Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMERCIAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Development of Low Global Warming Potential Refrigerant Solutions for Commercial Refrigeration Systems using a Life Cycle Climate Performance Design Tool

Commercial refrigeration systems are known to be prone to high leak rates and to consume large amounts of electricity. As such, direct emissions related to refrigerant leakage and indirect emissions resulting from primary energy consumption contribute greatly to their Life Cycle Climate Performance (LCCP). In this paper, an LCCP design tool is used to evaluate the performance of a typical commercial refrigeration system with alternative refrigerants and minor system modifications to provide lower Global Warming Potential (GWP) refrigerant solutions with improved LCCP compared to baseline systems. The LCCP design tool accounts for system performance, ambient temperature, and system load; system performance is evaluated using a validated vapor compression system simulation tool while ambient temperature and system load are devised from a widely used building energy modeling tool (EnergyPlus). The LCCP design tool also accounts for the change in hourly electricity emission rate to yield an accurate prediction of indirect emissions. The analysis shows that conventional commercial refrigeration system life cycle emissions are largely due to direct emissions associated with refrigerant leaks and that system efficiency plays a smaller role in the LCCP. However, as a transition occurs to low GWP refrigerants, the indirect emissions become more relevant. Low GWP refrigerants may not be suitable for drop-in replacements in conventional commercial refrigeration systems; however some mixtures may be introduced as transitional drop-in replacements. These transitional refrigerants have a significantly lower GWP than baseline refrigerants and as such, improved LCCP. The paper concludes with a brief discussion on the tradeoffs between refrigerant GWP, efficiency and capacity.

GWP↗

Improving the Energy Performance of New and Existing Commercial Buildings: A DOE Status Report

It is technically and economically feasible for our nation’s commercial buildings to consume substantially less energy--and produce substantially less carbon dioxide--than they do. Yet owners of existing buildings are not taking full advantage of today’s best energy saving technologies and practices; and developers of new buildings are, most often, constructing to minimum energy codes rather than pushing for greater efficiency. The U.S. Department of Energy (DOE) is addressing these challenges by developing cost-effective technologies and practices that deliver significant improvements in commercial building performance. DOE, through its Commercial Building Initiative, is also collaborating with industry-leading companies and organizations to demonstrate, monitor, and help move these technologies from the laboratory to the marketplace. Ultimately, DOE’s dual strategy of pairing aggressive research and development with market engagement, demonstration, and deployment will dramatically improve the energy performance of new and existing commercial buildings throughout the nation.

Holuj, Brian↗

Energy Management in Small Commercial Buildings: A Look at How HVAC Contractors Can Deliver Energy Efficiency to this Segment

While buildings smaller than 50,000 sq ft account for nearly half of the energy used in US commercial buildings, energy efficiency programs to-date have primarily focused on larger buildings. Interviews with stakeholders and a review of the literature indicate interest in energy efficiency from the small commercial building sector, provided solutions are simple and low-cost. An approach to deliver energy management to small commercial buildings via HVAC contractors and preliminary demonstration findings are presented. The energy management package (EMP) developed includes five technical elements: benchmarking and analysis of monthly energy use; analysis of interval electricity data (if available), a one-hour onsite walkthrough, communication with the building owner, and checking of results. This data-driven approach tracks performance and identifies low-cost opportunities, using guidelines and worksheets for each element to streamline the delivery process and minimize the formal training required. This energy management approach is unique from, but often complementary to conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Because HVAC contractors already serve these clients, the transaction cost to market and deliver energy management services can be reduced to the order of hundreds of dollars per year. This business model, outlined briefly in this report, enables the offering to benefit the contractor and client even at the modest expected energy savings in small buildings. Results from a small-scale pilot of this approach validated that the EMP could be delivered by contractors in 4-8 hours per building per year, and that energy savings of 3-5percent are feasible through this approach.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Regional Climate Zone Modeling of a Commercial Absorption Heat Pump Hot Water Heater Part 1: Southern and South Central Climate Zones

