Identification of Noise Covariances for Voltage Dynamics Estimation in Microgrids.
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
This paper proposes predictive cooperative voltage control method in a power system with high penetration of photovoltaic (PV) units. Cooperative distributed control of the reactive power output of PV inverters is coordinated with operation of voltage regulators (VRs) to maintain system voltages within an appropriate bandwidth. Probabilistic forecasting of the solar power generation and the loads is applied to estimate voltage changes which, in turn, are used to set the VR tap positions for preventing large voltage fluctuations with the lowest risk considering the voltage distribution estimation. The fine tuning of voltage adjustment is achieved by cooperative control of PV inverters to maintain a uniform voltage profile across the system. The proposed method is tested on the modified IEEE 123-node test feeder with high PV penetration using real insolation data and with constant loads replaced by several different load profiles. Simulation results demonstrate the effectiveness of the coordinated approach for voltage control with cooperative PV and predictive VR controls taking into account probabilistic load and solar power forecasts.
Due to the insufficient measurements in the distribution system state estimation (DSSE), full observability and redundant measurements are difficult to achieve without using the pseudo measurements. The matrix completion state estimation (MCSE) combines the matrix completion and power system model to estimate voltage by exploring the low-rank characteristics of the matrix. This paper proposes a robust matrix completion state estimation (RMCSE) to estimate the voltage in a distribution system under a low-observability condition. Tradition state estimation weighted least squares (WLS) method requires full observability to calculate the states and needs redundant measurements to proceed a bad data detection. The proposed method improves the robustness of the MCSE to bad data by minimizing the rank of the matrix and measurements residual with different weights. It can estimate the system state in a low-observability system and has robust estimates without the bad data detection process in the face of multiple bad data. The method is numerically evaluated on the IEEE 33-node radial distribution system. The estimation performance and robustness of RMCSE are compared with the WLS with the largest normalized residual bad data identification (WLS-LNR), and the MCSE.
Due to the insufficient measurements in the distribution system state estimation (DSSE), full observability and redundant measurements are difficult to achieve without using the pseudo measurements. The matrix completion state estimation (MCSE) combines the matrix completion and power system model to estimate voltage by exploring the low-rank characteristics of the matrix. This paper proposes a robust matrix completion state estimation (RMCSE) to estimate the voltage in a distribution system under a low-observability condition. Tradition state estimation weighted least squares (WLS) method requires full observability to calculate the states and needs redundant measurements to proceed a bad data detection. The proposed method improves the robustness of the MCSE to bad data by minimizing the rank of the matrix and measurements residual with different weights. It can estimate the system state in a low-observability system and has robust estimates without the bad data detection process in the face of multiple bad data. The method is numerically evaluated on the IEEE 33-node radial distribution system. The estimation performance and robustness of RMCSE are compared with the WLS with the largest normalized residual bad data identification (WLS-LNR), and the MCSE.
This is the docker image for Pacific Northwest National Laboratory's DSSE (distribution system state estimator) used for the demo of OEDI-SI platform. To support the operation of modern distribution systems, operators require real-time visibility into system states. Due to a lack of measurements and unbalanced operation, the state estimation in distribution systems is challenging. This submission is related to an OEDI-SI use case which demonstrates the application of an extended Kalman filter-based state estimator on an IEEE-123 bus system. The state estimator uses the measurements to generate voltage estimates for the system.
This paper considers the problem of recovering missing entries in a partially observed matrix from relatively few measurements (i.e., the so-called matrix completion problem) with the aim of increasing the presently limited observability of low-voltage distribution grids. To this end, the partially observed matrix is formed using scarce voltage magnitude measurements while accounting for their spatial information. Voltage readings are assumed to be collected from distribution utility sensors and/or geographically-distributed cable television network sensors located in immediate proximity to distribution grid nodes. A matrix completion approach built on the parameter-less singular value shrinkage technique is used to estimate voltage magnitudes at otherwise non-observable low-voltage nodes using a small number of single- or multiple-snapshot data. The effectiveness of the proposed approach is demonstrated using a U.S.-style distribution test system from the synthetic SMART- DS data set under very low- to moderate-observability conditions.
