Search NASA⌕ Search

SEARCH · Search NASA

Results for “utility meter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Framework for Identifying Building Energy Models of Localized Utility Service Areas Using Smart Meter Data

Bottom-up load modeling of buildings offers a versatile approach to simulating baseline demand and scenarios of future technology evolution and adoption at the individual building level. This capability is essential to understanding how future load shapes may change with the adoption of electric equipment and vehicles, particularly as it relates to grid planning and infrastructure investments. Traditionally, grid planning techniques have used historical load data to predict future load and infrastructure needs. However, with the anticipated rise in adoption of electrification technologies such as heat pumps and electric vehicles, historical data become less reliable predictors of the future. By employing ResStock, a high-fidelity building stock modeling tool, we can fine-tune electrification scenarios and aggregate models to represent varying geographic resolutions of the grid system, while considering the underlying features of homes. This may enable a more accurate and responsive approach to anticipate and plan for the evolving landscape of energy demands. We present a new framework that leverages building stock energy modeling to identify building models that align with the load shapes and housing attributes of buildings with AMI data. This approach applies two model layers: (1) a classification step that identifies the presence of air conditioning, electric heating, and electric water heating, and (2) an optimization routine that identifies building energy models aligning with load profile data from advanced metering infrastructure meters. This report demonstrates one approach to deploying this framework, and presents results for three test cases that use both modeled and AMI data to assess performance. For a test case using AMI data in Fort Collins, Colorado, we observed a median monthly electricity load CV-RMSE of 16.6%, and a top ten daily heating and cooling median absolute percent error of 7.7% and 8.3%, respectively. For each AMI meter, we identify a set of potential energy models so that downstream use-cases can account for uncertainty driven by variability of baseline technologies and occupant behavior, which impact the response to electrification and energy efficiency scenarios. Our results indicate that ResStock has potential as a scalable solution for modeling residential energy demand at local grid resolutions. Its performance depends on location-specific factors, underlying building characteristics, and the level of aggregation, offering a path towards more precise and adaptive distribution grid planning for the evolving energy landscape.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Fidelity Analysis of EV Integration on Real Utility Feeders in Colorado

Residential electric vehicle (EV) charging has the potential to alter long-held assumptions on load characteristics impacting distribution grid planning, operations, and design standards. This study identifies analysis and control methods to increase the affordability of residential EV charging both for Xcel Energy and their customers. The project also provides solutions for more reliable grid interconnection that can support a reliable utility business model prepared for increasing EV charging load in the coming years. For this project, we referenced Level 2 alternating current (AC) onboard charging profiles for various vehicle models and high-fidelity charging data collected at the experimental setup established at the EV Research Infrastructure Laboratory at the National Renewable Energy Laboratory (NREL). Next, we developed EV adoption models for 2030 and 2040 for the Boulder and Aurora regions in Colorado. Moreover, we evaluated different smart charging control algorithms and compared their performance. We developed time-of-use (TOU)-based and grid-aware active EV charging control methods and integrated them within the study region to understand field impacts. Diving deeper, we selected 10 feeders in Boulder and Aurora for high-fidelity grid modeling down to the house level. We executed detailed grid analysis comparing the smart charge management (SCM) algorithms we developed. Finally, we created a novel tool, Electric Vehicle Infrastructure--Distribution System Integration Tool (EVI-DiST), to integrate all the approaches in a single software environment to provide easy integration, fast simulation, and detailed evaluation capability for utility engineers and other stakeholders.

33 ADVANCED PROPULSION SYSTEMS↗

Optimizing Facility Operations by Applying Machine Learning to the Army Reserve Enterprise Building Control System (Final Report)

