Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAUNCH TIME”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Aerospace Safety Advisory Panel Annual Report for 1999

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for the calendar year 1999.This was a year of notable achievements and significant frustrations. Both the Space Shuttle and International Space Station (ISS) programs were delayed.The Space Shuttle prudently postponed launches after the occurrence of a wiring short during ascent of the STS-93 mission. The ISS construction schedule slipped as a result of the Space Shuttle delays and problems the Russians experienced in readying the Service Module and its launch vehicle. Each of these setbacks was dealt with in a constructive way. The STS-93 short circuit led to detailed wiring inspections and repairs on all four orbiters as well as analysis of other key subsystems for similar types of hidden damage. The ISS launch delays afforded time for further testing, training, development, and contingency planning. The safety consciousness of the NASA and contractor workforces, from hands-on labor to top management, continues high. Nevertheless, workforce issues remain among the most serious safety concerns of the Panel. Cutbacks and reorganizations over the past several years have resulted in problems related to workforce size, critical skills, and the extent of on-the-job experience. These problems have the potential to impact safety as the Space Shuttle launch rate increases to meet the demands of the ISS and its other customers. As with last year's report, these work- force-related issues were considered of sufficient import to place them first in the material that follows. Some of the same issues of concern for the Space Shuttle and ISS arose in a review of the launch vehicle for the Terra mission that the Panel was asked by NASA to undertake. Other areas the Panel was requested to assess included the readiness of the Inertial Upper Stage for the deployment of the Chandra X-ray Observatory and the possible safety impact of electromagnetic effects on the Space Shuttle. The findings and recommendations in this report do not highlight any major, immediate issues that might compromise the safe pursuit of the various NASA programs. They do, however, cover concerns that the Panel believes should be addressed in the interest of maintaining NASA's excellent safety record.The Panel is pleased to note that remedial efforts for some of the findings raised are underway. Given appropriate funding and cooperative efforts among the Administration, the Congress and the various contractors, the Panel is convinced that safety problems can be avoided or solved resulting in lower risk for NASA's human space and aeronautics programs. Section II of this report contains specific findings and recommendations generated by Panel activities during the calendar year 1999. Section III presents more detailed information in support of these findings and recommendations. A current roster of Panel members, consultants, and staff is included as Appendix A. Appendix B contains NASA's response to the findings and recommendations from the 1998 annual report. It has been augmented this year to include brief explanations of why the Panel classified the NASA response as " open,""continuing," or "closed." Appendix C lists the fact-finding activities of the Panel in 1999.

Blomberg, Richard D.↗

Time Domain Stability Margin Assessment of the NS Space Launch System GN&C Design for Exploration Mission One

The baseline stability margins for NASA's Space Launch System (SLS) launch vehicle were generated via the classical approach of linearizing the system equations of motion and determining the gain and phase margins from the resulting frequency domain model. To improve the fidelity of the classical methods, the linear frequency domain approach can be extended by replacing static, memoryless nonlinearities with describing functions. This technique, however, does not address the time varying nature of the dynamics of a launch vehicle in flight. An alternative technique for the evaluation of the stability of the nonlinear launch vehicle dynamics along its trajectory is to incrementally adjust the gain and/or time delay in the time domain simulation until the system exhibits unstable behavior. This technique has the added benefit of providing a direct comparison between the time domain and frequency domain tools in support of simulation validation.

Clements, Keith↗

Time Domain Stability Margin Assessment of the NASA Space Launch System GN&C Design for Exploration Mission One

The baseline stability margins for NASA's Space Launch System (SLS) launch vehicle were generated via the classical approach of linearizing the system equations of motion and determining the gain and phase margins from the resulting frequency domain model. To improve the fidelity of the classical methods, the linear frequency domain approach can be extended by replacing static, memoryless nonlinearities with describing functions. This technique, however, does not address the time varying nature of the dynamics of a launch vehicle in flight. An alternative technique for the evaluation of the stability of the nonlinear launch vehicle dynamics along its trajectory is to incrementally adjust the gain and/or time delay in the time domain simulation until the system exhibits unstable behavior. This technique has the added benefit of providing a direct comparison between the time domain and frequency domain tools in support of simulation validation.