Commercial hot water heating accounts for approximately 0.78 Quads of primary energy use with 0.44 Quads of this amount from natural gas fired heaters. An ammonia-water based commercial absorption system, if fully deployed, could achieve a high level of savings, much higher than would be possible by conversion to the high efficiency nonheat-pump gas fired alternatives. In comparison with air source electric heat pumps, the absorption system is able to maintain higher coefficients of performance in colder climates. The ammonia-water system also has the advantage of zero Ozone Depletion Potential and low Global Warming Potential. A thermodynamic model of a single effect ammonia-water absorption system for commercial space and water heating was developed, and its performance was investigated for a range of ambient and return water temperatures. This allowed for the development of a performance map which was then used in a building energy modeling software. Modeling of two commercial water heating systems was performed; one using an absorption heat pump and another using a condensing gas storage system. The energy and financial savings were investigated for a range of locations and climate zones in the southern and south central United States. A follow up paper will analyze northern and north/central regions. Results showed that the system using an absorption heat pump offers significant savings.

Geoghegan, Patrick J↗

Do energy costs really affect commercial mortgage default risk? New results and implications for energy efficiency investments [PowerPoint]

This paper presents new results on the link between energy factors and commercial mortgage default. First, we summarize results from an empirical analysis of the impact of source energy use intensity (EUI) and electricity prices on mortgage default. We used a unique data set that merges building-level energy use data from city benchmarking ordinances and financial data for commercial mortgages on the same buildings. We found that building source EUI and electricity price are statistically and economically associated with commercial mortgage defaults. Next, we present five case studies on the impact of energy use and price variations on default risk: three office buildings, a hotel, and a multi-family residential building. We use the empirical model coefficients to compute the default risk impacts due to variations in source EUI and electricity price over the course of the mortgage term. We found that variations in source EUI could raise or lower the default rates in these properties by between 5% and 40%, depending on the property type and geography. Electricity pricing has an even greater effect – roughly 60% change in default rate in the Denver area and nearly 90% in northern California. Finally, we propose an energy risk score that lenders can use to assess energy risk and inform mortgage terms. The score is being developed and piloted in collaboration with three mortgage lenders. We conclude with implications of this score as a market signal and mechanism for incentivizing energy efficiency investments through the commercial mortgage channel.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Moisture Transfer in Commercial Buildings Due to Air Leakage: A New Feature in the Online Airtightness Savings Calculator

Air leakage through the building envelopes is responsible for a large amount of energy use. The US Department of Energy Windows and Building Envelope Research and Development Roadmap for Emerging Technologies states that, in 2010, air infiltration was responsible for 20% of primary energy consumption attributable to the fenestration and building envelopes of commercial buildings. Despite this fact, improving airtightness is not always recognized by commercial building owners, as they have been slow in acknowledging and diminishing the detrimental effects of air leakage on energy use, comfort, indoor air quality, and building material durability.The design and construction industry would benefit from a credible, easy-to-use tool that estimates potential energy and financial savings in a standardized manner so designers and contractors can give building owners compelling reasons to invest in reducing air leakage. In 2016–2017, Oak Ridge National Laboratory, the National Institute of Standards and Technology, the Air Barrier Association of America, and the US-China Clean Energy Research Center for Building Energy Efficiency collaborated to develop an online calculator. This user-friendly calculator is free to the public and uses the simulation results of the whole building energy simulation tool EnergyPlus and the airflow simulation tool CONTAM. In 2018–2019, the calculator was expanded to add moisture transfer calculations given that air leakage through the building envelope can have a significant impact on moisture transfer and associated impacts. Four more commercial building types were also added to the existing database of three building types as part of this update. This paper describes the procedure used to calculate moisture transfer due to air leakage and provides examples that demonstrate the moisture transfer for each of the seven commercial building types that are currently part of the calculator.

