PV Hosting Capacity Estimation: Experiences with Scalable Framework

Hosting capacity is an indication of the amount of solar photovoltaics (PV) that can be hosted in a distribution system without additional changes to infrastructure or oper-ations. This paper presents a framework for estimating the PV hosting capacity at scale. First, we analyze computational, modeling and other key challenges of performing relevant, large-scale simulations, provided along with the experiences and lessons learned. Then, we develop two open-source Python-based software tools to conduct repeatable distribution analyses: the Distribution Integration Solution Cost Options (DISCO) for configuring and analyzing simulations and the Job Automation and Deployment Engine (JADE) for parallelizing jobs on high-performance computing clusters. A case study of hosting capacity estimation for the SMART-DS San Francisco (SFO) 2000+ synthetic feeders, is used to demonstrate the capability of the developed DISCO+JADE framework and tools. The framework and tools can help utilities assess the overall hosting capacity of their service territory, which can help them better plan for the overall upgrade costs to integrate more PV in the future. The experiences are shared to aid the tool users and researchers to conduct relevant studies and research.

distributed energy resources↗

PV Hosting Capacity Estimation: Experiences with Scalable Framework; Preprint

Hosting capacity is an indication of the amount of photovoltaics (PV) can be hosted in a distribution system. This paper presents a framework for estimating distributed PV hosting capacity at scale. We first analyze the key challenges of performing relevant large scale simulation including computational and modeling challenges. Then, we develop two python-based software tools in order to conduct repeatable distribution analyses: Distribution Integration Solution Cost Options (DISCO) for configuring and analyzing simulations, and JADE for parallelizing jobs on HPC clusters. A case study of hosting capacity estimation for SMART-DS SFO 2000+ synthetic feeders is used to demonstrate the capability of the developed framework and tools. The framework and tools can help utilities assess the overall hosting capacity of their service territory, through which the overall upgrade cost can be better planned in order to integrate more PV in the future.

distributed energy resources↗

Scaled Implementation of Smart Charge Management for Electric Vehicles

Smart charge management (SCM) has become a critical strategy for mitigating potential grid impacts and reducing electricity costs for all customers. This study will evaluate the economics of implementing light-duty EV SCM at scale across the United States. This work will enhance distribution system analysis by estimating SCM implementation costs, exploring viable business cases, and developing a framework for national-level applications. The primary methodology involves leveraging detailed grid modeling from a specific service territory and using spatial extrapolation techniques to generalize findings to other regions. The analysis will develop key metrics to quantify the costs and benefits of SCM, including implementation costs relative to strategy and scale, the cost of distribution system upgrades with and without SCM, and the percentage of peak-load reduction. The objective is to produce a comprehensive report and a parameterized framework that enables utilities to self-assess the value of SCM in their own service territories. This will support the development of cost-effective charging strategies, accelerate the energization of new EV chargers, and facilitate the seamless integration of EVs into the nation's power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Region-Specific Merchant Hydrogen Market Assessment and Techno-Economic Assessment of Electrolytic Hydrogen Generation: Cooperative Research and Development Final Report, CRADA Number CRD-18-00751

Utilities need to recover value from baseload and some renewable assets even when the electricity is curtailed. The declining cost of renewables (particularly solar), the persistently low-cost of natural gas, and the declining electricity demand, have all worked to lower the price of electricity. Furthermore, the baseload assets have a high turndown cost, which is not reflected in the low market electricity prices. One option for utilizing the curtailed electricity is hydrogen generation. One important aspect of this project will be to provide a “go/no-go” recommendation on the economic feasibility of pursuing hydrogen generation vs. other markets that could offtake curtailed electricity or nuclear steam. This project will specifically assess the opportunities for hydrogen production and use in the service territories of Southern Company Services (SCS), Exelon SBC, and Xcel Energy. Each utility partner represents a different mix of generation fleets: Exelon has significant nuclear assets, Xcel is primarily renewables (wind) with some nuclear, and SCS represents both a renewables fleet and a heavily baseload fleet, which includes significant nuclear. The Contractors will conduct the study of hydrogen market opportunities by first considering the approximate electricity demand and price profiles for the year, and power generation capacity that can be used to produce hydrogen. Therefore, a profile for hydrogen generation will also be developed to better understand the quantity and timing of hydrogen production. Once the hydrogen production schedule is estimated, hydrogen storage requirements can be determined. This effort will provide sufficient information to make a go/no-go decision on moving ahead with a detailed regional case study for hydrogen production in any of the three utility areas.

