Search NASA⌕ Search

SEARCH · Search NASA

Results for “Injection testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Stratigraphically Controlled Stress Variations at the Hydraulic Fracture Test Site-1 in the Midland Basin, TX

We investigated the relationship between stratigraphy, stress, and microseismicity at the Hydraulic Fracture Test Site-1. The site comprises two sets of horizontal wells in the Wolfcamp shale and a deviated well drilled after hydraulic fracturing. Regional stresses indicate normal/strike-slip faulting with E-W compression. Stress measurements in vertical and horizontal wells show that the minimum principal stress varies with depth. Strata with high clay and organic content show high values of the least compressive stress, consistent with the theory of viscous stress relaxation. By integrating data from core, logs, and the hydraulic fracturing stages, we constructed a stress profile for the Wolfcamp sequence, which predicts how much pressure is required for hydraulic fracture growth. We applied the results to fracture orientation data from image logs to determine the population of pre-existing faults that are expected to slip during stimulation. We also determined microseismic focal plane mechanisms and found slip on steeply dipping planes striking NW, consistent with the orientations of potentially active faults predicted by the stress model. This case study represents a general approach for integrating stress measurements and rock properties to predict hydraulic fracture growth and the characteristics of injection-induced microseismicity.

microseismicity↗

Aquifer Hydraulic Testing and Characterization Plan for the Ringold Formation Unit A in the Hanford 200-ZP-1 Groundwater Operable Unit and Vicinity

This document presents a plan for testing and characterizing the hydraulic properties of the Ringold Formation, member of Wooded Island – unit A (Rwia) in the 200-ZP groundwater operable unit. The testing approach includes multiple field methods and associated analyses designed to investigate and understand aquifer hydraulic properties over a range of scales. Testing was designed to achieve specific testing objectives identified previously in the 200 ZP-1 Groundwater Operable Unit Ringold Formation Unit A Characterization Sampling and Analysis Plan (Ringold A SAP). The test plan provides necessary technical and operational detail for writing subsequent field test instruction documents specific to each testing location. Hydraulic characterization activities will proceed in a phased manner focusing on areas identified to have knowledge gaps and also critical for remedy modifications and/or selection. These activities are designed to minimize impact to pump-and-treat (P&T) operations and to use existing P&T injection and extraction wells as stress wells, and include use of the new Rwia monitoring wells installed for Ringold A SAP activities. ZP-1 hydraulic testing will include slug testing in new Rwia wells, shutdown-recovery tests in multiple Rwia and composite Ringold Formation member of Wooded Island – unit E (Rwie)-Rwia aquifer test locations, installation of new Automated Water Level Network stations in Rwia monitoring wells, characterization of P&T and barometric responses, identifying the vertical distribution of hydraulic conductivity in the Rwia and Rwie units using electromagnetic borehole flowmeter tests, and single-well tracer testing in select Rwia monitoring wells. Slug testing to be conducted during drilling is described under the Ringold A SAP. The remaining testing activities are to be conducted after well drilling and completion and are described in this test plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Subsurface Characterization and Machine Learning Predictions at Brady Hot Springs: Preprint

Subsurface data analysis, reservoir modeling, and machine learning (ML) techniques have been applied to the Brady Hot Springs (BHS) geothermal field in Nevada, USA to further characterize the subsurface and assist with optimizing reservoir management. Hundreds of reservoir simulations have been conducted in TETRAD-G and CMG STARS to explore different injection and production fluid flow rates and allocations and to develop a training data set for ML. This process included simulating the historical injection and production since 1979 and prediction of future performance through 2040. ML networks were created and trained using TensorFlow based on multilayer perceptron (MLP), long short-term memory (LSTM), and convolutional neural network (CNN) architectures. These networks took as input selected flow rates, injection temperatures, and historical field operation data and produced estimates of future production temperatures. This approach was first successfully tested on a simplified single fracture doublet system, followed by the application to the BHS reservoir. Using an initial BHS dataset with 37 simulated scenarios, the trained and validated network predicted the production temperature for 6 production wells with the mean absolute percentage error of less than 8%. In a complementary analysis effort, the principal component analysis applied to 13 BHS geological parameters revealed that vertical fracture permeability shows the strongest correlation with fault density and fault intersection density. A new BHS reservoir model was developed considering the fault intersection density as proxy for permeability. This new reservoir model helps to explore under-exploited zones in the reservoir. A data gathering plan to obtain additional subsurface data was developed; it includes temperature surveying for three idle injection wells, at which the reservoir simulations indicate high bottom-hole temperatures. The collected data assist with calibrating the reservoir model and may lead to converting these wells to producers to access under-exploited zones in the reservoir. Data gathering activities are planned for the first quarter of 2021.