Shrestha, Som↗

Energy Savings Impacts of Airtightness in U.S. Commercial Buildings

Air leakage in commercial buildings in the U.S. accounts for about one quad of energy annually. As the thermal resistance of commercial building envelopes continues to improve, the relative contribution of air leakage to heating and cooling loads is increasing. Several manufacturers have developed advance air barrier technologies and construction practices to reduce the air leakage in buildings. To help in the market penetration of these advance technologies, advances in easy to use tools for determining the impact of air leakage are needed. Oak Ridge National Laboratory (ORNL), the Air Barrier Association of America, the National Institute of Standards and Technology, and the US-China Clean Energy Research Center for Building Energy Efficiency partnered to develop an online calculator that estimates the potential energy and cost savings in major US, Canadian, and Chinese cities from improvements in airtightness. The calculator estimates the energy and cost savings potential based on the pre and post retrofit air leakage rates for prototype commercial buildings. This report explores extending these savings to determine the national level energy savings potential based on the weightage of commercial building type in different ASHRAE climate zone locations. The base infiltration rate of 1.07 CFM/ft2 was assumed for these calculations and the savings were calculated for three different air infiltration target rates of 0.4 CFM/ft2, 0.25 CFM/ft2, and 0.06 CFM/ft2. The national source energy savings of 238, 283, and 313 TBtu respectively were estimated for these target air infiltration rates.

Bhandari, Mahabir↗

Commercial Energy Code Compliance – Just the Facts, Ma’am

What percent of newly constructed commercial buildings comply with the energy code? How much energy and cost could be saved if the compliance increased? Which code requirements have both low compliance rates and high savings potential? These are the questions U.S. Department of Energy (DOE) is trying to answer through its Commercial Energy Code Field Study. Previous commercial studies have been very limited and did not result in a widely accepted and tested methodology. DOE’s goal is to create a standardized methodology that can produce actionable results at a reasonable study cost, that can be used by state and local governments and utilities and provides valuable information to policy makers. This paper builds on the methodology presented at the 2016 Summer Study and provides a first glimpse of the results as seen in the field. The field study team has implemented the pilot methodology, compiling a data set of over 200 office and retail buildings in climate zones 2A and 5A. The approach is based on identifying lost savings on a total energy cost basis rather than simply counting the quantity of measures that do not meet code. This paper will review the findings of that analysis, discuss critical aspects of the methodology, such as sampling and recruitment strategies, and identify areas where the greatest return—bang for the buck—exists in improving compliance with codes in commercial buildings. In addition, the team will make specific recommendations for jurisdictions looking to use the methodology to maximize energy code savings achieved in the field.

Cheslak, Kimberly↗

An Energy Calculator for Simple Commercial Buildings

According to the EIA, simple commercial buildings account for 97% of total commercial building stock. However, most simple commercial buildings for example small- to mid-sized offices, retail, schools and warehouses do not benefit from the data-driven decision-making capabilities of whole-building energy modeling. The high cost of custom modeling limits the use of energy modeling of simple buildings for new construction or retrofit measures. Lack of tools providing helpful information on interactive savings estimates creates difficulties in meeting aggressive decarbonization and energy efficiency goals for simple building designers and utility program managers. This paper reviews a beta phase Simple Building Calculator with the ability to generate relatively accurate and interactive modeling results based on a limited but robust set of inputs. It can evaluate whole-building or single measure savings in new or existing buildings, compare measure package choices, or provide simplified performance modeling for energy codes and utility incentives. The tool combines physical (annual whole building prototype simulation) and statistical modeling techniques to predict annual energy performance. It supports a variety of building characteristics for envelope, HVAC, and lighting with parameters ranging from vintage to max tech configurations, as well as support for single-zone and simple multi-zone HVAC systems. The Simple Building Calculator was designed to provide immediate feedback for otherwise computationally intensive tasks like measure comparison, development of multiple measure package combinations, or verification that measures meet efficiency targets—all with the goal of providing a tool for quick annual energy simulation of simple commercial buildings.

