Search NASA⌕ Search

SEARCH · Search NASA

Results for “waste characterization and management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

NASA Exploration Toilet On-orbit Results and Impact on Future Missions

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continued to be made with each on-orbit operation that culminated in additional crew use of the UWMS on ISS. Additional problems were evaluated during troubleshooting and testing with the UWMS hardware using water and pretreat to simulate crew use. This paper summarizes the additional testing, troubleshooting and the results as well as characterizes the additional data obtained and summarizes the interpretation of the data to characterize the hardware’s operational nuances. Use of the hardware by crew is planned and will also be summarized. The paper will also describe the additional portions of the technology demonstration that were completed and the benefits that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

toilet↗

NASA Exploration Toilet on-Orbit Results and Impact on Future Missions

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continued to be made with each on-orbit operation that culminated in additional crew use of the UWMS on ISS. Additional problems were evaluated during troubleshooting and testing with the UWMS hardware using water and pretreat to simulate crew use. This paper summarizes the additional testing, troubleshooting and the results as well as characterizes the additional data obtained and summarizes the interpretation of the data to characterize the hardware’s operational nuances. Use of the hardware by crew is planned and will also be summarized. The paper will also describe the additional portions of the technology demonstration that were completed and the benefits that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

toilet↗

NASA Exploration Toilet on-Orbit Results and Impact on Future Missions

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continued to be made with each on-orbit operation that culminated in additional crew use of the UWMS on ISS. Additional problems were evaluated during troubleshooting and testing with the UWMS hardware using water and pretreat to simulate crew use. This paper summarizes the additional testing, troubleshooting and the results as well as characterizes the additional data obtained and summarizes the interpretation of the data to characterize the hardware’s operational nuances. Use of the hardware by crew is planned and will also be summarized. The paper will also describe the additional portions of the technology demonstration that were completed and the benefits that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

toilet↗

NASA Exploration Toilet on-Orbit Results and Impact on Future Missions

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continued to be made with each on-orbit operation that culminated in additional crew use of the UWMS on ISS. Additional problems were evaluated during troubleshooting and testing with the UWMS hardware using water and pretreat to simulate crew use. This paper summarizes the additional testing, troubleshooting and the results as well as characterizes the additional data obtained and summarizes the interpretation of the data to characterize the hardware’s operational nuances. Use of the hardware by crew is planned and will also be summarized. The paper will also describe the additional portions of the technology demonstration that were completed and the benefits that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

toilet↗

Transient Thermal Analyses of Passive Systems on SCEPTOR X-57

As efficiency, emissions, and noise become increasingly prominent considerations in aircraft design, turning to an electric propulsion system is a desirable solution. Achieving the intended benefits of distributed electric propulsion (DEP) requires thermally demanding high power systems, presenting a different set of challenges compared to traditional aircraft propulsion. The embedded nature of these heat sources often preclude the use of traditional thermal management systems in order to maximize performance, with less opportunity to exhaust waste heat to the surrounding environment. This paper summarizes the thermal analyses of X-57 vehicle subsystems that don't employ externally air-cooled heat sinks. The high-power battery, wires, high-lift motors, and aircraft outer surface are subjected to heat loads with stringent thermal constraints. The temperature of these components are tracked transiently, since they never reach a steady-state equilibrium. Through analysis and testing, this report demonstrates that properly characterizing the material properties is key to accurately modeling peak temperature of these systems, with less concern for spatial thermal gradients. Experimentally validated results show the thermal profile of these systems can be sufficiently estimated using reduced order approximations.

Thermal Analyses↗

Phase II and III Solid Waste Management Unit Assessment and Confirmatory Sampling Report for Per- and Polyfluorinated Alkyl Substances, Potential Release Location 237, Kennedy Space Center, Florida