40 EE - Geothermal Technologies Office (EE-4G)↗

Time-Lapse Vertical Seismic Profiling (VSP) for CO 2 Storage in a Depleted Oil Field in Northern Michigan

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership initiative. Since its founding, MRCSP has made significant strides toward making CCUS a viable option for states in the region. The public/private consortium, funded through the DOE Regional Carbon Sequestration Initiative, brings together nearly 40 industry partners and 10 states. Battelle, as the project lead, oversees research, development and operations and coordinates activities among the partners. The incremental, phased approach has built a valuable knowledge base for the industry and paved the way for commercial-scale adoption of CCUS technologies. From 2008 to 2020, MRCSP Phase III focused on the development of large-scale injection projects. This report is part of a series of reports prepared under the Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase). These reports summarize and detail the findings of the work conducted under the Phase III project. This report describes the Dover 33 VSP study to test the effectiveness of time-lapse Vertical Seismic Profile (VSP) for detecting and delineating a plume of more than 271,000 tonnes of CO2 injected into the Brown Niagaran and A-1 Carbonate formations within the Dover 33 reef between March 2013 and September 2016. Five 2D walkaway VSP (WVSP) source lines were acquired by SIGMA3 in September 2016 to investigate the possible time-lapse response in both P-wave and PS-wave seismic data. The data was compared to the same survey geometry acquired in March 2013 by SR2020. The seismic energy was recorded into an 80-level, three-component geophone array deployed into the Dover 1-33 well and placed just above the reef. P-wave and PS-wave reflection images were produced for each of the three source lines from both the 2013 baseline and 2016 monitor surveys. The images were then compared to look for changes in the reflectivity at and around the injection location that might indicate how the CO 2 has moved over this time period. This technique revealed several localized areas with sizable impedance differences inside the reef where CO 2 would be expected; however, a large number of similar impedance “hotspots” were also detected outside the reef in areas where injected CO 2 would not be expected. Therefore, a second analysis that involved calculating P-wave and S-wave travel time differences between the 2013 and 2016 VSPs was conducted to look for a change that could be caused by the CO 2 plume.

01 COAL, LIGNITE, AND PEAT↗

Enhanced passivation and stability of negative charge injected SiN x with higher nitrogen content on the boron diffused surface of n-type Si solar cells

This paper explores the potential of the negatively charged SiN x using plasma charge injection technology to passivate the front textured boron-diffused emitter of n-type Si solar cells. The high-x value single SiN x layer with x ≥ 1.30 (x = N/Si) previously developed for the planarized rear-side passivation of p-type silicon solar cells, with an excellent passivation and charge stability, was found to be unacceptable for the passivation on the front textured boron emitter of n-type cells due to a severe bulk lifetime degradation issue. Therefore, in this study, we investigated a new concept of depositing a dual-x SiN x with a low-x SiN x layer (x~1.01) on top of a high-x SiN x layer (x~1.30) for passivation of the front textured rough surface of boron diffused emitter in n-type cells. Here, the optimized dual-x SiN x stack reveals the promise of charge retention for more than 25 years in field operation as well as excellent passivation of boron-doped emitter without bulk lifetime degradation. N-type cells with the optimized dual-x SiN x after charge injection show comparable cell performance to Al 2 O 3 passivated reference cells. The results of cell-level light stability tests using one-cell minimodules exhibit cell performance decay characteristics similar to the traditional Al 2 O 3 /SiN x passivated reference module.

