Search NASA⌕ Search

SEARCH · Search NASA

Results for “utility investments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Strategies for Flood Resilience and Grid Investment Among Iowa's Electric Distribution Utilities

Flooding poses a growing threat to Iowa's electric distribution system, yet utilities face significant data and modeling challenges in planning effective resilience investments. This report provides a foundational assessment of how distribution utilities in Iowa, investor-owned, municipal, and cooperative, approach resilience planning, with a focus on flood risk. It combines hazard characterization, review of state and utility practices, and application of NLR's Energy Resilience Analysis for Distribution Systems (ERAD) and Capacity Expansion Decision Support for Distribution Networks (CADET) tools. Using FEMA floodplains, Iowa Flood Center depth grids, and utility infrastructure data, the analysis quantifies asset exposure, simulates outage risks, and evaluates resilience strategies such as pole hardening, undergrounding, and substation protection. Results indicate that while feeder-level upgrades provide incremental benefits, the most significant reductions in outage risk are achieved through targeted substation interventions. The report highlights key data gaps, such as limited elevation data and fragility functions, and underscores the need for probability-weighted investment frameworks to address both frequent and catastrophic flood events. These insights aim to support utilities, state agencies, and federal partners in prioritizing resilience investments that safeguard Iowa's electric grid against future flooding.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Examples of State and Utility Actions on Proactive Planning and Investments

As states across the U.S. confront rising electricity demand, clean energy deployment, grid modernization imperatives, and the integration of large new loads, some regulators and utilities are shifting away from reactive, “just-in-time” investment approaches toward more proactive planning and investment frameworks. This report compiles examples of jurisdictional and utility actions that reshape planning processes, cost recovery mechanisms, and performance oversight to anticipate—rather than simply respond to—future grid needs. Several themes emerge from state actions examined in this report. First, legislatures and commissions are increasingly directing utilities to proactively upgrade their distribution and transmission systems, reflecting a shift toward a forward-looking system that aligns planning with state policy goals. Second, states are establishing long-term, iterative planning frameworks that often feature multi-year horizons, biannual or annual compliance reporting, structured opportunities for stakeholder engagement, and emphasis on collaboration among utilities, regulators, and stakeholders. Third, states are actively investigating innovative cost recovery mechanisms designed to support accelerated electrification and grid modernization, while balancing consumer advocates’ concerns regarding the ratepayer financial risks of premature investments. Fourth, performance metrics and reporting requirements are being developed to ensure transparency and accountability for proactive investments. Fifth, methodological improvements in planning—such as aligning load forecasting assumptions, incorporating sensitivities, and considering load management potential across building, vehicles, storage, and demand response—are recurring areas of stakeholder focus across jurisdictions. Overall, these developments signify a growing recognition among state regulators, utilities, and stakeholders that proactive planning—supported by clear definitions, consistent and transparent methodologies, robust performance metrics, and innovative cost recovery mechanisms—is a tool that can be used to address the scale and urgency of contemporary grid needs.

electricity market↗

Major Drivers of Long-Term Distribution Transformer Demand

Distribution transformers, used to step-down medium voltage to service-voltage level for end-use electrical consumption, are currently experiencing major shortages. Utilities are experiencing extended lead times for transformers of up to 2 years (a 4x increase on lead times pre-2022) and prices have gone up by as much as 5-6 times in the past 2 years. Current shortages have been attributed to pent-up post-pandemic demand, workforce shortages and low retention rates, component supply chain challenges, and materials shortages (grain-oriented electrical steel, aluminum, and copper). The supply of this equipment is critical for the reliability and growth of the power system, and in meeting administration climate goals in terms of electrification of demand and the growth of renewable energy. This report details some of the initial analysis conducted by the National Renewable Energy Laboratory (NREL), supported by the Department of Energy's Office of Electricity and Office of Policy, in assessing the long-term demand trends for distribution transformers. Expected increased demand is due to a confluence of not only electrification and renewable energy growth, but also in the context of aging electric infrastructure, increased frequency and severity of extreme weather events, and utility-driven investments in reliability and resiliency of the electricity distribution system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessing Environmental and Socioeconomic Factors of Urban Flood Vulnerability in Kansas City, Kansas

