samples using low-flow techniques before and after purging 100 gallons from the well. Monitoring well MW0064 was sampled to supplement shallow VOC data north of Hot Spot 2 and east of Hot Spot 4. Monitoring well MW0089 was sampled due to its proximity to MW0090. MW0090 is screened in a deeper interval and had an unexpected detection of trichloroethene (TCE) during the 2013 LTM, which was corroborated during the March 2014 verification sampling. Monitoring well MW0130 was sampled to provide additional VOC data beneath the semi-confining clay layer in the Hot Spot 2 area.

Monitoring↗

Launch Complex 39A, SWMU 008, Operations, Maintenance, and Monitoring Report, Kennedy Space Center, FL

This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from Year 1 operation of the air sparging (AS) groundwater interim measure (IM) for High-Concentration Plumes (HCPs) and Low-Concentration Plumes (LCPs) within the perimeter fence line at Launch Complex 39A (LC39A) located at Kennedy Space Center (KSC), Florida. The objective of the LC39A groundwater IM is to actively decrease concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC) in groundwater in the HCP and LCP within the pad perimeter fence line via AS to levels less than Florida Department of Environmental Protection (FDEP) Groundwater Cleanup Target Levels (GCTLs). The objective was developed because LC39A is currently being leased to Space Exploration Technologies (SpaceX), and the original IM for monitored natural attenuation (MNA) over an extended period of time was not suitable for future planned site use.

Operations↗

Mobile Launch Platform Vehicle Assembly Building Area (SWMU 056) Hot Spot 3 Bioremediation Interim Measures Work Plan, Kennedy Space Center, Florida

This Interim Measures Work Plan (IMWP) presents an approach and design for the remediation of chlorinated volatile organic compound (CVOC) groundwater impacts using bioremediation (biostimulation and bioaugmentation) in Hot Spot 3, which is defined by the area where CVOC (trichloroethene [TCE], cis-1,2-dichloroethene [cDCE], and vinyl chloride [VC]) concentrations are greater than 10 times their respective Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentration (NADC) [10xNADC] near the western Mobile Launch Platform (MLP) structure. The IM treatment area is the Hot Spot 3 area, which is approximately 0.07 acres and extends from approximately 6 to 22 and 41 to 55 feet below land surface (ft BLS). Within Hot Spot 3, a source zone (SZ; area with TCE concentrations greater than 1% solubility [11,000 micrograms per liter (micrograms/L)]) was delineated and is approximately 0.02 acres and extends from approximately 6 to 16 and 41 to 50 ft BLS.

MLPV↗

Wilson Corners SWMU 001 2015 Annual Long Term Monitoring Report Kennedy Space Center, Florida