14 SOLAR ENERGY↗

Testing the Jump Finding Code for NEXUS Qubit Analysis

At Fermilab, the NEXUS dilution refrigerator is repeating the same experiment from Wilen et al. 1 underground to further investigate the effect of ionizing radiation and cosmic ray muons on qubit decoherence. This refrigerator is 100m underground in the MINOS cavern to significantly lower the incident rate of cosmic ray muons, meaning the majority of incidents is due to ionizing radiation. To gain a better understanding of how the rate of ionizing radiation affects the qubits, we use 4 radiation configurations to collect data from the chip. In this work, we examine the efficiency of our jump detection code to find jumps of various sizes. We do so using simulated data with a known number of injected jumps of known sizes. These jumps are charge offsets of the qubit, thought to be due to quasiparticle poisoning. To test this, we run the jump finding code on an array of simulated data in which two main parameters, the smoothing factor and the threshold at which a charge offset is considered a jump, are changed to test an array of these parameters. We then perform a χ2 analysis to find the best combination of these two parameters.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Mitigating municipal solid waste fouling in biofuel conversion via screw surface modifications

Here, municipal solid waste (MSW)'s 40–60 % carbon content makes it a feedstock for biofuel production via pyrolysis. One challenge in the conversion process is MSW fouling due to thermal decomposition. The accumulated deposit on the injection screw often leads to plugging and constriction. This study examined the morphology and composition of the MSW fouling deposit and conducted a thermal simulation to understand the temperature gradience of the injection screw. Surface modifications including smoothening and anti-adhesion coating were proposed for the injection screw to address the deposit problem. For evaluating the candidate mitigations, a bench-scale fouling test was developed with the gas environment, temperature, and sliding speed relevant to the contact interface between the MSW particles and the screw. Results suggested that a smoother screw surface could reduce the grip and a non-metallic coating with a lower surface energy could decrease adhesion, consequently leading to less fouling. Specifically, reducing the roughness from 2 to 0.6 and then to 0.2 μm proportionally decreased the amount of deposit, and the diamond-like-carbon, CrN, and NiCr–CrC composite coatings effectively hindered the fouling process. This study provides fundamental insights into the MSW fouling and proof-of-concept of potential mitigations through the screw surface modification.

09 BIOMASS FUELS↗

Optimal Voltage Control in Low-Observable Unbalanced Distribution Systems

The increased integration of distributed energy resources (DERs) in distribution systems brings both advantages and technical challenges. High levels of DERs can often cause over/under voltage problems. Classical voltage control algorithms are based on full knowledge of voltage states across all nodes in the system. However, this may not be a practical assumption since many locations in distribution systems are unobservable. Therefore, this paper proposes a new model predictive control (MPC) based control algorithm that accounts for system unobservability to efficiently eliminate voltage violations with as low as 50% fraction of observable nodes. Additionally, an analytical voltage sensitivity framework is employed to quickly determine the change in voltage states due to PV injections. The effectiveness of the proposed method is validated via simulations on the unbalanced IEEE 37 node test system.

Abujubbeh, Mohammad↗

Pulse Detonation Engine for Advanced Oxy-Combustion of Coal-Based Fuel for Direct Power Extraction Applications

