FY12 Quarter 3 Computing Utilization Report – LANL

DSW continues to dominate the capacity workload, with a focus in Q3 on common model baselining runs in preparation for the Annual Assessment Review (AAR) of the weapon systems. There remains unmet demand for higher fidelity simulations, and for increased throughput of simulations. Common model baselining activities would benefit from doubling the resolution of the models and running twice as many simulations. Capacity systems were also utilized during the quarter to prepare for upcoming Level 2 milestones. Other notable DSW activities include validation of new physics models and safety studies. The safety team used the capacity resources extensively for projects involving 3D computer simulations for the Furrow series of experiments at DARHT (a Level 2 milestone), fragment impact, surety theme, PANTEX assessments, and the 120-day study. With the more than tripling of classified capacity computing resources with the addition of the Luna system and the safety team's imminent access to the Cielo system, demand has been met for current needs. The safety team has performed successful scaling studies on Luna up to 16K PE size-jobs with linear scaling, running the large 3D simulations required for the analysis of Furrow. They will be investigating scaling studies on the Cielo system with the Lustre file system in Q4. Overall average capacity utilization was impacted by negative effects of the LANL Voluntary Separation Program (VSP) at the beginning of Q3, in which programmatic staffing was reduced by 6%, with further losses due to management backfills and attrition, resulting in about 10% fewer users. All classified systems were impacted in April by a planned 2 day red network outage. ASC capacity workload continues to focus on code development, regression testing, and verification and validation (V&V) studies. Significant capacity cycles were used in preparation for a JOWOG in May and several upcoming L2 milestones due in Q4. A network transition has been underway on the unclassified networks to increase access of all ASC users to the unclassified systems through the Yellow Turquoise Integration (YeTI) project. This will help to alleviate the longstanding shortage of resources for ASC unclassified code development and regression testing, and also make a broader palette of machines available to unclassified ASC users, including PSAAP Alliance users. The Moonlight system will be the first capacity resource to be made available through the YETI project, and will make available a significant increase in cycles, as well as GPGPU accelerator technology. The Turing and Lobo machines will be decommissioned in the next quarter. ASC projects running on Cielo as part of the CCC-3 include turbulence, hydrodynamics, burn, asteroids, polycrystals, capability and runtime performance improvements, and materials including carbon and silicone.

43 PARTICLE ACCELERATORS↗

SU-G-201-11: Exploring the Upper Limits of Dose Sculpting Capacity of the Novel Direction Modulated Brachytherapy (DMBT) Tandem Applicator

Purpose: To explore and quantify the upper limits in dose sculpting capacity of the novel direction modulated brachytherapy (DMBT) tandem applicator compared with conventional tandem design for {sup 192}Ir-based HDR planning. Methods: The proposed DMBT tandem applicator is designed for image-guided adaptive brachytherapy (IGABT), especially MRI, of cervical cancer. It has 6 peripheral holes of 1.3-mm width, grooved along a 5.4-mm diameter nonmagnetic tungsten alloy rod of density 18.0 g/cc, capable of generating directional dose profiles – leading to enhanced dose sculpting capacity through inverse planning. The external dimensions are identical to that of conventional tandem design to ensure clinical compatibility. To explore the expansive dose sculpting capacity, we constructed a hypothetical circular target with 20-mm radius and positioned the DMBT and conventional tandems at the center. We then incrementally shifted the positions laterally away from the center of up to 15 mm, at 1-mm steps. The in-house coded gradient projection-based inverse planning system was then used to generate inverse optimized plans ensuring identical V100=100% coverage. Conformity index (CI) was calculated for all plans. Results: Overall, the DMBT tandem generates more conformal dose distributions than conventional tandem for all lateral positional shifts of 0-15 mm (CI=0.91–0.52 and 0.99–0.34, respectively), with an exception at the central position due to the ideal circular dose distribution, generated by the {sup 192}Ir, fitting tightly around the circular target (CI = 0.91 and 0.99, respectively). The DMBT tandem is able to generate dose conformity of CI>0.8 at up to 6-mm positional shift while the conventional tandem violates this past 2-mm shift. Also, the CI ratio (=DMBT/conv.) increases rapidly until about 8 mm and then stabilizes beyond. Conclusion: A substantial enhancement in the dose sculpting capacity has been demonstrated for the novel DMBT tandem applicator. While further studies are warranted, the concept is promising for potential clinical translation.