Per- and polyfluoroalkyl substances (PFAS) Phase II and III Solid Waste Management Unit (SWMU) Assessment (SA) and Confirmatory Sampling (CS) were conducted at the John F. Kennedy Space Center (KSC), Potential Release Location (PRL) 237, located in Merritt Island, Brevard County, Florida for the National Aeronautics and Space Administration (NASA) under Contract 80KSC019D0010/80KSC019F0289. A Phase I SA and CS Report was previously submitted that identified 33 locations of concern (LOCs) at KSC associated with the storage, use, or release of materials containing PFAS. The objectives of the Phase II and III SA and CS were to: - Complete site and source characterization of identified LOCs; - Identify areas of potential concern (AOPCs) where past or present activities may have resulted in a release of PFAS to the environment; - Qualitatively characterize migration potential of released PFAS to environmental media (primarily soil, groundwater, surface water, and sediment); and - Identify potential receptors for exposure to PFAS-impacted environmental media. Surface water samples were collected from LOCs/AOPCs and locations on the KSC periphery during PFAS CS Phases I, II and III. Including duplicate samples, 143 environmental samples were analyzed for 14 PFAS compounds and 104 environmental samples were analyzed for 18 PFAS compounds. Ten of the analytes on the 14 compound list were detected at least once in surface water at KSC, with a wide range in magnitude of detections. The State of Florida has surface water screening levels (SWSLs) for perfluorooctanoic acid (PFOA) and perfluorooctanesulfonic acid (PFOS) in surface water, both for human and ecological receptors. The human health screening levels are lower than the ecological ones and are used in this report. PFOA was not detected in surface water at concentrations exceeding the SWSL at any LOC or Area of Potential Concern (AOPC). PFOS was detected in surface water at concentrations exceeding the SWSL at 28 LOCs/AOPCs, plus 42 locations on the KSC periphery. The data suggest a wide distribution of PFAS, particularly PFOS, in surface water but the sources of surface water contamination are not yet adequately understood. Sediment samples were collected during Phases II and III but not Phase I. Including duplicate samples, 104 environmental samples were analyzed for 14 PFAS compounds and 10 environmental samples were analyzed for 18 PFAS compounds. Twelve compounds were detected in sediment at KSC, with a wide range in magnitude of detections. There are currently no screening levels or cleanup target levels (CTLs) for sediment. The need to delineate and further characterize PFAS in sediment will be evaluated for those sites that move forward into Site Assessment. Groundwater samples were collected via DPT from LOCs/AOPCs and locations on the KSC periphery during PFAS CS Phases I, II and III. Including duplicate samples, 812 environmental DPT groundwater samples were analyzed for 14 PFAS compounds and 247 environmental samples were analyzed for 18 PFAS compounds. Twelve of the 14 compounds were detected in groundwater at KSC, with a wide range in magnitude of detections. The State of Florida has provisional groundwater cleanup target levels (GCTLs) for PFOA, PFOS and the additive concentration of PFOA+PFOS. PFOA was detected in groundwater at concentrations exceeding its provisional GCTL at 16 LOCs/AOPCs, with no exceedances on the KSC periphery. PFOS was detected in groundwater at concentrations exceeding its provisional GCTL at 30 LOCs/AOPCs, plus two locations on the KSC periphery. PFOA+PFOS was detected in groundwater at concentrations exceeding the provisional GCTL at 31 LOCs/AOPCs, plus two locations on the KSC periphery. Soil samples were collected during Phases II and III but not Phase I. Including duplicate samples, 292 environmental samples were analyzed for 14 PFAS compounds and 80 environmental samples were analyzed for 18 PFAS compounds. Fourteen compounds were detected in soil at KSC, with a wide range in magnitude of detections. The State of Florida has provisional soil cleanup target levels (SCTLs) for PFOA and PFOS. There were no PFOA results above its provisional SCTL. There was one LOC with a result above the provisional SCTL for residential settings. Recommendations are presented for each LOC and AOPC.

PFAS↗

The Trash Compaction Processing Systems (TCPS) Ground Unit Control Sample Testing

The Trash Compaction Processing System (TCPS) is being developed by NASA and Sierra Space to process crew trash for long-duration missions. The system compacts and thermally processes mixed spacecraft waste to reduce volume and stabilize the material while managing gas and liquid effluents. A Ground Unit (GU) located at Sierra Space in Madison, Wisconsin was used to run a series of tests using standardized control samples representing different trash conditions, including nominal, high liquid, high cloth, benign, and foam. Gas grab samples were collected during processing and analyzed to identify the compounds present in the effluent stream and compare the concentrations to the NASA spacecraft maximum allowable concentrations (SMACs). Additional testing included odor testing at White Sands Test Facility, aerosol measurements, microbiology, and tile characterization. Overall, the compounds detected in the gas samples were well below the SMAC limits for all trash models tested. The results from this testing are being used to help guide the verification approach and test planning for the TCPS Flight Unit that is planned for on-orbit testing on the International Space Station.

