Search NASA⌕ Search

SEARCH · Search NASA

Results for “Collaborative”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Gearbox Reliability Collaborative High-Speed Shaft Calibration

Instrumentation has been added to the high-speed shaft, pinion, and tapered roller bearing pair of the Gearbox Reliability Collaborative gearbox to measure loads and temperatures. The new shaft bending moment and torque instrumentation was calibrated and the purpose of this document is to describe this calibration process and results, such that the raw shaft bending and torque signals can be converted to the proper engineering units and coordinate system reference for comparison to design loads and simulation model predictions.

17 WIND ENERGY↗

Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test Report

Many gearboxes in wind turbines have not been achieving their expected design life [1]; they do, however, commonly meet or exceed the design criteria specified in current standards in the gear, bearing, and wind turbine industry as well as third-party certification criteria. The cost of gearbox replacements and rebuilds, as well as the downtime associated with these failures, has elevated the cost of wind energy. In 2006, the U.S. Department of Energy established the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC). Its key goal is to understand the root causes of premature gearbox failures and improve their reliability [2]. The GRC is examining a hypothesis that the gap between design-estimated and actual wind turbine gearbox reliability is caused by underestimation of loads, inaccurate design tools, the absence of critical elements in the design process, or insufficient testing. This test report describes the recent tests of GRC gearbox (GB) 2 in the National Wind Technology Center (NWTC) dynamometer and documents any modifications to the original test plan [3]. In this manner, it serves as a guide for interpreting the publicly released data sets with brief analyses to illustrate the data. Specific objectives of the test were to assess the effect of dynamic nontorque load (NTL) on the planetary section, generator misalignment on the highspeed shaft (HSS), and field representative conditions on the gearbox in general. Detailed analysis of those test objectives will be presented in subsequent publications.

17 WIND ENERGY↗

Gearbox Reliability Collaborative Investigation of High-Speed-Shaft Bearing Loads

The loads and contact stresses in the bearings of the high speed shaft section of the Gearbox Reliability Collaborative gearbox are examined in this paper. The loads were measured though strain gauges installed on the bearing outer races during dynamometer testing of the gearbox. Loads and stresses were also predicted with a simple analytical model and higher-fidelity commercial models. The experimental data compared favorably to each model, and bearing stresses were below thresholds for contact fatigue and axial cracking.

17 WIND ENERGY↗

Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test Plan

This document describes the Phase 3 test plan for the Gearbox Reliability Collaborative Gearbox #3. The primary test objective is to measure the planetary load sharing characteristics in the same conditions as the original gearbox design. If the measured load-sharing characteristics are close to the design model, the projected three-times improvement in planetary section predicted fatigue life and the efficacy of preloaded tapered roller bearings in mitigating the planetary bearing fatigue failure mode will have been demonstrated.

17 WIND ENERGY↗

Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test Report

Many gearboxes in wind turbines do not achieve their expected design life; they do, however, commonly meet or exceed the design criteria specified in current standards in the gear, bearing, and wind turbine industry as well as third-party certification criteria. The cost of gearbox replacements and rebuilds, as well as the downtime associated with these failures, increases the cost of wind energy. In 2007, the U.S. Department of Energy established the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC). Its goals are to understand the root causes of premature gearbox failures and to improve their reliability. The GRC is examining a hypothesis that the gap between design-estimated and actual wind turbine gearbox reliability is caused by underestimation of loads, inaccurate design tools, the absence of critical elements in the design process, or insufficient testing. This report describes the recently completed tests of GRC Gearbox 3 in the National Wind Technology Center dynamometer and documents any modifications to the original test plan. In this manner, it serves as a guide for interpreting the publicly released data sets with brief analyses to illustrate the data. The primary test objective was to measure the planetary load-sharing characteristics in the same conditions as the original GRC gearbox design. If the measured load-sharing characteristics are close to the design model, the projected improvement in planetary section fatigue life and the efficacy of preloaded TRBs in mitigating the planetary bearing fatigue failure mode will have been demonstrated. Detailed analysis of that test objective will be presented in subsequent publications.

