Search NASA⌕ Search

SEARCH · Search NASA

Results for “Lab Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Laser-Induced Thermal Acoustics Theory and Expected Experimental Errors when Applied to a Scramjet Isolator Model

A scramjet isolator model test apparatus is being assembled in the Isolator Dynamics Research Lab (IDRL) at the NASA Langley Research Center in Hampton, Virginia. The test apparatus is designed to support multiple measurement techniques for investigating the flow field in a scramjet isolator model. The test section is 1-inch high by 2-inch wide by 24-inch long and simulates a scramjet isolator with an aspect ratio of two. Unheated, dry air at a constant stagnation pressure and temperature is delivered to the isolator test section through a Mach 2.5 planar nozzle. The isolator test section is mechanically back-pressured to contain the resulting shock train within the 24-inch isolator length and supports temperature, static pressure, and high frequency pressure measurements at the wall. Additionally, nonintrusive methods including laser-induced thermal acoustics (LITA), spontaneous Raman scattering, particle image velocimetry, and schlieren imaging are being incorporated to measure off-wall fluid dynamic, thermodynamic, and transport properties of the flow field. Interchangeable glass and metallic sidewalls and optical access appendages permit making multiple measurements simultaneously. The measurements will be used to calibrate computational fluid dynamics turbulence models and characterize the back-pressured flow of a scramjet isolator. This paper describes the test apparatus, including the optical access appendages; the physics of the LITA method; and estimates of LITA measurement uncertainty for measurements of the speed of sound and temperature.

Middleton, Troy F.↗

Verification Tools Secure Online Shopping, Banking

Just like rover or rocket technology sent into space, the software that controls these technologies must be extensively tested to ensure reliability and effectiveness. Ames Research Center invented the open-source Java Pathfinder (JPF) toolset for the deep testing of Java-based programs. Fujitsu Labs of America Inc., based in Sunnyvale, California, improved the capabilities of the JPF Symbolic Pathfinder tool, establishing the tool as a means of thoroughly testing the functionality and security of Web-based Java applications such as those used for Internet shopping and banking.

Source record↗

Multiplexer/Demultiplexer Loading Tool (MDMLT)

The purpose of the MDMLT is to improve the reliability and speed of loading multiplexers/demultiplexers (MDMs) in the Software Development and Integration Laboratory (SDIL) by automating the configuration management (CM) of the loads in the MDMs, automating the loading procedure, and providing the capability to load multiple or all MDMs concurrently. This loading may be accomplished in parallel, or single MDMs (remote). The MDMLT is a Web-based tool that is capable of loading the entire International Space Station (ISS) MDM configuration in parallel. It is able to load Flight Equivalent Units (FEUs), enhanced, standard, and prototype MDMs as well as both EEPROM (Electrically Erasable Programmable Read-Only Memory) and SSMMU (Solid State Mass Memory Unit) (MASS Memory). This software has extensive configuration management to track loading history, and the performance improvement means of loading the entire ISS MDM configuration of 49 MDMs in approximately 30 minutes, as opposed to 36 hours, which is what it took previously utilizing the flight method of S-Band uplink. The laptop version recently added to the MDMLT suite allows remote lab loading with the CM of information entered into a common database when it is reconnected to the network. This allows the program to reconfigure the test rigs quickly between shifts, allowing the lab to support a variety of onboard configurations during a single day, based on upcoming or current missions. The MDMLT Computer Software Configuration Item (CSCI) supports a Web-based command and control interface to the user. An interface to the SDIL File Transfer Protocol (FTP) server is supported to import Integrated Flight Loads (IFLs) and Internal Product Release Notes (IPRNs) into the database. An interface to the Monitor and Control System (MCS) is supported to control the power state, and to enable or disable the debug port of the MDMs to be loaded. Two direct interfaces to the MDM are supported: a serial interface (debug port) to receive MDM memory dump data and the calculated checksum, and the Small Computer System Interface (SCSI) to transfer load files to MDMs with hard disks. File transfer from the MDM Loading Tool to EEPROM within the MDM is performed via the MILSTD- 1553 bus, making use of the Real- Time Input/Output Processors (RTIOP) when using the rig-based MDMLT, and via a bus box when using the laptop MDMLT. The bus box is a cost-effective alternative to PC-1553 cards for the laptop. It is noted that this system can be modified and adapted to any avionic laboratory for spacecraft computer loading, ship avionics, or aircraft avionics where multiple configurations and strong configuration management of software/firmware loads are required.

