Search NASA⌕ Search

SEARCH · Search NASA

Results for “Energy Efficient Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

348 records · Page 20

Beam test performance of prototype silicon detectors for the Outer Tracker for the Phase-2 Upgrade of CMS

A new CMS tracker detector will be installed for operation at the High Luminosity LHC (HL-LHC). This detector comprises modules with two closely spaced parallel sensor plates and front-end ASICs capable of transmitting tracking information to the CMS Level-1 (L1) trigger at the 40 MHz beam crossing rate. The inclusion of tracking information in the L1 trigger decision will be essential for selecting events of interest efficiently at the HL-LHC. The CMS Binary Chip (CBC)has been designed to read out and correlate hits from pairs of tracker sensors, forming so called track stubs. For the first time, a prototype irradiated module and a full-sized module, both equipped with the version 2 of the CBC, have been operated in test beam facilities. The efficiency of the stub finding logic of the modules for various angles of incidence has been studied. The ability of the modules to reject tracks with transverse momentum less than 2 GeV has been demonstrated. For modules built with irradiated sensors, no significant drop in the stub finding performance has been observed. Results from the beam tests are described in this paper.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Introducing a Markov chain-based time calibration procedure for multi-channel particle detectors: application to the SuperFGD and ToF detectors of the T2K experiment

Inter-channel mis-synchronisation can be a limiting factor to the time resolution of high performance timing detectors with multiple readout channels and independent electronics units. In these systems, time calibration methods employed must be able to efficiently correct for minimal mis-synchronisation between channels and achieve the best detector performance. We present an iterative time calibration method based on Markov Chains, suitable for detector systems with multiple readout channels. Starting from correlated hit pairs alone, and without requiring an external reference time measurement, the method solves for fixed per-channel offsets, with precision limited only by the intrinsic single-channel resolution. A mathematical proof that the method is able to find the correct time offsets to be assigned to each detector channel in order to achieve inter-channel synchronisation is given, and it is shown that the number of iterations to reach convergence within the desired precision is controllable with a single parameter. Numerical studies are used to confirm unbiased recovery of true offsets. Finally, the application of the calibration method to the Super Fine-Grained Detector (SuperFGD) and the Time of Flight (TOF) detector at the upgraded T2K near detector (ND280) shows good improvement in overall timing resolution, demonstrating the effectiveness in a real-world scenario and scalability.

calibration and fitting methods↗

A System Approach to Deep Heating Savings Through Measurement, Management, and Motivation