Clements, Keith↗

Ares I-X Ground Diagnostic Prototype

The automation of pre-launch diagnostics for launch vehicles offers three potential benefits: improving safety, reducing cost, and reducing launch delays. The Ares I-X Ground Diagnostic Prototype demonstrated anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage Thrust Vector Control and for the associated ground hydraulics while the vehicle was in the Vehicle Assembly Building at Kennedy Space Center (KSC) and while it was on the launch pad. The prototype combines three existing tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool from Qualtech Systems Inc. for fault isolation and diagnostics. The second tool, SHINE (Spacecraft Health Inference Engine), is a rule-based expert system that was developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification, and used the outputs of SHINE as inputs to TEAMS. The third tool, IMS (Inductive Monitoring System), is an anomaly detection tool that was developed at NASA Ames Research Center. The three tools were integrated and deployed to KSC, where they were interfaced with live data. This paper describes how the prototype performed during the period of time before the launch, including accuracy and computer resource usage. The paper concludes with some of the lessons that we learned from the experience of developing and deploying the prototype.

Schwabacher, Mark A.↗

Multi-Objective Hybrid Optimal Control for Multiple-Flyby Interplanetary Mission Design Using Chemical Propulsion

The customer (scientist or project manager) most often does not want just one point solution to the mission design problem Instead, an exploration of a multi-objective trade space is required. For a typical main-belt asteroid mission the customer might wish to see the trade-space of: Launch date vs. Flight time vs. Deliverable mass, while varying the destination asteroid, planetary flybys, launch year, etcetera. To address this question we use a multi-objective discrete outer-loop which defines many single objective real-valued inner-loop problems.

Design↗

Environmental Exposure Conditions for Teflon FEP on the Hubble Space Telescope Investigated

The Hubble Space Telescope (HST) was launched into low Earth orbit on April 24,1990. During the first servicing mission in December 1993 (3.6 years after launch), multilayer insulation (MLI) blankets were retrieved from the two magnetic sensing systems located on the light shield. Retrieval of one of the solar arrays during this mission also provided MLI blanket material from the solar array drive arm. These MLI materials were analyzed in ground-based facilities, and results indicate that the space-facing outer layer of the MLI, aluminized Teflon FEP (DuPont; fluorinated ethylene propylene), was beginning to degrade. Close inspection of the FEP revealed through-the-thickness cracks in areas with the highest solar exposure and stress concentration. During the second servicing mission in February 1997 (6.8 years after launch), astronauts observed and documented severe cracking in the outer layer of the MLI blankets on both the solar-facing and anti-solar-facing surfaces. During this second mission, some material from the outer layer of the light shield MLI was retrieved and subsequently analyzed in ground-based facilities. After the second servicing mission, a Failure Review Board was convened by NASA Goddard Space Flight Center to address the MLI degradation problem on HST. Members of the Electro-Physics Branch of the NASA Glenn Research Center at Lewis Field participated on this board. To determine possible degradation mechanisms, board researchers needed to consider all environmental constituents to which the FEP MLI surfaces were exposed. On the basis of measurements, models, and predictions, environmental exposure conditions for FEP surfaces on HST were estimated for various time periods from launch in 1990 through 2010, the planned end-of-life for HST. The table summarizes these data including the number and temperature ranges of thermal cycles; equivalent Sun hours; fluence and absorbed radiation dose from solar event x rays; fluence and absorbed dose from solar wind protons and electrons trapped in Earth s magnetic field; fluence of plasma electrons and protons; and atomic oxygen fluence.

Dever, Joyce A.↗

Atlas V Launch Incorporated NASA Glenn Thermal Barrier

In the Spring of 2002, Aerojet experienced a major failure during a qualification test of the solid rocket motor that they were developing for the Atlas V Enhanced Expendable Launch Vehicle. In that test, hot combustion gas reached the O-rings in the nozzle-to-case joint and caused a structural failure that resulted in loss of the nozzle and aft dome sections of the motor. To improve the design of this joint, Aerojet decided to incorporate three braided carbon-fiber thermal barriers developed at the NASA Glenn Research Center. The thermal barriers were used to block the searing-hot 5500 F pressurized gases from reaching the temperature-sensitive O-rings that seal the joint. Glenn originally developed the thermal barriers for the nozzle joints of the space shuttle solid rocket motors, and Aerojet decided to use them on the basis of the results of several successful ground tests of the thermal barriers in the shuttle rockets. Aerojet undertook an aggressive schedule to redesign the rocket nozzle-to-case joint with the thermal barriers and to qualify it in time for a launch planned for the middle of 2003. They performed two successful qualification tests (Oct. and Dec. 2002) in which the Glenn thermal barriers effectively protected the O-rings. These qualification tests saved hundreds of thousands of dollars in development costs and put the Lockheed-Martin/Aerojet team back on schedule. On July 17, 2003, the first flight of an Atlas V boosted with solid rocket motors successfully launched a commercial satellite into orbit from Cape Canaveral Air Force Station. Aero-jet's two 67-ft solid rocket boosters performed flawlessly, with each providing thrust in excess of 250,000 lbf. Both motors incorporated three Glenn-developed thermal barriers in their nozzle-to-case joints. The Cablevision satellite launched on this mission will be used to provide direct-to-home satellite television programming for the U.S. market starting in late 2003. The Atlas V is a product of the military's Enhanced Expendable Launch Vehicle program designed to provide assured military access to space. It can lift payloads up to 19,100 lb to geosynchronous transfer orbit and was designed to meet Department of Defense, commercial, and NASA needs. The Atlas V and Delta IV are two launch systems being considered by NASA to launch the Orbital Space Plane/Crew Exploration Vehicle. The launch and rocket costs of this mission are valued at $250 million. Successful application of the Glenn thermal barrier to the Atlas V program was an enormous breakthrough for the program's technical and schedule success.