Brewer, Lenox Allen↗

Comparison of Experimental Surface and Flow Field Measurements to Computational Results of the Juncture Flow Model

Wing-body juncture flow fields on commercial aircraft configurations are challenging to compute accurately. The NASA Advanced Air Vehicle Program's juncture flow committee is designing an experiment to provide data to improve Computational Fluid Dynamics (CFD) modeling in the juncture flow region. Preliminary design of the model was done using CFD, yet CFD tends to over-predict the separation in the juncture flow region. Risk reduction wind tunnel tests were requisitioned by the committee to obtain a better understanding of the flow characteristics of the designed models. NASA Ames Research Center's Fluid Mechanics Lab performed one of the risk reduction tests. The results of one case, accompanied by CFD simulations, are presented in this paper. Experimental results suggest the wall mounted wind tunnel model produces a thicker boundary layer on the fuselage than the CFD predictions, resulting in a larger wing horseshoe vortex suppressing the side of body separation in the juncture flow region. Compared to experimental results, CFD predicts a thinner boundary layer on the fuselage generates a weaker wing horseshoe vortex resulting in a larger side of body separation.

Roozeboom, Nettie H.↗

Comparison of Experimental Surface and Flow Field Measurements to Computational Results of the Juncture Flow Model

Wing-body juncture flow fields on commercial aircraft configurations are challenging to compute accurately. The NASA Advanced Air Vehicle Program's juncture flow committee is designing an experiment to provide data to improve Computational Fluid Dynamics (CFD) modeling in the juncture flow region. Preliminary design of the model was done using CFD, yet CFD tends to over-predict the separation in the juncture flow region. Risk reduction wind tunnel tests were requisitioned by the committee to obtain a better understanding of the flow characteristics of the designed models. NASA Ames Research Center's Fluid Mechanics Lab performed one of the risk reduction tests. The results of one case, accompanied by CFD simulations, are presented in this paper. Experimental results suggest the wall mounted wind tunnel model produces a thicker boundary layer on the fuselage than the CFD predictions, resulting in a larger wing horseshoe vortex suppressing the side of body separation in the juncture flow region. Compared to experimental results, CFD predicts a thinner boundary layer on the fuselage generates a weaker wing horseshoe vortex resulting in a larger side of body separation.

Roozeboom, Nettie H.↗

The Interaction of the Space Shuttle Launch and Entry Suits and Sustained Weightless on Astronaut Egress Locomotion

The purpose of this study was to determine the consequences of extended periods of weightlessness during space missions on astronauts f ability to perform a simulated contingency egress while wearing either of the Launch and Entry suits immediately after space flight. In our previous lab-based study of simulated contingency egress, we found only 4 of 12 non-astronauts wearing the Launch and Entry Suit (LES) successfully completed the simulated egress. However, 4 of 4 of the previous failures (when tested wearing the LES), were then successful in completing the test wearing the Advanced Crew Escape Suit (ACES). Therefore, this study tested 21 Astronaut Volunteers wearing either the LES or ACES while performing a simulated egress on a treadmill (TM) onboard the Crew Transportation Vehicle immediately after space flight at either the Kennedy Space Center or Edwards AFB. Astronauts walked for 400 meters at 1.6m/sec with g-suit inflation level set to preflight testing levels, visor down, breathing from the suit emergency O2 supply. Metabolic, heartrate, and perceived exertion data were collected during these post-flight tests. Exactly the same preflight simulated egress tests on a TM were performed in the lab at NASA/JSC by each crewmember at L-60. Preflight testing found 2 of the 21 crewmembers were unable to complete the simulated contingency egress. Postflight, 9 crew (8 ACES, 1 LES) completed the simulated contingency egress of 400 meters at 1.6m/sec. and 12 failed to meet that standard (7 ACES, 5 LES). Preflight physiological response tests failed to identify crew capable of performing the egress vs. those who failed. However, 18 of the 21 crew did make at least 2.67 minutes into the postflight egress testing. At that point in time, heartrate was higher (P <=.20) for the failures compared to the finishers. These findings indicate that NASA fs switch to the ACES for space flight crews should be expedited.