Pluvial flooding, over-saturated ground, and drainage systems disproportionately impact historically marginalized urban neighborhoods during extreme rainfall events. These communities are impacted by physical and socioeconomic factors that make them vulnerable to flooding events, such as high concentrations of impervious landcover, high precipitation rates, and a combined sewer system framework. Despite known vulnerability to environmental hazards, understanding potential pluvial street-level flooding events are largely unknown. Using the open-source National Capital Project’s Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation model, NASA DEVELOP examined neighborhood scale runoff retention and potential economic damages for risk mapping throughout Kansas City, Kansas. The generated outputs aid in identifying vulnerable neighborhoods susceptible to flooding and in need of future intervention. Previous studies have applied this model framework to understand urban flood vulnerability regarding ecosystem services, urban planning, and flood mitigation strategies. We utilized the InVEST outputs to develop indices pertaining to environmental justice factors of race, socioeconomic status, social vulnerability, and health. The findings indicate that historically redlined neighborhoods in Kansas City, Kansas face disproportional impacts from flood events and are subject to greater environmental stressors. This research provides an approach to utilizing an open-source flood vulnerability model to empower neighborhood-scale environmental justice analysis, enhancing the local communities' understanding of present-day impacts of historical environmental injustices.

Hadwynne Gross↗

A Review of the Evaluation of Building Energy Code Compliance in the United States

Building energy codes are essential tools for achieving energy efficiency in buildings. However, the full energy savings potential of these codes can only be realized if buildings are constructed in compliance with them. Therefore, evaluating building energy code compliance is crucial in bridging the gap between the energy efficiency requirements set by energy codes and the actualized energy savings achieved. An energy code compliance evaluation serves as a mechanism to assess construction practices, evaluate the effectiveness of code enforcement, identify gaps in compliance, and guide strategies for improvement through training and education. Conducting code compliance evaluation activities involves field studies that require careful design and significant resources. Historically, more emphasis has been placed on developing and adopting building energy codes, while efforts to evaluate compliance have been relatively limited and lacking consistent approaches. The passage of the 2009 American Recovery and Reinvestment Act (ARRA), which mandated that states create plans for achieving 90% compliance within eight years, stimulated the need for an energy code compliance evaluation. As a result, federal, state, and local governments, and utilities have invested in the development of methodologies and tools for code compliance evaluation studies. This paper reviews the code compliance evaluation studies conducted in the United States over the past three decades. It describes and compares the methodologies and metrics used to assess building energy code compliance, summarizes the general elements and steps involved in the evaluation process, and discusses common issues in these studies. Over time, code compliance evaluation methodologies have evolved from isolated development within individual states, regions, and utilities, to widely accepted protocols applicable across different states and local jurisdictions. There has been a transition in compliance metrics, shifting from historical compliance rates to energy-consumption-oriented approaches.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Multi-Stage and Multi-Timescale Robust Co-Optimization Planning for Reliable and Sustainable Power Systems. Final Report

In this project, Clarkson University, in collaboration with Southern Methodist University and University of Pittsburgh, conducted the research to model, design, and implement a sophisticated generation and transmission co-optimization planning decision tool, called Multi-stage and Multi-timescale robust Co-Optimization Planning (MMCOP). The MMCOP decision tool intends to facilitate generation and transmission co-optimization planning of emerging power systems, while mitigating risks and uncertainties in both short-term operation dynamics and long-term policy and technology changes. Long-term power system planning aims at optimizing asset utilization by investing in a proper mix of various generation technologies and transmission lines to supply the future load growth. In particular, the Clean Power Plan (CPP), which is designed to combat climate change and reduce carbon emissions by setting a national limit on carbon pollution from power plants, may dramatically change the landscape of the power industry by further promoting clean energy and phasing out emissions-intensive generation technologies. In addition, novel non-wire alternatives (e.g., demand response (DR), distributed generation (DG), energy efficiency (EE), and smart grid technologies) and the computational complexity for large-scale systems significantly complicate the system planning procedure even further. However, existing conventional planning approaches neglect short-term variability and uncertainty of renewable energy, hourly chronological operation details, and physical nonlinear characteristics of the alternating current transmission network. As a result, existing conventional planning approaches may not work properly, and power systems reliability could be in jeopardy. In observing the limitations of existing conventional planning approaches and addressing new challenges of emerging power systems, the main scope of this project to develop co-optimization planning models within a multi-stage and multi-timescale framework. In particular, random contingencies, key uncertainty factors, and AC power flows are included to derive expansion plans while considering both long-term reliability and short-term flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Establishing and Maintaining Engagement for a Distributional Equity Analysis [Slides]