Dunlap, Patrick H., Jr.↗

Planning and Estimation of Operations Support Requirements

Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.

Newhouse, Marilyn E.↗

Mass Reduction: The Weighty Challenge for Exploration Space Flight

Meeting nutritional and acceptability requirements is critical for the food system for an exploration class space mission. However, this must be achieved within the constraints of available resources such as water, crew time, stowage volume, launch mass and power availability.  Due to resource constraints, exploration class missions are not expected to have refrigerators or freezers for food storage, and current per person food mass must be reduced to improve mission feasibility.  The Packaged Food Mass Reduction Trade Study (Stoklosa, 2009) concluded that the mass of the current space food system can be effectively reduced by decreasing water content of certain foods and offering nutrient dense substitutes, such as meal replacement bars and beverages. Target nutrient ranges were established based on the nutritional content of the current breakfast and lunch meals in the ISS standard menu. A market survey of available commercial products produced no viable options for meal replacement bar or beverage products. New prototypes for both categories were formulated to meet target nutrient ranges. Samples of prototype products were packaged in high barrier packaging currently used for ISS and underwent an accelerated shelf life study at 31 degC and 41 degC (50% RH) for 24 weeks. Samples were assessed at the following time points: Initial, 6 weeks, 12 weeks, and 24 weeks. Testing at each time point included the following: color, texture, water activity, acceptability, and hexanal analysis (for food bars only). Proof of concept prototypes demonstrated that meal replacement food bars and beverages can deliver a comparable macronutrient profile while reducing the overall mass when compared to the ISS Standard Menu. Future work suggestions for meal replacement bars: Reformulation to include ingredients that reduce hardness and reduce browning to increase shelf life. Micronutrient analysis and potential fortification. Sensory evaluation studies including satiety tests and menu fatigue. Water Intake Analysis: The water in thermostabilized foods is considered as part of a crewmember's daily water intake. Extensive meal replacement would require further analyses to determine if additional water provisioning would be required per crewmember negating some of the mass savings.

Kloeris, Vickie L.↗

Sounding of the Cleft Ion Fountain Energization Region

The objectives of the ground-based observations in support of the SCIFER are: Acquire and display ionospheric conditions prior to launch to aid in the establishment of launch criteria in real time. Observers at both stations participated in real-time visual interpretation. Solar wind data from IMP-8 and WIND were acquired and interpreted in real time. Telephonic and data links were established at the observatory for the launch window period. Ground-based observatory countdown and launch criteria were developed. 2) Relate optical and magnetic ionospheric signatures observed from the ground to magnetospheric boundaries in the energetic particle flux measured at the payload. The energetic electron trapping boundary was found to correspond to the equatorward edge of the discrete auroral arcs forming the dayside aurora. The energetic electron trapping boundary was found to correspond to the poleward edge of pulsating aurora. The pulsating aurora was found to correspond to one second bursts of energy-dispersed electrons originating in the equatorial plane. Pulsations at larger intervals corresponded to travel times to the conjugate region and return. The pulsating aurora was also directly linked to the geomagnetic pulsations and traveling magnetic vortices, all occurring equatorward of the trapping boundary. 630 nm emission corresponding to less than 10 eV electron precipitation was observed equatorward of the trapping boundary (L=15) and ascribed to photoelectrons from the sunlit conjugate region. 3) Aid in the interpretation of time/space incongruities in the rocket data. The motion of the payload conjugate across the aurora showed that the payload passed over three distinct arc systems on the poleward side of the trapping boundary. These results were reported in a series of articles to be printed in Geophysical Research Letters on June 15, l996.