This document presents the findings of the 2015 Long Term Monitoring (LTM) that was completed at the Wilson Corners site, located at the National Aeronautics and Space Administration John F. Kennedy Space Center, Florida. The objectives of the 2015 LTM event were to evaluate the groundwater flow direction and gradient, to monitor the vertical and horizontal extent of the volatile organic compounds (VOCs; including the upgradient and sidegradient extents, which are monitored every five years), and to monitor select locations internal to the dissolved groundwater plume. The 2015 LTM event included several upgradient and sidegradient monitoring wells that are not sampled annually to verify the extent of VOCs in this portion of the site. The December 2015 LTM groundwater sampling event included, depth to groundwater measurements, 40 VOC samples collected using passive diffusion bags, and one VOC sample collected using low-flow techniques. Additionally, monitoring well MW0052DD was overdrilled and abandoned using rotasonic drilling techniques. The following conclusions can be made based on the 2015 LTM results: groundwater flow is generally to the west with northwest and southwest flow components from the water table to approximately 55 feet below land surface (ft BLS); peripheral monitoring wells generally delineate VOCs to groundwater cleanup target levels (GCTLs) except for monitoring wells MW0088, MW0090, MW0095, and NPSHMW0039, which had vinyl chloride (VC) concentrations near the GCTL and MW0062, which had trichloroethene (TCE), cis-1,2-dichloroethenen (cDCE), and VC concentrations above natural attenuation default concentrations (NADCs); VOCs in interior downgradient wells generally fluctuate within historic ranges except for monitoring wells in the north-northwest portion of the site, which have increasing VC concentrations indicating potential plume migration and expansion; Historically, the vertical extents of the VOCs were delineated by monitoring wells screened greater than 60 ft BLS (MW0083 through MW0086, and MW0078). The 2015 LTM results indicate that concentrations of daughter product cDCE is greater than the NADC in MW0078 and that cDCE and VC are greater than NADCs in MW0130. TCE was greater than the GCTL in monitoring well MW130 and not detected above method detection limits (9 micrograms per Liter) in monitoring well MW0078. No GCTL exceedances were identified in monitoring wells MW0083 or MW0086; the dissolved plume footprint appears generally stable, though not fully delineated by monitoring well data in the northeast portion of the site; and 2015 LTM results generally support the existing Conceptual Site Model. Geosyntec recommends modifying the LTM program, collecting a verification sample from monitoring well MW0062, and performing a direct push technology instigation in the northnortheastern portion of the site. A cluster of monitoring wells (MW0132 [2 to 12 ft BLS], MW0133 [15 to 25 ft BLS], and MW0134 [29 to 34 ft BLS]) is proposed to delineate impacts in the northnortheast portion of the site. Geosyntec recommends installation of a vertical extent well in the center of the site (Hot Spot 2 area) post-remediation implementation.

groundwater↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

Know Your Enemy - Implementation of Bioremediation within a Suspected DNAPL Source Zone Following High-Resolution Site Characterization at Contractors Road Heavy Equipment Area, Kennedy Space Center, Florida

The National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), has adopted high-resolution site characterization (HRSC) sampling techniques during baseline sampling prior to implementation of remedies to confirm and refine the conceptual site model (CSM). HRSC sampling was performed at Contractors Road Heavy Equipment Area (CRHE) prior to bioremediation implementation to verify the extent of the trichloroethene (TCE) dense non-aqueous phase liquid (DNAPL) source area (defined as the area with TCE concentrations above 1% solubility) and its daughter product dissolved plume that had been identified during previous HRSC events. The results of HRSC pre-bioremediation implementation sampling suggested that the TCE source area was larger than originally identified during initial site characterization activities, leading to a design refinement to improve electron donor distribution and increase the likelihood of achieving remedial objectives. Approach/Activities: HRSC was conducted from 2009 through 2014 to delineate the vertical and horizontal extent of chlorinated volatile organic compounds (CVOCs) in the groundwater. Approximately 2,340 samples were collected from 363 locations using direct push technology (DPT) groundwater sampling techniques. Samples were collected from up to 14 depth intervals at each location using a 4-foot sampling screen. This HRSC approach identified a narrow (approx. 5 to 30 feet wide), approximately 3,000 square foot TCE DNAPL source area (maximum detected TCE concentration of 160,000 micrograms per liter [micro-g/L] at DPT sampling location DPT0225). Prior to implementation of a bioremediation interim measure, HRSC baseline sampling was conducted using DPT groundwater sampling techniques. Concentrations of TCE were an order of magnitude lower than previous reported (12,000 micro-g/L maximum at DPT sampling location DPT0225) at locations sampled adjacent to previous sampling locations. To further evaluate the variability in concentrations observed additional sampling was conducted in 2016. The results identified higher concentrations than originally detected within the previously defined source area and the presence of source zone concentrations upgradient of the previously defined source area (maximum concentration observed 570,000 micro-g/L). The HRSC baseline sampling data allowed for a revision of the bioremediation design prior to implementation. Bioremediation was implemented within the eastern portion of the source area in November and December 2016 and quarterly performance monitoring was completed in March and June 2017. Reductions in CVOC concentrations from baseline were observed at all performance monitoring wells in the treatment area, and by June 2017, an approximate 95% CVOC mass reduction was observed based on monitoring well sampling results. Results/Lessons Learned: The results of this project suggest that, due to the complexity of DNAPL source zones, HRSC during pre-implementation baseline sampling in the TCE source zone was an essential strategy for verifying the treatment area and depth prior to remedy implementation. If the upgradient source zone mass was not identified prior to bioremediation implementation, the mass would have served as a long-term source for the dissolved plume.