60 APPLIED LIFE SCIENCES↗

CERF – A Geospatial Model for Assessing Future Energy Production Technology Expansion Feasibility

Electricity system expansion planning faces significant challenges not only because of commonly modeled uncertainties such as future demand growth, fuel prices, and technology cost and performance, but also because of challenges such as climate change and carbon policies that can affect supply and demand. Changes in energy technology, natural resource availability, and population migration and growth will affect the feasibility of power plant siting, potentially hindering the achievement of policy goals. New modeling approaches are needed that couple future projections of energy system expansion with “on the ground” feasibility modeling—where both are informed by a consistent set of assumptions about future climate trends, resource availability, climate policy, socioeconomics, and environmental regulations. This research describes the development and evaluation of the Capacity Expansion Regional Feasibility (CERF) model, a geospatial tool for scenario analysis of electricity system expansions.

grid expansion, water-energy nexus, power plant si↗

Potential Impacts of Transportation and Building Electrification on the Grid: A Review of Electrification Projections and their Effects on Grid Infrastructure, Operation, and Planning

This paper highlights the main impacts of transportation and building electrification on electricity grid infrastructure, operations, and planning. We focus on which electric technologies are expected to grow, how electrification will impact electricity demand and grid activities, and which solutions might improve the integration of these technologies. Recent industry reports show increasing projections of electrification technologies in the coming decades. Studies show that increased demand from electrification will likely require grid capacity expansion and make grid operations and planning more challenging; however, multiple non-wires solutions exist to ensure integration is efficient and cost-effective. Electrification of space heating and especially transportation is expected to have the largest impact on electricity demand in the near future. Uncontrolled electric vehicle charging poses a significant challenge to grid operations, but control strategies create an opportunity for improved efficiency. Other insights include a high level of uncertainty in electrification adoption and potential benefits of combining electrification technologies with renewable generation and energy storage.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Recent advances and challenges in optimization models for expansion planning of power systems and reliability optimization

Optimization models for expansion planning of power systems aim to determine capacities, investment timing, and location of power systems to satisfy the power demands while minimizing the total cost. The models have become complex in recent years to reflect both regulations on conventional energy sources and the increasing penetration of renewable energy sources (RES). This paper reviews the basic concepts and optimization models for expansion planning of power systems. We first explain the definition and features of generation expansion planning (GEP), transmission expansion planning (TEP), and generation and transmission expansion planning (GTEP). To address the computational challenges of large-scale expansion planning problems, we review several simplifications including temporal and spatial aggregation, and decomposition methods. This paper also addresses power system reliability defined as the probability of satisfying the load demand while withstanding failures of components. Finally, the goal of this paper is to provide a research overview, discuss trends in expansion planning of power systems, and suggest directions for future research.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Scheduling and Airport Taxiway Path Planning Under Uncertainty

Congestion and uncertainty on the airport surface are major constraints to the available capacity of the air transport system. This project is to study the problem of planning and scheduling airport surface movement at large airports. Specifically, we focus on the departure time scheduling and taxiway path planning of multiple aircraft under uncertainty. We also developed a simulation tool that is capable of simulating aircraft movement along the taxiway and possible uncertainty during the movement.

Li, Jiaoyang↗

The Regional Energy Deployment System (ReEDS) Model

This presentation is from the ReEDS webinar given on October 31, 2019. This presentation provides an overview of the Regional Energy Deployment System (ReEDS) model.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Delivery drone route planning over a battery swapping network

Many enterprises invest on drone delivery research and development to drop off packages at consumers’ doorsteps in a matter of minutes. We study delivery drone route planning over a battery swapping network allowing farther reach by penetrating current battery capacity constraints. A mixed-integer nonlinear programming model is created to plan efficient drone routing over the swapping machines by minimizing the delivery lead time. We develop an exact solution method, evaluate its performance, and compare it with a straightforward nonlinear solver application. A case study highlights the applicability of the model. Data and source code to the solver are publicly shared.

drone battery swapping↗

Duke Energy Carbon-Free Resource Integration Study

Duke Energy has partnered with the National Renewable Energy Laboratory (NREL) to evaluate pathways to achieving their carbon-free targets and to assess the operational impacts of the resulting system. This report details findings from Phase II of the Duke Low Carbon Resource Integration study, which consisted of three separate but interrelated analyses: (1) a resource assessment exploring the technical and economic potential and characteristics of wind and solar resources in the Carolinas; (2) capacity expansion modeling identifying the least-cost investment pathways for achieving 70% CO 2 emissions reductions in North Carolina by 2030 and a net-zero electricity system by 2050; and (3) detailed production cost modeling of power system operations at the higher shares of low- and zero-carbon emitting generation sources, informed by the capacity expansion modeling portion of the analysis. The analysis finds that Duke Energy can approach the 2030 and 2050 emissions target in North Carolina through investment in a combination of solar, wind, and storage along with maintaining its existing nuclear fleet. The average cost of CO 2 abatement in the Carolinas through 2021-2050 is on the order of $\$27-33$ per metric ton (range of $\$9-34$ per metric ton across key sensitivities).Duke Energy can expected increased interchange with neighbors to help balance higher levels of solar, although the ability to do this will depend on whether neighboring regions also move to integrate more carbon-free resources. As Duke Energy moves toward both the 2030 and 2050 targets, addressing energy needs during the winter peak period becomes particularly important, and the system relies on the availability of resources such as renewable or hydrogen combustion turbines, seasonal storage, or other similar technologies that are dispatchable but able to operate at low capacity factors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Why Are We Talking About Capacity Markets?

