At least 37 records · Page 2

Chapter 24: Strategic Energy Management (SEM) Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

Strategic energy management (SEM) focuses on achieving energy-efficiency improvements through systematic and planned changes in facility operations, maintenance, and behaviors (OM&B) and capital equipment upgrades in large energy-using facilities, including industrial buildings, commercial buildings, and multi-facility organizations such as campuses or communities. Facilities can institute a spectrum of SEM actions, ranging from a simple process for regularly identifying energy-savings actions, to establishing a formal, third-party recognized or certified SEM framework for continuous improvement of energy performance. In general, SEM programs that would be considered part of a utility program will contain a set of energy-reducing goals, principles, and practices emphasizing continuous improvements in energy performance or savings through energy management and an energy management system (EnMS).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Chapter 22: Compressed Air Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures (September 2011 - August 2020)

Compressed-air systems are used widely throughout industry for many operations, including pneumatic tools, packaging and automation equipment, conveyors, and other industrial process operations. Compressed-air systems are defined as a group of subsystems composed of air compressors, air treatment equipment, controls, piping, pneumatic tools, pneumatically powered machinery, and process applications using compressed air. A compressed-air system has three primary functional subsystems: supply, distribution, and demand. Air compressors are the primary energy consumers in a compressed-air system and are the primary focus of this protocol. The two compressed-air energy efficiency measures specifically addressed in this protocol are: high-efficiency/variable speed drive (VSD) compressor replacing modulating, load/unload, or constant-speed compressor; compressed-air leak survey and repairs. This protocol provides direction on how to reliably verify savings from these two measures using a consistent approach for each.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 18: Variable Frequency Drive Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

An adjustable-speed drive (ASD) includes all devices that vary the speed of a rotating load, including those that vary the motor speed and linkage devices that allow constant motor speed while varying the load speed. The Variable Frequency Drive Evaluation Protocol presented here addresses evaluation issues for variable-frequency drives (VFDs) installed on commercial and industrial motor-driven centrifugal fans and pumps for which torque varies with speed. Constant torque load applications, such as those for positive displacement pumps, are not covered by this protocol.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chapter 5: Residential Furnaces and Boilers Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

The high-efficiency boiler and furnace measure produces gas heating savings resulting from installation of more energy-efficient heating equipment in a residence. Such equipment, which ranges in size from 60 kBtu/hr to 300 kBtu/hr, is installed primarily in single-family homes and multifamily buildings with individual heating systems for each dwelling unit. This protocol does not cover integrated heating and water heating units which can be used in lieu of space heating only equipment.

09 BIOMASS FUELS↗

Chapter 7: Refrigerator Recycling Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy-Efficiency Savings for Specific Measures

Refrigerator recycling programs are designed to save energy by removing operable, albeit less efficient, refrigerators from service. By offering free pickup, providing incentives, and disseminating information about the operating cost of less efficient refrigerators, these programs are designed to encourage consumers to: - Limit the use of secondary refrigerators -Relinquish refrigerators previously used as primary units when they are replaced (rather than keeping the existing refrigerator as a secondary unit) -Prevent the continued use of less efficient refrigerators in another household through a direct transfer (giving it away or selling it) or indirect transfer (resale on the used appliance market). Commonly implemented by third-party contractors (who collect and decommission participating appliances), these programs generate energy savings through the retirement of inefficient appliances. The decommissioning process captures environmentally harmful refrigerants and foam, and enables recycling of the plastic, metal, and wiring components.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 16: Retrocommissioning Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

Retrocommissioning (RCx) is a systematic process for optimizing energy performance in existing buildings. It specifically focuses on improving the control of energy-using equipment (e.g., heating, ventilation, and air conditioning [HVAC] equipment and lighting) and typically does not involve equipment replacement. Field results have shown proper RCx can achieve energy savings ranging from 5 percent to 20 percent, with a typical payback of two years or less (Thorne 2003). The method presented in this protocol provides direction regarding: (1) how to account for each measure's specific characteristics and (2) how to choose the most appropriate savings verification approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 19: HVAC Controls (DDC/EMS/BAS) Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