Control Samples↗

Solar Thermal Upper Stage Cryogen System Engineering Checkout Test

The Solar Thermal Upper Stage technology (STUSTD) program is a solar thermal propulsion technology program cooperatively sponsored by a Boeing led team and by NASA MSFC. A key element of its technology program is development of a liquid hydrogen (LH2) storage and supply system which employs multi-layer insulation, liquid acquisition devices, active and passive thermodynamic vent systems, and variable 40W tank heaters to reliably provide near constant pressure H2 to a solar thermal engine in the low-gravity of space operation. The LH2 storage and supply system is designed to operate as a passive, pressure fed supply system at a constant pressure of about 45 psia. During operation of the solar thermal engine over a small portion of the orbit the LH2 storage and supply system propulsively vents through the enjoy at a controlled flowrate. During the long coast portion of the orbit, the LH2 tank is locked up (unvented). Thus, all of the vented H2 flow is used in the engine for thrust and none is wastefully vented overboard. The key to managing the tank pressure and therefore the H2 flow to the engine is to manage and balance the energy flow into the LH2 tank with the MLI and tank heaters with the energy flow out of the LH2 tank through the vented H2 flow. A moderate scale (71 cu ft) LH2 storage and supply system was installed and insulated at the NASA MSFC Test Area 300. The operation of the system is described in this paper. The test program for the LH2 system consisted of two parts: 1) a series of engineering tests to characterize the performance of the various components in the system: and 2) a 30-day simulation of a complete LEO and GEO transfer mission. This paper describes the results of the engineering tests, and correlates these results with analytical models used to design future advanced Solar Orbit Transfer Vehicles.

Olsen, A. D↗

A Simplified Model of VIPER Thermal Management System. Part II: Integrated Vehicle

NASA’s Volatiles Investigating Polar Exploration Rover (VIPER) thermal management system (TMS) relies on four loop heat pipes (LHPs) to transport electronic waste heat to the vehicle cooling radiative surface and avoid overheating. The TMS has also ten constant conductance heat pipes (CCHPs) dedicated to balance the thermal load within the internal environment where the avionics boxes are mounted, also called warm electronic box (WEB), and to transport the heat from two of the science payload instruments. The TMS also uses two thermal straps to thermally link the batteries to the WEB. These thermal components, in addition to heaters, thermostat, multi-layer insulation (MLIs), and isolators forms the core of the VIPER TMS. The complex heat transport balance managed by the TMS is challenging to characterize and model. The more fidelity and granularity of a model, the more costly the computational resources needed and the longer the simulation and modeling time. When the priority is to provide quick but reliable assessments of the thermal performance or real time thermal feedback for training of console operators, simplified modeling tools are needed. To satisfy that need, this paper describes the effort to develop and correlate a model of VIPER TMS based on control volume approach. The correlation effort in particular focuses on hibernation, cold thermal balance, and hot thermal balance data from the integrated vehicle thermal vacuum (TVAC) test. Thus, the correlated model captures the heat leaks during hibernations and the performance at two extremes, bounding, operating scenarios.

Loop Heat Pipe↗

A Simplified Model of VIPER Thermal Management System. Part II: Integrated Vehicle

NASA’s Volatiles Investigating Polar Exploration Rover (VIPER) thermal management system (TMS) relies on four loop heat pipes (LHPs) to transport electronic waste heat to the vehicle cooling radiative surface and avoid overheating. The TMS has also ten constant conductance heat pipes (CCHPs) dedicated to balance the thermal load within the internal environment where the avionics boxes are mounted, also called warm electronic box (WEB), and to transport the heat from two of the science payload instruments. The TMS also uses two thermal straps to thermally link the batteries to the WEB. These thermal components, in addition to heaters, thermostat, multi-layer insulation (MLIs), and isolators forms the core of the VIPER TMS. The complex heat transport balance managed by the TMS is challenging to characterize and model. The more fidelity and granularity of a model, the more costly the computational resources needed and the longer the simulation and modeling time. When the priority is to provide quick but reliable assessments of the thermal performance or real time thermal feedback for training of console operators, simplified modeling tools are needed. To satisfy that need, this paper describes the effort to develop and correlate a model of VIPER TMS based on control volume approach. The correlation effort in particular focuses on hibernation, cold thermal balance, and hot thermal balance data from the integrated vehicle thermal vacuum (TVAC) test. Thus, the correlated model captures the heat leaks during hibernations and the performance at two extremes, bounding, operating scenarios.