Greenisen, M. C.↗

Propellant Delivery via VDC Driven Pump

The SMART (Scalable Mobile Autonomous Rocket engine Test) testbed system initiative at SSC was conceived to attempt to address many of the principal cost drivers in developing and maintaining a rocket engine test facility. The system (optimized to test engines and components generating up to 10K lbf nominal thrust) is serving as a testbed for innovative technologies and processes to provide lower cost test services with a rapid test cadence and expedient turnaround times. The system can also potentially be used as a testbed to test other related technologies relevant to surface situations (e.g., moon, Mars associated with crogenic fluid management, engine/component testing, autonomous operations, etc.). This FY20 CIF project, being conducted as part of the SMART testbed system, is developing and testing a propellant delivery system via electrically driven centrifugal pumps (obviating dependence upon Multi-Layer Pressure Vessels) with configuration and operation by a minimal number of personnel. During FY20 the team identified the requirements and worked with P3 and Masten Space Systems to develop the long lead (9 months after receipt of order) items, the 400 VDC pumps, for delivery in mid FY21. Since control of the 400 VDC pump motor is not well developed the team has established heuristics to control flows in LN2 at off nominal shaft speeds to allow deep throttling of the pump in flow test scenarios. Various test scenarios including nominal i.e. high flow high pressure, high flow low pressure, low flow high pressure, low flow low pressure, minimum throttle step change, and low inlet pressure cavitation testing were developed ahead of the anticipated hardware delivery and test. FY20 COVID Stage 3 conditions restricted access to the center and hindered lab work, so efforts focused on the system design and testing plans along with the project procurement paperwork for the hardware... now with its anticipated delivery in spring FY21. Some limited access to the center is expected by spring/summer FY21 for the continuing second year (FY21) CIF project effort meant to be focused upon system integration and initial testing.

Aaron Head↗

ES61 – Mechanical Components Test Facility Capabilities

The Mechanical Components Test Facility (MCTF), also known as "Leak Lab" at MSFC is a multi-capability lab that facilitates payload evolution from proof-of-concept to on-orbit operations. We also have the capability to bring our equipment to various location for off-site testing.

Jamboree↗

Experiences with Lab-on-a-chip Technology in Support of NASA Supported Research

Under the auspices of the Microgravity Sciences and Application Department at Marshall Space Flight Center, we have custom designed and fabricated a lab-on-a-chip (LOC) device, along with Caliper Technologies, for macromolecular crystal growth. The chip has been designed to deliver specified proportions of up-to five various constituents to one of two growth wells (on-chip) for crystal growth. To date, we have grown crystals of thaumatin, glucose isomerase and appoferitin on the chip. The LOC approach offered many advantages that rendered it highly suitable for space based hardware to perform crystal growth on the International Space Station. The same hardware that was utilized for the crystal growth investigations, has also been used by researchers at Glenn Research Center to investigate aspects of microfluidic phenomenon associated with two-phase flow. Additionally, our LOCAD (Lab-on-a-chip Application Development) team has lent its support to Johnson Space Center s Modular Assay for Solar System Exploration project. At present, the LOCAD team is working on the design and build of a unique lab-on-a-chip breadboard control unit whose function is not commercially available. The breadboard can be used as a test bed for the development of chip size labs for environmental monitoring, crew health monitoring assays, extended flight pharmacological preparations, and many more areas. This unique control unit will be configured for local use and/or remote operation, via the Internet, by other NASA centers. The lab-on-a-chip control unit is being developed with the primary goal of meeting Agency level strategic goals.