Thousands of U.S. Department of Defense (DoD) buildings have building automation systems (BASs) and/or advanced meters. Although these systems have a wealth of data, performance optimization requires time and expertise to review and act on that information. Machine learning (ML) can provide automated and actionable insights to controls operators. This demonstration implemented proven ML methods on the Army Reserve Enterprise Building Control System. ML refers to algorithms that “learn” from data and improve their performance on a given task over time. In the buildings domain these tasks range from predicting future energy consumption, to identifying operational issues before faults occur, to optimizing control decisions. To learn, ML requires input data, which – for buildings – typically consists of instrument data such as energy consumption data and subsystem controls information such as set-point temperatures, and context data consisting of information such as the physical location of the building, the area of the building, and the weather. ML models use the relationships learned from the input data to make predictions with new, previously unseen, data. The team was able to investigate and successfully implement the following ML use cases: labeling consumption data as anomalous or non-anomalous; baseline whole-building load prediction (unknown fault status); fault detection (validation not possible); and site prioritization for energy-related projects. Due to the constraints of the project, interventions were not able to be implemented during the demonstration; therefore, assessments of operational cost savings and maintenance avoided could not be performed. The project has been presented at two leading national building conferences and two additional publications to peer-reviewed journals are currently in preparation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Heat Pump Retrofits for Central Plant Hydronic Heating Systems: A Software Toolkit for Screening and Design

Retrofitting existing central plants with high-efficiency heat pump technologies can play a crucial role in achieving long-term planning goals. Modern heat pump technologies are able to use waste heat recovery to meet a building's heating demand, but there is a lack of accessible tools designed for non-HVAC experts, such as building owners, to quickly and easily conduct what-if analysis, e.g., estimating retrofit costs and payback period for their partial or full equipment replacement. This paper introduces an open-source software toolkit designed to facilitate the initial screening and decision-making of heat pump retrofits in existing central plants using a building's yearly load profile from metered or utility bill data. The toolkit evaluates the technical and economic viability of replacing traditional central plant equipment with various options including water-to-water or air-to-water heat pumps, which can provide efficient and lower-cost heating and cooling. It allows users to compare current central plant configurations with retrofit scenarios, assessing energy consumption, life-cycle costs, and environmental impact. The toolkit offers (1) a web-based tool designed for user-friendly access by a broad audience and (2) Python-based source code for researchers and engineers conducting parametric studies and design parameter optimization. The toolkit compares a typical central plant configuration to a configuration that uses a heat pump to supply hydronic heating and cooling. The output metrics include energy consumption and output of each equipment, life-cycle cost analyses and metrics, and environmental impact of the system.

Excell, L↗

Connecting Electric Vehicle Charging Infrastructure to Commercial Buildings

Electric vehicles (EVs) are growing in popularity and gaining meaningful market share with record sales year over year in the last decade. EV charging equipment, also known as EV chargers (EVC) or EV supply equipment (EVSE), must proportionally match the growing number of new EVs on the road for a comparable experience to gas-powered vehicles. The majority of EV charging currently happens at residential buildings. However, demand for EV charging at commercial buildings will significantly increase with wider mainstream EV adoption and as businesses return to more normal operation following COVID-19 pandemic disruptions. Charging equipment can include various sub-systems like power conditioning module, control software, safety devices, metering, communication, cooling, connectors, and its wiring. EV charging at commercial buildings could be used for public, workplace, and commercial fleet charging. This document aims to describe how EVC can be connected to commercial buildings, including considerations for facility managers, and the effects that charging will have on the buildings electrical distribution system. More specifically, this resource provides an overview of: understanding EV charging basics: how charging equipment connects to the building and to EVs; required infrastructure updates needed at the building site to connect EVC to existing distribution systems; network strategies for cost-effective operation; metering and utility considerations for billing and incentives; charging equipment ownership options; future trends in EVC connection to buildings.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Housing Energy Connection Project (Final Technical Report)

This project expanded existing medium-voltage distribution to 33 households, a daycare, a mechanical shop, irrigation pumps, and a sewer lift station, all of which previously received electric service from the local electric utility. As part of the project, automatic meter reading (AMR) and advanced metering infrastructure (AMI) was installed to allow the Tribe to set up its own electric metering like a utility. The primary objective of this project was to expand the Tribe-owned electrical distribution to provide highly reliable electrical service to these existing loads. The objective was successfully met after project completion. The project reduced high costs for electric energy previously supplied by the utility, by supplanting utility-supplied electric power with Tribe-generated electric power. The project gave the Tribe greater independence from traditional power sources and provided jobs for the community.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Equitable Design of Behind-the-Meter Energy Storage Programs: A Customer Perspective

Utility deployment of energy storage is done as a utility-scale asset connected directly to the grid (front of meter) or in partnership with a customer on the customer’s premises (behind the meter). By offering incentives for customers to install behind-the-meter storage, utilities can gain operational control of the assets and operate them in a manner that benefits all customers. Some states have also begun providing increased incentive levels to low-income customers to ensure that they can equitably share in the benefits of behind-the-meter energy storage programs. This paper evaluates different approaches to energy storage procurement from the customer’s perspective and evaluates how behind-the-meter programs can be equitably structured while keeping customers financially indifferent between front-of-meter and behind-the-meter energy storage procurements.