17 WIND ENERGY↗

Gearbox Reliability Collaborative Gearbox 3 Planet Bearing Calibration

The Gearbox Reliability Collaborative gearbox was redesigned to improve its load-sharing characteristics and predicted fatigue life. The most important aspect of the redesign was to replace the cylindrical roller bearings with preloaded tapered roller bearings in the planetary section. Similar to previous work, the strain gages installed on the planet tapered roller bearings were calibrated in a load frame. This report describes the calibration tests and provides the factors necessary to convert the measured units from dynamometer testing to bearing loads, suitable for comparison to engineering models.

17 WIND ENERGY↗

State-Tribal Collaboration on Energy 101 [Slides]

For states interested in working with Tribal Nations on energy projects, it is important to understand Tribal sovereignty and what this means for a collaborative relationship. This presentation will explain how Tribal sovereignty was established, what that means for energy sovereignty, and how states can use this understanding to better engage with Tribal Nations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NRIC FY 2025 Collaboration Initiatives Annual Report

The National Reactor Innovation Center (NRIC) is a national program established by the U.S. Department of Energy (DOE) in 2019 and led by Idaho National Laboratory (INL). Its mission is to work with industry and national laboratories to bridge the gap between concept, demonstration, and commercialization of advanced nuclear technology. NRIC works to inspire stakeholders and the public, empower innovators, and deliver successful outcomes through efficient collaboration and coordination with partners. NRIC is partnered with industry to accelerate the demonstration and deployment of advanced nuclear technology using DOE’s national laboratory infrastructure and expertise. NRIC’s vision is to establish four new experimental facilitates and two large reactor test beds for integrated technology demonstrators and experimentation by 2028 and complete two advanced nuclear technology tests by 2030.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

CCAT-prime Collaboration: Science Goals and Forecasts with Prime-Cam on the Fred Young Submillimeter Telescope

Abstract We present a detailed overview of the science goals and predictions for the Prime-Cam direct-detection camera–spectrometer being constructed by the CCAT-prime collaboration for dedicated use on the Fred Young Submillimeter Telescope (FYST). The FYST is a wide-field, 6 m aperture submillimeter telescope being built (first light in late 2023) by an international consortium of institutions led by Cornell University and sited at more than 5600 m on Cerro Chajnantor in northern Chile. Prime-Cam is one of two instruments planned for FYST and will provide unprecedented spectroscopic and broadband measurement capabilities to address important astrophysical questions ranging from Big Bang cosmology through reionization and the formation of the first galaxies to star formation within our own Milky Way. Prime-Cam on the FYST will have a mapping speed that is over 10 times greater than existing and near-term facilities for high-redshift science and broadband polarimetric imaging at frequencies above 300 GHz. We describe details of the science program enabled by this system and our preliminary survey strategies.

79 ASTRONOMY AND ASTROPHYSICS↗

Gearbox Reliability Collaborative Update (Presentation)

This presentation was given at the Sandia Reliability Workshop in August 2013 and provides information on current statistics, a status update, next steps, and other reliability research and development activities related to the Gearbox Reliability Collaborative.

17 WIND ENERGY↗

High-Speed Shaft Bearing Loads Testing and Modeling in the NREL Gearbox Reliability Collaborative: Preprint

Bearing failures in the high speed output stage of the gearbox are plaguing the wind turbine industry. Accordingly, the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) has performed an experimental and theoretical investigation of loads within these bearings. The purpose of this paper is to describe the instrumentation, calibrations, data post-processing and initial results from this testing and modeling effort. Measured HSS torque, bending, and bearing loads are related to model predictions. Of additional interest is examining if the shaft measurements can be simply related to bearing load measurements, eliminating the need for invasive modifications of the bearing races for such instrumentation.

17 WIND ENERGY↗