Monaco, Lisa↗

CryoCart Restoration and Vacuum Pipe Construction

Propulsion systems that utilize hypergolic propellants have been used to power space vehicles since the beginning of the space program. Liquid methane and oxygen propulsion systems have emerged as an alternative and have proven to be more environmentally friendly. The incorporation of liquid methane/liquid oxygen (LOX) into the propulsion system has demonstrated an increase in engine performance, as well as a reduction in the volume, size and complexity of the system. Consequently, reducing the total mass of the vehicle which is a crucial aspect that is considered when planning space missions to both the Moon and Mars [1]. Project Morpheus has made significant advancements in liquid oxygen/liquid methane propulsion system technologies by incorporating a LOX/methane propulsion system to a vertical test bed. The vehicle consisted of a 5,000 lb main engine and four 20 lb remote control system (RCS) engines that utilize liquid methane/LOX as its propellant [1]. The vehicle completed successful flight testing at Kennedy Space Center in 2014 which marked the completion of the Morpheus project. Subsequent projects utilizing Morpheus' vertical test bed have been developed to make further advancements. One of the subsequent projects consisted of the addition of a smaller 2,000 lb main engine and a cold helium heat exchanger which would make it possible for a pressurant tank systems to be send to Mars or the Moon by significantly decreasing the overall mass and volume of the pressurant tank. The hot fire tests of the integrated system with the smaller main engine and cold helium heat exchanger were successful at sea level, but further studies are being conducted to better understand how the vertical test bed will behave under thermal-vacuum conditions. For this reason, the integrated vehicle will be taken to Plum Brook to be tested in a chamber capable of simulating these conditions. To ensure that the vehicle will function properly under vacuum conditions, testing will be first completed at the component level. During this process, the igniter of the main engine and the RCS thrusters will be tested under a vacuum. To complete the testing of the components, the test setup first needed to be finalized. The CryoCart is being used to feed the propellants to the test article. The CryoCart is a movable test set-up that was developed in 2009 to provide a mobile platform for testing oxygen/methane systems with hot-fire capability up to 100 lbf. The CryoCart consists of three different systems: Oxygen, Methane, and liquid Nitrogen. The Oxygen and Methane systems are placed into two different carts while the liquid nitrogen system is mainly located in the methane cart. Over the years, the CryoCart has been utilized for different projects and has undergone deterioration. For this reason, a new phase has been developed to rebuild it to working conditions once again. During my internship, I was aiding in the construction and restoration of the CryoCart. In the initial stages of the process, I updated the fluid and electrical schematics for the oxygen, methane, and test article systems. The original CryoCart consisted of an electrical panel that utilized electromechanical relays and a terminal to drive the igniter power and signal, as well as the main fuel and oxygen valves. This electrical panel connected to the CryoCart through various wire harnesses that could be found exiting from the CryoCart. First, it was determined how these harnesses connected to the electromechanical relays so that they worked correctly. Once the electrical system was understood, an alternative for the electromechanical relays and the Molex connectors used throughout the system was sought since these components can often prove to be unreliable. Solid State relays and MIL connectors were purchased to serve as replacements. Upon arrival of the parts, crimping and wiring was completed to install the new solid state relays and MIL connectors. During the replacement of the relays and connectors, system checks of the electrical system were ran to ensure that the system was working correctly. While completing system checks, the pressure transducers that were not functioning properly were also replaced and any issue with the wiring or signal was addressed. Once the electrical components were replaced, the restoration of the fluid system began. Parts of the tubing in the CryoCart had to be rebuild and often consisted of sizing, cutting, bending, filing, and sanding the tubing to prepare it to be flared. Many components had to be proof-tested to bring their certifications up to date, and several components had to be replaced. Various flex hoses, valves, and fittings were send to the Clean Lab because they were new, dirty, or had gone through proof-testing. Once they arrived from the cleaning lab they had to be put back to the system and leak checks and functional tests were conducted. In the Nitrogen system, the copper tubing located in the Oxygen cart was rebuild and Aerogel insulation was added to this section. A new gaseous nitrogen system was added to the CryoCart to purge the vacuum tube which will serve as the test chamber. Once the CryoCart was completed, construction of parts of the vacuum tube began. A flange was manufactured with welded fittings to hold the line of the vacuum pump as well as some extra fittings which will serve as extra inlets used to introduce fluid lines to the vacuum tube. Stress analysis was ran in this flange to ensure that it would not fail under vacuum conditions. The fluid lines leading from the air side of the vacuum to the test article were also constructed and added to the mount that had already been manufactured. Three different sets of tubing were constructed to accommodate the seven different RCS thruster and the main engine igniter that are going to be tested. Full electrical system checks were completed to ensure that all the wire harnesses and valves were functioning. Upon the completion of the CryoCart and the vacuum tube, hot fire testing for the RCS thrusters and the main engine igniter are going to begin. During this time any issues encountered with the engines or igniter will be addressed to ensure that the components function under vacuum conditions. After successful completion of testing, the vertical test bed, Morpheus, will be rebuilt and prepared to be sent to Plum Brook. In Plum Brook, the vehicle will be tested in the thermal-vacuum chamber to demonstrate that integrated lox-methane propulsion system operation in space-like conditions. This internship has allowed me the opportunity to gain valuable hands on experience and to develop skills that will aid in my education as well as in the workforce, while at the same time helping me determine that I would like to further pursue a career in propulsion engineering.