Twitchell, Jeremy B.↗

Utility-scale Building Type Assignment Using Smart Meter Data

United States building energy use accounted for 40% of total energy use, 74% of peak demand, and $412 billion in 2019. Building energy modeling allows researchers to simulate building physics, gain insights into possible energy/demand saving opportunities, and assess cost-effective resilience amidst climate change. Many building features needed to create building energy models are readily available such as 2D footprints and LiDAR (height). A critical feature that is not generally obtainable is the building type. In partnership with a utility, a years worth of real-world, 15-minute electrical use data has been examined. The smart meter data is compared to 97 different prototype building energy models to assign building type. Real-world considerations including data preparation, quality assurance, and handling of missing values for advanced metering infrastructure data are addressed. Euclidean distance for pattern-matching of energy use, dynamic time warping, and time-window statistics with machine learning are compared for determining building type from measured electricity use.

Bass, Brett↗

Assessment and Commissioning of Electrical Substation Grid Testbed with a Real-Time Simulator and Protective Relays/Power Meters in the Loop

Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible trouble-shooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.

Piesciorovsky, Emilio↗

Electrolyte and Cutoff Potential Effects on Cycle Life of Li4Ti5O12/LiNi0.9Mn0.1O2 Batteries for Behind-the-Meter Storage Applications

Behind-the-Meter Storage (BTMS) is a stationary battery energy storage system that is connected to the electrical distribution system on the customer's side of the utility's service meter. BTMS systems are used to store electrical energy from the grid as well as inconstant, renewable energy, such as local solar and wind generation. A successful BTMS system will allow the customer to pair their energy generation and storage to optimize electrical consumption from the grid, improving reliability and minimizing cost. For BTMS applications, batteries must be designed and optimized with different set of criteria from other leading segments of the Li-ion battery market, like transportation, due the system being stationary and proximal to the residential or commercial building it's benefitting. BTMS applications prioritize safety, cost (low/no-critical materials), reliability (20-year calendar life), and durability (10,000 cycle life), while having the ability to (minimally) compromise energy density and rate capability. Lithium titanate (Li4Ti5O12-, LTO) is a promising anode candidate for BTMS applications due to its high safety and capacity retention, while maintaining a reasonable 160 mAhg-1 reversable capacity and composition of relatively abundant materials. (1) Specifically, LTO has a high working voltage which helps to prevent Li dendrite formation, improving safety. Furthermore, LTO also has negligible lithiation-based volume change, leading to less mechanical pulverization, or loss of active material, upon cycling. For the cathode, materials with little or no Co are of high interest due to the high cost and low abundance of Co. LiMn2O4 (LMO) has been paired with LTO for BTMS applications in the past due to its safety, low cost (abundancy), and reasonably high operating voltage. (2-4) However, the low capacity of LMO limits energy density and specific energy. While not the highest priority for BTMS applications, increasing energy density will enable deployment in space constrained BTMS applications and decrease total cost. LiNi0.9Mn0.1O2 (LN-MO) is a recently developed material with promise due to its high operating voltage and relatively low price. (5) However, Ni-rich layered oxides, including LNMO, tend to struggle with capacity retention during high-voltage cycling due to mechanical pulverization, irreversible phase transitions, and unstable solid-electrolyte interphase. The study presented here focuses on building an understanding of how electrolyte solvent and varied cutoff potentials will impact the cycle life of LTO/LN-MO cells. Specifically, a comparison is provided between ethylene carbonate (EC), ethyl methyl carbonate (EMC), fluoroethylene carbonate (FEC), and Gen2 electrolyte solvents with 1M Lithium hexafluorophosphate (LiPF6) salt, cycling to two upper termination potentials, 2.6V and 2.7V. Electrochemical testing and diagnostics (e.g., differential capacity analysis, area specific impedance, constant voltage hold, and rate capability) and post-mortem characterization will be used to understand the aging behavior and failure mechanisms of the 8 cell combinations (four electrolytes and two voltage cutoffs). Cells with FEC electrolyte showed a lower initial capacity compared to cells with Gen2, EMC, and EC cycling at both voltages; however, the cells with FEC showed consistent trends in capacity retention with 2.6V and 2.7V termination potentials, while the cells with the other electrolytes showed much higher rates of capacity loss when cycling to the higher voltage. These results indicate that FEC may play a role in improving durability of high-voltage, Ni-rich electrode systems for use in high-cycle applications, such as BTMS.