Due to the lack of sufficient online measurements for distribution system observability, pseudo-measurements from short-term load or distributed renewable energy resources (DERs) forecasting are used. However, the accuracy of them is low and thus significantly limits the performance of distribution system state estimation (DSSE). In this paper, a robust DSSE that integrates multi-source measurement data is proposed. Specifically, the historical low-voltage (LV) side smart meters are used to forecast load and DERs injections via the support vector machine (SVM) with optimally tuned parameters. By contrast, the online smart meters at LV side are utilized to derive equivalent power injections at the MV/LV transformers, yielding more accurate pseudo-measurements compared to the forecasted injections. Furthermore, to deal with bad data caused by communication loss, instrumental errors and cyber attacks, robust DSSE that relies on generalized maximum-likelihood (GM)-estimation criterion is developed. The projection statistics are developed to adjust the weights of each measurement, leading to better balance between pseudo- and real-time measurements. Numerical results conducted on modified IEEE 33-bus system with DG integration demonstrate the effectiveness and robustness of the proposed method.
The primary subject of this Report is the description and characterization of results (voltages, currents, radiation dose and dose-rates) from the HERMES accelerator operated in the Outdoor Mode. The shots described range from 10266 – 10313, and were taken in late 2016. In the course of determining the most accurate estimates of voltage and current, a prescriptive procedure is developed to process the raw data posted to the HERMES database. The current estimates are tied to voltage determination using the MITL theory of Mendel, as modified by Schumer and Ottinger. The converter currents are accurately recorded due to newly calibrated monitors at the converter location. Additional historical information about the development of the HERMES current monitor set is included to enhance the archival value of this Report. The evolution of the TLD faceplate profile from non-peaked center to center-peaked is discussed, with hypotheses as to the cause. The prescriptive procedure discussed herein is accurate as of the day of printing. Should the prescription be modified and updated, this Report would also need updating.
The Electron-Ion Collider (EIC) will employ crab cavities to maximize luminosity. A time-domain simulation is developed to study the interaction between the particle beam and the crab cavities in the EIC, including the Low-Level RF (LLRF) feedback loops. The simulation is validated through power and induced voltage estimates. We then use the simulation tool to study the beam loading effects on the crabbing voltage and thus on the beam transverse position and tilt. We also study the crabbing voltage regulation and transmitter power transients as a function of the LLRF design.
Realizing complete observability in the three-phase distribution system remains a challenge that hinders the implementation of classic state estimation algorithms. In this paper, a new method, called the pruned physics-aware neural network (P2N2), is developed to improve the voltage estimation accuracy in the distribution system. The method relies on the physical grid topology, which is used to design the connections between different hidden layers of a neural network model. To verify the proposed method, a numerical simulation based on one- year smart meter data of load consumptions for three-phase power flow is developed to generate the measurement and voltage state data. The IEEE 123-node system is selected as the test network to benchmark the proposed algorithm against the classic weighted least squares (WLS). Numerical results show that P2N2 outperforms WLS in terms of data redundancy and estimation accuracy.
Realizing complete observability in the three-phase distribution system remains a challenge that hinders the implementation of classical state estimation algorithms. In this paper, a new method so-called pruned physics-aware neural network (P2N2) is developed to improve the voltage estimation accuracy in the distribution system. The method relies on the physical grid topology, which is used to design the connections between different hidden layers of a neural network model. To verify the proposed method, a numerical simulation based on one-year smart meter data of load consumptions for threephase power flow is developed to generate the measurement and voltage state data. The IEEE 123 node system is selected as the test network to benchmark the proposed algorithm against the classical weighted least squares (WLS). Numerical results show that P2N2 outperforms WLS, in terms of data redundancy and estimation accuracy.
This work presents an efficient data-driven method to construct probabilistic voltage envelopes (PVE) using power flow learning in grids with network contingencies. First, a network-aware Gaussian process (GP) termed Vertex-Degree Kernel (VDK-GP), developed in prior work, is used to estimate voltage–power functions for a few network configurations. The paper introduces a novel multi-task vertex degree kernel (MT-VDK) that amalgamates the learned VDK-GPs to determine power flows for unseen networks, with a significant reduction in the computational complexity and hyperparameter requirements compared to alternate approaches. Simulations on the IEEE 30-Bus network demonstrate the retention and transfer of power flow knowledge in both N-1 and N-2 contingency scenarios. The MT-VDK-GP approach achieves over 50 % reduction in mean prediction error for novel N-1 contingency network configurations in low training data regimes (50–250 samples) over VDK-GP. Additionally, MT-VDK-GP outperforms a hyper-parameter based transfer learning approach in over 75 % of N-2 contingency network structures, even without historical N-2 outage data. Furthermore, the proposed method demonstrates the ability to achieve PVEs using sixteen times fewer power flow solutions compared to Monte-Carlo sampling-based methods.
