Search NASA⌕ Search

SEARCH · Search NASA

Results for “Electricity system flexibility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

352 records · Page 20

Application of Analytical Hierarchy Process for Narrowing Down Nep Candidate Reactor Designs

Nuclear electric propulsion (NEP)-powered vehicles have been contemplated for human Mars missions. The nuclear power system contemplates using a high temperature light-weight nuclear reactor for the production of electrical power in the range of 2-5 MWe with a 3-10 year service life. A myriad of technology options exist for achieving these mission objectives. The analytic hierarchy process (AHP), a multi-attribute decision method, is being used to narrow down the candidate designs. The AHP is a structured decision process that fuses model-supplied quantitative data with subjective assessments to facilitate decisions that involve multiple competing criteria. Proven end-to-end nuclear design and systems analysis tools will be used to provide quantitative performance data such as end-to-end system reliability, system robustness to recover from off-normal conditions, system specific weight (α in kg/kWe), and the ability to meet the service life-time and power level requirements. Three high assay low enriched uranium (HALEU) reactor concepts, namely, gas-, heat pipe- and pumped liquid-cooled nuclear cores coupled to a He/Xe gas or supercritical CO2- Brayton power conversion system are being modeled using the AHP to understand the trade-offs associated with these design combinations. In addition to the reactor and power conversion options, there are a myriad of additional components and subsystems – e.g., radiators, heat exchangers, and recuperators – that also figure into the evaluation process. The choice of the right overall system is a multidimensional problem that has to include not only quantitative data, but also the so called “external factors”, examples of which include the component and subsystem Technology Readiness Levels (TRLs), the associated Advancement Degrees of Difficulty (AD2), the cost and schedule required to achieve a technical maturity consistent with mission infusion, alignment with the priorities of NASA’s Space Nuclear Propulsion program, and alignment with other ongoing government and commercial investments in micro reactors. Focused expert elicitations form the basis for qualitative data set. As a final step, decision-makers individually express their opinions regarding the relative importance of the criteria and preferences among the alternatives through pairwise comparisons. The paper will describe the AHP approach, progress to-date applying it to the NEP human Mars mission problem, and preliminary results. Use of AHP provides sufficient flexibility for incorporating industry input at different stages as the technologies evolve through additional research and development. It is expected that the decision process will be ongoing and expanded to examine additional options and technology choices, culminating in a defensible set of candidate reactor concepts that will form the basis for developing a multi-year NEP technology maturation strategy. .

Dasari V Rao↗

Error Sources and Mitigation Strategies for Thermocouples Integrated in Flexible Thermal Protection System Materials