electrolyte↗

State Indicators for Advancing Demand Flexibility and Energy Efficiency in Buildings - Part I [Slides]

This slide deck report identifies objectives and key indicators for state activities that advance demand flexibility in buildings — legislation, utility regulatory proceedings, executive orders and programs. It also illustrates progress to date and identifies trends, gaps, and opportunities. Part I of the report focuses on (1) demand response and (2) energy efficiency targeted to reduce peak demand or integrate with demand response. This section covers building energy codes, appliance and equipment standards, resource standards, utility planning, utility programs, advanced metering infrastructure and meter data, rate design, state programs, state energy planning, and related state policies and regulations. Part II of the report addresses traditional energy efficiency indicators, including utility and state programs, codes, and standards that support annual energy savings. See the additional links for an infographic, library of cited state documents on demand flexibility, and presentation to the NASEO-NARUC Grid-Interactive Efficient Buildings Working Group.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Outdoor Test Bed Performance of a Power Line Sensor Using a Real-Time Event Simulator

This report summarizes the design and application of an outdoor power line sensor testbed (OPLST) with a real-time simulator and power meter to compare a potential transformer (PT) and current transformer (CT) versus an advanced line-post sensor. The OPLST was created to validate advanced medium-voltage (20/34.5 kV) outdoor power line sensors used in electrical distribution systems. Electrical utilities have installed metering and relay-protection transformers like PTs and CTs for several decades. The PTs/CTs are iron core measurement transformers based on the electromagnetic induction principle and provide reliable data in normal grid operation. However, new outdoor power line sensors (OPLS) using other technologies like voltage divider, Rogowski coil and optical principles have become available and may have favorable performance and costs compared to PTs/CTs. Therefore, the importance of testing these technologies with the PT/CT, to compare the measured phase voltage/current at different power grid scenarios is crucial to understand the performance of these new OPLS. For this study a G&W Electric Model CVS-36-O power line sensor was chosen as the OPLS to test with voltage/current signals. An OPAL-RT Technologies Model OP4510 real-time simulator and Schweitzer Engineering Laboratories Model SEL-735 power meter were installed with the 20/34.5 kV OPLST to compare the measured transient events collected from an advanced OPLS and the PT/CT. This system is installed at the Distributed Energy Communications and Control (DECC) lab, Oak Ridge National Laboratory (ORNL). The simulator generated different power grid scenarios (electrical faults, capacitor bank operation, service restoration, etc.), and its analog-output signals were connected to the voltage/current amplifiers that feed the 20/34.5 kV aerial cable loop through the PT/CT devices. Additional PT/CT devices were also wired with the medium voltage aerial cable loop to measure the phase current/voltage signals and server as references. After each test, common format for transient data exchange (COMTRADE) files were collected from the SEL-735 power meter and used to compare the performance of the OPLS with the PT/CT. The behavior of analog signals, harmonic components, total harmonic distortion and crest factors were assessed and found favorable for the G&W sensor as compared to the reference PT/CT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Gaining Real-Time Water Leak Detection

