Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distribution System Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Study of optimum propellant production facilities for launch of space shuttle vehicles

An integrated propellant manufacturing plant and distribution system located at Kennedy Space Center is studied. The initial planned propellant and pressurant production amounted to 160 tons/day (TPD) LH2, 10 TPD GH2, 800 TPD LO2, 400 TPD LN2, and 120 TPD GN2. This was based on a shuttle launch frequency of 104 per year. During the study, developments occurred which may lower cryogen requirements. A variety of plant and processing equipment sizes and costs are considered for redundancy and supply level considerations. Steam reforming is compared to partial oxidation as a means of generating hydrogen. Electric motors, steam turbines, and gas turbines are evaluated for driving compression equipment. Various sites on and off Government property are considered to determine tradeoffs between costs and problems directly associated with the site, product delivery and storage costs, raw material costs, and energy costs. Coproduction of other products such as deuterium, methanol, and ammonia are considered. Legal questions are discussed concerning a private company's liabilities and its rights to market commercial products under Government tax and cost shelters.

Laclair, L. M.↗

Siting solar thermal power experiments

The Small Community Solar Thermal Power Experiment will test a point-focusing, distributed receiver system in a small community, electric utility application. Site planning is becoming increasingly important for solar experiments as well as all kinds of development due to increased competition for desirable sites and increased complexity of regulatory requirements. Siting issues can be categorized as: (1) resources and physical environmental at this site; (2) acquisition, permits and regulations; and (3) development requirements and costs. These issues are addressed with respect to the unique requirements of solar thermal power experiments.

Holbeck, H. J.↗

A logical model of cooperating rule-based systems in space mission ground support facilities

This paper describes an abstract reference model of cooperating rule-based systems (CRBSs). The model is intended to assist in the planning, specification, development, and verification of space information systems involving multiple, distributed, communicating rule-based systems. The functions performed in ground control systems are described, and five types of rule-based systems that could be used in such centers are identified. The interactions between rule-based systems are examined, and the unique requirements of such systems are addressed. A four-layer logical model is discussed which provides a framework for discussing solutions to unique CRBS requirements. The elements and operations at each layer are described.

Bailin, Sidney C.↗

The Airborne Visible/Infrared Imaging Spectrometer (AVIRIS)

AVIRIS is a facility consisting of a flight system, a ground data system, a calibration facility, and a full-time operations team. The facility was developed by JPL under funding from NASA. NASA also provides funding for operations and maintenance. The flight system is a whisk-broom imager that acquires data in 224 narrow, contiguous spectral bands covering the solar reflected portion of the electromagnetic spectrum. It is flown aboard the NASA high altitude ER-2 research aircraft. The ground data system is a facility dedicated to the processing and distribution of data acquired by AVIRIS. It operates year round at JPL. The calibration facility consists of a calibration laboratory at JPL and a suite of field instruments and procedures for performing inflight calibration of AVIRIS. A small team of engineers, technicians, and scientists supports a yearly operations schedule that includes 6 months of flight operations, 6 months of routine ground maintenance of the flight system, and year-round data processing and distribution. Details of the AVIRIS system, its performance history, and future plans are described.

Vane, Gregg↗

SU-F-SPS-05: Experimental Validation of Peripheral Dose Distribution of Electron Beams for Eclipse Electron Monte Carlo Algorithm

Purpose: In this study, the two available calculation algorithms of the Varian Eclipse treatment planning system(TPS), the electron Monte Carlo(eMC) and General Gaussian Pencil Beam(GGPB) algorithms were used to compare measured and calculated peripheral dose distribution of electron beams. Methods: Peripheral dose measurements were carried out for 6, 9, 12, 15, 18 and 22 MeV electron beams of Varian Triology machine using parallel plate ionization chamber and EBT3 films in the slab phantom. Measurements were performed for 6×6, 10×10 and 25×25cm{sup 2} cone sizes at dmax of each energy up to 20cm beyond the field edges. Using the same film batch, the net OD to dose calibration curve was obtained for each energy. Films were scanned 48 hours after irradiation using an Epson 1000XL flatbed scanner. Dose distribution measured using parallel plate ionization chamber and EBT3 film and calculated by eMC and GGPB algorithms were compared. The measured and calculated data were then compared to find which algorithm calculates peripheral dose distribution more accurately. Results: The agreement between measurement and eMC was better than GGPB. The TPS underestimated the out of field doses. The difference between measured and calculated doses increase with the cone size. The largest deviation between calculated and parallel plate ionization chamber measured dose is less than 4.93% for eMC, but it can increase up to 7.51% for GGPB. For film measurement, the minimum gamma analysis passing rates between measured and calculated dose distributions were 98.2% and 92.7% for eMC and GGPB respectively for all field sizes and energies. Conclusion: Our results show that the Monte Carlo algorithm for electron planning in Eclipse is more accurate than previous algorithms for peripheral dose distributions. It must be emphasized that the use of GGPB for planning large field treatments with 6 MeV could lead to inaccuracies of clinical significance.

