Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generating Site”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Energy Technology Innovation Partnership Project [Slides]

This presentation introduces the Energy Technology Innovation Partnership Project (ETIPP) and outlines proposed technical assistance to support St. Vincent's House in developing a resilient community hub in Galveston, Texas. The project explores opportunities for on-site energy solutions to ensure continuity of critical services during coastal hazards and grid disruptions. The session aims to gather stakeholder input to refine priorities and inform next steps for resilient, reliable, and cost-effective energy strategies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Radar data processing and analysis

Digitized four-channel radar images corresponding to particular areas from the Phoenix and Huntington test sites were generated in conjunction with prior experiments performed to collect X- and L-band synthetic aperture radar imagery of these two areas. The methods for generating this imagery are documented. A secondary objective was the investigation of digital processing techniques for extraction of information from the multiband radar image data. Following the digitization, the remaining resources permitted a preliminary machine analysis to be performed on portions of the radar image data. The results, although necessarily limited, are reported.

Ausherman, D.↗

Study of component technologies for fuel cell on-site integrated energy systems

Heating, ventilation and air conditioning equipment are integrated with three types of fuel cells. System design and computer simulations are developed to utilize the thermal energy discharge of the fuel in the most cost effective manner. The fuel provides all of the electric needs and a loss of load probability analysis is used to ensure adequate power plant reliability. Equipment cost is estimated for each of the systems analyzed. A levelized annual cost reflecting owning and operating costs including the cost of money was used to select the most promising integrated system configurations. Cash flows are presented for the most promising 16 systems. Several systems for the 96 unit apartment complex (a retail store was also studied) were cost competitive with both gas and electric based conventional systems. Thermal storage is shown to be beneficial and the optimum absorption chiller sizing (waste heat recovery) in connection with electric chillers are developed. Battery storage was analyzed since the system is not electric grid connected. Advanced absorption chillers were analyzed as well. Recommendations covering financing, technical development, and policy issues are given to accelerate the commercialization of the fuel cell for on-site power generation in buildings.

Lee, W. D.↗

Potential availability of diesel waste heat at Echo Deep Space Station (DSS 12)

Energy consumption at the Goldstone Echo Deep Space Station (DSS 12) is predicted and quantified for a future station configuration which will involve implementation of proposed energy conservation modifications. Cogeneration by the utilization of diesel waste-heat to satisfy site heating and cooling requirements of the station is discussed. Scenarios involving expanded use of on-site diesel generators are presented.

Hughes, R. D.↗

Basalt generation at the Apollo 12 site. Part 1: New data, classification, and re-evaluation

New data are reported from five previously unanalyzed Apollo 12 mare basalts that are incorporated into an evaluation of previous petrogenetic models and classification schemes for these basalts. This paper proposes a classification for Apollo 12 mare basalts on the basis of whole-rock Mg# (molar 100*(Mg/(Mg+Fe))) and Rb/Sr ratio (analyzed by isotope dilution), whereby the ilmenite, olivine, and pigeonite basalt groups are readily distinguished from each other. Scrutiny of the Apollo 12 feldspathic 'suite' demonstrates that two of the three basalts previously assigned to this group (12031, 12038, 12072) can be reclassified: 12031 is a plagioclase-rich pigeonite basalt; and 12072 is an olivine basalt. Only basalt 12038 stands out as a unique sample to the Apollo 12 site, but whether this represents a single sample from another flow at the Apollo 12 site or is exotic to this site is equivocal. The question of whether the olivine and pigeonite basalt suites are co-magmatic is addressed by incompatible trace-element chemistry: the trends defined by these two suites when Co/Sm and Sm/Eu ratios are plotted against Rb/Sr ratio demonstrate that these two basaltic types cannot be co-magmatic. Crystal fractionation/accumulation paths have been calculated and show that neither the pigeonite, olivine, or ilmenite basalts are related by this process. Each suite requires a distinct and separate source region. This study also examines sample heterogeneity and the degree to which whole-rock analyses are representative, which is critical when petrogenetic interpretation is undertaken. Sample heterogeneity has been investigated petrographically (inhomogeneous mineral distribution) with consideration of duplicate analyses, and whether a specific sample (using average data) plots consistently upon a fractionation trend when a number of different compostional parameters are considered. Using these criteria, four basalts have been identified where reported analyses are not representative of the whole-rock composition: 12005, an ilmenite basalt; 12006 and 12036, olivine basalts; and 12031 previously classified as a feldspathic basalt, but reclassified as part of the pigeonite suite.