Chrest, Anne↗

Soil Mixing with Steam and Zero Valent Iron Remediation Performance Monitoring Results at Wilson Corner, Kennedy Space Center, Florida

The National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Remediation Program implemented a groundwater interim measure between September 2014 and February 2015, to remediate a trichloroethene (TCE) groundwater source area at the Wilson Corners site. The groundwater plume is associated with the release of chlorinated solvents (specifically TCE) from historic precision cleaning and laboratory operations. A summary of the groundwater interim measure using soil mixing with steam and zero valent iron (also referred to as large diameter auger [LDA]) was presented at the 2015 Florida Remediation Conference. The objective of this presentation is to provide performance monitoring results.

Chrest, Anne M.↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM completed in September 2019 for the Northern Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. The IGWM was implemented for the Northern VOC Area to provide additional data, to be evaluated along with previous long-term monitoring data, to determine future IGWM options and to evaluate the efficacy of monitored natural attenuation (MNA) as a passive remedial measure in comparison to active remedies for the Northern VOC Area. The primary contaminants of concern in the Northern VOC Area are trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), vinyl chloride (VC), and benzene.

groundwater↗

Components Cleaning Facility, SWMU 030 Eastern High-Concentration Plume Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements and coordination specifics to implement an air sparging (AS) Interim Measure (IM) to remediate groundwater at the Components Cleaning Facility (CCF), Eastern High Concentration Plume (HCP) Area located at Kennedy Space Center (KSC), Florida. The objective of the CCF East IM is to remediate groundwater where trichloroethene, cis-1,2-dichloroethene, and vinyl chloride concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Criteria (NADC) (identified as the HCP) via AS and to transition to monitored natural attenuation. CCF has been designated Solid Waste Management Unit 030 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

James Lloyd↗

General Services Administration Reclamation Yard (SWMU 010) 2020-2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred from October 2020 through June 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include four field events: (1) October 2020 – Chlorinated VOC Plume groundwater sampling via Direct Push Technology (DPT) – 68 groundwater samples were collected from 14 locations at varying intervals; (2) December 2020 – Site-wide semi-annual water level measurements of 52 monitoring wells and sampling of 39 monitoring wells; (3) May 2021 – Chlorinated VOC Plume monitoring well installation – two monitoring wells were installed and screened from 10 to 20 feet below land surface (bls); and (4) May/June 2021 – Site-wide semi-annual water level measurements of 53 monitoring wells and sampling of 40 monitoring wells. Results showed substantial reduction of both plumes. Conclusions and recommendations are presented.

VOC↗

Adaptative Site Management for a 115 Acre Chlorinated Solvent Plume with Two Separate Source Areas at Kennedy Space Center, Florida