08 HYDROGEN↗

Factorization Machine Learning for Disaggregation of Transmission Load Profiles with High Penetration of Behind-the-Meter Solar

The ever-growing high penetration of ubiquitously distributed energy resources, especially behind-the-meter solar (BTM) generations, has significant impacts on nodal load (i.e., net injection) profiles and consequently caused imperative operational challenges to system operators such as regional transmission organizations (RTOs). Illustrated by real-world nodal data and examples at PJM Interconnection, this paper first discusses the application and necessity of effectively extracting daily nodal load profiles in a non-intrusive manner. More importantly, a novel bi-level architecture, including Factorization Machines (FM) learning procedure has been proposed to effectively disaggregate not only one node but every node in an RTO service territory. Specifically, FM leaning is adopted to capture the interconnections between related features to better utilize the correlation between buses in the same region and between a single bus and the zonal load. The proposed bi-level technique is numerically validated using real-world, minute-level, normalized, and anonymized nodal data at PJM service territory.

behind the meter solar, load disaggregation, load ↗

Serving in the Public Interest: Samuel Insull and the Public Service Utility Imaginary

This chapter examines the rhetoric of Samuel Insull as an example of how early electricity utility executives framed the idea of granting monopoly territories in terms of the “public interest.” While the public interest has not always maintained sustained attention in public policy research, the concept remains as strong as ever a justification for specific policies and procedures that shape how utilities deliver energy to the public. Insull’s public speeches and other events demonstrate an important instantiation of the coproduction of an energy transition and the reimagining of how the public and energy companies interact. Though this model is by no means perfect, it represents an idea of sociotechnical order that has sustained for over a century, a level of persistent change that is instructive for considering how to shape the ongoing transition to sustainable energy systems.

Tidwell, Abraham SD↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Strategic Condition Framework for Energy Innovation

Building upon previous work in innovation, technology, and economic fields, we propose a conceptual framework to address the interplay dynamics of public policy and the value chains of clean energy technology innovation systems, by focusing on market structural and strategic conditions in relation to the rate and direction of knowledge diffusion within activity-based value chains. Our framework extends beyond socio-technical transition models by considering such nuances as: 1) the implications of geography, 2) the locus of knowledge types, 3) the dynamics of financial and knowledge flow, and 4) emphasizing the importance of both market structure and institutional conditions. At the firm level, we consider dynamics of interactions between suppliers and customers, innovation activities, the competitive environment, and the firm’s broader strategic relationship to governance activities and structures; we allow for the fact that each of these aspects of a firm’s identity may have a strategically relevant geographic dimension (e.g., service territories, locational concentration of input resources, etc.). We provide a proof-of-concept application of the U.S. utility-scale solar photovoltaic (PV) and onshore wind sectors, including their interactions with the U.S. power market, which we in present in a web-based information platform (Energy I-SPARK, ei-spark.lbl.gov).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

National Grid: Using the LEAD Tool Data to Target Energy Affordability Services to Eligible Customers in New York

In the following use case, investor-owned utility company, National Grid, used the Low-Income Energy Affordability Data (LEAD) Tool to support the implementation of its Home Energy Affordability Team (HEAT), a weatherization program for income-eligible residential natural gas customers in its service territory in Long Island, New York. Using LEAD Tool data, National Grid was able to determine how many households may be eligible for the program to inform additional marketing efforts. This use case is an example of how utilities of all sizes and types in the United States can use the LEAD Tool in similar ways to gain insights and better address customer energy affordability needs.

Low-Income Energy Affordability Data Tool, LEAD To↗

Performance Assessment of High Efficiency Variable Speed Air-Source Heat Pump in Cold Climate Applications

This project was part of an effort by ComEd's emerging technology program to evaluate the energy saving potential of new energy efficiency technologies. The focus of this technology assessment was to determine energy and peak demand savings potentials of a high efficiency variable speed, air-source, split system heat pump designed for cold climate applications. The results of this technology assessment will be used by CLEAResult to develop a new energy efficiency measure for Commonwealth Edison Company's incentive programs. The project utilized the National Renewable Energy Laboratory's (NREL) Thermal Test Facility to experimentally characterize cooling and heating performance of a high efficiency heat pump split system under varying outdoor climate conditions. The selected climate conditions represented summer and low temperature winter conditions in ComEd's service territory. The laboratory experimentation results were used to develop equipment performance curves required by EnergyPlus hourly simulation engine. Using typical meteorological year 3 weather data for the Chicago O'Hare airport, hourly building simulations (using the EnergyPlus engine) was utilized to estimate the annual energy savings of the high efficiency heat pump in comparison to a standard efficiency unit in the following U.S. Department of Energy (DOE) building codes program energy prototypes: Single-family residence; Strip mall; and Low-rise office.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Behavioral and Population Data-Driven Distribution System Load Modeling