Neal, Clive R.↗

THE SUCCESSFUL UTILIZATION OF COMMERCIAL TREATMENT CAPABILITIES TO DISPOSITION HANFORD NO-PATH-FORWARD SUSPECT TRANSURANIC WASTES

The U.S. Department of Energy (DOE) Richland Operations Office (RL) has adopted the 2015 Vision for Cleanup of the Hanford Site. The CH2M HILL Plateau Remediation Company's (CHPRC) Waste and Fuels Management Project (W&FMP) and their partners support this mission by providing centralized waste management services for the Hanford Site waste generating organizations. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as ''no-path-forward waste.'' A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from Hanford's Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed and are currently being implemented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Neutron imaging for geothermal energy systems

Geothermal systems extract heat energy from the interior of the earth using a working fluid, typically water. Three components are required for a commercially viable geothermal system: heat, fluid, and permeability. Current commercial electricity production using geothermal energy occurs where the three main components exist naturally. These are called hydrothermal systems. In the US, there is an estimated 30 GW of base load electrical power potential for hydrothermal sites. Next generation geothermal systems, named Enhanced Geothermal Systems (EGS), have an estimated potential of 4500 GW. EGSs lack in-situ fluid, permeability or both. As such, the heat exchange system must be developed or engineered within the rock. The envisioned method for producing permeability in the EGS reservoir is hydraulic fracturing, which is rarely practiced in the geothermal industry, and not well understood for the rocks typically present in geothermal reservoirs. High costs associated with trial and error learning in the field have led to an effort to characterize fluid flow and fracturing mechanisms in the laboratory to better understand how to design and manage EGS reservoirs. Neutron radiography has been investigated for potential use in this characterization. An environmental chamber has been developed that is suitable for reproduction of EGS pressures and temperatures and has been tested for both flow and precipitations studies with success for air/liquid interface imaging and 3D reconstruction of precipitation within the core.

Bingham, Philip R↗

Existing Whole-House Solutions Case Study: National Grid Deep Energy Retrofit Pilot, Massachusetts and Rhode Island

Between December, 2009 and December, 2012 42 deep energy retrofit (DER) projects were completed through a pilot program sponsored by National Grid and conducted in Massachusetts and Rhode Island. Thirty-seven of these projects were comprehensive retrofits while five were partial DERs, meaning that high performance retrofit was implemented for a single major enclosure component or a limited number of major enclosure components. Building Science Corporation developed a consistent "package" of measures in terms of the performance targeted for major building components. Pre- and post-retrofit air leakage measurements were performed for each of the projects. Each project also reported information about project costs including identification of energy-related costs. Post-retrofit energy-use data was obtained for 29 of the DER projects, and was analyzed based on the net energy used by the DER project regardless of whether the energy was generated on site or delivered to the site. Based on the community experience, this DER package is expected to result in yearly source energy use near 110 MMBtu/year or approximately 40% below the Northeast regional average. Larger to medium sized homes that successful implement these retrofits can be expected to achieve source EUI that is comparable to Passive House targets for new construction. The community of DER projects show post-retrofit airtightness below 1.5 ACH50 to be eminently achievable.

airtightness↗

Challenges in Implementing a Multi-Partnership Geothermal Power Plant

The UND-CLR binary geothermal power plant project is a piggyback operation on a secondary-recovery water-flood project in the Cedar Hills oil field in the Williston Basin. Two open-hole horizontal wells at 2,300 m and 2,400 m depths with lateral lengths of 1,290 m and 860 m produce water at a combined flow of 51 l s -1 from the Lodgepole formation (Miss.) for injection into the Red River formation (Ordovician). The hydrostatic head for the Lodgepole is at ground surface and the pumps, which are set at 650 m depth, have run continuously since 2009. Water temperature at the wellhead is 103 °C and CLR passes the water through two large air-cooled heat exchangers prior to injection. In all aspects, the CLR water flood project is ideal for demonstration of electrical power production from a low-temperature geothermal resource. However, implementation of the project from concept to power production was analogous to breaking trail in deep snow in an old growth forest. There were many hidden bumps, detours, and in some instances immoveable barriers. Problems with investors, cost share, contracts with CLR, resistance from local industry, cost of installation, delays by the ORC supplier, and the North Dakota climate all caused delays and setbacks. Determination and problem solving by the UND team eventually overcame most setbacks, and in April 2016, the site began generating power. Figure 1: Schematic of the water supply well at the UND CLR binary geothermal power plant REFERENCES Williams, Snyder, and Gosnold, 2016, Low Temperature Projects Evaluation and Lesson Learned, GRC Transactions, Vol. 40, 203-210 Gosnold, LeFever, Klenner, Mann, Salehfar, and Johnson, 2010, Geothermal Power from Coproduced Fluids in the Williston Basin, GRC Transactions, Vol. 34, 557-560