Background/Objectives. During Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) activities, Geosyntec delineated a chlorinated volatile organic compound (CVOC) plume at the National Aeronautics and Space Administration’s (NASA’s) Vehicle Assembly Building (VAB) area located at KSC, Florida. The RFI activities identified an approximate 115-acre dissolved plume (primarily vinyl chloride) and a trichloroethene (TCE) source area in an active aerospace complex that is surrounded by sensitive wetland/waterbodies. Due to the size of the impacted area, the Corrective Measure Design included a multi-component strategy: (i) address the source area via bioremediation; (ii) protect sensitive wetlands from impacted groundwater discharge via biosparging; and (iii) Long Term Monitoring (LTM) of the remaining dissolved plume. After the Corrective Measures implementation (CMI), NASA and Geosyntec worked with Florida Department of Environmental Protection (FDEP) to implement an adaptive site management for the complex, 115-acre site outside of the traditional RCRA process. The adaptive site management approach relied on performing supplemental assessments and implementing Interim Measures (IMs) to further assess and implement remedies over time while working within site and budget constraints, with an overall goal of achieving enough mass reduction to transition the entire site to LTM and eventually achieve site closure. Approach/Activities. After the biosparge barrier was operational and bioremediation within the source area (referred to as Hot Spot 1) achieved the Corrective Action Objective (CAO), supplemental assessment of the area between Hot Spot 1 and the biosparge barrier was performed. The conceptual site model was updated using the supplemental assessment results and an air sparge system IM was designed to treat an approximate 1.2 acre area (referred to as Hot Spot 2). After installation of the air sparge system, supplemental assessment within the remainder of the 115-acre dissolved plume was performed and a second TCE source area was identified. The TCE source area and associated areas with elevated CVOC concentrations (referred to as Hot Spot 3) were delineated and a bioremediation IM was implemented. Also, the downgradient impacts from Hot Spot 3 were adjacent to a sensitive waterbody, and negotiations with the FDEP allowed the area to be monitored using LTM. Results/Lessons Learned. The performance of supplemental assessment activities and implementation of remedial alternatives as IMs allowed NASA to successfully address groundwater impacts over time, while working within the FDEP regulatory framework. The implementation of the CMI and multiple IMs has achieved the following goals: (i) the biosparge barrier has mitigated the potential discharge of impacted groundwater to an adjacent wetland; (ii) enhanced bioremediation within Hot Spot 1 achieved the CAO within 2 years and transitioned the area into LTM; (iii) operation of an air sparge system within Hot Spot 2 removed TCE as a constituent of concern and contributed to a reduction (approximately 43%) in the impacted groundwater area outside the air sparge treatment area (plume collapse); and (iv) bioremediation within Hot Spot 3 removed approximately 80% of the CVOC mass and contributed to a reduction (approximately 47%) in the impacted groundwater area outside the bioremediation IM treatment area. Overall, the adaptive approach is protecting the sensitive water bodies surrounding the complex site and reducing the area of impacted groundwater, which is moving the entire site towards LTM.

Rebecca C Daprato↗

General Services Administration Reclamation Yard, SWMU 010, 2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred in November and December 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include two field events: (1) November 2021 – PCB/VOA Plume groundwater sampling via Direct Push Technology – 70 groundwater samples were collected from 10 locations at varying intervals; and (2) December 2021 – Site-wide semi-annual water level measurements of 54 monitoring wells, redevelopment of 5 monitoring wells, and sampling of 35 monitoring wells. Results for the PCB/VOA plume demonstrated COCs have not rebounded since the 2018 source removal, with groundwater cleanup target levels (GCTLs) exceeded in the 10-30 ft. below ground surface interval only. In the Chlorinated VOC plume area, there were no detections of COCs above a GCTL for at least the second consecutive sampling event for the sampled wells. Cleanup objectives have been met, and it is recommended that VOC monitoring be discontinued. Underground injection control parameters will continue to be monitored in three wells until those analytes return to background concentrations.

