Unmanned Aircraft Systems (UAS) Traffic Management Project (UTM) Small UAS Communications and Navigation
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
• Develop and validate airspace operations and integration requirements to enable safe, large-scale UAS operations. • Provide prototype (software) UTM system for further FAA testing and development.
Explore the source record for details and available documents.
This document provides an overview of the UASP-kit and its purpose. The sections contain instructions on how to use each of the UASP-kit’s features. A simplified version of the setup instructions can be found on the two quick-start guides included in your UASP-kit.
Two phase-optimized multisine peak factor minimization algorithms are presented and evaluated. The first algorithm minimizes peak factor by iteratively clipping the peaks of generated multisine signals. The second algorithm optimizes peak factor indirectly through minimization of an approximation of the infinity norm of the multisine. Algorithm performance was evaluated as a function of different signal properties, including the number of harmonics, harmonic spacing, and number of snow harmonics (extra harmonics included for further reduction of the peak factor). The two algorithms are compared against results obtained by minimizing peak factor directly using a simplex algorithm, which has been a common approach when designing phase-optimized multisines for system identification flight tests. Sample results show that the clipping and infinity norm algorithms produced multisine signals with comparable peak factors that were lower than that of the simplex algorithm. However, the clipping algorithm runs an order of magnitude faster than the other two algorithms, which also makes it practical to repeat the algorithm multiple times to achieve even lower peak factors.
Two phase-optimized multisine peak factor minimization algorithms are presented and evaluated. The first algorithm minimizes peak factor by iteratively clipping the peaks of generated multisine signals. The second algorithm optimizes peak factor indirectly through minimization of an approximation of the infinity norm of the multisine. Algorithm performance was evaluated as a function of different signal properties, including the number of harmonics, harmonic spacing, and number of snow harmonics (extra harmonics included for further reduction of the peak factor). The two algorithms are compared against results obtained by minimizing peak factor directly using a simplex algorithm, which has been a common approach when designing phase-optimized multisines for system identification flight tests. Sample results show that the clipping and infinity norm algorithms produced multisine signals with comparable peak factors that were lower than that of the simplex algorithm. However, the clipping algorithm runs an order of magnitude faster than the other two algorithms, which also makes it practical to repeat the algorithm multiple times to achieve even lower peak factors.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
The CSTF at SRS contain 51 waste tanks with 8 closed waste tanks between FTF and HTF. SRMC is the LW contractor. The LW mission includes removing legacy nuclear waste from these tanks and treating it for final disposition. Once the bulk of the waste has been removed from a tank, it will undergo inspection and sampling to characterize the remaining waste in the tank prior to it being operationally closed. There are multiple points in the tank closure process where an inspection is performed, and there are multiple parts of a tank that get inspected. Waste tanks have a primary containment vessel (referred to as the “Primary”) and a secondary containment vessel (referred to as the “Annulus”) that surrounds the primary. Both of these sections of a tank receive multiple inspections throughout the closure process.
This paper is a collaboration between SNL and the Israel Atomic Energy Commission (IAEC) - sponsored by NA211, Office of International Nuclear Security. The paper was accepted for publication by the International Atomic Energy Agency's (IAEA) International Conference on Nuclear Security (ICONS 2024).
An aircraft control system is described which is particularly suited to rotary wing aircraft. Longitudinal acceleration and course rate commands are derived from a manual control stick to control translational velocity of the aircraft along a flight path. In the collective channel the manual controls provide vertical velocity commands. In the yaw channel the manual controls provide sideslip or heading rate commands at high or low airspeeds, respectively. The control system permits pilots to fly along prescribed flight paths in a precise manner with relatively low work load.