Pressure gain combustion and magnetohydrodynamic (MHD) systems have the potential to provide a step increase in the efficiency of combined-cycle power plants. Specific advantages include a net pressure increase to the system instead of a pressure drop, the high temperature of the detonation waves can increase the efficiency of power extraction compared to other processes, significant thermal energy can be released in a compact region, and the high velocities of the flow increase extraction of electrical power. In summary, a pressure gain combustor coupled with a MHD has the potential to be transformative. Despite the potential advantages, relatively little research has been conducted considering coupled pressure gain combustion systems with MHD systems. With this background and motivation, the overall goal of this effort was to advance the knowledge, technology, and computational tools associated with coupled detonation and MHD systems. A joint experimental and computational approach was used while seeking to accomplish the goals of this work. Specifically, two pulse detonation engines were developed and used for the experiments to produce detonations. Detonation speeds were measured for a variety of flow and fuel conditions (e.g., methane, propane, with coal particles). Preliminary electrical conductivity measurements were collected. An extensive amount of research was performed to identify sensitivities of detonation behaviors to the presence of combustion products. Computationally, a twofold approach was used in this work. First, a solver was developed for solving the governing equations for a reactive flow with coupled detonation and ionization chemistry. The solver was applied to study the impacts of seed material ionization on detonation. Second, a conservation element-solution element (CE-SE) based numerical solver for detonation studies with a reduced reaction mechanism for oxy-methane combustion was developed and verified on standard test cases. Key findings and contributions from this work are as follows. A system was developed for injecting powderized coal, or other seeding material, into a pulse-detonation system. The influence of a combustion product (i.e., CO 2 ) on detonation behavior was identified. Knowledge gained from this work is applicable to devices such as rotating detonation engines, where combustion products mix with fresh reactants. A system for measuring the electrical conductivity of the exhaust from a pulse-detonation engine was developed. The open-source solver, Clawpack, was extended to solve the reactive Euler equations for simulating detonations. A coupled combustion and ionization chemistry was developed in a single chemical kinetic model for methane oxidation. This model can be used to solve coupled MHD and detonation simulations. It was found that parasitic interactions from ionization chemistry with the magnetic field can reduce the detonation velocity by up to 8%, with a potential impact on power extraction of 15%. It is recommended that interactions between the detonation front and MHD field be considered. Higher gas temperatures and velocities were achieved owing to oxy-fuel detonations. Use of radical dissociation reactions in the reduced reaction mechanism, was found to be critical in predicting detonation temperature and velocity accurately.

01 COAL, LIGNITE, AND PEAT↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) Milestone 6.0: Evaluation of Class VI Readiness

Introduction. Project OASIS is approximately 30 miles southeast of Birmingham, Alabama, and approximately 5 miles north-northwest of Alabama Power Company's Plant Gaston. Geologically, the Project area is in the Alabama fold and thrust belt province. This work builds on the initiatives of the Southeast Regional Carbon Utilization and Storage Acceleration Partnership (SECARB-USA, DE-FE0031830) that identified nearly 500 million metric tonnes of CO 2 emitted on an annual basis that is not collocated with prospective storage geology (the Coastal Plain of the Southeastern US in this context). This observation suggests costly investments in connective infrastructure (e.g., pipelines) or exploratory well drilling campaigns to identify CO 2 storage opportunities in under explored areas. While not traditionally thought of for saline storage, these studies suggest that storage prospects in the Valley and Ridge Province occur in relatively flat lying structural panels between thrust faults. For the Project OASIS region, available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The Project OASIS surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage in an under explored region. This initiative benefits the regions emitters as the data generated from this study can inform their own internal decision making. The field program included geological and geophysical evaluations, reservoir engineering analyses, and risk assessments. This report evaluates existing data, as well as a variety of modeling scenarios to evaluate project readiness. Importantly, the impact of this study is not limited to Alabama as there are numerous large emitters throughout Appalachia, in similar geologic settings, contemplating their decarbonization options.

20 FOSSIL-FUELED POWER PLANTS↗

History Matching and Prediction of a Polymer Flood Pilot in Heavy Oil Reservoir on Alaska North Slope

The first-ever polymer flood pilot to enhance heavy oil recovery on Alaska North Slope is ongoing. After more than 3 years of polymer injection, significant benefit has been observed from the decrease in water cut from 65% to less than 15% in the project producers. The primary objective of this study is to develop a robust history-matched reservoir simulation model capable of predicting future polymer flood performance. In this work, the reservoir simulation model has been developed based on the geological model and available reservoir and fluid data. In particular, four high transmissibility strips were introduced to connect the injector-producer well pairs, simulating short-circuiting flow behavior that can be explained by viscous fingering and reproducing the water cut history. The strip transmissibilities were manually tuned to improve the history matching results during the waterflooding and polymer flooding periods, respectively. It has been found that higher strip transmissibilities match the sharp water cut increase very well in the waterflooding period. Then the strip transmissibilities need to be reduced with time to match the significant water cut reduction. The viscous fingering effect in the reservoir during waterflooding and the restoration of injection conformance during polymer flooding have been effectively represented. Based on the validated simulation model, numerical simulation tests have been conducted to investigate the oil recovery performance under different development strategies, with consideration for sensitivity to polymer parameter uncertainties. The oil recovery factor with polymer flooding can reach about 39% in 30 years, twice as much as forecasted with continued waterflooding. Besides, the updated reservoir model has been successfully employed to forecast polymer utilization, a valuable parameter to evaluate the pilot test’s economic efficiency. All the investigated development strategies indicate polymer utilization lower than 3.5 lbs/bbl in 30 years, which is less than that of the same polymer used in a polymer pilot in Argentina.