Chaidez, Mariana↗

EOS-AM1 Nickel Hydrogen Cell Interim Life Test Report

This paper reports the interim results of the Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missiles and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of the tests is to verify that the EOS-AM-l cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 13000 LEO cycles completed as of September 2, 1996. Each cycle consists of a 64 minute charge (VT at 1.507 volts per cell, 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5% DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60% DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 ampercs (VT at 1.54 volts per cell to 1.09 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three, 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battely, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (-5 C) cold plate. The entire assembly is located in a thermal chamber operating at +3 C. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at +10 C. The real-time LEO life test battery has met all performance requirements through the first 13,000 cycles, including: end of charge and discharge cell voltages and voltage gradients; end of chalge and discharge cell pressures; within cell and between cell temperature gradients; discharge capacity; current and power levels; and all chalge parameters. The accelerated stress test battely has completed over 5900 cycles as of 9/11/96. This paper reports both battery performances as a function of cycle life, with individual cell performance comparisons repolted for selected cycles in both tests.

Bennett, C. W.↗

EOS-AM1 Nickel Hydrogen Cell

This paper reports the interim results of the Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missile and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of die tests is to verify that the EOS-AM-1 cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 18,202 LEO cycles completed as of September 1, 1997. Each cycle consists of a 64 minute charge (VT at 1.507 volts per cell, 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5% DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60% DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 amperes (VT at 1.54 volts per cell to 1.09 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three, 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battery, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (-5 C) cold plate. The entire assembly is located in a thermal chamber operating at +30 C. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at +10 C. The real-time LEO life test battery has met all performance requirements through the first 18,202 cycles, including: end of charge mid discharge cell voltages and voltage gradients; end of charge and discharge cell pressures; within cell and between cell temperature gradients; discharge capacity; current and power levels; and all charge parameters. The accelerated stress test battery has completed 11,998 cycles when the test was terminated. The stress test unit met all test parameters. This paper reports battery perfortnances as a funcfion of cycle life for both the real-time LEO and the accelerated life test regimes.