The HVAC Controls Evaluation Protocol is designed to address evaluation issues for direct digital controls/energy management systems/building automation systems (DDC/EMS/BAS) that are installed to control heating, ventilation, and air-conditioning (HVAC) equipment in commercial and institutional buildings. (This chapter refers to the DDC/EMS/BAS measure as HVAC controls.) This protocol may also be applicable to industrial facilities such as clean rooms and labs, which have either significant HVAC equipment or spaces requiring special environmental conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 22: Compressed Air Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

Compressed-air systems are used widely throughout industry for many operations, including pneumatic tools, packaging and automation equipment, conveyors, and other industrial process operations. Compressed-air systems are defined as a group of subsystems composed of air compressors, air treatment equipment, controls, piping, pneumatic tools, pneumatically powered machinery, and process applications using compressed air. A compressed-air system has three primary functional subsystems: supply, distribution, and demand. Air compressors are the primary energy consumers in a compressed-air system and are the primary focus of this protocol. The two compressed-air energy efficiency measures specifically addressed in this protocol are: High-efficiency/variable speed drive (VSD) compressor replacing modulating, load/unload, or constant-speed compressor; and Compressed-air leak survey and repairs. This protocol provides direction on how to reliably verify savings from these two measures using a consistent approach for each.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 23: Combined Heat and Power Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

The main focus of most evaluations is to determine the energy-savings impacts of the installed measure. This protocol defines a combined heat and power (CHP) measure as a system that sequentially generates both electrical energy and useful thermal energy from one fuel source at a host customer's facility or residence. This protocol is aimed primarily at regulators and administrators of ratepayer-funded CHP programs; however, project developers may find the protocol useful to understand how CHP projects are evaluated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chapter 4: Small Commercial and Residential Unitary and Split System HVAC Heating and Cooling Equipment-Efficiency Upgrade Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

The specific measure described here involves improving the overall efficiency in air-conditioning systems as a whole (compressor, evaporator, condenser, and supply fan). The efficiency rating is expressed as the energy efficiency ratio (EER), seasonal energy efficiency ratio (SEER), and integrated energy efficiency ratio (IEER). The higher the EER, SEER or IEER, the more efficient the unit is.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Radio frequency plasma method for uniform surface processing of RF cavities and other three-dimensional structures

A method for efficient plasma etching of surfaces inside three-dimensional structures can include positioning an inner electrode within the chamber cavity; evacuating the chamber cavity; adding a first inert gas to the chamber cavity; regulating the pressure in the chamber; generating a plasma sheath along the inner wall of the chamber cavity; adjusting a positive D.C. bias on the inner electrode to establish an effective plasma sheath voltage; adding a first electronegative gas to the chamber cavity; optionally readjusting the positive D.C. bias on the inner electrode reestablish the effective plasma sheath voltage at the chamber cavity; etching the inner wall of the chamber cavity; and polishing the inner wall to a desired surface roughness.