Brief Presenter Biography:Ruth Miller is an aer-ospace systems engineer in the Entry Systems and Ve-hicle Development Branch at NASA Ames Research Center.Introduction:The flexible thermal protection sys-tem (FTPS) on NASA’s Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) vehicle will be in-strumented with thermocouples (TCs) to measure the in-depth thermal response during entry into Earth’s atmos-phere[1, 2]. Accurate flight temperature measurements are critical for verifying vehicle performance during the flight test and reducing uncertainties in the thermal models.However,the deployable nature of inflatable decelerator technology presents challengesfor integrat-ing TCs, specifically the TCsneed to be compactableand cannot damage the FTPSnor the inflatable structure(IS).Unlike traditional rigid aeroshells, routing TCsthrough the thickness of the FTPS could cause signifi-cant damage during packing of the deployable aeroshellbecause the different layers may shift small amounts in relation to each other imparting strain on the TCsand FTPS materials. The LOFTID TCleads are routed from the measurement location back to the data acquisition system in the vehicle centerbody within the same FTPS layer that they are monitoring the temperature. This ap-proach eliminates the need to put holes in the FTPS lay-ers,butas a consequence,the insulated TCleads travel for an appreciable distance through a region that will expose them to high temperaturesand large thermal gra-dients.LOFTID’s TCswere baselined to be commercially available Type K TCswith a binder impregnated glass braid insulation. These TCswere chosen because they had been used successfully on IRVE-3 and in ground-based arc jet testing. Additionally, these TCsdid notdamage the FTPS nor IS during packing and deploy-ment testing. However, the glass braid insulation is only rated to a maximum continuous use temperature of 482ºC. For reference, the duration of the heat pulse on the LOFTID vehicle is on the order of minutes and themaximum predicted temperaturebeneaththe outermost FTPS layersis 1350ºC.Ground-based testing in a tube furnace at NASA Ames Research Centerwas conducted to determine if the baseline TCsrouted through FTPS samples would survive and provide accurate temperature measure-mentsat LOFTID flight-relevant temperatures[3].The test results showed large measurement errors occurred beginning at approximately 400°C due to conductive deposits on the TCinsulation electrically shorting the TCleads.The conductive deposits and thus electrical shorting weredetermined to be caused by twoerror sources:1.The organic binder on the TCinsulation carbon-izingin a high temperature, low oxygen envi-ronment2.Decomposition products from the FTPSperme-atingthe braided TC insulationFurther testing in the tube furnace demonstrated that heat cleaning the TCinsulation effectivelyremovedthe organic binder andeliminatedthe first error source.The second error sourcewas shown to be mitigated by the addition of amica wraparound each individual TCleadtoact as an impermeable barrier.To understand the applicability of theground-based tube furnace test results to flight,anarc jet testseriesat Boeing’s Large Core Arc Tunnel (LCAT) facilitywas conducted[4].The error sourcesand mitigation strate-giesidentified in the tube furnace testing were substan-tiatedin the arc jet testing.However, the arc jet testing also revealed three new error sources:1.Glass TCinsulation meltingwhich resultsin electrical shorting of the TCeither through di-rect contact between the two leads or through the electrically conductive FTPS materials2.TCwire meltingwhich results in a noisy and/or open-loop TCresponse3.Type K TCwire green-rotwhich results in large calibration errors Scope of the Presentation:This presentation will include a brief discussion onthe effect of electrical shorting on the output of a TC(i.e. how to identify elec-trical shorting in TCdataand what the associated erroris).The tube furnace and arc jet test resultswill be dis-cussedand the solutions LOFTID is implementing to mitigate the error sourcesidentified in the tube furnace and arc jet testingwill be presented.Additionally, futureresearch and development work to eliminateTCerror sourcesfor future missionswill be recommended.