Across multi-tenant commercial office and multifamily buildings, centrally metered fuel use represents a substantial fraction of whole-building energy use. Energy audit practitioners understand that improving heating distribution efficiency is typically more of an opportunity than combustion efficiency and that differing thermal comfort preferences between tenants are the bane of operators across these building typologies. There is an unmet market need for retrofit technologies that allow for the delivery of the right amount of heat to the right spaces, at the right time. The Energy Management and Information System (EMIS) package fills this gap through enhanced controls and metering, incorporating low-cost sensors and wireless communication infrastructure to provide a platform for ongoing commissioning and tenant feedback, including heat cost allocation. With support from the US DOE Building Technologies Office, Steven Winter Associates, Inc. (SWA) partnered with Sentient Buildings, E Source, building owners, and utility and policy stakeholders, to demonstrate a market viable EMIS that achieves a reduction in space heating energy use by reducing heating load, improving control, and positively impacting behavior while providing an acceptable financial return. In this study, EMIS packages were implemented in two New York City multifamily rental buildings. Both buildings conducted basic mechanical work (e.g., repairing steam traps) to ensure the heating system was operating well before any tenant feedback was layered in. Heating Energy Use Reports (HEUR) were created to provide tenants with social comparisons and energy savings tips to influence their behavior; these were provided monthly to all tenants in both buildings. Additionally, one building allocated heating costs to a portion of the tenants. Heat cost allocation (HCA) has a long history in the European Union (EU), although it is not common in the US or in steam-heated buildings. SWA leveraged existing EU best practices and stakeholder feedback to develop a Heat Cost Allocation algorithm that was considered equitable and intuitive. Energy use and tenant behavior impacts were tracked throughout the study. The basic mechanical repair work saved between 11-20% of heating energy. Those savings rose to 17-24% with the addition of tenant feedback. While it may not be possible to precisely determine the impact of COVID-19 on research studies like this, there may have been additional savings realized had the study taken place in a period of normal occupancy patterns. These types of central heating systems have been a blind spot for utilities, who have traditionally had little visibility into detailed behind-the-meter gas usage. Heating energy savings stayed consistent during the coldest months, indicating the potential for utilities to utilize EMIS packages for peak gas demand reductions or demand response programs. Tenant comfort was also improved. Post installation, room temperatures more closely matched thermostat set points. Perhaps due to this greater level of control, the vast majority of tenants being billed for heating were accepting of the allocation costs. And tenants receiving heat cost allocations were more likely to reduce their thermostat setpoints than tenants receiving behavioral feedback without financial impacts were. Variation in building specifics makes it difficult to provide precise energy and financial savings estimates. But within the range of expected conditions, the study identified a few key variables that can have the greatest impact on financial returns: the cost of fuel, the ability and willingness to allocate heating costs to tenants, and a well-functioning heating system as a starting point. This study focused on two multifamily buildings, but additional use cases, such as commercial buildings and affordable housing, should be explored to better understand the full market potential. While this type of upgrade has the potential for deep energy reductions and cost savings, future projects should take into account the balance of costs and benefits between owners and tenants, especially in the affordable, regulated, or other low-to-moderate income (LMI) segments of the market. Rent credits, utility allowances, or a shared savings program are possible options to accelerate adoption of this strategy in these market segments.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automated Data Review of Analytical Laboratory Results at Los Alamos National Laboratory - 20299

Newport News Nuclear BWXT-Los Alamos, LLC (N3B) collects samples in support of the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) Los Alamos Legacy Cleanup Contract (LLCC). N3B receives and reviews over 1.6 million sample data points annually in support of various ongoing environmental monitoring and remediation projects of the LLCC. N3B must demonstrate and document that reported external analytical laboratory data produced for the LLCC are of sufficient quality to fulfill their intended purpose and to support defensible decision making as described in EPA QA/G4 Guidance for the Data Quality Objectives Process 1994. In 2018, N3B assumed management of the LLCC along with the Environmental Information Management (EIM) database that contains all historical and current environmental data associated with the LLCC. The entire EIM database is shared between N3B, Triad National Security, LLC (Triad), and New Mexico Environment Department (NMED). These three parties jointly manage the database, its configuration, and changes / updates. All environmental data that are entered into EIM are updated and available, on a daily basis, in the linked public database Intellus New Mexico (Intellus). The quality and defensibility of the environmental data generated from sampling activities is a key component of an effective remediation process. Providing quality data is accomplished through a data assessment process that includes examination, verification, and validation. Examination is the assessment of completeness of the deliverables, identification of any reporting errors, and determining the usability of the data based on the laboratory's evaluation of its data as described in the case narrative received with the data. Verification consists of an evaluation of the Electronic Data Deliverables (EDD) data report to determine the extent to which the external analytical laboratories met method and contract-specific quality control and reporting requirements. Validation consists of determining the data quality and the extent to which the external analytical laboratories accurately and completely reported all sample and quality control results and satisfied all contract requirements. EIM contains an automatic Data Validation Module which performs automated data review (DVM ADR). DVM ADR is a tool to assist in the validation process. When DVM ADR is used in conjunction with manual examination of sample data packages, the combination of the two will meet and exceed the requirements of verification. N3B recognized an opportunity for process improvement, focusing on DVM ADR configuration and enhancements in EIM. Testing EIM's configuration provided proof of the DVM ADR's capabilities and flexibility to accurately perform routine data checks based on analytical methods and regulatory requirements. In addition, the DVM ADR module was improved through enhancements for all analytes, particularly upgrades for radiochemistry data. Extensive testing of the DVM ADR module occurred using EDDs from actual laboratory analyses on the EIM testing site. During this process, N3B manipulated EDD information to verify that the actual outcomes matched the expected outcomes. The results of this testing were shared with the database architects, and configuration improvements were identified to address these results. During this process, N3B identified that the radiochemical DVM ADR capabilities were underutilized, and so enhanced the DVM ADR functionality with respect to radioanalytical assessment. N3B environmental data uploads to Intellus on a daily basis from EIM, once the analytical data undergoes examination and verification. As such, it is important to have a high level of confidence in the quality and defensibility of the data. The process of manual examination, along with the DVM ADR, in conjunction with full validation of a percentage the data specified through the Data Quality Objectives greatly increases efficiency of data review and confidence level of the quality of the data, and gives the project managers, governmental offices, and the public expedited access to high-quality data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Circular Economy for Solar Photovoltaic System Materials: Drivers, Barriers, Enablers, and U.S. Policy Considerations

