Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Space Station operations

An evaluation of the success of the Space Station will be based on the service provided to the customers by the Station crew, the productivity of the crew, and the costs of operation. Attention is given to details regarding Space Station operations, a summary of operational philosophies and requirements, logistics and resupply operations, prelaunch processing and launch operations, on-orbit operations, aspects of maintainability and maintenance, habitability, and questions of medical care. A logistics module concept is considered along with a logistics module processing timeline, a habitability module concept, and a Space Station rescue mission.

Gray, R. H.↗

Maintenance and supply options

The object of the Maintenance and Supply Option was to develop a high level operational philosophy related to maintenance and supply operations and incorporate these concepts into the Lunar Base Study. Specific products to be generated during this task were three trade studies and a conceptual design of the Logistic Supply Module. The crew size study was performed to evaluate crew sizes from the baseline size of four to a crew size of eight and determine the preferred crew size. The second trade study was to determine the impact of extending surface stay times and recommend a preferred duration of stay time as a function of crew, consumables, and equipment support capabilities. The third trade study was an evaluation of packaging and storage methods to determine the preferred logistics approach to support the lunar base. A modified scenario was developed and served as the basis of the individual trade studies. Assumptions and guidelines were also developed from experience with Apollo programs, Space Shuttle operations, and Space Station studies. With this information, the trade studies were performed and a conceptual design for the Logistic Supply Module was developed.

Source record↗

Expendable launch vehicle transportation for the space station

Logistics transportation will be a critical element in determining the Space Station Freedom's level of productivity and possible evolutionary options. The current program utilizes the Space Shuttle as the only logistics support vehicle. Augmentation of the total transportation capability by expendable launch vehicles (ELVs) may be required to meet demanding requirements and provide for enhanced manifest flexibility. The total operational concept from ground operations to final return of support hardware or its disposal is required to determine the ELV's benefits and impacts to the Space Station Freedom program. The characteristics of potential medium and large class ELVs planned to be available in the mid-1990's (both U.S. and international partners' vehicles) indicate a significant range of possible transportation systems with varying degrees of operational support capabilities. The options available for development of a support infrastructure in terms of launch vehicles, logistics carriers, transfer vehicles, and return systems is discussed.

Corban, Robert R.↗

Sensitivity study of Space Station Freedom operations cost and selected user resources

The results of sensitivity studies performed to estimate probable ranges for four key Space Station parameters using the Space Station Freedom's Model for Estimating Space Station Operations Cost (MESSOC) are discussed. The variables examined are grouped into five main categories: logistics, crew, design, space transportation system, and training. The modification of these variables implies programmatic decisions in areas such as orbital replacement unit (ORU) design, investment in repair capabilities, and crew operations policies. The model utilizes a wide range of algorithms and an extensive trial logistics data base to represent Space Station operations. The trial logistics data base consists largely of a collection of the ORUs that comprise the mature station, and their characteristics based on current engineering understanding of the Space Station. A nondimensional approach is used to examine the relative importance of variables on parameters.

Accola, Anne↗

ECLS resupply for Space Station Freedom

The design of logistics carriers is presented emphasizing the use of cost-effective pressurized and nonpressurized versions to resupply consumable fluids and provide on-orbit support for the Space Station Freedom. The requirements for the Environmental Control and Life Support (ECLS) system include high-pressure oxygen and nitrogen as well as consumables that do not require pressurization. The nominal and contingency requirements are given for logistics carriers designed to support various mission scenarios by resupplying and servicing fluid systems on-orbit. The resulting design overview for the logistics carriers describes the cryogenic-nitrogen storage during launch and operation of the unpressurized version and the flexible payload-support capacity of the pressurized version. The carriers are characterized as lightweight and versatile, and the resupply of cryogenic nitrogen is a flight-proven capability.