Devens Reserve Forces Training Area is a United States Army Reserve (USAR) Installation that struggles with severe water leaks, often causing significant damage to the facility and requiring major renovation. Traditional water use is highly dependent on occupancy, so it can be difficult to benchmark a facility’s water use. It can be exceptionally difficult when occupancy is transient and/or varies. Pacific Northwest National Laboratory (PNNL) collaborated with Devens to implement real-time monitoring of their water consumption by utilizing the smart meter data from their existing 23 water meters. PNNL created a simple algorithm to calculate hourly water consumption and trigger an alert to be instantly emailed to Devens’ personnel when there appears to be a water leak in any building with a smart water meter. Here, this approach is expected to save hundreds of thousands of dollars in unnecessary water consumption costs and damages from leaks and was implemented with little-to-no costs or service disruptions. Next steps for this project include slow leak detection through nighttime monitoring and to extrapolate this water leak approach to the remainder 360 water meters on USAR’s Enterprise Building Control System so USAR sites across the country can be instantly notified of potential water leaks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Beyond Energy Efficiency: A clustering approach to embed demand flexibility into building energy benchmarking

The intermittency of carbon-free renewables and the demand changes associated with the widespread push for electrifying the transportation and building sectors provides an opportunity for buildings to go beyond energy efficiency and push towards providing demand flexibility to the electricity grid. The duality of energy efficiency and demand flexibility is necessary for success in a sustainable and reliable energy transition. Current building energy benchmarking models are limited in their ability to integrate concepts of demand flexibility and/or utilize granular smart meter data. Thus, current benchmarking methods are focused annual energy usage and fail to incorporate how the time of use of energy consumption impacts emissions in a quickly changing energy grid. Without a more comprehensive view of energy usage and associated real-time emissions, current benchmarking methods are unlikely to realize the full decarbonization potential of buildings. New emerging data streams provide an opportunity to develop a new generation of benchmarking energy models that embed dimensions of energy efficiency, grid interactivity, and demand flexibility into their analysis. In this paper, we propose a four-step method for embedding grid interactivity and demand flexibility into building benchmarking models that utilizes emerging building and time-series electricity data streams. We first engineer features to produce a mix-type dataset that encompasses many attributes of grid-interactive and efficient buildings, and then we apply K-medoids using Gower's Distance to produce peer-group clusters. We apply the method to a case study of 306 primary and secondary schools in southern California, USA. The results show that the method effectively clusters buildings by attributes of demand flexibility and energy efficiency. The clustering results reveal patterns in inefficient building operations and demand inflexibility at the building peer group level. In conclusion, the interpretation of clusters can serve as an integrated energy efficiency and demand flexibility benchmarking model and inform performance-specific policy targeting for buildings that go beyond traditional efficiency measures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Securing the Modern Grid: Federal Investments, Digitization, and Supply Chain Strategy

Across the United States (U.S.) grid expansion and modernization is underway, paving the way for accelerated load growth and intelligent resource management. Digitization of the grid is supported by several state and federal programs, providing support for utilities installing advanced metering infrastructure (AMI), AI-powered analytics systems, battery energy storage systems (BESS), and distributed energy resource management systems (DERMS) to transform the grid from a one-way power delivery system into an intelligent, responsive network that will enable faster load growth and power expansion of data centers for advanced artificial intelligence (AI) applications. The digital transformation of America's grid presents opportunity for increased efficiency and resiliency but also introduces new digital risks that require careful management. Digital equipment often contains several vulnerabilities such as unencrypted communication protocols, and persistent remote access capabilities that could be exploited to manipulate device settings, coordinate service disruptions, or inject false data into grid operations. These digital risks become particularly important as the grid must rapidly scale to support AI-driven data centers, which the administration has identified as essential for maintaining U.S. technological leadership and economic competitiveness. These vulnerabilities are compounded by supply chain realities: Chinese manufacturers currently produce 70-90% of essential grid components including inverters, batteries, and control systems, with the U.S. lacking domestic manufacturing capacity for critical assets like extra-high voltage transformers. Recent federal legislation has established Foreign Entity of Concern (FEOC) restrictions to address these risks, requiring projects to achieve escalating thresholds of non-FEOC content to receive tax credits while utilities work to expand sourcing channels for their supply chains and strengthen security measures. These restrictions arrive precisely when utilities face unprecedented electricity demand growth driven by the rapid growth in data centers, creating a considerable challenge: rapidly expanding infrastructure while navigating complex compliance requirements while lacking viable alternatives for many critical components. Idaho National Laboratory (INL) and its partners have developed practical approaches to help utilities navigate these intersecting challenges as they leverage federal investment to strengthen and grow the grid. These solutions include Cyber-Informed Engineering (CIE) principles that build resilience directly into systems, the Cirrus tool for secure cloud migration, and enhanced procurement guidance that embeds security requirements throughout equipment lifecycles. Federal initiatives, such as the Technical Assistance for Digital Assurance (TADA) project, provide direct support to utilities implementing these approaches while facilitating knowledge sharing across the industry. While these tools and frameworks cannot eliminate all risks inherent in foreign supply chain dependencies, they offer pragmatic pathways for strengthening security posture without sacrificing the deployment momentum essential to meeting surging electricity demand. Ultimately, securing America's digital energy infrastructure demands dedicated coordination across multiple fronts: building domestic supply chains, implementing robust digital assurance practices, and maintaining the aggressive modernization timeline necessary for reliability, resilience, and energy independence.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Roadmap and Benchmarking: Privacy in Federated Load Forecasting