Thermal Modeling↗

Application of ERTS-1-data to the protection and management of New Jersey's coastal environment

The author has identified the following significant results. New Jersey's planned, regionalized network of sewage disposal facilities has been plotted on an ERTS-1 mosaic and circulation parameters for each of the planned outfall locations have been analyzed using the ERTS-1 imagery and comparative aircraft photography. Work is continuing on the circulation and dispersion of barge-dumped wastes in the New York Bight area. One of the largest remote sensing experiments ever attempted in this country was completed on April 7, 1973 during the ERTS-1 overpass. The test area included the northern portion of New Jersey and the Raritan Bay - New York Harbor area. Three NASA aircraft, two helicopters, nine surface vessels, 40 ground team personnel, and numerous oceanographic, radiometric, and meteorological equipment were deployed in an effort to characterize the surface and near-surface circulation dynamics in this 600 square mile area, during an entire tidal cycle. The analyses of these data in concert with all previous ERTS-1 overpasses will provide information that can lead to a better and more rational use of the nearshore marine environment. The data will be utilized to plan future outfall locations, regulating offshore disposal of wastes, etc.

Yunghans, R. S.↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Recycle of Inorganic Nutrients for Hydroponic Crop Production Following Incineration of Inedible Biomass

Recovery of resources from waste streams is essential for future implementation and reliance on a regenerative life support system. The major waste streams of concern are from human activities and plant wastes. Carbon, water and inorganics are the primary desired raw materials of interest. The goal of resource recovery is maintenance of product quality to insure support of reliable and predictable levels of life support function performance by the crop plant component. Further, these systems must be maintained over extended periods of time, requiring maintenance of nutrient solutions to avoid toxicity and deficiencies. Today, reagent grade nutrients are used to make nutrient solutions for hydroponic culture and these solutions are frequently changed during the life cycle or sometimes managed for only one crop life cycle. The focus of this study was to determine the suitability of the ash product following incineration of inedible biomass as a source of inorganic nutrients for hydroponic crop production. Inedible wheat biomass was incinerated and ash quality characterized. The incinerator ash was dissolved in adequate nitric acid to establish a consistent nitrogen concentration in all nutrient solution treatments. Four experimental nutrient treatments were included: control, ash only, ash supplemented to match control, and ash only quality formulated with reagent grade chemicals. When nutrient solutions are formulated using only ash following-incineration of inedible biomass, a balance in solution is established representing elemental retention following incineration and nutrient proportions present in the original biomass. The resulting solution is not identical to the control. This imbalance resulted in suppression of crop growth. When the ash is supplemented with nutrients to establish the same balance as in the control, growth is identical to the control. The ash appears to carry no phytotoxic materials. Growth in solution formulated with reagent grade chemicals but matching the quality of the ash only treatment resulted in growth similar to that of the ash only treatment. The ash product resulting from incineration of inedible biomass appears to be a suitable form for recycle of inorganic nutrients to crop production.

Bubenheim, David L.↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Characterization of Volume F Trash from Four Recent STS Missions: Weights, Categorization, Water Content

The fate of space-generated solid wastes, including trash, for future missions is under consideration by NASA. Several potential treatment options are under consideration and active technology development. Potential fates for space-generated solid wastes are: Storage without treatment; storage after treatment(s) including volume reduction, water recovery, sterilization, and recovery plus recycling of waste materials. Recycling might be important for partial or full closure scenarios because of the prohibitive costs associated with resupply of consumable materials. For this study, we determined the composition of trash returned from four recent STS missions. The trash material was 'Volume F' trash and other trash, in large zip-lock bags, that accompanied the Volume F trash. This is the first of two submitted papers on these wastes. This one will cover trash content, weight and water content. The other will report on the microbial Characterization of this trash. STS trash was usually made available within 2 days of landing at KSC. The Volume F bag was weighed, opened and the contents were catalogued and placed into one of the following categories: food waste (and containers), drink containers, personal hygiene items - including EVA maximum absorbent garments (MAGs)and Elbow packs (daily toilet wipes, etc), paper, and packaging materials - plastic firm and duct tape. Trash generation rates for the four STS missions: Total wet trash was 0.602 plus or minus 0.089 kg(sub wet) crew(sup -1) d(sup -1) containing about 25% water at 0.154 plus or minus 0.030 kg(sub water) crew(sup -1) d(sup -1) (avg plus or minus stdev). Cataloguing by category: personal hygiene wastes accounted for 50% of the total trash and 69% of the total water for the four missions; drink items were 16% of total weight and 16% water; food wastes were 22% of total weight and 15% of the water; office waste and plastic film were 2% and 11% of the total waste and did not contain any water. The results can be used by NASA to determine requirements and criteria for Waste Management Systems on future missions.