Distribution system residential load modeling and analysis for different geographic areas within a utility or an independent system operator territory are critical for enabling small-scale, aggregated distributed energy resources to participate in grid services under Federal Energy Regulatory Commission Order No. 2222 [1]. In this study, we develop a methodology of modeling residential load profiles in different geographic areas with a focus on human behavior impact. First, we construct a behavior-based load profile model leveraging state-of-the-art appliance models. We simulate human activity and occupancy using Markov chain Monte Carlo methods calibrated with the American Time Use Survey data set. Second, we link our model with cleaned Current Population Survey data from the U.S. Census Bureau. Finally, we populate two sets of 500 households using California and Texas census data, respectively, to perform an initial analysis of the load in different geographic areas with various group features (e.g., different income levels). To distinguish the effect of population behavior differences on aggregated load, we simulate load profiles for both sets assuming fixed physical household parameters and weather data. Analysis shows that average daily load profiles vary significantly by income and income dependency varies by locality.

American Time Use Survey↗

Deep Factorization Machine Learning for Disaggregation of Transmission Load Profiles with High Penetration of Behind-The-Meter Solar

The ever-growing integration of distributed energy resources (DERs), especially behind-the-meter (BTM) solar generations, poses imperative operational challenges to system operators such as regional transmission organizations (RTOs). It is important for RTOs to effectively and accurately extract actual load profiles at the transmission level for a single node with significant BTM solar injection. This paper first illustrates the necessity of disaggregating the daily actual load profile of a single node. Furthermore, by segmenting nodes with selected timeseries features, nodes with significant BTM solar generation are identified. Lastly, a bi-level framework is proposed, comprising reference node disaggregation and DeepFM nodal disaggregation, aimed at disaggregating the nodal load profiles from which system operators require more information. By adopting a hybrid Deep Factorization Machine (DeepFM) model, the model achieve accurate results by extracting both linear and nonlinear relations between nodes in the same region and the zonal load and nodal load profile. To overcome the lack of ground truth, this paper segments the load profile into daytime, nighttime, and zero-crossing points and utilizes the latter two for evaluation purposes. The proposed disaggregation procedure is validated using real world, minute-level, normalized, and anonymized nodal data in the PJM service territory.

42 ENGINEERING↗

Impact of Connected Communities

Buildings account for 35% of CO 2 emissions and almost 40% of the United States’ energy use. High-performance homes and neighborhoods play an important role in supporting efforts to decarbonize the US power system by 2035. Significant reductions in CO 2 emissions within the residential sector can be realized through electrification of loads paired with the flexibility created by leveraging smart Internet of Things (IoT) capabilities to shift energy use based on grid signals, thus improving generation/distribution efficiency and maximizing the use of renewable generation capacity. All of this can be achieved while allowing smart home appliances and equipment to meet homeowner needs – including reducing power bills - while optimizing operation in conjunction with the grid using novel control techniques. The Grid-Interactive Efficient Buildings Roadmap by the US Department of Energy’s (DOE’s) Building Technologies Office (BTO) notes that implementing grid-interactive efficient building (GEB) technology has the potential to reduce CO 2 emissions by 80 million tons/year—roughly equivalent to 17 million cars. To achieve this vision, the US Department of Energy’s Oak Ridge National Laboratory (ORNL)—in collaboration with Southern Company Research & Development, Alabama Power, Georgia Power, BTO and the US DOE’s Office of Electricity (OE) —is developing and demonstrating novel connected communities at two locations. Southern Company in turn engaged with industry partners, including design firms, residential developers, and residential HVAC and appliance manufacturers because their participation would be critical to the success of the initial research project, as well as the future scaling to the Southern Company service territory and beyond. Impacts of the Connected Communities projects in Alabama and Georgia are outlined including: energy, grid services and data management learnings; homeowner feedback; vendor engagement; adoption by utilities; technical, policy and business model challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Statistical Steady-State Stability Analysis for Transmission System Planning for Offshore Wind Power Plant Integration

This paper presents a statistical steady-state stability analysis for transmission system planning studies in order to identify operational issues inherent in the integration of offshore wind power plants. It includes normal and contingency operation. This study considers the integration of a 1000-MW offshore wind power plant into the FirstEnergy/PJM service territory in the U.S. Great Lakes region as a case study and uses a realistic computer model of the U.S. Eastern Interconnection, a 63,000-bus test system. The results show the utility of this statistical analysis tool and its effectiveness in identification of the operational impacts as a result of the integration of offshore wind power plant.