Wang, Xindan↗

SECARB Post Injection Assessment Report

The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and The Bureau of Economic Geology (BEG), at the University of Texas at Austin, managed all activities associated with the Early Test field site near Cranfield, Mississippi (the Early Test or Cranfield Project). The SECARB project at Cranfield was focused downdip of the oil rim and on demonstrating the stacked nature of the storage potential at this location: enhanced oil recovery (EOR) up-dip and saline downdip. Because the injection for EOR continued after the SECARB project ended, no actual post-injection period occurred. However, information collected during the SECARB-monitored injection period, including pressure and CO2 plume position, was utilized in an EOR carbon lifecycle assessment. The carbon lifecycle assessment provided insight on tracking injection fronts and production efficiencies across the field. To complete the post injection assessment, taking into account the continuing EOR period after closeout of SECARB field activities, this report provides data and analysis done under another DOE-funded project. The follow up project focused on the carbon lifecycle of EOR and included an assessment of EOR at as-operated and under possible future scenarios. This work was published by Hossieni et al. (2018) and Hosseininoosheri (2019).

01 COAL, LIGNITE, AND PEAT↗

Control of Cement Timing, Mineralogy, and Texture on Hydro-chemo-mechanical Coupling from CO2 Injection into Sandstone: A Synthesis

Carbon capture, utilization, and storage (CCUS) has been widely applied to enhance oil recovery (CO2-EOR). A thorough investigation of the impact of injecting CO2 into a heterogeneous reservoir is critical to understanding the overall reservoir robustness and storage performance. We conducted fifteen flow-through tests on Morrow B sandstone that allowed for chemical reactions between a CO2-rich brackish solution and the sandstones, and four creep/flow-through tests that simultaneously allowed for chemical reactions and stress monitoring. From fluid chemistry and X-ray computed tomography, we found that the dissolution of disseminated cements and the precipitation of iron-rich clays did not significantly affect the permeability and geomechanical properties. Minor changes in mechanical properties from Brazilian and creep tests indicated that the matrix structure was well-supported by early diagenetic quartz overgrowth cement and the reservoir’s compaction history at deep burial depths. However, one sample experienced a dissolution of poikilotopic calcite, leading to a permeability increase and significant tensile strength degradation due to pore opening, which overcame the effect of the early diagenetic cements. We concluded that the Morrow B sandstone reservoir is robust for CO2 injection. Most importantly, cement timing, the abundance and texture of reactive minerals, and the reservoir’s burial history are critical in predicting reservoir robustness and storage capacity for CO2 injection.

Wu, Zhidi (ORCID:0000000338869492)↗

Active Lithium Injection for a Real Time Control of the Divertor Heat Flux for Fusion Devices