Coproduced, geothermal, binary power↗

Electricity Cost for Electric Vehicle Fast Charging

As the adoption of plug-in electric vehicles (PEVs) continues to grow, so does the development of a network of fast-charging stations to support long-distance travel and provide alternatives to residential and workplace charging. Fast charging, however, could be significantly more expensive than residential/workplace charging, mainly due to high power consumption and low utilization. This poster highlights NREL's review of the current cost of electricity for PEV fast charging in the United States as well as its evaluation of alternative charting options to mitigate electricity costs for public fast-charging stations via on-site electricity generation (from photovoltaics) and storage.

25 ENERGY STORAGE↗

On the Formalization of Development and Assessment Process for Digital Twins in the Nearly Autonomous Management and Control System

In recent years, the autonomous control system has been encouraged in advanced reactors for restoring economic viability, simplifying the operation and maintenance, and enabling remote-site power generations [1]. Since the reactor is expected to be operated for a long period of time with a limited number of individuals onsite, it is recommended that the autonomous control system should have access to very realistic models of the state of processes in the whole lifecycle, together with these process behaviors in interaction with their environment in the real world. As a result, digital twin (DT) technology is suggested in autonomous control systems. DT is defined as a digital representation of a physical object or system, which contains a record for the histories of loads, operation and maintenance status, predictions for the near-term transient of important state variables, and decision-making process [2]. Since machine learning (ML) can recognize patterns within a complex system in real-time applications, it has been used to build DTs in the autonomous control systems for advanced reactors. Meanwhile, due to the rareness of operation data in accident scenarios, the development and assessment of DTs is expected to be mainly driven by simulations. Although the capability and feasibility of ML-based DTs are recognized in improving the safety and efficiency of reactor control, a major concern from the regulatory commission and the nuclear industry is whether the information from a DT is developed and assessed in accordance with expectation and requirements by the target decision. Such concerns not only affect the acceptance criteria for DTs, but also values that can be extracted from DTs and autonomous control system during operations. Inspired by the success of formal methods in improving the reliability and robustness of computer programming and software development, it is suggested that the development and assessment process (DAP) for both separate DTs and integral control system should be formalized in a transparent, consistent, and improvable manner. In this study, a digital-twin development and assessment process (DT-DAP) is proposed by adapting the evaluation model development and assessment process (EMDAP) [3] to requirements by the autonomous control system, ML algorithms, and DT technology. To demonstrate the framework, a baseline nearly autonomous management and control (NAMAC) system with ML-based DTs for diagnosis and prognosis is developed and assessed based on the framework. It is found that with selected testing methods and techniques, the DT-DAP can help identify errors in DTs and NAMAC which would otherwise be left unverified. Meanwhile, it is found that the DT-DAP can improve the DTs and NAMAC by continuously learning and iterating through different elements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Setting an optimal procedure for transferring intermediate radioactive effluents: contribution of laboratory experiments - 15234

The INB35 nuclear facility at the CEA Saclay center is in charge of collecting and treating radioactive effluents generated from site's research activities. The first step of the process consists of an evaporation. The concentrate is an IL radioactive suspension with high salt concentration and suspended matter content. Until the 1990's, the resulting effluents were bitumen coated and since 2012 they have been cemented. During the 1990's, concentrates were stored in 7 tanks, named MA50X with X from 1 to 7. With today's changes to safety regulations, the effluents must now be transferred before tank dismantling. According to the site records, the compositions of the liquid wastes MA501, MA502, MA503, MA504, MA506 and MA507 are similar. From 2013 to 2014, effluents contained in MA502, MA503, MA504 tanks have been transferred. Several difficulties have been encountered: - The tanks were historically different, especially manhole tank access - Since the 1990's, effluent composition has changed due to water evaporation. The salt concentration has increased and insoluble elements have formed a deposit in the bottom of the tanks resulting in high composition heterogeneity - In some tanks, a wall breeze-blade exists dividing the tank into two zones, which complicates the interventions. Major challenges have been met and will be described in the presentation. - To obtain an effluent which is as homogeneous as possible, the duration of mixing has been optimized. - To pump the liquid, it has been necessary to treat the effluent with nitric acid. This step has been optimized thanks to experiments in laboratory and hydrodynamic modelling. - A mobile workshop has been designed in order to perform the effluent transfer. It is set up directly above the tanks and can be moved from one tank to another on rails. Laboratory experiments have been carried out to characterize the suspension and sludge in order to understand its chemical behavior. - The treatment of the effluent has been studied in the laboratory and is now mastered. - The analytical strategy has been optimized. The close collaboration between the analytical laboratory and the dismantling project was a real advantage. Thanks to this, the duration of the last transfer on MA 504 was reduced by half, compared to the first operations. Transfer operations will be described and the differences and similarities between laboratory and in-situ observations will be pointed out. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developments in the Regulatory Framework of Nuclear Waste Management in Germany - Licensing Procedures for storage of SNF and Public Involvement - 19612