60 APPLIED LIFE SCIENCES↗

A Technology Maturation Plan for the Development of Nuclear Electric Propulsion

Over the last two years NASA’s Space Nuclear Propulsion (SNP) Project formulated a Technology Maturation Plan (TMP) for development of the sub-systems needed for a MW-class Nuclear Electric Propulsion (NEP) system which, combined with a high thrust chemical propulsion stage, would be suitable for human missions to Mars. Two recent assessments, independently conducted by the National Academies for Science, Engineering, and Medicine and the NASA Engineering & Safety Center, concluded that the technologies required for a high-power NEP system are immature and the attendant risks insufficiently quantified to justify initiating a flight project. For NEP to be available as a viable option to meet flight opportunities in the late 2030s / 2040s time frame, development of the key sub-systems must begin now. SNP has subdivided the NEP system into five Critical Technology Elements (CTE): the nuclear reactor, power conversion, power management and distribution, electric propulsion sub-system, and the primary heat rejection system. Development plans for each of these CTEs have been drafted which will serve as the template for a focused milestone-driven research and development campaign intended to advance each CTE to Technology Readiness Level (TRL) 5. This will be accomplished by building and testing hardware at relevant power levels (~ 1 MW) and for relevant durations (2,500 hours, ~10% of the required operational lifetime) and conducting numerical modeling of the CTEs anchored by the accumulated test data to predict system performance and reliability. Concurrent with this work, high-level coupled system/mission modeling will be carried out to refine the key performance parameters that the various CTEs must achieve. Non-advocate reviews will be held at milestone points to assess progress and inform down-select decisions. The strategy for formulating the TMP was described previously; this paper describes ongoing progress on the drafting and baselining of the plan, including key specific details.

Space Nuclear Propulsion↗

A Technology Maturation Plan for the Development of Nuclear Electric Propulsion

Over the last two years NASA’s Space Nuclear Propulsion (SNP) Project formulated a Technology Maturation Plan (TMP) for development of the sub-systems needed for a MW-class Nuclear Electric Propulsion (NEP) system which, combined with a high thrust chemical propulsion stage, would be suitable for human missions to Mars. Two recent assessments, independently conducted by the National Academies for Science, Engineering, and Medicine and the NASA Engineering & Safety Center, concluded that the technologies required for a high-power NEP system are immature and the attendant risks insufficiently quantified to justify initiating a flight project. For NEP to be available as a viable option to meet flight opportunities in the late 2030s / 2040s time frame, development of the key sub-systems must begin now. SNP has subdivided the NEP system into five Critical Technology Elements (CTE): the nuclear reactor, power conversion, power management and distribution, electric propulsion sub-system, and the primary heat rejection system. Development plans for each of these CTEs have been drafted which will serve as the template for a focused milestone-driven research and development campaign intended to advance each CTE to Technology Readiness Level (TRL) 5. This will be accomplished by building and testing hardware at relevant power levels (~ 1 MW) and for relevant durations (2,500 hours, ~10% of the required operational lifetime) and conducting numerical modeling of the CTEs anchored by the accumulated test data to predict system performance and reliability. Concurrent with this work, high-level coupled system/mission modeling will be carried out to refine the key performance parameters that the various CTEs must achieve. Non-advocate reviews will be held at milestone points to assess progress and inform down-select decisions. The strategy for formulating the TMP was described previously*; this paper describes ongoing progress on the drafting and baselining of the plan, including key specific details. * “Strategy for Developing Technologies for Megawatt-class Nuclear Electric Propulsion Systems”, K.A. Polzin, et. al., International Electric Propulsion Conference IEPC 2022, IEPC-2022-155