Data-driven techniques for energy demand forecasting continue to emerge with promising impacts on distribution grid planning. However, the development of robust and generalizable machine learning models requires that representative high quality training data are available. Distributed energy resources have begun to embed intelligence, gathering large amounts of data on customer demand, behavior, and household devices that are connected to the grid. Though utilities aggregate meter-level demand data for load shaping, demand response, outage management, reliability planning, and billing applications, there lies an inherent privacy concern in sharing consumption data that may identify individual consumer behavioral patterns. Hence, while sharing the data is crucial, the private sensitive customer data must be safeguarded from being exposed or manipulated. In this study, we propose a roadmap for implementing a based privacy preserving framework to support the advancement of data-driven analytics in data-sensitive distributed energy resources environments. The roadmap incorporates federated learning–a distributed training framework, differential privacy–a statistical framework that provides guarantees to safeguard the leakage of sensitive data, secure multiparty computation and homomorphic encryption– techniques for encrypting model gradients and applying secure aggregation on the server. Moreover, we perform baseline experiments on the federated short-term load forecasting (STLF) task using open-source residential load profile datasets, offering insights into the challenges of integrating differential privacy into federated learning.

Abebe, Waqwoya [Oak Ridge National Laboratory (ORN↗

Characterizing the Oscillatory Properties of Bulk Electric Systems

This paper presents a process for characterizing the oscillatory dynamics of a large bulk power system. As a demonstration, the process is applied to the Western Interconnection of North America. Several complementary analysis approaches, both new and existing, are employed to provide a comprehensive understanding of the oscillatory properties of the system. Established modal analysis techniques based on ringdown and mode-meter algorithms are utilized. In addition, we derive and apply methods based on spectral correlation analysis to identify modal frequencies, distinguish between modes that are closely spaced in frequency, and determine locations at which the modes are observable. Critical interarea modes are identified and characterized using actual-system synchrophasor measurements taken over several years of operation in concert with industry-standard simulation models. This includes 145 hours of PMU data and two planning base cases.

42 ENGINEERING↗

RODeO (Revenue Operation and Device Optimization Model) [SWR 20-67]

The Revenue, Operation, and Device Optimization (RODeO) model explores optimal system design and operation considering different levels of grid integration, equipment cost, operating limitations, financing, and credits and incentives. RODeO is a price-taker model formulated as a mixed-integer linear programming (MILP) model in the GAMS modeling platform. The objective is to maximizes the net revenue for a collection of equipment at a given site. The equipment includes generators (e.g., gas turbine, steam turbine, solar, wind, hydro, fuel cells, etc.), storage systems (batteries, pumped hydro, gas-fired compressed air energy storage, long-duration systems, hydrogen), and flexible loads (e.g., electric vehicles, electrolyzers, flexible building loads). The input data required by RODeO can be classified into three bins: 1) utility service data, which refers to retail utility rate information (meter cost, energy and demand charges), 2) electricity market data, which include energy and reserve prices, 3) other inputs, which refer to additional electrical demand, product output demand, technological assumptions, financial properties, and operational parameters.

Guerra Fernandez, Omar Jose↗