Bennett, Charles W.↗

EOS-AM1 Nickel Hydrogen Cell Interim Life Test Report

This paper reports the interim results Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missiles and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of the tests is to verify that the EOS-AM-1 cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 18202 LEO cycles completed as of September 1, 1997. Each cycle consists of a 64-minute charge (VT at 1,507 volts per cell, 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5 percent DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60 percent DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 amperes (VT at 1.54 volts per cell to 1.90 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three, 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battery, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (minus 5 deg) cold plate. The entire assembly is located in a thermal chamber operating at plus 3 deg. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at plus 10 deg. The real-time LEO life test battery has met all performance requirements through the first 18,202 cycles, including: end of charge and discharge cell voltages and voltage gradients; end of charge and discharge cells pressures; within cell and between cell temperature gradients dischare capacity; current and power levels; and all charge parameters. The accelerated stress test battery has completed 11998 cycles when the test was terminated. The stress test unit met all test parameters. This paper reports battery performances as a function of cycle life for both the real-time LEO and the accelerated life test regimes.

Bennett, Charles W.↗

EOS--AM1 Nickel Hydrogen Cell Interim Life Test Report

This paper reports the interim results of the Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missiles and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of the tests is to verify that the EOS-AM-1 cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 18202 LEO cycles completed as of September 1, 1997. Each cycle consists of a 64 minute charge (VT at 1.507 volts per cell. 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5% DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60% DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 amperes (VT at 1.54 volts per cell to 1.09 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three. 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battery, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (-5 C) cold plate. The entire assembly is located in a thermal chamber operatina at +30 C. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at +10 C. The real-time LEO life test battery has met all performance requirements throuch the first 18,202 cycles, including: end of chargee and discharge cell voltages and voltace -radients; end of charge and discharge cell pressures; within cell and between cell temperature gradients; discharge capacity; current and power levels; and all charge parameters. The accelerated stress test battery has completed 11,998 cycles when the test was terminated. The stress test unit met all test parameters. This paper reports battery performances as a function of cycle life for both the real time LEO and the accelerated life test regimes.

Bennett, C. W.↗

Earth Independent Medical Operations (EIMO) Datascope: Challenges and Potential Solutions

Data flows and storage/retrieval capacity are severely constrained during missions in space and challenges will become even greater during exploration class missions. There is a need for an artificial intelligence (AI)-based clinical decision support system (CDSS) to monitor and analyze data to provide real-time consultative support for crew medical officer (CMO) decision-making. EIMO is defined as the gradual transition of medical care and decision making from terrestrial to space-based assets, enabling support of astronaut health and performance and reducing overall mission risk. While a hallmark of this paradigm shift from low-earth orbit is that on-board care will increasingly become the responsibility of the astronauts for primary management and decision making, terrestrial assets will continue to be paramount in pre-mission screening and planning, as well as prevention, health maintenance and long-term care contingencies. New capabilities and systems that enable progressively more robust and resilient systems and crews will be necessary to reduce risk and increase probability of deep space exploration mission success. An aspiration for EIMO is to develop AI-enhanced solutions for analysis of crew health & performance data and to facilitate clinical decision support for autonomous medical operations. A “system of systems” approach is envisioned whereby EIMO will deploy AI-supported natural language processing and machine learning (ML) techniques to utilize embedded reference databases and real-time data streams [input vectors] from multiple data sources. Constituent input vectors may include environmental controls, countermeasures data, behavioral data, physiologic wearables, point-of-care laboratory tests, personalized medical records, inventory trade space risk assessments, COTS medical databases, and ground support inputs. An ideal AI capability would possess trained fusion algorithms to cross reference input vectors with medical ‘knowledge’ [cultivated database] to stratify relevant data streams for predictive and actionable capabilities. In addition, EIMO will feature mobility, in that it can be accessed and can push/pull data within and between multiple vehicles/habitats. Large amounts and variable sources of data can be leveraged to diagnose, inform treatment strategies, and potentially predict medical events and performance decrements. Inclusion of advanced training tools using extended reality will enable increasingly autonomous medical care to aid a CMO when ground support is unavailable or time-delayed beyond required action window, e.g., emergent medical situations. EIMO CDSS would require very large datasets to train pre-flight and significant amounts of data are needed to support ML via in-flight CDSS operations. An additional challenge will be to find sufficient data to train a model relevant to astronaut demographics. The rapid, accelerating evolution of this field creates a propitious solution space to leverage multi-modal AI through public-private partnership(s). The status of multi-modal AI systems today would preclude their use for long duration missions as they remain unreliable and are subject to “digital hallucinations” and other errors that could pose operational risk. A federated labs structure is being considered to test and optimize data flow from the multiple input vectors leading to field testing in suitable ground/flight analogs. Critical to the success of an EIMO CDSS will be integration and interoperability and success will be defined by a system that can serve as an in-flight medical consult for the CMO providing critical support during medical contingencies. Benefits to terrestrial medicine may be significant as an outflow of the EIMO medical system, particularly for remote areas and communities lacking significant infrastructure, personnel and resources.