Higginbotham, Keith↗

EMU evolution

Evolution of Extravehicular Mobility Unit (EMU) technology is necessary to support the Extravehicular Activity (EVA) requirements of the Space Station Freedom Program and those of the Space Exploration Initiative (SEI). Key qualities supporting long-duration missions include technologies that are highly reliable, durable, minimize logistics requirements, and are in-flight maintainable and serviceable. While these qualities are common to SSF and SEI EVA, development paths will differ where specific mission requirements impose different constraints. Development of reusable, regenerative technologies is necessary to minimize the logistics penalties. Increased battery discharge/recharge cycle life and usable wet life, compact high current density fuel cells, reusable CO2 absorbing media, and thermal radiation coupled with venting heat rejection technologies are just some methods of reducing consumables. Development must strive for durable, reliable systems that are in-flight serviceable and maintainable, which are vital for missions where logistics capabilities are extremely constrained. Key areas include suit components (e.g., gloves, boots, and cooling garments), and life support hardware such as fans, pumps, instrumentation, and emergency O2 systems. Higher pressure suits will reduce EVA prebreathe requirements and pre-EVA operations overall. Many challenges of higher pressure suits have been addressed by on-going development. Emphasis on glove development is necessary to provide low fatigue, dexterous glove mobility at higher suit pressures. Minimum impact hooks and scars which support an advanced SSF EMU have been identified. These accommodations permit upgrades that support servicing of low volume, high pressure oxygen systems, and hydrogen technologies such as fuel cell, and venting hydrogen heat rejection systems.

Rouen, M.↗

RACE pulls for shared control

Maintaining and supporting an aircraft fleet, in a climate of reduced manpower and financial resources, dictates effective utilization of robotics and automation technologies. To help develop a winning robotics and automation program the Air Force Logistics Command created the Robotics and Automation Center of Excellence (RACE). RACE is a command wide focal point. Race is an organic source of expertise to assist the Air Logistic Center (ALC) product directorates in improving process productivity through the judicious insertion of robotics and automation technologies. RACE is a champion for pulling emerging technologies into the aircraft logistic centers. One of those technology pulls is shared control. Small batch sizes, feature uncertainty, and varying work load conspire to make classic industrial robotic solutions impractical. One can view ALC process problems in the context of space robotics without the time delay. The ALC's will benefit greatly from the implementation of a common architecture that supports a range of control actions from fully autonomous to teleoperated. Working with national laboratories and private industry, we hope to transition shared control technology to the depot floor. This paper provides an overview of the RACE internal initiatives and customer support, with particular emphasis on production processes that will benefit from shared control technology.

Leahy, M. B., Jr.↗

Space Station evolution study

This is the Space Station Freedom (SSF) Evolution Study 1993 Final Report, performed under NASA Contract NAS8-38783, Task Order 5.1. This task examined: (1) the feasibility of launching current National Space Transportation System (NSTS) compatible logistics elements on expendable launch vehicles (ELV's) and the associated modifications, and (2) new, non-NSTS logistics elements for launch on ELV's to augment current SSF logistics capability.

Evans, David B.↗

Rack Insertion End Effector (RIEE) guidance

NASA-KSC has developed a mechanism to handle and insert Racks into the Space Station Logistic Modules. This mechanism consists of a Base with 3 motorized degrees of freedom, a 3 section motorized Boom that goes from 15 to 44 feet in length, and a Rack Insertion End Effector (RIEE) with 5 hand wheels for precise alignment. During the 1993 NASA-ASEE Summer Faculty Fellowship Program at KSC, I designed an Active Vision (Camera) Arrangement and developed an algorithm to determine (1) the displacements required by the Room for its initial positioning and (2) the rotations required at the five hand-wheels of the RIEE, for the insertion of the Rack, using the centroids fo the Camera Images of the Location Targets in the Logistic Module. Presently, during the summer of '94, I completed the preliminary design of an easily portable measuring instrument using encoders to obtain the 3-Dimensional Coordinates of Location Targets in the Logistics Module relative to the RIEE mechanism frame. The algorithm developed in '93 can use the output of this instrument also. Simplification of the '93 work and suggestions for the future work are discussed.