Sajadi, Amirhossein↗

ICE Calculator 2: Final Report for Phase 1 and 2 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

ICE 2.0 Phase 2 Final Report In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE Calculator 2 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE Calculator 2 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 and 2 of the ICE Calculator 2 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 2 was sponsored by six utilities: Empire District Electric Company, Evergy Missouri, Pacific Gas & Electric, San Diego Gas & Electric, Southern California Edison, and Union Electric. Phase 1 and 2 involved 15 customer interruption cost survey activities representing a total of 30 electricity distribution service territories. ICE Calculator Version 2.0 and 2.2 Comparison This memorandum describes–at a high-level–the improvements in interruption cost estimates for the version 2.2 of the ICE Calculator (released February 2026) compared to version 2.0 (released in April 2025). Version 2.2 of the ICE Calculator corresponds to Phase 2 of the initiative, while version 2.0 corresponds to Phase 1. The improvements in version 2.2 result from both a significant increase in the number of customer responses that have been collected and the identification of seven additional factors that help estimate customer interruption costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preparing Distribution Utilities for the Future - Unlocking Demand-Side Management Potential: A Novel Analytical Framework

The balance of supply and demand in the power systems has traditionally been served solely through generation and network capacity planning and operations. However, with increased requirements for flexibility due to the uptake in variable renewable generation sources such as wind and solar there is a need to increased demand-side flexibility. In addition, there are increased communications and flexibility capabilities emerging on the demand-side from the adoption of advanced metering infrastructures and smart meter deployment and intelligent loads such as smart thermostats and schedulable white goods (e.g. dishwashers and washing machines). Unlocking demand-side flexibility can bring system benefits from peak load reduction bringing about generation capacity and network upgrade deferral, to reducing demand and more efficient utilization of generation and network capacity. Unlocking demand-side flexibility is an evolving process for utilities and solutions must be tailored to each specific customer group. Demand-side management (DSM) is a broad set of tools that can include demand response (both dispatchable and non-dispatchable), energy efficiency and distributed energy resources and demand-side technologies. The National Renewable Energy Laboratory (NREL), in collaboration with BSES Rajdhani Power Ltd. (BRPL) and Deloitte, examined the potential of DSM in BRPL’s service territory, developing detailed information on customer classes and willingness to participate in DSM. The study developed modeling frameworks for load analysis and the analysis tools to assess the potential of time-of-use tariffs in motivating customers to reduce their peak period energy consumption. The study shows that BRPL customers, specifically their domestic customers, are willing to participate in DSM programs and that time-of-use pricing can help BRPL reduce their peak demand and help unlock demand-side flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Connecting Risk and Resilience for a Power System Using the Portland Hills Fault Case Study

Active seismic faults in the Pacific Northwest area have encouraged electric utilities in the region to deeply contemplate and proactively intervene to support grid resilience. To further this effort this research introduces Monte Carlo (MC)-based power system modeling as a means to inform the Performance Based Earthquake Engineering method and simulates 100,000 sample earthquakes of a 6.8 magnitude (M6.8) Portland Hills Fault (PHF) scenario in the Portland General Electric (PGE) service territory as a proof of concept. This paper also proposes the resilience metric Seismic Load Recovery Factor (SLRF) to quantify the recovery of a downed power system and thus can be used to quantify earthquake economic risk. Using MC results, the SLRF was evaluated to be 19.7 h and the expected economic consequence cost of a M6.8 PHF event was found to be $\$180$ million with an annualized risk of $\$90,000$ given the event’s 1 in 2000 year probability of occurrence. The MC results also identified the eight most consequential substations in the PGE system—i.e., those that contributed to maximum load loss. This paper concludes that retrofitting these substations reduced the expected consequence cost of a M6.8 PHF event to $117 million.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Estimates of the Economic Impacts of Long-Duration, Widespread Power Disruptions in Puerto Rico

A typical electricity customer in Puerto Rico experienced nearly 27 hours of power interruptions in 2023–with many customers experiencing extremely long duration outages during a single event (i.e., greater than one month). This project involved conducting state-of-the-art surveying to assess the direct costs of power outages occurring across Puerto Rico, developing customer-specific models to estimate future costs over varying outage durations, and comparing these estimates to FEMA’s Value of Unit Service for Electricity. We estimate that a territory-wide power outage may cost customers $\$1$, $\$5$ and $\$29$ billion during one-, 14-, and 30-day interruptions, respectively. However, these are lower-bound estimates because our study focused on direct economic costs and, by necessity, did not fully incorporate (1) indirect impacts to the economy; (2) costs to repair or replace damaged utility infrastructure; and (3) the broader societal consequences including increased morbidity- and mortality-related costs. The information contained in this study can be used to estimate the direct economic value of past or proposed investments in power system resilience. We conclude with a discussion of this study’s limitations and suggest additional research to improve stakeholder understanding of the impacts of power outages across Puerto Rico.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