R A Miller↗

Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2018-2020 Period Phase 2

Lockheed Martin Aeronautics Company (LM), working in conjunction with General Electric Global Research (GE GR) and Stanford University, executed a 19 month program responsive to the NASA sponsored "N+2 Supersonic Validation: Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2018-2020 Period" contract. The key technical objective of this effort was to validate integrated airframe and propulsion technologies and design methodologies necessary to realize a supersonic vehicle capable of meeting the N+2 environmental and performance goals. The N+2 program is aligned with NASA's Supersonic Project and is focused on providing system level solutions capable of overcoming the efficiency, environmental, and performance barriers to practical supersonic flight. The N+2 environmental and performance goals are outlined in the technical paper, AIAA-2014-2138 (Ref. 1) along with the validated N+2 Phase 2 results. Our Phase 2 efforts built upon our Phase 1 studies (Ref. 2) and successfully demonstrated the ability to design and test realistic configurations capable of shaped sonic booms over the width of the sonic boom carpet. Developing a shaped boom configuration capable of meeting the N+2 shaped boom targets is a key goal for the N+2 program. During the LM Phase 1 effort, LM successfully designed and tested a shaped boom trijet configuration (1021) capable of achieving 85 PLdB under track (forward and aft shock) and up to 28 deg off-track at Mach 1.6. In Phase 2 we developed a refined configuration (1044-2) that extended the under 85 PLdB sonic boom level over the entire carpet of 52 deg off-track at a cruise Mach number of 1.7. Further, the loudness level of the configuration throughout operational conditions calculates to an average of 79 PLdB. These calculations rely on propagation employing Burger's (sBOOM) rounding methodology, and there are indications that the configuration average loudness would actually be 75 PLdB. We also added significant fidelity to the design of the configuration in this phase by performing a low speed wind tunnel test at our LTWT facility in Palmdale, by more complete modelling of propulsion effects in our sonic boom analysis, and by refining our configuration packaging and performance assessments. Working with General Electric, LM performed an assessment of the impact of inlet and nozzle effects on the sonic boom signature of the LM N+2 configurations. Our results indicate that inlet/exhaust streamtube boundary conditions are adequate for conceptual design studies, but realistic propulsion modeling at similar stream-tube conditions does have a small but measurable impact on the sonic boom signature. Previous supersonic transport studies have identified aeroelastic effects as one of the major challenges associated with the long, slender vehicles particularly common with shaped boom aircraft (Ref. 3). Under the Phase 2 effort, we have developed a detailed structural analysis model to evaluate the impact of flexibility and structural considerations on the feasibility of future quiet supersonic transports. We looked in particular at dynamic structural modes and flutter as a failure that must be avoided. We found that for our N+2 design in particular, adequate flutter margin existed. Our flutter margin is large enough to cover uncertainties like large increases in engine weight and the margin is relatively easy to increase with additional stiffening mass. The lack of major aeroelastic problems probably derives somewhat from an early design bias. While shaped boom aircraft require long length, they are not required to be thin. We intentionally developed our structural depths to avoid major flexibility problems. So at the end of Phase 2, we have validated that aeroelastic problems are not necessarily endemic to shaped boom designs. Experimental validation of sonic boom design and analysis techniques was the primary objective of the N+2 Supersonic Validations contract; and in this Phase, LM participated in four high speed wind tunnel tests. The first so-called Parametric Test in the Ames 9x7 tunnel did an exhaustive look at variation effects of the parameters: humidity, total pressure, sample time, spatial averaging distance and number of measurement locations, and more. From the results we learned to obtain data faster and more accurately, and made test condition tolerances easy to meet (eliminating earlier 60 percent wasted time when condition tolerances could not be held). The next two tests used different tunnels. The Ames 11 ft tunnel was used to test lower Mach numbers of 1.2 and 1.4. There were several difficulties using this tunnel for the first time for sonic boom including having to shift the measurement Mach numbers to 1.15 and 1.3 to avoid flow problems. It is believed that the 11 ft could be used successfully to measure sonic boom but there are likely to be a number of test condition restrictions. The Glenn 8x6 ft tunnel was used next and the tunnel has a number of desirable features for sonic boom measurement. While the Ames 9x7 can only test Mach 1.55 to 2.55 and the 11 ft can only test Mach 1.3 and lower, the Glenn 8x6 can test continuously from Mach 0.3 to 2.0. Unfortunately test measurement accuracy was compromised by a reference pressure drift. Post-test analysis revealed that the drift occurred when Mach number drifted slightly. Test measurements indicated that if Mach number drift is eliminated, results from the 8x6 would be more accurate, especially at longer distances, than results from the 9x7. The fourth test in the 9x7, called LM4, used everything we learned to comprehensively and accurately measure our new 1044-02 configuration with a full-carpet shaped signature design. Productivity was 8 times greater than our Phase 1 LM3 test. Measurement accuracy and repeatability was excellent out to 42 in. However, measurements at greater distances require the rail in the aft position and become substantially less accurate. Further signature processing or measurement improvements are needed for beyond near-field signature validation.