The Distributional Equity Analysis (DEA) is an analytical framework that allows for the evaluation of the distributional equity of utility resource investments in combination with benefit-cost analysis. This guide serves as a resource for organizations to develop an engagement strategy for a DEA that is accessible, inclusive, and grounded in community interests. It is organized by the guiding principles of engagement for a DEA, summarized in the figure on the right, and offers a compendium of resources for further support and learning.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electricity Rate Designs for Large Loads: Evolving Practices and Opportunities

Electricity demand from large load customers such as data centers is projected to grow significantly in the near term. While data centers play an important role in advancing technology innovation and economic growth in the United States, data center energy needs present challenges and opportunities for electricity supply and infrastructure. This technical brief serves as a foundation for the discussion of issues and sharing of perspectives among utilities, regulators, large load customers, and other stakeholders. As utilities and regulators explore rate structures to address growing data center electricity demand, several issues have emerged: -Fair allocation of electricity system costs to large-load customers without unfair shifting of costs to other customers -Appropriate mitigation of the financial risks associated with stranded assets from underutilized utility system investments -Mitigation of operational and resource adequacy risks if electricity demand exceeds supply -Appropriate risk-sharing in commercializing newer electricity technologies such as advanced geothermal, small modular reactors, and long duration energy storage -Accommodating the diverse needs of large-load customers, such as having the option to match electricity consumption with output from carbon-free resources or using onsite generation to provide system capacity The technical brief also identifies key design elements that aim to address these issues and uses leading examples from pending and approved rate structures, agreements, and special contracts to ground the elements in practice.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Aquifer thermal energy storage program

The purpose of the Aquifer Thermal Energy Storage Demonstration Program is to stimulate the interest of industry by demonstrating the feasibility of using a geological formation for seasonal thermal energy storage, thereby, reducing crude oil consumption, minimizing thermal pollution, and significantly reducing utility capital investments required to account for peak power requirements. This purpose will be served if several diverse projects can be operated which will demonstrate the technical, economic, environmental, and institutional feasibility of aquifer thermal energy storage systems.

Fox, K.↗

Oblique wing supersonic transport concepts

The economic and technical features of two SST concepts that offer the potential of reducing the impact of the environmental constraints on the aircraft design and performance are presented. The potential economic performance of these aircraft is referenced to equivalent passenger size subsonic designs employing consistent design guidelines and assumptions. Total operating cost and airline return on investment are utilized for the economic comparisons.

Galloway, Thomas↗

Report on the Creation and Progress of the Hydrogen Regulatory Research Review Group