36 MATERIALS SCIENCE↗

On multichannel film dosimetry with channel-independent perturbations

Purpose: Different multichannel methods for film dosimetry have been proposed in the literature. Two of them are the weighted mean method and the method put forth byMicke et al. [“Multichannel film dosimetry with nonuniformity correction,” Med. Phys. 38, 2523–2534 (2011)] and Mayer et al. [“Enhanced dosimetry procedures and assessment for EBT2 radiochromic film,” Med. Phys. 39, 2147–2155 (2012)]. The purpose of this work was to compare their results and to develop a generalized channel-independent perturbations framework in which both methods enter as special cases. Methods: Four models of channel-independent perturbations were compared: weighted mean, Micke–Mayer method, uniform distribution, and truncated normal distribution. A closed-form formula to calculate film doses and the associated type B uncertainty for all four models was deduced. To evaluate the models, film dose distributions were compared with planned and measured dose distributions. At the same time, several elements of the dosimetry process were compared: film type EBT2 versus EBT3, different waiting-time windows, reflection mode versus transmission mode scanning, and planned versus measured dose distribution for film calibration and for γ-index analysis. The methods and the models described in this study are publicly accessible through IRISEU. Alpha 1.1 ( http://www.iriseu.com ). IRISEU. is a cloud computing web application for calibration and dosimetry of radiochromic films. Results: The truncated normal distribution model provided the best agreement between film and reference doses, both for calibration and γ-index verification, and proved itself superior to both the weighted mean model, which neglects correlations between the channels, and the Micke–Mayer model, whose accuracy depends on the properties of the sensitometric curves. With respect to the selection of dosimetry protocol, no significant differences were found between transmission and reflection mode scanning, between 75 ± 5 min and 20 ± 1 h waiting-time windows or between employing EBT2 or EBT3 films. Significantly better results were obtained when a measured dose distribution was used instead of a planned one as reference for the calibration, and when a planned dose distribution was used instead of a measured one as evaluation for the γ-analysis. Conclusions: The truncated normal distribution model of channel-independent perturbations was found superior to the other three models under comparison and the authors propose its use for multichannel dosimetry.

61 RADIATION PROTECTION AND DOSIMETRY↗

UMP Reference Language - Examples

This document provides example language for referencing the use of Uniform Methods Project (UMP) protocols followed by examples of language that is currently in use, which helps the reader understand when and how the protocols are used and ensures consistent citation of relevant UMP protocols.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Comparison of unfolding methods using RooFitUnfold

In this study we describe RooFitUnfold, an extension of the RooFit statistical software package to treat unfolding problems, and which includes most of the unfolding methods that commonly used in particle physics. The package provides a common interface to these algorithms as well as common uniform methods to evaluate their performance in terms of bias, variance and coverage. In this paper we exploit this common interface of RooFitUnfold to compare the performance of unfolding with the Richardson–Lucy, Iterative Dynamically Stabilized, Tikhonov, Gaussian Process, bin-by-bin and inversion methods on several example problems.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Optimizing Seasonal‐To‐Decadal Analog Forecasts With a Learned Spatially‐Weighted Mask

Abstract Seasonal‐to‐decadal climate prediction is crucial for decision‐making in a number of industries, but forecasts on these timescales have limited skill. Here, we develop a data‐driven method for selecting optimal analogs for seasonal‐to‐decadal analog forecasting. Using an interpretable neural network, we learn a spatially‐weighted mask that quantifies how important each grid point is for determining whether two climate states will evolve similarly. We show that analogs selected using this weighted mask provide more skillful forecasts than analogs that are selected using traditional spatially‐uniform methods. This method is tested on two prediction problems using the Max Planck Institute for Meteorology Grand Ensemble: multi‐year prediction of North Atlantic sea surface temperatures, and seasonal prediction of El Niño Southern Oscillation. This work demonstrates a methodical approach to selecting analogs that may be useful for improving seasonal‐to‐decadal forecasts and understanding their sources of skill.

Geology↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

All-Speed Methods and Long-Duration Time Integration for Incorporation into the 7-Equation Two-Phase Model

The numerical simulation of multiphase flows in Light Water (Nuclear) Reactors, LWRs, for normal, accident, and off-normal operation, and for operational optimization must cover a huge disparity of transient time durations, from milliseconds to years. In addition, our recent work has shown that the application of classical Riemann approaches, which pervade modern computational fluid dynamics (CFD), suffer numerical accuracy degradation, especially for compressible liquid flows. In this setting, all-speed or Mach uniform methods are need which can be accurately and efficiently integrated over a very large range of time scales. Thus we need a multi-time-scale integration approach to compliment our previously documented multi-spatial-scale approach to multiphase flow modeling. This report briefly summarizes our efforts in these areas.