Morgenstern, John↗

Command and Data Handling Branch Internship

Modular Integrated Stackable Layers (MISL) is a computer system designed for simple, fast, and cost effective flexible reconfiguration in space environments such as the ISS and Orion projects for various uses. Existing applications include wireless and wired communications, data acquisition and instrumentation, and camera systems, and potential applications include bus protocol converters and subsystem control. MISL is based on Texas Instruments (TI)' MSP430 16-bit ultra-low-power microcontroller device. The purpose of my project was to integrate the MISL system with a liquid crystal display (LCD) touchscreen. The LCD, manufactured by Crystalfontz and part number CFAF320240F-035T-TS, is a 320 by 240 RGB resistive color screen including an optional carrier board. The vast majority of the project was done with Altium Designer, a tool for printed circuit board (PCB) schematic capture, 3D design, and FPGA (Field Programmable Gate Array) development. The new PCB was to allow the LCD to directly stack to the rest of MISL. Research was done with datasheets for the TI microcontroller and touchscreen display in order to meet desired hardware specifications. Documentation on prior MISL projects was also utilized. The initial step was to create a schematic for the LCD, power bus, and data bus connections between components. A layout was then designed with the required physical dimensions, routed traces and vias, power and ground planes, layer stacks, and other specified design rules such as plane clearance and hole size. Multiple consultation sessions were held with Hester Yim, the technical discipline lead for the Command and Data Handling Branch, and Christy Herring, the lead PCB layout designer in the Electronic Design and Manufacturing Branch in order to ensure proper configuration. At the moment, the PCB is awaiting revision by the latter-mentioned branch. Afterwards, the board will begin to undergo the manufacturing and testing process. Throughout the internship at Johnson Space Center, I gained several technical and professional skills. I gained proficiency in Altium Designer and experience using subversion clients, as well as knowledge in PSpice with OrCAD and battery design for spaceflight from on-site. I also gained networking, organization, and communication skills throughout meetings with coworkers and other interns. This internship at Johnson Space Center has impacted my future aspirations by further inspiring me to follow a career path into space rated engineering technology and human spaceflight applications. After graduation, I plan to attend graduate Modular Integrated Stackable Layers (MISL) is a computer system designed for simple, fast, and cost effective flexible reconfiguration in space environments such as the ISS and Orion projects for various uses. Existing applications include wireless and wired communications, data acquisition and instrumentation, and camera systems, and potential applications include bus protocol converters and subsystem control. MISL is based on Texas Instruments’ MSP430 16 bit ultra-low power microcontroller device. The purpose of my project was to integrate the MISL system with a liquid crystal display touchscreen. The LCD, manufactured by Crystalfontz and part number CFAF320240F-035T-TS, is a 320x240 RGB resistive color screen including an optional carrier board.The vast majority of the project was done with Altium Designer, a tool for printed circuit board (PCB) schematic capture, 3D design, and FPGA development. The new PCB was to allow the LCD to directly stack to the rest of MISL. Research was done with datasheets for the TI microcontroller and touchscreen display in order to meet desired hardware specifications. Documentation on prior MISL projects was also utilized. The initial step was to create a schematic for the LCD, power bus, and data bus connections between components. A layout was then designed with the required physical dimensions, routed traces and vias, power and ground planes, layer stacks, and other specified design rules such as plane clearance and hole size. Multiple consultation sessions were held with Hester Yim, the technical discipline lead for the Command and Data Handling Branch, and Christy Herring, the lead PCB layout designer in the Electronic Design and Manufacturing Branch in order to ensure proper configuration. At themoment, the PCB is awaiting revision by the latter-mentioned branch. Afterwards, the board will begin to undergo the manufacturing and testing process.Throughout the internship at Johnson Space Center, I gained several technical and professional skills. I gained proficiency in Altium Designer and experience using subversion clients, as well as knowledge in PSpice with OrCAD and battery design for spaceflight from on-site. I also gained networking, organization, and communication skills throughout meetings with coworkers and other interns. This internship at Johnson Space Center has impacted my future aspirations by further inspiring me to follow a career path into space rated engineering technology and human spaceflight applications. After graduation, I plan to attend graduate school for a master's or doctorate degree in electrical or computer engineering.

Billings, Rachel Mae↗

International Space Station (ISS) Plasma Contactor Unit (PCU) Utilization Plan Assessment Update