Hart, Reid↗

Microstructural Characterization of A709 Commercial Heats with Precipitation Treatment

This report discusses work conducted at Idaho National Laboratory in fiscal year 2022 associated with the precipitates in Alloy 709 (A709). The purpose of this work is to support the development of the A709 Code Cases to qualify A709 in Section III, Division 5 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. This would permit the use of A709 for elevated-temperature nuclear construction. This work encompassed two broad goals. The first goal was to understand the microstructure of the second commercial heat of plate A709 purchased through the Advanced Reactors Technologies Program in both the solution-annealed and precipitation-treated conditions. Transmission electron microscopy was utilized to characterize these microstructures. Direct comparisons were then made between the solution-annealed and precipitation-treated conditions as well as between the first and second commercial heats of plate A709. The second goal was to understand the impact of variations in the time and temperature of the precipitation treatment on the properties of A709. The precipitation treatment temperature was varied from 750°C to 800°C for times ranging from 3 hours to 30 hours. The hardness of each precipitation treatment variation was measured. All of the precipitation treatment variations investigated besides a specimen from the second commercial heat of plate A709 precipitation treated at 800? for 9 hours met the room-temperature hardness requirement specified in ASTM A213 and SA-213 for UNS S31025. The hardness measured for the specimen from the second commercial heat of plate A709 that was precipitation treated at 800? for 9 hours is considered an outlier. The next step is to look at the extremes of the precipitation treatment variations investigated and conduct elevated-temperature mechanical testing. The purpose of this testing would be to assess if these time and temperature variations have any impact on the mechanical performance.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Connecting Electric Vehicle Charging Infrastructure to Commercial Buildings

Electric vehicles (EVs) are growing in popularity and gaining meaningful market share with record sales year over year in the last decade. EV charging equipment, also known as EV chargers (EVC) or EV supply equipment (EVSE), must proportionally match the growing number of new EVs on the road for a comparable experience to gas-powered vehicles. The majority of EV charging currently happens at residential buildings. However, demand for EV charging at commercial buildings will significantly increase with wider mainstream EV adoption and as businesses return to more normal operation following COVID-19 pandemic disruptions. Charging equipment can include various sub-systems like power conditioning module, control software, safety devices, metering, communication, cooling, connectors, and its wiring. EV charging at commercial buildings could be used for public, workplace, and commercial fleet charging. This document aims to describe how EVC can be connected to commercial buildings, including considerations for facility managers, and the effects that charging will have on the buildings electrical distribution system. More specifically, this resource provides an overview of: understanding EV charging basics: how charging equipment connects to the building and to EVs; required infrastructure updates needed at the building site to connect EVC to existing distribution systems; network strategies for cost-effective operation; metering and utility considerations for billing and incentives; charging equipment ownership options; future trends in EVC connection to buildings.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Experimental Aging and Lifetime Prediction in Grid Applications for Large-Format Commercial Li-Ion Batteries