Accelerator's beam quality is highly affected by the anode voltage's stability. The accelerator examined in this study is an ion implantation accelerator which anode voltage is regulated by an electromechanical system shown in Fig 1. The system works by stepping down the input grid voltage to generate a high anode voltage of up to 2.5 kV through a motor generator. It was desired that the system be able to correct for disturbances and instabilities in the input voltage swiftly while minimizing overshoots and steady state errors. Moreover, it should maintain such capability satisfactorily despite of degradations. It was predicted that this adaptive capability would be limited to a certain extent where if degradations become too severe, system's performance would deteriorate considerably such that maintenance actions or component replacements are required. The mechanism to control anode voltage, estimate and extend the system's Remaining Useful Life (RUL) in an integrated manner is explored in this paper. (authors)
The introduction of phasor measuring units (PMUs) in power systems significantly improves the possibilities for monitoring and analyzing power system dynamics. Synchronized measurements make it possible to directly measure phase angles between corresponding phasors in different locations within the power system. Improved monitoring and remedial action capabilities allow network operators to utilize the existing power system in a more efficient way. Improved information allows fast and reliable emergency actions, which reduces the need for relatively high transmission margins required by potential power system disturbances. In this chapter, the applications of PMU in modern power systems are presented. Specifically, the topics touched in this chapter include state estimation, voltage and transient stability, oscillation monitoring, event and fault detection, situation awareness, and model validation. A case study using Characteristic Ellipsoid method based on PMU to monitor power system dynamic is presented.
This paper examines the problem of state estimation in power distribution systems under low-observability conditions. The recently proposed constrained matrix completion method which combines the standard matrix completion method and power flow constraints has been shown to be effective in estimating voltage phasors under low-observability conditions using single-snapshot information. However, the method requires solving a semidefinite programming (SDP) problem, which becomes computationally infeasible for large systems and if multiple-snapshot (time-series) information is used. This paper proposes an efficient algorithm to solve the constrained matrix completion problem with time-series data. This algorithm is based on reformulating the matrix completion problem as a bilinear (non-convex) optimization problem, and applying the alternating minimization algorithm to solve this problem. This paper proves the summable convergence of the proposed algorithm, and demonstrates its efficacy and scalability via IEEE 123-bus system and a real utility feeder system. This paper also explores the value of adding more data from the history in terms of computation time and estimation accuracy.
This paper examines the problem of state estimation in power distribution systems under low-observability conditions. The recently proposed constrained matrix completion method which combines the standard matrix completion method and power flow constraints has been shown to be effective in estimating voltage phasors under low-observability conditions using single-snapshot information. However, the method requires solving a semidefinite programming (SDP) problem, which becomes computationally infeasible for large systems and if multiple-snapshot (time-series) information is used. This paper proposes an efficient algorithm to solve the constrained matrix completion problem with time-series data. This algorithm is based on reformulating the matrix completion problem as a bilinear (non-convex) optimization problem, and applying the alternating minimization algorithm to solve this problem. This paper proves the summable convergence of the proposed algorithm, and demonstrates its efficacy and scalability via IEEE 123-bus system and a real utility feeder system. This paper also explores the value of adding more data from the history in terms of computation time and estimation accuracy.
Zinc ferrite (ZnFe 2 O 4 ) is a perspective lithium ion battery material, owing to its large theoretical capacity (1000 mAh/g). Here, we report a density functional study of the discharge process at early stage from ZnFe 2 O 4 up to LixZnFe2O4 (x = 2), aiming to provide fundamental understanding of the mechanism. According to our calculations, with x increasing up to 1 the intercalation of Li+ ions prefer octahedral 16c sites, which is accompanied by Zn 2+ ion displacement from tetrahedral 8a sites to 16c sites starting at x = 0.25 and the gain in stability; while the stability decreases for 1 < x ≤ 2 due to the occupation of Li+ ions at the less active tetrahedral 8a/48f/8b sites. The open-circuit voltages estimated based on the structures of stable intermediates identified by the DFT calculations are in good agreement with the experimental values. Our results highlight the importance of the interplay among Li, O 2- , Fe 3+ and Zn 2+ in enabling the high performance as LIB materials.