The International Space Station (ISS) vehicle undergoes spacecraft charging as it interacts with Earth's ionosphere and magnetic field. The interaction can result in a large potential difference developing between the ISS metal chassis and the local ionosphere plasma environment. If an astronaut conducting extravehicular activities (EVA) is exposed to the potential difference, then a possible electrical shock hazard arises. The control of this hazard was addressed by a number of documents within the ISS Program (ISSP) including Catastrophic Safety Hazard for Astronauts on EVA (ISS-EVA-312-4A_revE). The safety hazard identified the risk for an astronaut to experience an electrical shock in the event an arc was generated on an extravehicular mobility unit (EMU) surface. A catastrophic safety hazard, by the ISS requirements, necessitates mitigation by a two-fault tolerant system of hazard controls. Traditionally, the plasma contactor units (PCUs) on the ISS have been used to limit the charging and serve as a "ground strap" between the ISS structure and the surrounding ionospheric plasma. In 2009, a previous NASA Engineering and Safety Center (NESC) team evaluated the PCU utilization plan (NESC Request #07-054-E) with the objective to assess whether leaving PCUs off during non-EVA time periods presented risk to the ISS through assembly completion. For this study, in situ measurements of ISS charging, covering the installation of three of the four photovoltaic arrays, and laboratory testing results provided key data to underpin the assessment. The conclusion stated, "there appears to be no significant risk of damage to critical equipment nor excessive ISS thermal coating damage as a result of eliminating PCU operations during non- EVA times." In 2013, the ISSP was presented with recommendations from Boeing Space Environments for the "Conditional" Marginalization of Plasma Hazard. These recommendations include a plan that would keep the PCUs off during EVAs when the space environment forecast input to the ISS charging model indicates floating potentials (FP) within specified limits. These recommendations were based on the persistence of conditions in the space environment due to the current low solar cycle and belief in the accuracy and completeness of the ISS charging model. Subsequently, a Noncompliance Report (NCR), ISS-NCR-232G, Lack of Two-fault Tolerance to EVA Crew Shock in the Low Earth Orbit Plasma Environment, was signed in September 2013 specifying new guidelines for the use of shock hazard controls based on a forecast of the space environment from ISS plasma measurements taken prior to the EVA [ISS-EVA-312-AC, 2012]. This NESC assessment re-evaluates EVA charging hazards through a process that is based on over 14 years of ISS operations, charging measurements, laboratory tests, EMU studies and modifications, and safety reports. The assessment seeks an objective review of the plasma charging hazards associated with EVA operations to determine if any of the present hazard controls can safely change the PCU utilization plan to allow more flexibility in ISS operations during EVA preparation and execution.

Hernandez-Pellerano, Amri↗

The Earliest Ion Channels in Protocellular Membranes

Cellular membranes with their hydrophobic interior are virtually impermeable to ions. Bulk of ion transport through them is enabled through ion channels. Ion channels of contemporary cells are complex protein molecules which span the membrane creating a cylindrical pore filled with water. Protocells, which are widely regarded as precursors to modern cells, had similarly impermeable membranes, but the set of proteins in their disposal was much simpler and more limited. We have been, therefore, exploring an idea that the first ion channels in protocellular membranes were formed by much smaller peptide molecules that could spontaneously selfassemble into short-lived cylindrical bundles in a membrane. Earlier studies have shown that a group of peptides known as peptaibols is capable of forming ion channels in lipid bilayers when they are exposed to an electric field. Peptaibols are small, non-genetically encoded peptides produced by some fungi as a part of their system of defense against bacteria. They are usually only 14-20 residues long, which is just enough to span the membrane. Their sequence is characterized by the presence of non-standard amino acids which, interestingly, are also expected to have existed on the early earth. In particular, the presence of 2-aminoisobutyric acid (AIB) gives peptaibols strong helix forming propensities. Association of the helices inside membranes leads to the formation of cylindrical bundles, typically containing 4 to 10 monomers. Although peptaibols are excellent candidates for models of the earliest ion channels their structures, which are stabilized only by van der Waals forces and occasional hydrogen bonds between neighboring helices, are not very stable. Although it might properly reflect protobiological reality, it is also a major obstacle in studying channel behavior. For this reason we focused on two members of the peptaibol family, trichotoxin and antiamoebin, which are characterized by a single conductance level. This indicates that their structures are unique and stable. In addition, it is also believed that the trichotoxin channel displays some selectivity between potassium and chloride ions. This makes trichotoxin and antiamoebin ideal models of the earliest ion channels that could provide insight into the origins of ion conductance and selectivity. In the absence of crystal structure of the trichotoxin and antiamoebin channels, we propose their molecular models based on experimentally determined number of monomers forming the bundles. We use molecular dynamics simulations to validate the models in terms of their conductance and selectivity. On the basis of our simulations we show that the emergence of channels built of small, alpha-helical peptides was protobiologically plausible and did not require highly specific amino acid sequences, which is a convenient evolutionary trait. Despite their simple structure, such channels could possess properties that, at the first sight, appear to require markedly larger complexity. To this end, we will discuss how the amino acid sequence and structure of primitive channels give rise to the phenomena of ionic conductance and selectivity across the earliest cell walls, which were essential functions for the emergence and early evolution of protocells. Furthermore, we will argue that even though architectures of membrane proteins are not nearly as diverse as those of water-soluble proteins, they are sufficiently flexible to adapt readily to the functional demands arising during evolution.