Due to the growth of electric vehicle and stationary energy storage markets, the production and use of lithium-ion batteries has grown exponentially in recent years. For many of these applications, large-format lithium-ion batteries are being utilized, as large cells have less inactive material relative to their energy capacity and require fewer electrical connections to assemble into packs. And especially for stationary energy storage systems, where energy delivered is the only revenue source, the economics of these battery systems is highly dependent on cell lifetime. However, testing of large-format lithium-ion batteries is time consuming and requires high current channels and large testing chambers, making information on the performance of commercial, large-format lithium-ion batteries hard to come by. Here, accelerated aging test data from four commercial large-format lithium-ion batteries is reported. These batteries span both NMC-Gr and LFP-Gr cell chemistries, pouch and prismatic formats, and a range of cell designs with varying power capabilities. Accelerated aging test results are analyzed to examine both cell performance, in terms of efficiency and thermal response under load, as well as cell lifetime. Cell thermal response is characterized by measuring temperature during cycle aging, which is used to calculated a normalized thermal resistance value that may help estimate both cell cooling needs or to help extrapolate aging test results to different thermal environments. Cell lifetime is evaluated qualitatively, considering simply the average calendar and cycle life across a range of conditions, as well as quantitatively, using statistical modeling and machine-learning methods to identify predictive aging models from the accelerated aging data. These predictive aging models are then used to investigate cell sensitivities to stressors, such as cycling temperature, voltage window, and C-rate, as well as to predict cell lifetime in various stationary storage applications. Results from this work show that cell lifetime and sensitivity to aging conditions varies substantially across commercial cells, necessitating testing for specific cell formats to make quantitative lifetime predictions. That being said, all commercial cells tested here are predicted to reach at least 10-year lifetimes for stationary storage applications. Based on the aging test results and modeling, some cells are expected to be relatively insensitive to temperature and use-case, making them suited for simple use cases with little or no thermal management and simple controls, while the lifetime of other cells could be extended to 20+ years if operated with thermal management and degradation-aware controls.

battery↗

Spatio-temporal and weather characterization of road loads of electrified heavy-duty commercial vehicles across U.S. interstate roads

Adoption of battery electric vehicles (BEV) in heavy duty (HD) commercial freight transportation is difficult due to technological and economic hurdles. Beyond safety and compliance, fleet and operational logistics necessitate both high uptime and parity with diesel system productivity/Total Cost of Ownership to support widespread deployment of electric powertrains. However, relatively high energy storage costs, along with the higher weight of BEV systems, limit the viability of HD commercial freight transport to shorter-range applications where smaller batteries will serve for mission energy requirements (single operational shift). Knowing the energy consumption and operating variations of these commercial vehicle systems is crucial for effectively sizing the energy storage systems. This paper is the first in a series of studies to understand the regional specific operating design domain variations of commercial Class 8 HD trucks and the associated impact to their energy requirements. In particular, the local weather conditions are shown to influence the total vehicle energy usage. Further, the impact of temperature, pressure, and humidity changes are shown to impact the local air density. This is needed to calculate aerodynamic drag on vehicles and has been found to play a significant role in the overall performance of a vehicle. Although the methodology of calculating air density varies only slightly throughout the literature, the application to transportation has still been limited. This study provides a means by which air density can be estimated for the contiguous U.S. using the NOAA MADIS dataset. These air density estimates were then used to determine vehicle performance in varying regions of the country to highlight the importance of consideration of weather variables when monitoring vehicle performance, but also to provide recommendations based on these locales upon fleet conversion to BEVs.

Moore, Amy↗

Nuclear Safety via Commercial Grade Dedication - Hitting the Right Target - 12163

S.A.Technology has developed and implemented a highly effective Commercial Grade Dedication program that has been used to qualify a variety of equipment to the rigorous requirements of ASTM NQA-1. In specific cases, S.A.Technology personnel have worked closely with clients to develop complex Commercial Grade Dedication plans that satisfy the scrutiny of the US Department of Energy. These projects have been as simple as Passive Mechanical systems, and as complicated as Active Mechanical and Electrical systems. S.A.Technology's Commercial Grade Dedication plans have even been used as presentation materials to a client's internal departments encompassing Engineering, Quality and Procurement. This is the new target of today's CGD: exposing the reasoning behind the dedication process. Previously, only test and inspection results were expected. Today's CGD now needs to show how the decisions presented are the right decisions to make. We must be willing to undergo the process of learning how each new piece of equipment is affected by the system it is placed into, as well as understanding how that equipment can affect the system itself. It is a much more complicated and time-consuming endeavor to undertake. On top of it all, we must be able to voice those discoveries and rationalizations in a clear and concise manner. Unless we effectively communicate our intentions to the reader, we will not be understood. If researched correctly and presented properly, today's Commercial Grade Dedication plans will answer the appropriate questions before they are asked. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Routing Options for Transporting Commercial Spent Nuclear Fuel in the Continental United States - 17504