Nuclear Electric Propulsion↗

Distributed computing for autonomous on board planning and sequence validations

We propose a new conceptual approach to system-level autonomy that exploits in a synergistic way recent breakthroughs in three specific areas: automatic generation of embeddable planning and validation software, integration of telecommunications forecaster and planning tools, and fault-tolerant assignment of computing tasks to multiple processors.

autonomy synergy software telecommunications compu↗

Cyber Threat Landscape for Distribution Systems

INL cyber analysts will present an overview of the current threat landscape for distribution systems. We will begin with examples of known attacks that have occurred recently to motivate the threat analysis and mitigation discussed in the remainder of the presentation. Examples may include the attacks affecting wind plants in Europe in Spring 2022, ransomware attacks on city utilities and commercial distribution systems, and advanced persistent threats (APTs) including the attacks on Ukrainian electric system in 2015 and 2016, as well as more recent evidence of other APT activity. We will present the end-to-end attack paths and discuss the various attacker skills, financing, motivations, and access that contributed to these attacks. In the second part of this presentation, we will discuss mitigating the cyber threats for distribution systems. We will discuss recent publicly disclosed vulnerabilities and explain their relevant context for distribution system security. Likely attacks to affect distribution systems, such as denial-of-service (DoS), ransomware, edge-device compromise, and advanced persistent threats (APTs) will be described. In addition to an overview of these kinds of attacks, we will provide examples of the various ways in which these attacks can start and what systems they can affect. Simple, cost-effective counter-measures to these attacks will be discussed and we will emphasize how these mitigations can reduce threats when properly applied and maintained.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Verification and Validation of Flight-Critical Systems

For the first time in many years, the NASA budget presented to congress calls for a focused effort on the verification and validation (V&V) of complex systems. This is mostly motivated by the results of the VVFCS (V&V of Flight-Critical Systems) study, which should materialize as a a concrete effort under the Aviation Safety program. This talk will present the results of the study, from requirements coming out of discussions with the FAA and the Joint Planning and Development Office (JPDO) to technical plan addressing the issue, and its proposed current and future V&V research agenda, which will be addressed by NASA Ames, Langley, and Dryden as well as external partners through NASA Research Announcements (NRA) calls. This agenda calls for pushing V&V earlier in the life cycle and take advantage of formal methods to increase safety and reduce cost of V&V. I will present the on-going research work (especially the four main technical areas: Safety Assurance, Distributed Systems, Authority and Autonomy, and Software-Intensive Systems), possible extensions, and how VVFCS plans on grounding the research in realistic examples, including an intended V&V test-bench based on an Integrated Modular Avionics (IMA) architecture and hosted by Dryden.

Brat, Guillaume↗

ADMS Evaluation Platform

Deploying an ADMS or looking to optimize its value? NREL offers a low-cost, low-risk evaluation platform for assessing ADMS performance. The National Renewable Energy Laboratory (NREL) has developed a vendor-neutral advanced distribution management system (ADMS) evaluation platform and is expanding its capabilities. The platform uses actual grid-scale hardware, large-scale distribution system models, and advanced visualization to simulate realworld conditions for the most accurate ADMS evaluation and experimentation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Energy Resource Visual Emulator: Phase 1

To help federal energy managers assess, monitor, and manage cybersecurity while achieving decarbonization, the National Renewable Energy Laboratory's Distributed Energy Resource Cybersecurity Framework (DER-CF) offers a comprehensive, web-based assessment tool focusing on cyber governance or policies, technical management, and physical security. The DER-CF currently presents users with a series of pertinent cybersecurity questions, which are used to generate a site-specific report and recommendations. This paper outlines a technical approach to integrate the DER-CF with another key asset—NREL's Advanced Research on Integrated Energy Systems (ARIES) Cyber Range—to visualize cybersecurity resilience and compliance and to enhance the usability and accessibility of the DER-CF. The result is a new tool called the Distributed Energy Resource Visual Emulator (DER-VE). Its development will include regular conversations with stakeholders to assess the effectiveness of these efforts, refine the visualization capability, and ensure its value to our partners. Phase 0 of the integration project was concluded in 2021. Phase 1, completed in 2022, has two components: The first is developing a working visualization of system compliance using the DER-CF, and the second is planning the design of a server application that takes input data from the DER-CF and creates a personal emulated environment of the user's system or a selected reference architect. Major components that were addressed in this phase are the DER-CF output, compliance visualization, data model, and compliance server design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Concurrent planning and execution for autonomous robots