Malladi, Narasimha S.↗

Fuel Cell Power Plant Initiative: Preliminary Design of a Fixed-Base LFP/SOFC Power System - Volume 2

This report documents the preliminary design for a military fixed-base power system of 3 MWe nominal capacity using Westinghouse's tubular Solid Oxide Fuel Cell [SOFC] and Haldor Topsoe's logistic fuels processor [LFP]. The LFP provides to the fuel cell a methane rich sulfur free fuel stream derived from either DF-2 diesel fuel, or JP-8 turbine fuel. Fuel cells are electrochemical devices that directly convert the chemical energy contained in fuels such as hydrogen, natural gas, or coal gas into electricity at high efficiency with no intermediate heat engine or dynamo. The SOFC is distinguished from other fuel cell types by its solid state ceramic structure and its high operating temperature, nominally 1000'C. The SOFC pioneered by Westinghouse has a tubular geometry closed at one end. A power generation stack is formed by aggregating many cells in an ordered array. The Westinghouse stack design is distinguished from other fuel cell stacks by the complete absence of high integrity seals between cell elements, cells, and between stack and manifolds. Further, the reformer for natural gas [predominantly methane] and the stack are thermally and hydraulically integrated with no requirement for process water. The technical viability of combining the tubular SOFC and a logistic fuels processor was demonstrated at 27 kWe scale in a test program sponsored by the Advanced Research Projects Agency [ARPA) and carried out at the Southern California Edison's [SCE] Highgrove generating station near San Bernardino, California in 1994/95. The LFP was a breadboard design supplied by Haldor Topsoe, Inc. under subcontract to Westinghouse. The test program was completely successful. The LFP fueled the SOFC for 766 hours on JP-8 and 1555 hours of DF-2. In addition, the fuel cell operated for 3261 hours on pipeline natural gas. Over the 5582 hours of operation, the SOFC generated 118 MVVH of electricity with no perceptible degradation in performance. The LFP processed military specification JP-8 and DF-2 removing the sulfur and reforming these liquid fuels to a methane rich gaseous fuel. Results of this program are documented in a companion report titled 'Final Report-Solid Oxide Fuel Cell/ Logistic Fuels Processor 27 kWe Power System'.

Veyo, S.E.↗

STS-96 Mission Highlights

In this second part of a three-part video mission-highlights set, on-orbit spacecrew activities performed on the STS-96 Space Shuttle Orbiter Discovery and the International Space Station are reviewed. The flight crew consists of Kent V. Rominger, Commander; Rick D. Husband, Pilot; and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette (Canadian), and Valery Ivanovich Tokarev (Russian). The primary goals of this mission were to work on logistics and resupply the International Space Station. This second part in the mission series features video from Flight Day 4-7 (FD 4-7). FD 4 of STS-96 presents astronauts Tammy Jernigan and Dan Barry completing the second longest space walk in shuttle history. Footage includes Jernigan and Barry transferring and installing two cranes from the shuttle's payload bay to locations on the outside of the station. The astronauts enter the International Space Station delivering supplies and prepare the outpost to receive its first resident crew, scheduled to arrive in early 2000 on FD 5. The video also captures the crew involved in logistics transfer activities within the Discovery/ISS orbiting complex. FD 6 includes footage of Valery Tokarev and Canadian astronaut Julie Payette charging out the final six battery recharge controller units for two of Zarya's power-producing batteries and all crew members' involvement in logistics transfer activities from the SPACEHAB module to designated locations in the International Space Station. With the transfer work of FD 6 all but complete, the astronauts conduct some additional work, installing parts of a wireless strain gauge system that will help engineers track the effects of adding modules to the station throughout its assembly. Moving the few remaining items from Discovery to the ISS, then closing a series of hatches within the station's modules leading back to the shuttle are the primary activities contained in FD 7. Final coverage features Discovery's astronauts finishing their work inside the International Space Station, closing all of the hatches and readying the shuttle's small thrusters to be fired to raise the entire complex's orbit in preparation for the undocking and departure set for FD 8.

Source record↗

Demonstration of an Ultra-Short Channel Metal Monolith Catalytic Reactor for Trace Contaminant Control Applications

The International Space Station (ISS) Trace Contaminant Control Subassembly (TCCS) design is based upon proven, highly reliable technology. However, because its core unit operations rely upon expendable activated charcoal and an indirectly heated high temperature catalyst, annual logistics mass, crew time, and power consumption requirements are significant. To address this situation, a unique catalytic reactor design has been developed which is suitable for retrofit into the TCCS's high temperature catalytic oxidizer (HTCO) assembly. The unique design, which employs a metallic, ultra-short channel length monolith (USCM) catalyst substrate, was tested in a flight-like TCCS HTCO assembly to investigate its performance characteristics. Test results indicate that retrofitting the TCCS with a USCM-based catalytic reactor is feasible and that it may provide significant reductions in logistics mass, crew time, and power consumption. Savings indicated by test results are up to 81% for annual logistics, 56% for crew time, and 77% for startup transient duration. In addition, its demonstrated ability to operate in a power saving mode provides up to a 43% savings in average power consumption. A summary of the USCM demonstration test objectives, approach, results, and specific benefits to the TCCS's process economics are presented,