GSA Reclamation Yard↗

Paint and Oil Locker, SWMU 067 Southern Treatment Area Air Sparge System Construction Completion and Performance Monitoring and Paint and Oil Locker, Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion, Performance Monitoring, and Long-Term Monitoring (LTM) Report presents activities conducted at the Paint and Oil Locker (POL) (Solid Waste Management Unit [SWMU] 067) and Supply Warehouse #3 (SW3) (SWMU 088) sites located at the Kennedy Space Center (KSC), Florida. Activities include implementation and Year 1 (Quarters [Q] 1 through 4) and Q5 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) in the POL Southern Treatment Area, LTM results for the POL Northern Area and SW3, and supplemental direct push technology (DPT) sampling at both sites to support the LTM and performance monitoring programs. The timeframe for activities included in this report extends from August 2019 to August 2022. The scope for these sites currently includes two main components, which are documented within this report: (1) LTM at SW3 and POL Northern Area where an AS system began operation at these sites in May 2009 and June 2013, respectively, and subsequently turned off for both sites in March 2018 (during the previous reporting period); and (2) Active AS operations and performance monitoring in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The AS IM in the POL Southern Treatment Area was implemented between 2019 and 2021 to treat a chlorinated solvent groundwater plume that resulted from historic operations supporting the National Aeronautics and Space Administration’s (NASA) Space Program. The objective of the AS IM is to remediate groundwater within the treatment zone to support transition to monitored natural attenuation (MNA). The overall Corrective Action objective is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2- dichloroethene (tDCE), and vinyl chloride (VC) present in groundwater to levels below their respective State of Florida Groundwater Cleanup Target Levels (GCTLs). The AS IM was installed in the POL Southern Treatment Area to target the high concentration plume (HCP), which includes a source zone (SZ) area where TCE was found to exceed 11,000 micrograms per liter (µg/L), and extend to a depth of 30 feet below land surface (bls).

TCE↗

General Services Administration Reclamation Yard Solid Waste Management Unit 010: 2022 Groundwater Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the groundwater monitoring activities that occurred in September and October 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consist of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume were tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. Groundwater monitoring for VOCs in the Chlorinated VOC Plume area was discontinued following the December 2021 annual monitoring event. Annual groundwater monitoring for underground injection control (UIC) parameters continues for both the PCB/VOA Plume and the Chlorinated VOC Plume areas. The activities presented in this report include one field event: September and October 2022, which includes sitewide semi-annual water level measurements of 55 monitoring wells, redevelopment of all monitoring wells listed in the sampling plan, and groundwater sampling of 28 monitoring wells. The sampling and analysis demonstrated that the PCB/VOA plume is not expanding and is significantly reduced compared to before a 2018 source removal interim measure. Recommendations are made for the 2023 groundwater monitoring program.

groundwater↗

Decommissioning of Air Sparge System at Vertical Processing Facility, Solid Waste Management Unit 077 Implementation Report

This document discusses the decommissioning of the air sparge (AS) system at the Vertical Processing Facility (VPF), Solid Waste Management Unit 077 at Kennedy Space Center, Florida completed between January 30, 2023, and February 8, 2023. A 2005 Resource Conservation and Recovery Act Facility Investigation identified chlorinated volatile organic compound impacts at the site. Following assessment activities, an AS system was in operation intermittently from April 2012 through October 2017, when the system was permanently shutdown due to equipment failure. Trichloroethene and vinyl chloride remained above their groundwater cleanup target levels in several monitoring wells and the site was moved into the Industrial Area Long Term Monitoring Program. VPF continues to be sampled biennially; the most recent event was May 2022. Successful implementation of this decommissioning project will reduce the risk of accidental AS and soil vapor extraction well damage and will lower operating costs associated with maintaining obsolete AS systems. Decommissioning the AS system at VPF included vegetation clearing to access AS wells and associated piping, abandonment of all on site AS wells, temporary electrical outage, and site restoration. At the completion of demobilization and site restoration activities, the site was returned to its original or better than original condition.

Jason J Bublitz↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Paint and Oil Locker SWMU 067 Southern Treatment Area Air Sparge System Year 2 Performance Monitoring and Paint and Oil Locker Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Kennedy Space Center, Florida