According to article 6 of the German Atomic Energy Act (AtG), storage of Spent Nuclear Fuel requires a license. The competent licensing authority in this field is the Federal Office for Safety of Nuclear Waste Management (BfE). According to the Act for selecting a repository site for heat-generating radioactive waste (HAW) (Site Selection Act - StandAG) dating from 2017, BfE has been assigned the task of developing, conducting, and evaluating public participation procedures in the process of site search and selection for a deep geological repository for radioactive waste and SNF. Article 6 AtG applies to interim storage of SNF. If the legally defined licensing conditions by article 6 (2) AtG are met, the storage license applied for has to be granted. For on-site facilities, interim storage has been limited to 40 years. The licensing procedures for interim storage of SNF are carried out in accordance with the general administrative procedural rules. In certain cases due to the Environmental Impact Assessment Act (EIA Act), an EIA has to be carried out. In these cases, a formalized licensing procedure including an involvement of the public is conducted. The Nuclear Licensing Procedure Ordinance (AtVfV) originating from 1977 and reformulated in 1995 defines formalized rules for the public participation procedure which have to be followed strictly. These include a public hearing. The risen objections are evaluated by the licensing authority and taken account of in the licensing decision. The process of repository site selection defined by the StandAG exceeds these formalized procedures significantly: The objective of this process is to achieve a broad social consensus about the site selection procedure and about a repository site that will offer the best possible safety for one million years. Therefore, the process has to be particularly transparent, and involvement of the public - including newly developed forms of public involvement - is an essential part of it. BfE as competent authority in both the fields of repository site search and selection and licensing of interim storage of SNF has recently developed new strategies of involving the public concerning interim storage of SNF. Supplementing the standard licensing procedures, BfE presently informs and involves the public about topical issues regarding the present state and recent developments in the field of interim storage of SNF. Current central topics are for example the return of HAW and MAW from reprocessing of SNF in France and UK as well as perspective longer interim storage periods on the interface with final disposal. Regarding longer interim storage, host communities of interim storage facilities are concerned that interim storage might be extended indefinitely. Additionally, there is a strong fear of transports of radioactive waste and SNF from one place to another. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a utility computer-based training program on setpoint methodology for nuclear power plants - 129

The purpose of this paper is to provide an overview of the development of the Computer- Based Training (CBT) Program for utility engineers on Setpoint Methodology for nuclear power plants. This computer based training module was prepared by the Advanced Engineering Training initiative. The Advanced Engineering Training initiative is a nuclear industry effort to develop technical computer-based training modules for targeted areas of engineering expertise. The target audience is engineers at commercial nuclear power facilities in the U. S. These modules are being developed using the systematic approach to training and are being designed to maintain industry engineering expertise and to facilitate engineering knowledge transfer. The objective of this training effort is to support the development of the next generation of site technical experts for specific topic areas. The training is one part of three key components that would facilitate knowledge transfer to the future site Subject Matter Expert (SME). The following are the major focus areas covered in the Setpoint Methodology CBT: Chapter 1 provides an overview of the role instrument setpoints perform in the defense-in-depth safety analysis for the plant as well introducing key definitions related to setpoints. Chapter 2 provides the history and current regulatory requirements related to setpoint control including the laws and guidance provided by the U.S. NRC. Chapter 3 provides describes the setpoint methodology including terms, formulae, methods of combination, graded approach and methods for drift analysis. This is a major part of the training module in covering the incremental uncertainty terms that need to be considered and how they are combined. Chapter 4 provides and overview of the role of setpoints in Technical Specifications and associated documents. Chapter 5 describes how the regulatory process, related to setpoint control, has been implemented in NRC inspections and how the major elements of the 10 CFR 50.59 reviews apply to the performance of a new or revised setpoint calculation. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Distributed Wind for Commercial Loads

Distributed wind can help meet on site energy and resilience needs for a wide variety of commercial loads .While it is a variable resource, it has predictable daily and annual production trends. The presence of on-site renewable generation can enhance resilience, supplying power for long periods of time without worrying about conserving fuel supply. The addition of properly sized storage or complementary solar resources can further reduce the challenges of intermittency and reduce the need for fuel-limited backup power during outage situations. This fact sheet explores further the energy and resilience requirements of commercial loads and how distributed wind may be a good match to meet their load needs.