Strayer, Richard F.↗

Per- and Polyfluoroalkyl Substances Confirmatory Sampling Report, South Repeater Building (SWMU 121), Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Confirmatory Sampling (CS) Report was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document CS activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121, formerly known as the Area 3 Repeater Building (A3RB). A Phase I SWMU Assessment and Confirmatory Sampling Report (NASA 2019) and a Phase II and III SWMU Assessment and Confirmatory Sampling Report (NASA 2022b) were previously submitted detailing Center-Wide assessment activities performed at the John F. Kennedy Space Center (KSC) in Florida that identified 33 locations of concern and 19 areas of potential concern at KSC associated with the storage, use, or release of materials containing PFAS. A review of the analytical results from investigation derived waste samples collected in 2020 from the South Repeater Building area indicated concentrations of perfluorooctanesulfonic acid (PFOS) were above Florida Department of Environmental Protection (FDEP) provisional Groundwater Cleanup Target Levels of 70 nanograms per liter (ng/L) at a concentration of 1,750 ng/L. Following this review, the KSC Fire Chief was contacted; the Chief recalled fighting a brush fire in 1998 in the area, during which an unknown volume of aqueous film-forming foam was used to extinguish the fire. The Phase II and Phase III SWMU Assessment Report recommended this area proceed to CS. Historical results in this area are provided in Appendix A . PFAS CS activities were contracted at the South Repeater Building. Initial CS activities were conducted in accordance with the PFAS Assessment and Mitigation Work Plan (AECOM 2022), which was submitted to the NASA Remediation Project Management team and accepted by the team on November 1 and 8, 2021. The objectives of the PFAS CS were to: - - Confirm and begin to assess the extent of PFAS affected media in the South Repeater Building area. - - Identify locations for groundwater, soil, surface water, and soil core sampling. - - Qualitatively characterize the migration potential of released PFAS to environmental media (soil, groundwater, and surface water). The following activities were completed to meet the PFAS CS objectives: - - Installation of monitoring wells via direct push technology (DPT) and rotosonic techniques - - Groundwater, soil, and surface water sampling - - Collection of soil cores to evaluate site lithology - - Development of initial PFAS plume characterization

PFAS↗

Design Status of the Capillary Brine Residual in Containment Water Recovery System

One of the goals of the AES Life Support System (LSS) Project is to achieve 98% water loop closure for long duration human exploration missions beyond low Earth orbit. To meet this objective, the AES LSS Project is developing technologies to recover water from wastewater brine; highly concentrated waste products generated from a primary water recovery system. The state of the art system used aboard the International Space Station (ISS) has the potential to recover up to 85% water from unine wastewater, leaving a significant amounts of water in the waste brine, the recovery of which is critical technology gap that must be filled in order to enable long duration human exploration. Recovering water from the urine wastewater brine is complicated by the concentration of solids as water is removed from the brine, and the concentration of the corrosive, toxic chemicals used to stabilize the urine which fouls and degrades water processing hardware, and poses a hazard to operators and crew. Brine Residual in Containment (BRIC) is focused on solids management through a process of "in-place" drying - the drying of brines within the container used for final disposal. Application of in-place drying has the potential to improve the safety and reliability of the system by reducing the exposure to curew and hardware to the problematic brine residual. Through a collaboration between the NASA Johnson Space Center and Portland Status University, a novel water recovery system was developed that utilizes containment geometry to support passive capillary flow and static phase separation allowing free surface evaporation to take place in a microgravity environment. A notional design for an ISS demonstration system was developed. This paper describes the testing performed to characterize the performance of the system as well as the status of the system level design.

Sargusingh, Miriam J.↗