Mijajlovic, Milan↗

MOBI and FEANICS Programming in Labview

The flight software engineering branch provides design and development of embedded real-time software applications for flight and supporting ground systems to support the NASA Aeronautics and Space Programs. In addition, this branch evaluates, develops and implements new technologies for embedded real-time systems, and maintains a laboratory for applications of embedded technology. This branch supports other divisions and is involved with many other projects. My mentor Rochelle and I are involved in the Fluids and Combustion Facility (FCF) project, the MOBI project, and the FEANICS project. The Fluids and Combustion Facility (FCF) will occupy two powered racks on the International Space Station (ISS). It will be a permanent modular, multiuser facility to accommodate microgravity science experiments onboard the ISS's U.S. Laboratory Module. FCF will support NASA Human Exploration and Development of Space program objectives requiring sustained, systematic research in the disciplines of fluid physics and combustion science. The fluids experiment is called FIR and the combustion experiment is called CIR. The MOBI Experiment is an experiment that is performed to understand the physics of bubble segregation and resuspension in an inertia, monodisperse gas-liquid suspension, and to understand how bubble pressure resists segregation in suspensions with continuous phase inertia. The main focus of FEANICS and the solid combustion experiments will be to conduct basic and applied scientific investigations in fire-safety to support NASA's Bioastronautics Initiative. Based on data obtained in microgravity and experience gained from the beginning of the U.S. manned space program, these normal gravity flammability assessments have been assumed to be conservative with respect to flammability in all environments. However, some of the complex interactions that govern ignition and flame growth can only be evaluated in the long durations of microgravity available on the ISS. Before any of these projects actually go to the ISS, they are going to be tested on NASA's KC-135 Low-G airplane, the KC-135 Low-G Flight Research aircraft (a predecessor of the Boeing 707) is used to fly parabolas to create 20-25 seconds of weightlessness so that the astronauts can experience and researchers can investigate the effects of zero gravity. My mentor and I have been working with Labview to write the programs that are going to acquire, analyze and present the data acquired from these Test flights on the KC-135. We have been working closely with electrical, and mechanical engineers to make sure the program and the hardware can communicate and perform the operations necessary for the flight test. LabVIEW delivers a powerful graphical development environment for signal acquisition, measurement analysis, and data presentation, giving you the flexibility of a programming language without the complexity of traditional development tools. The programming of the control panel and the code are both done in GUIs which allow for flexibility in the code and the program.

Rios, Jeffrey N.↗

Modeling Deformable Linear Objects for Autonomous Robotic Outfitting of Lunar Surface Systems