When the local heat flux exceeds specified flux limit, tungsten PFC surfaces can be damaged, which is not acceptable for a reliable reactor operations. The divertor PFCs are typically designed for a specific heat flux limit usually assuming an average steady-state heat flux which is typically 5–10 MW/m 2 . However, in addition to steady-state heat flux, fusion reactor divertor PFCs could experience transient heat fluxes such as ELMs and/or other magnetic reconnection events which can deposit large transient heat fluxes onto the divertor PFCs. The transient divertor heat flux could be significantly larger than the steady-state heat flux which could damage the solid PFC surfaces. The divertor heat flux can be subjected to additional complications such as the uncertainties in the the divertor strike point heat flux projection. Moreover, there are additional experimental observations of non-axisymmetric power flux which can occur under non-axisymmetric magnetic perturbations. The liquid lithium (LL) PFCs is more resilient against such transient heat fluxes as they could evaporate LL as needed and the lost LL can be then replenished afterward. In this paper, we analyze a case for a transient divertor heat pulse of 1 MJ in 10 ms for a ITER-size reactor. This is a small perturbation (~ 0.1%) to the expected plasma stored energy compared to the previously analyzed case of 20 MJ heat pulse. Even with this relatively modest heat pulse, the LL surface undergoes ~ 100 °C temperature rise. However, the resulting LL surface heating without rapid cooldown mechanism could lead to excessive LL evaporation continuing well after the transient heat flux resulting in a significant Li injection of ~ 0.6 mol in about a 200 ms period. This amount of Li injection could cause plasma dilution and performance degradation. On the other hand, an active Li injection capability if optimized could prevent the LL surface temperature rise and thus reducing subsequent Li evaporation into the plasma by a factor of 7 compared to the passive LL PFC case. A crucial tool of active Li injection is a rapid response pellet injector which could inject light impurity pellets before the excessive heat flux could reach the divertor plate causing serious damage. A simple pellet ablation model suggests a favorable pellet deposition profile for smaller ~ 0.1 mm radius pellet with ~ 10–20 m/s velocity. Moreover, if it is possible to inject from the private flux region, the pellet injection efficiency into the high heat flux strike point region can be as high as 80% compared to ~ 50% for the injection from outer radius region. The pellet deposition efficiency can be further improved by designing a shell-pellet which can burst when a certain ablation fraction is reached. Finally, a possible implementation technique using an inductive pellet injector with a rapid time response of a few msec is proposed here which can be tested in NSTX-U.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

WISP: Watching grid Infrastructure Stealthily through Proxies (Final Technical Report)

The complex interdependencies of cyber systems (sensors and communications), physical grids and associated electricity market operations make protecting electric power grids a significant challenge. The energy sector is constantly under new, targeted, advanced and dangerous cyber-attacks that have the potential to result in the loss of human life. These threats are further exacerbated by our need to modernize the grid. One focus of cyber security research in smart grids is the securing of the SCADA system through advanced intrusion detection systems (IDS) and bad data detection algorithms in state estimation. These methods either require full knowledge of the system topology and parameters or fail to understand the physical behaviors under attack. WISP (Watching grid Infrastructure Stealthily through Proxies) is designed to provide additional protection to the power grid using only publicly available data. In particular, WISP exploits the spatio-temporal nature of the real time locational marginal prices (LMPs), in conjunction with other information such as bids, weather, outages and load data to analyze anomalous power pricing behaviors and then correlate those observations to localize regions of interest and identify potential cyber events. WISP is non-intrusive as the tool is deployed as a service in the Cloud or on premise and provides reliable information to system operators for enhanced situational awareness, without impeding energy delivery functions. The WISP technology comprises three modules: the data-driven anomaly detection core, the vulnerability and risk analysis and the root cause analysis. The data-driven anomaly detection core performs the tasks of feature selection, anomaly detection and attack region localization. The vulnerability and risk analysis module provides system level information of the vulnerable variables and times, assisting the operators in selecting monitoring and protection nodes. The root cause analysis module takes the detection results and identifies potential operational conditions that contribute to the detected anomalies. In Phase I, we have demonstrated the feasibility and effectiveness of WISP. We developed a realistic electricity market simulator capable of generating normal and attack market data under various operational conditions. We developed a series of cyber-attack detection and analysis algorithms and evaluated them under multiple data sources. Finally, we integrated all modules into an end-to-end software, providing functions for data management, data analytics and visualization. Specifically, we have achieved: (i) real-time data acceptance from external utility interfaces with >99% acceptance rate; (ii) high performance anomaly detection algorithms with >98% detection accuracy and <0.1% false alarm rate; and (iii) ultra-low computing delay <50 milliseconds. Additionally, our team developed algorithms to identify the vulnerable variables in electricity market operations and root cause analysis functions to identify major contributors to the price spikes. These ancillary modules are necessary when deploying WISP in real world industry environment. In Phase II, we have demonstrated the effectiveness of WISP software on realistic largescale power systems. We performed red team testing for the Phase I WISP software and identified software vulnerabilities and implemented corresponding mitigation solutions. We adapted the electricity market simulator for the Texas synthetic 2000-bus system and generated datasets for the false data injection attacks. We created database and visualization interfaces for the Texas system and the ISO New England system. We performed software optimization in terms of operation efficiency, computing speed and detection accuracy. Finally, we tested the software on the Texas system and the ISO New England system and evaluated the detection performance. Overall, we achieved above 89% detection rate, below 3% false alarm rate and below 37 seconds of end-to-end detection delay.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A sub-5 ps jitter time-to-digital converter ASIC with back-gate delay tuning in 22 nm CMOS