20 FOSSIL-FUELED POWER PLANTS↗

Distributed Wind for Commercial Loads

Distributed wind can help meet on site energy and resilience needs for a wide variety of commercial loads .While it is a variable resource, it has predictable daily and annual production trends. The presence of on-site renewable generation can enhance resilience, supplying power for long periods of time without worrying about conserving fuel supply. The addition of properly sized storage or complementary solar resources can further reduce the challenges of intermittency and reduce the need for fuel-limited backup power during outage situations. This fact sheet explores further the energy and resilience requirements of commercial loads and how distributed wind may be a good match to meet their load needs.

20 FOSSIL-FUELED POWER PLANTS↗

IMPROVEMENTS IN CONTAINER MANAGEMENT OF TRANSURANIC (TRU) AND LOW LEVEL RADIOACTIVE WASTE STORED AT THE CENTRAL WASTE COMPLEX (CWC) AT HANFORD

The Central Waste Complex (CWC) is the interim storage facility for Resource Conservation & Recovery Act (RCRA) mixed waste, transuranic waste, transuranic mixed waste, low-level and low-level mixed radioactive waste at the Department of Energy's (DOE'S) Hanford Site. The majority of the waste stored at the facility is retrieved from the low-level burial grounds in the 200 West Area at the Site, with minor quantities of newly generated waste from on-site and off-site waste generators. The CWC comprises 18 storage buildings that house 13,000 containers. Each waste container within the facility is scanned into its location by building, module, tier and position and the information is stored in a site-wide database. As waste is retrieved from the burial grounds, a preliminary non-destructive assay is performed to determine if the waste is transuranic (TRU) or low-level waste (LLW) and subsequently shipped to the CWC. In general, the TRU and LLW waste containers are stored in separate locations within the CWC, but the final disposition of each waste container is not known upon receipt. The final disposition of each waste container is determined by the appropriate program as process knowledge is applied and characterization data becomes available. Waste containers are stored within the CWC based on their physical chemical and radiological hazards. Further segregation within each building is done by container size (55-gallon, 85-gallon, Standard Waste Box) and waste stream. Due to this waste storage scheme, assembling waste containers for shipment out of the CWC has been time consuming and labor intensive. Qualitatively, the ratio of containers moved to containers in the outgoing shipment has been excessively high, which correlates to additional worker exposure, shipment delays, and operational inefficiencies. These inefficiencies impacted the LLW Program's ability to meet commitments established by the Tri-Party Agreement, an agreement between the State of Washington, the Department of Energy, and the Environmental Protection Agency. These commitments require waste containers to be shipped off site for disposal and/or treatment within a certain time frame. Because the program was struggling to meet production demands, the Production and Planning group was tasked with developing a method to assist the LLW Program in fulfilling its requirements. Using existing databases for container management, a single electronic spreadsheet was created to visually map every waste container within the CWC. The file displays the exact location (e.g., building, module, tier, position) of each container in a format that replicates the actual layout in the facility. In addition, each container was placed into a queue defined by the LLW and TRU waste management programs. The queues were developed based on characterization requirements, treatment type and location, and potential final disposition. This visual aid allows the user to select containers from similar queues and view their location within the facility. The user selects containers in a centralized location, rather than random locations, to expedite shipments out of the facility. This increases efficiency for generating the shipments, as well as decreasing worker exposure and container handling time when gathering containers for shipment by reducing movements of waste container. As the containers are collected for shipment, the remaining containers are segregated by queue, which further reduces future container movements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mill Seat Landfill Bioreactor Renewable Green Power (NY)

The project was implemented at the Mill Seat landfill located in the Town of Bergen, Monroe County, New York. The landfill was previously equipped with a landfill gas collection system to collect methane gas produced by the bioreactor landfill and transport it to a central location for end use. A landfill gas to energy facility was also previously constructed at the site, which utilized generator engines, designed to be powered with landfill methane gas, to produce electricity, to be utilized on site and to be sold to the utility grid. The landfill gas generation rate at the site had exceeded the capacity of the existing generators, and the excess landfill gas was therefore being burned at a candlestick flare for destruction. The funded project consisted of the procurement and installation of two (2) additional 800 KW Caterpillar 3516 generator engines, generator sets, switchgear and ancillary equipment.

09 BIOMASS FUELS↗