The U.S. Department of Energy (DOE) has a goal to develop solutions for the long-term, sustainable management of the nation's spent nuclear fuel and high-level radioactive waste. The DOE is planning for an integrated waste management system to transport, store, and dispose of spent nuclear fuel and high-level radioactive waste from commercial electricity generation, as well national defense activities. The DOE Office of Nuclear Energy (DOE-NE), Office of Spent Fuel and Waste Disposition's (SFWD) Integrated Waste Management (IWM) program is applying integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. Integrated waste management system architecture analyses are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all aspects of the back-end of the nuclear fuel cycle (transportation, storage, and disposal). One aspect of a potential future nuclear waste management system is transportation of spent nuclear fuel from the fleet of commercial nuclear reactors to destinations where waste management facilities, such as an interim storage facility, would be located. Example rail transportation routes from commercial nuclear reactor sites to various locations in the continental U.S. - chosen as hypothetical locations for future waste management system facilities - were evaluated in 2014 using DOE's GIS-based Stakeholder Tool for Assessing Radioactive Transportation (START). The objective of that evaluation was to identify and parameterize generic transportation routes for use in integrated waste management system analyses, the associated uncertainty in these selections, and the uncertainty associated with different transportation route selection criteria. The analysis presented herein considers rail transportation routes from commercial nuclear reactor sites to hypothetical destinations within the continental U.S. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sealed Source Security Challenges and Solutions: The Impact of Increased Commercial Disposal Access - 16557

Several recent developments have transformed the sealed source disposal landscape in the United States in ways unimaginable just a few years ago, including the initiation of operations at the first new commercial LLRW facility to open in the United States in decades; publication by the Nuclear Regulatory Commission (NRC) of revised commercial low-level radioactive waste (LLRW) disposal guidance; and the development and certification by the Department of Energy National Nuclear Security Administration (DOE/NNSA) of new transportation package designs for high-activity sources/devices. These developments will likely enable LLRW generators to dispose of risk-significant radioactive sealed sources that for decades have been without a commercial disposal pathway. However, challenges remain with regard to ensuring that these new commercial disposal pathways are effective, and that sealed source licensees take advantage of the new options in a timely manner. These challenges include costs related to both transportation and disposal that are likely much higher than most generators expected when they purchased their sources. DOE/NNSA is actively engaged with Federal, State, regional, private sector partners to address these challenges, including measures to encourage financial planning for end-of-life management of radioactive sealed sources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of the SNF Transportation Infrastructure at Operating Commercial Nuclear Power Plant Sites - 18466

The U.S. Department of Energy (DOE) has a goal to develop solutions for the long-term, sustainable management of the nation's spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The DOE Office of Nuclear Energy's (DOE-NE) Office of Integrated Waste Management (IWM) is applying integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. One aspect of an integrated nuclear waste management system architecture is transportation of spent nuclear fuel from the fleet of commercial nuclear reactors to interim storage and/or disposal facilities. This paper presents a preliminary evaluation of the SNF transportation infrastructure at existing commercial nuclear power plant sites. Reactor site surveys performed by DOE in the 1990's and early 2000's that described the transportation infrastructure at commercial reactor sites at that time served as the starting point for the evaluation. Geographical information systems (GIS) and available open-source information about the reactor sites were used to identify changes in the transportation infrastructure at operating commercial nuclear power plant sites. The data and schematics contained within the previous surveys were comparatively analyzed alongside the GIS tools Google Earth, Google Maps, and DOE's Stakeholder Tool for Assessing Radioactive Transportation (START) to determine potential transportation modes and to identify improvements to the transportation infrastructure that may be needed at each of the sites. The preliminary results obtained and the insight gained from this effort support both integrated waste management system architecture analyses and future planning efforts. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