The current U.S. nuclear generation fleet is increasingly recognized by governmental, scientific, public policy, and industrial communities as having a strategic role in support of the ongoing national transition to a clean energy future. Federal incentives and actions are aligning to expand the role of nuclear power as a viable and more flexible contributor to the evolving national clean energy mix through programs and initiatives such as nuclear power loan guarantees; the Inflation Reduction Act’s (IRA) clean nuclear electrical, steam, and hydrogen incentives; the Infrastructure Investment and Jobs Act (IIJA, also referred to as the Bipartisan Infrastructure Act or BIL); and near term Department of Energy (DOE) funding opportunities related to nuclear based hydrogen hubs and nuclear integrated hydrogen demonstration projects. . Additionally, leveraging clean nuclear electricity and steam is being explored by industries desiring to transition away from carbon-intensive energy sources. Even with all these emerging enablers, notable barriers remain for the widespread adoption of these opportunities within the U.S. nuclear fleet, including the following: • Assurance of the markets for alternate products needed to support decision-making for large capital modification investments • Electric utility mindset and business history centered solely on producing electricity • Design change complexity and regulatory uncertainty associated with plant modifications needed to support alternate product streams The DOE Light Water Reactor Sustainability (LWRS) Flexible Plant Operations and Generation (FPOG) Pathway is developing options to help U.S. nuclear power plants (NPP) in all these areas to enable NPPs designed for steady baseload operation to integrate with intermittent wind and solar capacity to assure reliable clean energy for the nation. Current and near-term laboratory research is focusing on the technical, regulatory, safety, demonstration, and economic elements in support of improving nuclear plant flexibility through hybrid production of electricity and other non-electric products such as hydrogen and energy arbitrage.

42 ENGINEERING↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utility Regulation Through Legislation: A Cautionary Tale for Legislators, Regulators, Stakeholders, and Utilities

State legislatures in the U.S. are becoming increasingly involved in utility regulation. While state utility legislation can expand regulator authority, for example in the case of renewable energy or energy efficiency standard administration, it can also reduce it. Given the challenging nature of for-profit monopoly regulation, state utility legislation often reduces regulator authority unintentionally. This editorial begins with an examination of the outcomes of state legislation related to baseload generation in the U.S. and the resulting impacts to customers, shareholders, and state economies. The record indicates that utility regulation through state legislation has caused significant economic harm, generally by encouraging for-profit utilities to make riskier investments. A description of more recent state legislation involving distribution grids is presented, along with evidence that increases in grid investment encouraged by state legislation has not improved the reliability of U.S. for-profit utilities. The authors claim that features common to state utility legislation, particularly the requirement that utilities provide investment plans to regulators in advance, practically eliminates cost disallowance risk. This, in turn, reduces regulator authority despite legislative provisions intended to protect consumers. The authors hypothesize that the practical elimination of cost disallowance risk, combined with information and expertise asymmetry among regulators and stakeholders, encourages for-profit monopoly utilities to make grid investments that are not cost effective. The editorial concludes that legislators should avoid utility regulation through legislation, thereby preserving regulator authority, whenever possible. The authors also present their fifth annual Customer Value Ranking of U.S. investor-owned electric utilities. The ranking represents a comparison of the benefits utilities deliver to customers (measured by reliability performance and customer satisfaction) to the costs customers pay (measured by O&M and capital spending per customer).

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Electric Distribution System Planning with DERs - High-level Assessment of Tools and Methods

This document addresses analytical tools and methods to support electric distribution system planning with distributed energy resources (DERs) and grid modernization, drawing on leading-edge research and examples from around the United States. In this report, tools include computer models and software, as well as other analytical aids and practices that support distribution system planning. At its core, distribution system planning is about supporting investment decisions. Enhanced and integrated distribution system planning allows utilities to move from a passive reactive role to smart proactive planning with respect to DERs. Distribution system planning can increase transparency around utility distribution system investments before they are brought to the regulatory body for cost recovery, can support deferring traditional infrastructure investments, and can provide information and incentives to customers and third parties about where DERs can help the grid. A growing number of states are beginning to consider a comprehensive distribution system planning process that addresses the costs and benefits of DERs, reflects more choices coming from the customer/third-party domains, is integrated with resource and transmission planning, and incorporates planning scenarios that reflect the dynamic and changing nature of the electricity system

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantifying the Financial Impacts of Electric Vehicles on Utility Ratepayers and Shareholders [Slides]