We present the design of a Time-to-Digital Converter (TDC) ASIC together with performance characterization results at cryogenic temperature (6-8 K), and at room temperature using emulated Low-Gain Avalanche Detector (LGAD) signals. The TDC design uses a two-step architecture with a ring-oscillator based counter and a Vernier delay line fine TDC. The TDC is implemented in an FD-SOI process, and back-gate tuning is used not only to correct threshold variation due to cryogenic operation, but also as a novel way to tune TDC delay elements with very little overhead. Using this technique, we demonstrate a design with very low power (0.5 mW) and area (0.003 mm 2 ). We present test results using the Fermilab Constant Fraction Discriminator (FCFD) ASIC to produce discriminated signals from an internal charge injection mechanism that mimics the waveform and signal amplitude of minimum ionizing particles impinging on LGAD sensors. We characterize the time precision of the full system and verify that the TDC ASIC contributes a negligible amount to the total system time precision, fully consistent with the expected jitter contribution of less than 5 ps. In conclusion, the results presented here demonstrate the utility of our TDC for applications in physics and quantum communications.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Preliminary Tests and Beam Dynamics Simulations of a Straight-Merger Beamline

Beamlines capable of merging beams with different energies are critical to many applications related to advanced accelerator concepts and energy-recovery linacs (ERLs). In an ERL, a low-energy "fresh" bright bunch is generally injected into a superconducting linac for acceleration using the fields established by a decelerated "spent" beam traveling on the same axis. A straight-merger system composed of a selecting cavity with a superimposed dipole magnet was proposed and recently test at AWA. This paper reports on the experimental results obtained so far along with detailed beam dynamics investigations of the merger concept and its ability to conserve the beam brightness associated with the fresh bunch.

Al Marzouk, A. A.↗

Improving anaerobic digestion of sewage sludge to renewable natural gas by the Advanced Pretreatment & Anaerobic Digestion technology (APAD): Pilot testing

Conventional anaerobic digestion (AD) of sewage sludge in wastewater treatment facilities suffers from low carbon conversion efficiency (CCE = 40%) and requires costly CO2 removal for injection of the produced CH4 into the natural gas grid. To address these limitations, we developed the Advanced Pretreatment and Anaerobic Digestion (APAD) process. This integrates Advanced Wet Oxidation & Steam Explosion (AWOEx) pretreatment of residual sludge after conventional AD, followed by biogas upgradation using a novel methanogenic strain, Methanothermobacter wolfeii BSEL, converting CO2 with H2 into CH4 or RNG (renewable natural gas). Pilot-scale results demonstrated that AWOEx pretreatment achieved a CCE of 62% for the residual sludge, 68% higher than the conventional AD process. The CH4 production was further increased by 79%. Subsequent biogas upgrading in a trickling bed reactor with H2 further enhanced total methane output by 100% and resulted in a final CO2 concentration of =3%. The integrated APAD process achieved a remarkable overall CCE of 83%, resulting in a 200% increase in RNG output when compared to conventional AD. Techno-economic analysis revealed that AWOEx pretreatment alone reduced sludge treatment costs from $494 to $253 per ton of dry solids. The complete APAD process incurred a higher cost of treatment of $530 per ton, driven by prices for bottled H2. The process did, however, show gains in energy recovery and decarbonization. Renewable H2, which may reduce in price in the near future, can positively improve the economics of biogas upgrading for the APAD process.

Life Cycle Assessment (LCA)↗