This paper presents structural models of deformable linear objects (DLOs). DLOs are a subclass of deformable objects that encompasses common outfitting elements such as cables and ropes. Models are validated through hardware experiments, and integration in a robotic autonomy architecture for space environments is discussed. A persistent human presence on the lunar surface is one of the next major milestones in space exploration. This requires the development of robust extraplanetary construction technologies including structures and materials modeling and robotic systems. Previous robotic construction technology development has primarily focused on structural assembly, with significantly less focus on robotically performed outfitting tasks to instantiate subsystems providing power, data, life support, etc. These tasks involve manipulation of highly flexible elements, which are difficult to model, such as cable harnesses, ropes, and hoses. Robotic manipulation of DLOs, especially cable harnesses, is an active area of research as cable harnesses are essential for providing power and data to space assets. DLO models that can be used for robot manipulator trajectory generation are necessary for autonomous operation of lunar infrastructure. There are many proposed methods for modeling DLOs, and they primarily fall into three types: 1) discrete model-based, 2) continuum model-based, and 3) Neural Network-based. These types each have pros and cons, and the tradeoff between model accuracy and computational speed informs which type should be used. An understanding of this trade-off is imperative for real-time control of autonomous systems. High computational requirements reduce the speed of the model, making real-time control difficult, while accuracy is critical to preventing collisions. Discrete models, such as a mass-spring multibody representation, require relatively few calculations, and accuracy is directly tied to the step size of the discretization. Continuum models, such as a B-spline representation or a Cosserat rod model (a mix of continuous and discrete), are more informed of the structural properties of the cable and are much more accurate than a rigid body mass-spring model, but at significant computational cost. A Neural Network approach can provide an online solution with very few computational steps, but properly generating training data can be difficult and validation for an in-space application is not trivial. This paper explores the trade-off between different modeling approaches and compares accuracy and computational speed/complexity of the three types mentioned above. Model accuracy is evaluated using a cable in a static configuration. True cable shape is obtained using a depth camera for RGB images and point-cloud segmentation. The purpose of this experiment is to evaluate the trade-offs of different approaches to the DLO modeling problem. Understanding the tradeoffs between different cable modeling techniques paves the way for developing robotic control and planning architectures necessary for real-time manipulation of DLOs for lunar infrastructure outfitting. Real-time control is required for robotic systems to be able to actively manipulate a cable in a harsh environment where model and sensor errors compound, and environmental conditions can cause significant disturbances. Cable routing must be performed in areas with high density of objects/obstacles: through truss structures, near solar panels or mirror arrays, next to bundles of electrical equipment. Understanding the best way to plan and manipulate a cable without disrupting the environment or damaging the cable is imperative to robotic outfitting operations on the lunar surface.

Amy M Quartaro↗

Power System Options Evaluated for the Radiation and Technology Demonstration Mission

The Radiation and Technology Demonstration (RTD) Mission is under joint study by three NASA Centers: the NASA Johnson Space Center, the NASA Goddard Space Flight Center, and the NASA Glenn Research Center at Lewis Field. This Earth-orbiting mission, which may launch on a space shuttle in the first half of the next decade, has the primary objective of demonstrating high-power electric thruster technologies. Secondary objectives include better characterization of Earth's Van Allen trapped-radiation belts, measurement of the effectiveness of the radiation shielding for human protection, measurement of radiation effects on advanced solar cells, and demonstration of radiation-tolerant microelectronics. During the mission, which may continue up to 1 year, the 2000-kg RTD spacecraft will first spiral outward from the shuttle-deployed, medium-inclination, low Earth orbit. By the phased operation of a 10-kW Hall thruster and a 10-kW Variable Specific Impulse Magneto-Plasma Rocket, the RTD spacecraft will reach a low-inclination Earth orbit with a radius greater than five Earth radii. This will be followed by an inward spiraling orbit phase when the spacecraft deploys 8 to 12 microsatellites to map the Van Allen belts. The mission will conclude in low Earth orbit with the possible retrieval of the spacecraft by the space shuttle. A conceptual RTD spacecraft design showing two photovoltaic (PV) array wings, the Hall thruster with propellant tanks, and stowed microsatellites is presented. Early power system studies assessed five different PV array design options coupled with a 120-Vdc power management and distribution system (PMAD) and secondary lithium battery energy storage. Array options include (1) state-of-the-art 10-percent efficient three-junction amorphous SiGe thin-film cells on thin polymer panels deployed with an inflatable (or articulated) truss, (2) SCARLET array panels, (3) commercial state-of-the-art, planar PV array rigid panels with 25-percent efficient, three-junction GaInP2/GaAs/Ge solar cells, (4) rigid panels with 25-percent efficient, three-junction GaInP2/GaAs/Ge solar cells, in a 2 -concentrator trough configuration, and (5) thin polymer panels with 25-percent efficient, three-junction GaInP2/GaAs/Ge solar cells deployed with an inflatable (or articulated) truss. To assess the relative merits of these PV array design options, the study group developed a dedicated Fortran code to predict power system performance and estimate system mass. This code also modeled Earth orbital environments important for accurately predicting PV array performance. The most important environmental effect, solar cell radiation degradation, was calculated from electron-proton fluence input from the industry standard AE8/AP8 trapped radiation models and the concept of damage equivalence. Power systems were sized to provide 10 kW of thruster power and approximately 1 kW of spacecraft power at end of life. Of the five PV array design options, the option 1 (thin-film cells) power system was the most massive 590 kg, whereas the option 4 (trough concentrator) power system was the lightest 260 kg. Arguably, the lowest cost would come from the option 3 (commercial array panels) power system with an acceptable, albeit greater, system mass of 320 kg. Predicted power system performance during the spiral-out mission phase is shown the preceding graph for the option 5 (flexible-panel) array. From the results, the radiation-induced power loss over time is evident as the spacecraft slowly spirals outward through the trapped proton belt. The importance of the spiral trip time is also evident in the two curves representing 74-day and 182-day spiral-out periods. The longer spiral time introduces a beginning-of-life power oversizing penalty greater than 1 kW. Future studies will analyze power system performance and mass with a 50-Vdc power management and distribution architecture favorable to the VASIMR thruster and longer missions.