J Lemery↗

Earth Independent Medical Operations (EIMO) Datascope: Challenges and Potential Solutions

Data flows and storage/retrieval capacity are severely constrained during missions in space and challenges will become even greater during exploration class missions. There is a need for an artificial intelligence (AI)-based clinical decision support system (CDSS) to monitor and analyze data to provide real-time consultative support for crew medical officer (CMO) decision-making. EIMO is defined as the gradual transition of medical care and decision making from terrestrial to space-based assets, enabling support of astronaut health and performance and reducing overall mission risk. While a hallmark of this paradigm shift from low-earth orbit is that on-board care will increasingly become the responsibility of the astronauts for primary management and decision making, terrestrial assets will continue to be paramount in pre-mission screening and planning, as well as prevention, health maintenance and long-term care contingencies. New capabilities and systems that enable progressively more robust and resilient systems and crews will be necessary to reduce risk and increase probability of deep space exploration mission success. An aspiration for EIMO is to develop AI-enhanced solutions for analysis of crew health & performance data and to facilitate clinical decision support for autonomous medical operations. A “system of systems” approach is envisioned whereby EIMO will deploy AI-supported natural language processing and machine learning (ML) techniques to utilize embedded reference databases and real-time data streams [input vectors] from multiple data sources. Constituent input vectors may include environmental controls, countermeasures data, behavioral data, physiologic wearables, point-of-care laboratory tests, personalized medical records, inventory trade space risk assessments, COTS medical databases, and ground support inputs. An ideal AI capability would possess trained fusion algorithms to cross reference input vectors with medical ‘knowledge’ [cultivated database] to stratify relevant data streams for predictive and actionable capabilities. In addition, EIMO will feature mobility, in that it can be accessed and can push/pull data within and between multiple vehicles/habitats. Large amounts and variable sources of data can be leveraged to diagnose, inform treatment strategies, and potentially predict medical events and performance decrements. Inclusion of advanced training tools using extended reality will enable increasingly autonomous medical care to aid a CMO when ground support is unavailable or time-delayed beyond required action window, e.g., emergent medical situations. EIMO CDSS would require very large datasets to train pre-flight and significant amounts of data are needed to support ML via in-flight CDSS operations. An additional challenge will be to find sufficient data to train a model relevant to astronaut demographics. The rapid, accelerating evolution of this field creates a propitious solution space to leverage multi-modal AI through public-private partnership(s). The status of multi-modal AI systems today would preclude their use for long duration missions as they remain unreliable and are subject to “digital hallucinations” and other errors that could pose operational risk. A federated labs structure is being considered to test and optimize data flow from the multiple input vectors leading to field testing in suitable ground/flight analogs. Critical to the success of an EIMO CDSS will be integration and interoperability and success will be defined by a system that can serve as an in-flight medical consult for the CMO providing critical support during medical contingencies. Benefits to terrestrial medicine may be significant as an outflow of the EIMO medical system, particularly for remote areas and communities lacking significant infrastructure, personnel and resources.