The Task Control Architecture (TCA) provides communication and coordination facilities to construct distributed, concurrent robotic systems. The use of TCA in a system that walks a legged robot through rugged terrain is described. The walking system, as originally implemented, had a sequential sense-plan-act control cycle. Utilizing TCA features for task sequencing and monitoring, the system was modified to concurrently plan and execute steps. Walking speed improved by over 30 percent, with only a relatively modest conversion effort.

Simmons, Reid G.↗

Distribution system versus bulk power system: identifying the source of electric service interruptions in the US

This study reports on the results from efforts by the Institute of Electric and Electronics Engineers (IEEE) Distribution Reliability Working Group (DRWG) and the U.S. Energy Information Administration (EIA) to improve the usefulness of reliability metrics by developing and then applying consistent, yet distinct measures of the continuity of supply based on the portion of the electric power system from which power interruptions originate: the lower voltage distribution system versus the high‐voltage bulk power system. The modified metrics better support reliability planning in the US because they separately measure the effectiveness of actions to improve reliability made by the two distinct groups of firms (and their regulators or oversight bodies) that are responsible for planning and operating each portion of the US electric power system. The authors then present for the first time quantitative information on the reliability of each portion of the US electric power system. When reliability is measured using the system average interruption duration index and the system average interruption frequency index, they find that the distribution system accounts for at least 94 and 92%, respectively, of all interruptions. They also find that these relationships have been stable over the recent past.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advance Distribution Management System (ADMS)

This presentation explores the transition from traditional distribution management systems to Advanced Distribution Management Systems (ADMS) as a foundation for smart grid development. It highlights the key benefits of ADMS, including enhanced reliability, improved operational efficiency, and increased situational awareness. The presentation also addresses common implementation challenges such as system integration, data management, and organizational readiness. It concludes with a forward-looking perspective on the evolving role of ADMS and essential takeaways for utilities and stakeholders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power System Wildfire Risks and Potential Solutions: A Literature Review & Proposed Metric

Several fire risk evaluation, fire tracking, and fire response resources are available. The risk metrics and fire response programs are sometimes modified to include a power system context. The risk metrics often evaluate the risk of fires causing power system faults or outages, especially on transmission systems. The response programs are modified to ensure the safety of power system equipment and first responders as well as to coordinate power system outages to both ensure safety during an active fire and prevent fire ignition during high risk periods. Although some aspects of wildfire responses have been adapted to include power system concerns, adaptations to power system operations and maintenance to include wildfire risks and responses are still nascent. In particular, a risk metric that evaluates the potential for power system components to ignite wildfires is needed to help guide power system upgrade efforts and power system fire safety measures. This document serves as a brief literature review of wildfire risk metrics and response programs and how they relate to power systems. It also includes a proposed risk metric and structure for describing the risk of a power system component igniting a fire.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design and Development of a 200-kW Turbo-Electric Distributed Propulsion Testbed

The National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center (AFRC) (Edwards, California) is developing a Hybrid-Electric Integrated Systems Testbed (HEIST) Testbed as part of the HEIST Project, to study power management and transition complexities, modular architectures, and flight control laws for turbo-electric distributed propulsion technologies using representative hardware and piloted simulations. Capabilities are being developed to assess the flight readiness of hybrid electric and distributed electric vehicle architectures. Additionally, NASA will leverage experience gained and assets developed from HEIST to assist in flight-test proposal development, flight-test vehicle design, and evaluation of hybrid electric and distributed electric concept vehicles for flight safety. The HEIST test equipment will include three trailers supporting a distributed electric propulsion wing, a battery system and turbogenerator, dynamometers, and supporting power and communication infrastructure, all connected to the AFRC Core simulation. Plans call for 18 high performance electric motors that will be powered by batteries and the turbogenerator, and commanded by a piloted simulation. Flight control algorithms will be developed on the turbo-electric distributed propulsion system.

distributed↗