Revenue sufficiency or 'missing money' concerns in wholesale electricity markets are important because they could lead to resource (or capacity) adequacy shortfalls. Capacity markets or other capacity-based payments are among the proposed solutions to remedy these challenges. This presentation provides a high-level overview of the importance of and process for ensuring resource adequacy, and then discusses considerations for capacity markets under futures with high penetrations of variable resources such as wind and solar.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Variable Renewable Energy in Long-Term Planning Models: A Multi-Model Perspective

Long-term capacity expansion models of the U.S. electricity sector have long been used to inform electric sector stakeholders and decision makers. With the recent surge in variable renewable energy (VRE) generators - primarily wind and solar photovoltaics - the need to appropriately represent VRE generators in these long-term models has increased. VRE generators are especially difficult to represent for a variety of reasons, including their variability, uncertainty, and spatial diversity. To assess current best practices, share methods and data, and identify future research needs for VRE representation in capacity expansion models, four capacity expansion modeling teams from the Electric Power Research Institute, the U.S. Energy Information Administration, the U.S. Environmental Protection Agency, and the National Renewable Energy Laboratory conducted two workshops of VRE modeling for national-scale capacity expansion models. The workshops covered a wide range of VRE topics, including transmission and VRE resource data, VRE capacity value, dispatch and operational modeling, distributed generation, and temporal and spatial resolution. The objectives of the workshops were both to better understand these topics and to improve the representation of VRE across the suite of models. Given these goals, each team incorporated model updates and performed additional analyses between the first and second workshops. This report summarizes the analyses and model 'experiments' that were conducted as part of these workshops as well as the various methods for treating VRE among the four modeling teams. The report also reviews the findings and learnings from the two workshops. We emphasize the areas where there is still need for additional research and development on analysis tools to incorporate VRE into long-term planning and decision-making.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Preliminary Findings of the South Africa Power System Capacity Expansion and Operational Modelling Study: Preprint

Wind and solar power contract prices have recently become cheaper than many conventional new-build alternatives in South Africa and trends suggest a continued increase in the share of variable renewable energy (vRE) on South Africa's power system with coal technology seeing the greatest reduction in capacity, see 'Figure 6: Percentage share by Installed Capacity (MW)' in [1]. Hence it is essential to perform a state-of-the-art grid integration study examining the effects of these high penetrations of vRE on South Africa's power system. Under the 21st Century Power Partnership (21CPP), funded by the U.S. Department of Energy, the National Renewable Energy Laboratory (NREL) has significantly augmented existing models of the South African power system to investigate future vRE scenarios. NREL, in collaboration with Eskom's Planning Department, further developed, tested and ran a combined capacity expansion and operational model of the South African power system including spatially disaggregated detail and geographical representation of system resources. New software to visualize and interpret modelling outputs has been developed, and scenario analysis of stepwise vRE build targets reveals new insight into associated planning and operational impacts and costs. The model, built using PLEXOS, is split into two components, firstly a capacity expansion model and secondly a unit commitment and economic dispatch model. The capacity expansion model optimizes new generation decisions to achieve the lowest cost, with a full understanding of capital cost and an approximated understanding of operational costs. The operational model has a greater set of detailed operational constraints and is run at daily resolutions. Both are run from 2017 through 2050. This investigation suggests that running both models in tandem may be the most effective means to plan the least cost South African power system as build plans seen to be more expensive than optimal by the capacity expansion model can produce greater operational cost savings seen only in the operational model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Memory Technologies and Data Recorder Design

Missions, both near Earth and deep space, are under consideration that will require data recorder capacities of such magnitude as to be unthinkable just a few years ago. Concepts requiring well over 16,000 GB of storage are being studied. To achieve this capacity via "normal means" was considered incredible as recently as 2004. This paper is presented in two parts. Part I describes the analysis of data recorder capacities for missions as far back as 35 years and provides a projection of data capacities required 20 years from now based upon missions either nearing launch, or in the planning stage. The paper presents a similar projection of memory device capacities as baselined in the ITRS - the International Technology Roadmap for Semiconductors. Using known Total Ionizing Dose tolerance going back as far as a decade, a projection of total dose tolerance is made for two prime technologies out to the year 2028.