As PV capacity increases, owners are also decommissioning older system assets. Estimates based on a 30-year lifetime assumption found that cumulative U.S. end-of-life (EoL) PV modules could total one million metric tons (Mt) by 2030 and up to 10 million Mt by 2050 (Weckend, Wade, and Heath 2016). Beyond maintenance replacements, early retirements that are due to efficiency upgrades and extreme weather, as well as PV deployment beyond earlier expectations, would increase these projections. PV system owners must evaluate equipment management options for used modules and system components retired during maintenance activities, refurbishment, repowering and system decommissioning. PV manufacturers must also evaluate material management options from customer returns, defects, and scrap. Management options for early retired and EoL PV system material include reuse, repair for reuse, recycling-based resource recovery, storage, and disposal. Disposal of PV system material increases the burden on landfill capacity, while reuse, repair for reuse, and recycling-based resource recovery (reuse/repair/recovery) options salvage valuable materials and provide secondary market opportunities and ancillary benefits (Weckend, Wade, and Heath 2016; EPA 2019c; SWEEP 2019). PV system owners may also decide store used modules and components as spares, or in the interim before a reuse or EoL management decision is made. Despite potential secondary market opportunities and the potential benefits associated with the repair/reuse/recovery of PV system material, anecdotal evidence suggests that in the United States decommissioned PV modules are stored, landfilled or otherwise disposed of (Salim et al. 2019; CPUC 2019b; DTSC 2019b; NREL 2019a). Some modules are being disposed of in municipal nonhazardous landfills and federally regulated hazardous treatment, storage, and disposal facilities, and others are being stored in warehouses until economically viable repair/reuse/recycling becomes available (CPUC 2019b; DTSC 2019b; NREL 2019a; Libby and Shaw 2018). As awareness of current practices grows, and the demand for critical PV module material increases, U.S. industry stakeholders, regulators, and policymakers are starting to (1) consider solutions to drive and enable environmentally sustainable materials management decisions and behaviors and (2) identify barriers to a circular economy for PV system materials. Circular economy principles attempt to transition from a "take-make-consume-dispose" linear economic system to a circular system that allows for the long life, and the reuse/repair/recovery of products and materials (Ellen MacArthur Foundation 2020). We begin this report by summarizing the drivers, barriers, and enablers to a circular economy for PV system materials in the United States. We then report on our analysis of federal and state regulatory considerations that may impact the repair/reuse/recovery of PV materials, and potential civil and criminal liabilities associated with noncompliance. We then discuss state policies and initiatives in the United States that expressly address PV system decommissioning and repair/reuse/recovery of PV materials. We conclude by providing case studies of U.S. business models for the repair/reuse/recovery of PV system materials. Our results are based on legal and literature-based research and interviews with solar industry stakeholders, regulators, and policymakers.

14 SOLAR ENERGY↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