This Year 2 Air Sparge (AS) System Performance Monitoring (PM) Report for Paint and Oil Locker (POL) Solid Waste Management Unit (SWMU) 067 Southern Treatment Area and Long- Term Monitoring (LTM) Report for POL Northern Area (SWMU 067) and Supply Warehouse #3 (SW3) SWMU 088 documents ongoing remedial efforts at the POL and SW3 sites at Kennedy Space Center (KSC), Florida. The overall goal for these sites is to reduce concentrations of groundwater contaminants of concern (COCs), specifically trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE) and vinyl chloride (VC), to below the State of Florida Groundwater Cleanup Target Levels (GCTLs). Remediation and reporting of POL and SW3 have been streamlined over the years due to the proximity of the two sites. The scope for these sites currently includes two main components: (1) LTM at SW3 and the POL Northern Area, where an AS system began operation in May 2009 (with expansion in December 2012) and June 2013, respectively, and subsequently turned off for both sites in March 2018 (NASA, 2019a); and (2) Active AS operations and PM in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The timeframe for activities covered under this report is from September 2022 to July 2023. Based on Year 2 system operation and PM results, the AS system at POL operated as designed and successfully met the performance objective of reducing VOCs to concentrations that support transition of the site from active remediation to long-term monitoring. The results from the samples collected from performance monitoring wells within the AS system ROI showed a significant decrease in COC concentrations since the baseline sampling event conducted in April 2020. Based on the Year 2 OM&M and monitoring results obtained from the POL Southern Treatment Area, the IM objective to reduce concentrations to below the LTM transition target concentrations for TCE, cDCE, tDCE, and VC has been achieved. LTM sampling events at SW3 were conducted in October 2022 and July 2023. LTM sampling was conducted at the POL Northern Area in October 2022, December 2022, March 2023, and July 2023. Analytical results from October 2022 and July 2023 generally indicate that concentrations of COCs have been stable or decreasing compared to the previous year. TCE remains greater than the NADC in one monitoring well (POL-MW0034S) and greater than the GCTL in one monitoring well (POL-MW0009S). Concentrations of cDCE were greater than the GCTL in one monitoring well (POL-MW0026S), and tDCE was non-detect or less than the GCTL in all monitoring wells sampled. VC was greater than the GCTL in four monitoring wells (MW0024, MW0025, MW0027, and MW0028) at SW3 and one monitoring well (MW0026S) at the POL Northern Area.

remediation↗

Former Central Heat Plant SWMU 045 Year 2 Air Sparge System Performance Monitoring Report

This Air Sparge (AS) Performance Monitoring (PM) Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities, PM results, and monitoring well installations supporting the AS Interim Measure (IM) at the Former Central Heat Plant (CHP) at Kennedy Space Center (KSC), Florida. CHP has been designated Solid Waste Management Unit 045 under the KSC Resource Conservation and Recovery Act Corrective Action Program. An AS IM was installed at CHP between 2019 and 2021, which included the installation of an AS system to treat a chlorinated solvent groundwater plume. Contaminants of concern (COCs) identified at CHP for the AS IM include tetrachloroethene (PCE), trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC). The completed AS system includes a network of 267 AS wells, which treat approximately 1.3 acres of contaminated groundwater. “Hot” compressor technology is used to treat the source zone, while a “cold” compressor is used to treat two hot spot (HS) areas (HS1 and HS2) and the high concentration plume (HCP). The AS system began operation in June-July 2021 and this document includes Year 2 of operation. The overall runtimes for the AS system for the Year 2 reporting period (October 2022 to September 2023) were approximately 69 percent for the cold trailer and 71 percent for the hot trailer. Air samples and vapor screening results collected during the reporting period showed concentrations less than applicable human health and air emissions permit criteria. Groundwater performance monitoring results show that AS treatment continues to be effective in reducing COC concentrations at CHP. At the shallow interval, COC concentrations were all non-detect, less than, or met their respective State of Florida Groundwater Cleanup Target Levels (GCTLs) at the end of Year 2 in September 2023. In the deep interval, 10 of the 15 PM wells detected COCs greater than their respective GCTLs, with two of these wells also exceeding the Natural Attenuation Default Concentration for VC. Based on Year 2 OM&M and PM results, continued operation of the AS system is required to meet the IM objective. It is therefore recommended to continue with AS IM operations at CHP with the following plan for Year 3.