Strauss, Karl F↗

Electricity Capacity Expansion Modeling, Analysis, and Visualization: A Summary of High-Renewable Modeling Experiences (Chinese Translation)

This is the Chinese translation of NREL/TP-6A20-64831. Mathematical and computational models are widely used for the analysis and design of both physical and financial systems. Modeling the electric grid is of particular importance to China for three reasons. First, power-sector assets are expensive and long-lived, and they are critical to any country's development. China's electric load, transmission, and other energy-related infrastructure are expected to continue to grow rapidly; therefore it is crucial to understand and help plan for the future in which those assets will operate. Second, China has dramatically increased its deployment of renewable energy (RE), and is likely to continue further accelerating such deployment over the coming decades. Careful planning and assessment of the various aspects (technical, economic, social, and political) of integrating a large amount of renewables on the grid is required. Third, companies need the tools to develop a strategy for their own involvement in the power market China is now developing, and to enable a possible transition to an efficient and high RE future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hubble Space Telescope On-orbit NiH2 Battery Performance

This paper summarizes the Hubble Space Telescope (HST) nickel-hydrogen (NiH2) battery performance from launch to the present time. Over the life of HST vehicle configuration, charge system degradation and failures together with thermal design limitations have had a significant effect on the capacity of the HST batteries. Changes made to the charge system configuration in order to protect against power system failures and to maintain battery thermal stability resulted in undercharging of the batteries. This undercharging resulted in decreased usable battery capacity as well as battery cell voltage/capacity divergence. This cell divergence was made evident during on-orbit battery capacity measurements by a relatively shallow slope of the discharge curve following the discharge knee. Early efforts to improve the battery performance have been successful. On-orbit capacity measurement data indicates increases in the usable battery capacity of all six batteries as well as improvements in the battery cell voltage/capacity divergence. Additional measures have been implemented to improve battery performance, however, failures within the HST Power Control Unit (PCU) have prevented verification of battery status. As this PCU fault prevents the execution of on-orbit capacity testing, the HST Project has based the battery capacity on trends, which utilizes previous on-orbit battery capacity test data, for science mission and servicing mission planning. The Servicing Mission 38 (SM-3B) in March 2002 replaced the faulty PCU. Following the servicing mission, on-orbit capacity test resumed. A summary of battery performance is reviewed since launch in this paper.

Rao, Gopalakrishna M.↗

Electric Grid Expansion Planning with High Levels of Variable Generation

Renewables are taking a large proportion of generation capacity in U.S. power grids. As their randomness has increasing influence on power system operation, it is necessary to consider their impact on system expansion planning. To this end, this project studies the generation and transmission expansion co-optimization problem of the US Eastern Interconnection (EI) power grid with a high wind power penetration rate. In this project, the generation and transmission expansion problem for the EI system is modeled as a mixed-integer programming (MIP) problem. This study analyzed a time series creation method to capture the diversity of load and wind power across balancing regions in the EI system. The obtained time series can be easily introduced into the MIP co-optimization problem and then solved robustly through available MIP solvers. Simulation results show that the proposed time series generation method and the expansion co-optimization model and can improve the expansion result significantly after considering the diversity of wind and load across EI regions. The improved expansion plan that combines generation and transmission will aid system planners and policy makers to maximize the social welfare. This study shows that modelling load and wind variations and diversities across balancing regions will produce significantly different expansion result compared with former studies. For example, if wind is modeled in more details (by increasing the number of wind output levels) so that more wind blocks are considered in expansion planning, transmission expansion will be larger and the expansion timing will be earlier. Regarding generation expansion, more wind scenarios will slightly reduce wind generation expansion in the EI system and increase the expansion of other generation such as gas. Also, adopting detailed wind scenarios will reveal that it may be uneconomic to expand transmission networks for transmitting a large amount of wind power through a long distance in the EI system. Incorporating more details of renewables in expansion planning will inevitably increase the computational burden. Therefore, high performance computing (HPC) techniques are urgently needed for power system operation and planning optimization. As a scoping study task, this project tested some preliminary parallel computation techniques such as breaking down the simulation task into several sub-tasks based on chronology splitting or sample splitting, and then assigning these sub-tasks to different cores. Testing results show significant time reduction when a simulation task is split into several sub-tasks for parallel execution.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