Widespread electric vehicle (EV) adoption is critical for meeting economy-wide decarbonization goals and, as a result, states are considering enabling policies and rate designs to accelerate EV deployment. EVs can provide possible financial upside to electric utilities and ratepayers in several ways. For example, from the utility perspective, EVs could drive increased electricity sales and new earnings opportunities through increased capital investments. From the ratepayer perspective, increased electric loads from EVs could reduce average all-in retail rates. The degree to which there are net benefits or costs to shareholders and/or ratepayers depends on how EVs are integrated and managed through enabling grid investments and charging strategies. Using Berkeley Lab’s Financial Impacts of Distributed Energy Resources (FINDER) model that mimics the electric utility investment planning and ratemaking processes, we estimate the utility earnings and customer rate impacts of EVs using a bookend approach of “managed” (i.e., best case) and “mismanaged” (i.e., worst case) charging strategies for a generic summer-peaking, investor-owned, and vertically integrated utility. The analysis also examines the sensitivity of results to different assumptions of EV deployment characteristics, EV impacts on retail electricity sales, incremental distribution system costs, EV charging location, and utility EV enablement costs (i.e., utility costs to invest in EV charging, controls, and communication to deliver and administer EV programs). The results are intended to inform EV policies and deployment strategies that maximize utility system benefits and minimize ratepayer costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Bridging the Gap on Data, Metrics, and Analyses for Grid Resilience to Weather Events: Information that utilities can provide regulators, state energy offices, and other stakeholders

A growing number of states require regulated utilities to file resilience plans to improve the electric grid’s ability to anticipate, withstand, adapt to and recover from increasingly severe weather events. This report aims to help state regulators identify and request data, metrics, and analyses from utilities and use it in decisions on utility resilience plans and investments. The report reviews state requirements and utility plans focused on overall grid resilience, climate change resilience and vulnerabilities, infrastructure modernization, storm protection, and wildfire mitigation. It details types of data, metrics, and analyses across five categories--and provides examples of each from the utility plans. The first category is vulnerability assessments, or evaluations of the susceptibility of systems, communities, or assets to potential harm from identified hazards. The second is data on hazards and the exposure of utility assets and customers to these hazards. The third is attribute metrics, or system characteristics that contribute to or describe the resilience of a system. The fourth is performance metrics, which are impacts of resilience investments on system performance--typically a reduction of negative impacts from hazard events. Finally, evaluation and prioritization are analyses that utilities conduct to estimate impacts from resilience measures (evaluation) and prioritize measures based on costs and estimated impacts (prioritization). The report concludes with examples of key trends and emerging best practices for states and utilities, and identifies areas for further research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hardware-in-the-Loop Evaluation of Grid-Edge DER Chip Integration Into Next-Generation Smart Meters

To facilitate the implementation of distributed energy resource management systems (DERMS), we propose to insert a grid-edge distributed energy resource (DER) chip hosting a DERMS algorithm into the next generation of smart meters. This will create a pathway for the wide adoption of DERMS technology because many utilities plan to invest in advanced metering infrastructure in the near future. This will also bridge the gap between an electrical power utility and DERs behind the meter. The DER chip is designed to follow power direction signals from the DERMS coordinator while balancing its local objectives. We tested the chip using a controller- and power-hardware-in-the-loop evaluation under three scenarios that a DERMS could face in the real world. The DER chip was capable of and effective at directing four heterogeneous DERs to respond to a DERMS coordinator for grid services (e.g., voltage regulation and a virtual power plant).

distributed energy resource management system↗

Hardware-in-the-Loop Evaluation of Grid-Edge DER Chip Integration Into Next-Generation Smart Meters: Preprint

To facilitate the implementation of distributed energy resource management systems (DERMS), we propose to insert a grid-edge distributed energy resource (DER) chip hosting a DERMS algorithm into the next generation of smart meters. This will create a pathway for the wide adoption of DERMS technology because many utilities plan to invest in advanced metering infrastructure in the near future. This will also bridge the gap between an electrical power utility and DERs behind the meter. The DER chip is designed to follow power direction signals from the DERMS coordinator while balancing its local objectives. We tested the chip using a controller- and power-hardware-in-the-loop evaluation under three scenarios that a DERMS could face in the real world. The DER chip was capable of and effective at directing four heterogeneous DERs to respond to a DERMS coordinator for grid services (e.g., voltage regulation and a virtual power plant).

distributed energy resource management system↗