Kintner, P.↗

NIR Color vs Launch Date: A 20-Year Analysis of Space Weathering Effects on the Boeing 376 Spacecraft

The Boeing HS‐376 spin stabilized spacecraft was a popular design that was launched continuously into geosynchronous orbit starting in 1980 with the last launch occurring in 2002. Over 50 of the HS‐376 buses were produced to fulfill a variety of different communication missions for countries all over the world. The design of the bus is easily approximated as a telescoping cylinder that is covered with solar cells and an Earth facing antenna that is despun at the top of the cylinder. The similarity in design and the number of spacecraft launched over a long period of time make the HS‐376 a prime target for studying the effects of solar weathering on solar panels as a function of time. A selection of primarily non‐operational HS‐376 spacecraft launched over a 20 year time period were observed using the United Kingdom Infrared Telescope on Mauna Kea and multi‐band near‐infrared photometry produced. Each spacecraft was observed for an entire night cycling through ZYJHK filters and time‐varying colors produced to compare near‐infrared color as a function of launch date. The resulting analysis shown here may help in the future to set launch date constraints on the parent object of unidentified debris objects or other unknown spacecraft.

Frith, James↗

Natural Convection Cooling of the Advanced Stirling Radioisotope Generator Engineering Unit

After fueling and prior to launch, the Advanced Stirling Radioisotope Generator (ASRG) will be stored for a period of time then moved to the launch pad for integration with the space probe and mounting on the launch vehicle. During this time, which could be as long as 3 years, the ASRG will operate continuously with heat rejected from the housing and fins. Typically, the generator will be cooled by forced convection using fans. During some of the ground operations, maintaining forced convection may add significant complexity, so allowing natural convection may simplify operations. A test was conducted on the ASRG Engineering Unit (EU) to quantify temperatures and operating parameters with natural convection only and determine if the EU could be safely operated in such an environment. The results show that with natural convection cooling the ASRG EU Stirling convertor pressure vessel temperatures and other parameters had significant margins while the EU was operated for several days in this configuration. Additionally, an update is provided on ASRG EU testing at NASA Glenn Research Center, where the ASRG EU has operated for over 16,000 hr and underwent extensive testing.

Lewandowski, Edward J.↗

Designing for solid rocket booster reusability

The Solid Rocket Booster (SRB) of the Space Shuttle Program has been designed to be recovered, refurbished, and reused up to 19 times on subsequent launches. The design modifications to the SRB to incorporate this capability include the addition of a parachute recovery system and minor structural modifications to the nose cone, forward skirt, aft skirt, and solid rocket motor structures for withstanding the water impact loading. In addition, the detail design of subsystem hardware requires careful attention to corrosion prevention and facility of refurbishment operations. A cost analysis comparing the reusable SRB with an expendable version shows a substantial reduction in Space Shuttle cost per flight is achieved with the reusable design approach.

Nevins, C. D.↗

Spectral analysis of skeletal muscle changes resulting from 59 days of weightlessness in Skylab 2

During stressful exercise of the m. gastrocnemius, preflight and postflight surface electromyograms (EMG) were taken from each of the Skylab II astronauts. Measurements on the muscle were made once 5 days before launch, and four times postflight on recovery day, 4 days after recovery, 16 days after recovery and 29 days after recovery. It was hypothesized that the disused gastrocnemius would exhibit dysfunction characteristics similar to those found in laboratory studies on disuse and of pathologically astrophied muscle, and that physical stress would be associated with heightened fatigability in the muscle. Both hypotheses were sustained. The results showed significant shifts of the predominant frequency of the gastrocnemius into higher than normal bands which suggests a relationship between muscle disuse characteristics and pathologic dysfunction characteristics. It was concluded that the spectrally analyzed EMG is a sensitive measure of muscle dsyfunction that is associated with disuse. Antigravity muscles exhibit heightened susceptibility to fatigue when subjected to lengthy weightlessness.

Lafevers, E. V.↗

Impact of Space Transportation System on planetary spacecraft and missions design

Results of Jet Propulsion Laboratory (JPL) activities to define and understand alternatives for planetary spacecraft operations with the Space Transportation System (STS) are summarized. The STS presents a set of interfaces, operational alternatives, and constraints in the prelaunch, launch, and near-earth flight phases of a mission. Shuttle-unique features are defined and coupled with JPL's existing program experience to begin development of operationally efficient alternatives, concepts, and methods for STS-launched missions. The time frame considered begins with the arrival of the planetary spacecraft at Kennedy Space Center and includes prelaunch ground operations, Shuttle-powered flight, and near-earth operations, up to acquisition of the spacecraft signal by the Deep Space Network. The areas selected for study within this time frame were generally chosen because they represent the 'driving conditions' on planetary-mission as well as system design and operations.

Barnett, P. M.↗