Perry, J. L↗

A Method for Estimating Costs and Benefits of Space Assembly and Servicing By Astronauts and Robots

One aspect of designing future space missions is to determine whether Space Assembly and Servicing (SAS) is useful and, if so, what combination of robots and astronauts provides the most effective means of accomplishing it. Certain aspects of these choices, such as the societal value of developing the means for humans to live in space, do not lend themselves to quantification. However, other SAS costs and benefits can be quantified in a manner that can help select the most cost-effective SAS approach. Any space facility, whether it is assembled and serviced or not, entails an eventual replacement cost due to wear and obsolescence. Servicing can reduce this cost by limiting replacement to only failed or obsolete components. However, servicing systems, such as space robots, have their own logistics cost, and astronauts can have even greater logistics requirements. On the other hand, humans can be more capable than robots at performing dexterous and unstructured tasks, which can reduce logistics costs by allowing a reduction in mass of replacement components. Overall, the cost-effectiveness of astronaut SAS depends on its efficiency; and, if astronauts have to be wholly justified by their servicing usefulness, then the serviced space facility has to be large enough to fully occupy them.

Purves, Lloyd R.↗

STS-114 Crew Interviews Eileen Collins, CDR

Commander Eileen Collins of the STS-114 space mission is seen during a pre-launch interview. She answers questions about the primary goals of the mission which are to exchange the expedition six and expedition seven crews. Also, she says that a large amount of logistics will be taken up to the International Space Station. The primary payload on this mission include: 1) The Utilization and Logistics Flight-1 (ULF-1); 2) Raffaello Multi-Purpose Logistics Module (MPLM); and 3) External Stowage Platform (ESP-2) which are all explained in detail by the Commander. The Window Observational Research Facility (WORF) rack, Human Research Facility (HRF) rack, Minus Eighty Degree Laboratory Freezer (MELF) and EXPRESS rack are the Space Station equipment to be installed on the International Space Station (I.S.S.). Collins is the Intravehicular Activity (IVA) specialist for this mission who oversees the three Extravehicular Activity (EVA)'s performed by Mission Specialists Soichi Noguchi and Stephen Robinson. The three EVA's include an external camera installation, positioning devices for an ammonia system and the installation of Floating Potential Measuring Unit (FPMU). Commander Collins expresses that she wants to have a successful mission, and also wants to see the Earth from space.

Source record↗

NASA Experimental Program to Stimulate Competitive Research: South Carolina

The use of an appropriate relationship model is critical for reliable prediction of future urban growth. Identification of proper variables and mathematic functions and determination of the weights or coefficients are the key tasks for building such a model. Although the conventional logistic regression model is appropriate for handing land use problems, it appears insufficient to address the issue of interdependency of the predictor variables. This study used an alternative approach to simulation and modeling urban growth using artificial neural networks. It developed an operational neural network model trained using a robust backpropagation method. The model was applied in the Myrtle Beach region of South Carolina, and tested with both global datasets and areal datasets to examine the strength of both regional models and areal models. The results indicate that the neural network model not only has many theoretic advantages over other conventional mathematic models in representing the complex urban systems, but also is practically superior to the logistic model in its capability to predict urban growth with better - accuracy and less variation. The neural network model is particularly effective in terms of successfully identifying urban patterns in the rural areas where the logistic model often falls short. It was also found from the area-based tests that there are significant intra-regional differentiations in urban growth with different rules and rates. This suggests that the global modeling approach, or one model for the entire region, may not be adequate for simulation of a urban growth at the regional scale. Future research should develop methods for identification and subdivision of these areas and use a set of area-based models to address the issues of multi-centered, intra- regionally differentiated urban growth.