Medical Operations↗

Overview of the Jet/Surface Interaction Test (JSIT1)

This material was presented at the Acoustics Technical Working Group Meeting on April22, 2011. It provides an overview of an experiment called the Jet / Surface Interaction Test which was conducted to expand the database available regarding how a planar surface interacts with a jet to shield and/or enhance the jet noise. This presentation focuses on data obtained during Phase 1 of the test, JSIT1, which was conducted using the Small Hot Jet Acoustic Rig located in the Aeroacoustics Propulsion Lab at NASA GRCduring January and February, 2011. A second phase of the test, JSIT2, is planned for 2012.There were two parts of the phase 1 test. In part 1, known as the shielding surface part of the test, a planar surface was placed between the jet and the microphones. In part 2, the reflecting surface part of the test, the surface was placed on the opposite side of the jet so that the jet noise was free to reflect off the surface toward the microphones. Phased array, pressure sensitive paint, and far field acoustic data obtained during JSIT1 are presented. The phased array data illustrate how the jet noise is blocked by the shielding surface. It also shows that the low frequency scrubbing noise generated when the surface is impacted by the jet comes predominantly from the surface trailing edge. The far field data show the trailing edge noise to be a dipole source. The pressure sensitive paint data show how the pressure distribution on the surface varies as the surface is traversed toward jet.This material was presented at the Acoustics Technical Working Group Meeting on April22, 2011. It provides an overview of an experiment called the Jet/Surface Interaction Test which was conducted to expand the database available regarding how a planar surface interacts with a jet to shield and/or enhance the jet noise. This presentation focuses on data obtained during Phase 1 of the test, JSIT1, which was conducted using the Small Hot Jet Acoustic Rig located in the Aeroacoustics Propulsion Lab at NASA GRCduring January and February, 2011. A second phase of the test, JSIT2, is planned for 2012.There were two parts of the phase 1 test. In part 1, known as the shielding surface part of the test, a planar surface was placed between the jet and the microphones. In part 2, the reflecting surface part of the test, the surface was placed on the opposite side of the jet so that the jet noise was free to reflect off the surface toward the microphones. Phased array, pressure sensitive paint, and far field acoustic data obtained during JSIT1 are presented. The phased array data illustrate how the jet noise is blocked by the shielding surface. It also shows that the low frequency scrubbing noise generated when the surface is impacted by the jet comes predominantly from the surface trailing edge. The far field data show the trailing edge noise to be a dipole source. The pressure sensitive paint data show how the pressure distribution on the surface varies as the surface is traversed toward jet.

Podboy, Gary↗

Predicting Operational Performance of xEMU Boot at Lunar South Pole Temperatures using Thermal Desktop ®

The spacesuit boots that will be used on Artemis lunar south pole surface missions will be exposed to extremely cold temperatures (down to ~50 K). To assess the performance of the government’s Exploration Extravehicular Mobility Unit (xEMU) lunar boot in these permanently shadowed regions, testing was performed at the Jet Propulsion Lab (JPL) in the Cryogenic Ice Transfer, Acquisition Development, and Excavation Laboratory (CITADEL) thermal vacuum (TVAC) chamber. This paper documents the data analysis, thermal boot model correlation, and operational predictions conducted using data from the xEMU CITADEL TVAC test. Expected thermal conductances within the boot and between the boot and environment were calculated from test data, which was then used as an initial guess for conductances within a Thermal Desktop (TD) model. Correlation of the TD model using the internal SOLVER feature was performed across 10 different test points which varied external temperature, internal boot ventilation flowrate, and contact pressure. Operational performance at the lunar south pole was then predicted using results from the correlated model. While the predictions provide evidence for acceptable performance of the boots at the 100K environment test point, there is still substantial uncertainty in performance, especially at the 48K test point. This uncertainty is due in part to testing limitations such as contacting the foot to a hard metal plate rather than granular regolith, and model limitations such as the lack of a realistic foot model. These limitations and their impacts are addressed in detail in this paper. The results of this test series and model correlation underscore the importance of additional improved testing and modeling for characterizing the expected thermal resistance between the outside of the boot and the lunar surface.

Spacesuit↗