NASA’s Space Launch System Stands Ready on Doorstep of Maiden Voyage Launch and Progress Made to Future Missions
NASA and its partners made significant progress towards the Artemis I launch in 2022. The integrated Space Launch System (SLS)vehicleand Orion spacecraft were first rolled out of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center (KSC) in March. SLS is a super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars, and beyond. It isthebackbone of the Artemis human lunar exploration program. Rollout transported the vehicle to Launch Pad 39B for a series of tests, including the wet dress rehearsal (WDR). Multiple attempts were required to complete WDR, each building on the one before. Following the WDR campaign, NASA teams refined hardware and launch procedures, and the vehicle was prepared for its first launch attempt scheduled for August 29. Challenges with the weather and hardware resulted in a scrub on the 29th, and the second attempt was set for Sept. 3. A hydrogen leak on the tail service mast umbilical forced a scrub. NASA teams completed repairs and testing on the vehicle on Launch Pad 39B to preserve a launch attempt at the end of September. Managers chose to return the vehicle to the VAB to protect it fromthe threat of Hurricane Ian. Within the VAB, NASA further inspected and prepared SLS for selected November windows. In addition to progress to the Artemis I mission, significant progress was made on the Artemis II and Artemis III rockets. Progress was also made towards on the Block 1B and Block 2 variants, beginning on the fourth and ninth flight, respectively. Both variants will provide significant improvements in both launch mass and mission flexibility to multiple destinations. This paper will discuss Artemis I vehicle integration, testing, and available results from the launch campaign to date.