Sutton, Michael A.↗

A Simulation Based Approach for Contingency Planning for Aircraft Turnaround Operation System Activities in Airline Hubs

Commercial aircraft undergo a significant number of maintenance and logistical activities during the turnaround operation at the departure gate. By analyzing the sequencing of these activities, more effective turnaround contingency plans may be developed for logistical and maintenance disruptions. Turnaround contingency plans are particularly important as any kind of delay in a hub based system may cascade into further delays with subsequent connections. The contingency sequencing of the maintenance and logistical turnaround activities were analyzed using a combined network and computer simulation modeling approach. Experimental analysis of both current and alternative policies provides a framework to aid in more effective tactical decision making.

Adeleye, Sanya↗

Semi-Automated Diagnosis, Repair, and Rework of Spacecraft Electronics

NASA's Constellation Program for Exploration of the Moon and Mars places human crews in extreme isolation in resource scarce environments. Near Earth, the discontinuation of Space Shuttle flights after 2010 will alter the up- and down-mass capacity for the International Space Station (ISS). NASA is considering new options for logistics support strategies for future missions. Aerospace systems are often composed of replaceable modular blocks that minimize the need for complex service operations in the field. Such a strategy however, implies a robust and responsive logistics infrastructure with relatively low transportation costs. The modular Orbital Replacement Units (ORU) used for ISS requires relatively large blocks of replacement hardware even though the actual failed component may really be three orders of magnitude smaller. The ability to perform in-situ repair of electronics circuits at the component level can dramatically reduce the scale of spares and related logistics cost. This ability also reduces mission risk, increases crew independence and improves the overall supportability of the program. The Component-Level Electronics Assembly Repair (CLEAR) task under the NASA Supportability program was established to demonstrate the practicality of repair by first investigating widely used soldering materials and processes (M&P) performed by modest manual means. The work will result in program guidelines for performing manual repairs along with design guidance for circuit reparability. The next phase of CLEAR recognizes that manual repair has its limitations and some highly integrated devices are extremely difficult to handle and demand semi-automated equipment. Further, electronics repairs require a broad range of diagnostic capability to isolate the faulty components. Finally repairs must pass functional tests to determine that the repairs are successful and the circuit can be returned to service. To prevent equipment demands from exceeding spacecraft volume capacity and skill demands from exceeding crew time and training limits, the CLEAR project is examining options provided by non-real time tele-operations, robotics, and a new generation of diagnostic equipment. This paper outlines a strategy to create an effective repair environment where, with the support of ground based engineers, crewmembers can diagnose, repair and test flight electronics in-situ. This paper also discusses the implications of successful tele-robotic repairs when expanded to rework and reconfiguration of used flight assets for building Constellation infrastructure elements.

Struk, Peter M.↗

A Lunar Surface System Supportability Technology Development Roadmap

This paper discusses the establishment of a Supportability Technology Development Roadmap as a guide for developing capabilities intended to allow NASA's Constellation program to enable a supportable, sustainable and affordable exploration of the Moon and Mars. Presented is a discussion of "supportability", in terms of space facility maintenance, repair and related logistics and a comparison of how lunar outpost supportability differs from the International Space Station. Supportability lessons learned from NASA and Department of Defense experience and their impact on a future lunar outpost is discussed. A supportability concept for future missions to the Moon and Mars that involves a transition from a highly logistics dependent to a logistically independent operation is discussed. Lunar outpost supportability capability needs are summarized and a supportability technology development strategy is established. The resulting Lunar Surface Systems Supportability Strategy defines general criteria that will be used to select technologies that will enable future flight crews to act effectively to respond to problems and exploit opportunities in a environment of extreme resource scarcity and isolation. This strategy also introduces the concept of exploiting flight hardware as a supportability resource. The technology roadmap involves development of three mutually supporting technology categories, Diagnostics Test & Verification, Maintenance & Repair, and Scavenging & Recycling. The technology roadmap establishes two distinct technology types, "Embedded" and "Process" technologies, with different implementation and thus different criteria and development approaches. The supportability technology roadmap addresses the technology readiness level, and estimated development schedule for technology groups that includes down-selection decision gates that correlate with the lunar program milestones. The resulting supportability technology roadmap is intended to develop a set of technologies with widest possible capability and utility with a minimum impact on crew time and training and remain within the time and cost constraints of the Constellation program

Oeftering, Richard C.↗