Kerslake, Thomas W.↗

Asteroid Redirect Crewed Mission Nominal Design and Performance

In 2010, the President announced that, in 2025, the U.S. intended to launch a human mission to an asteroid [1]. This announcement was followed by the idea of a Capability Driven Framework (CDF) [2], which is based on the idea of evolving capabilities from less demanding to more demanding missions to multiple possible destinations and with increased flexibility, cost effectiveness and sustainability. Focused missions, such as a NASA inter-Center study that examined the viability and implications of sending a crew to a Near Earth Asteroid (NEA) [3], provided a way to better understand and evaluate the utility of these CDF capabilities when applied to an actual mission. The long duration of the NEA missions were contrasted with a concept described in a study prepared for the Keck Institute of Space Studies (KISS) [4] where a robotic spacecraft would redirect an asteroid to the Earth-Moon vicinity, where a relatively short duration crewed mission could be conducted to the captured asteroid. This mission concept was included in the National Aeronautics and Space Administration (NASA) fiscal year 2014 budget request, as submitted by the NASA Administrator [5]. NASA studies continued to examine the idea of a crewed mission to a captured asteroid in the Earth-Moon vicinity. During this time was an announcement of NASA's Asteroid Grand Challenge [6]. Key goals for the Asteroid Grand Challenge are to locate, redirect, and explore an asteroid, as well as find and plan for asteroid threats. An Asteroid Redirect Mission (ARM) study was being conducted, which supports this Grand Challenge by providing understanding in how to execute an asteroid rendezvous, capture it, and redirect it to Earth-Moon space, and, in particular, to a distant retrograde orbit (DRO). Subsequent to the returning of the asteroid to a DRO, would be the launch of a crewed mission to rendezvous with the redirected asteroid. This report examines that crewed mission by assessing the Asteroid Redirect Crewed Mission (ARCM) nominal design and performance costs associated with an Orion based crewed rendezvous mission to a captured asteroid in an Earth-Moon DRO. The ARM study includes two fundamental mission phases: 1) The Asteroid Redirect Robotic Mission (ARRM) and 2) the ARCM. The ARRM includes a solar electric propulsion based robotic asteroid return vehicle (ARV) sent to rendezvous with a selected near Earth asteroid, capture it, and return it to a DRO in the Earth-Moon vicinity. The DRO is selected over other possible asteroid parking orbits due to its achievability (by both the robotic and crewed vehicles) and by its stability (e.g., no orbit maintenance is required). After the return of the asteroid to the Earth-Moon vicinity, the ARCM is executed and carries a crew of two astronauts to a DRO to rendezvous with the awaiting ARV with the asteroid. The outbound and inbound transfers employ lunar gravity assist (LGA) flybys to reduce the Orion propellant requirement for the overall nominal mission, which provides a nominal mission with some reserve propellant for possible abort situations. The nominal mission described in this report provides a better understanding of the mission considerations as well as the feasibility of such a crewed mission, particularly with regard to spacecraft currently undergoing development, such as the Orion vehicle and the Space Launch System (SLS).

Condon, Gerald↗