Search NASA⌕ Search

SEARCH · Search NASA

Results for “Leasing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Observational Assessment of Metocean Conditions in the WFIP3 Region

The WFIP3 project, sponsored by the U.S. Department of Energy, is aimed at improving our understanding of the physics of the atmosphere and ocean that dictate the structure and variability of the wind resource within the MABL. As part of the project, a long-term offshore field campaign will take place along the U.S. East Coast to provide an unprecedented characterization of the MABL in the vicinity of the Massachusetts/Rhode Island wind energy lease areas. The unprecedented observational data set collected in the WFIP3 field campaign will allow intensive numerical modeling development and validation efforts. To inform the field campaign design and the preliminary studies associated with it, here we perform a characterization of the MABL and ocean conditions by leveraging available observations in the region.

lidars↗

Coupling fuel cycles with repositories: how repository institutional choices may impact fuel cycle design

The historical repository siting strategy in the United States has been a top-down approach driven by federal government decision making but it has been a failure. This policy has led to dispatching fuel cycle facilities in different states. The U.S. government is now considering an alternative repository siting strategy based on voluntary agreements with state governments. If that occurs, state governments become key decision makers. They have different priorities. Those priorities may change the characteristics of the repository and the fuel cycle. State government priorities, when considering hosting a repository, are safety, financial incentives and jobs. It follows that states will demand that a repository be the center of the back end of the fuel cycle as a condition of hosting it. For example, states will push for collocation of transportation services, safeguards training, and navy/private SNF (Spent Nuclear Fuel) inspection at the repository site. Such activities would more than double local employment relative to what was planned for the Yucca Mountain-type repository. States may demand (1) the right to take future title of the SNF so if recycle became economic the reprocessing plant would be built at the repository site and (2) the right of a certain fraction of the repository capacity for foreign SNF. That would open the future option of leasing of fuel to foreign utilities with disposal of the SNF in the repository but with the state-government condition that the front-end fuel-cycle enrichment and fuel fabrication facilities be located in that state.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Teaching Old Packaging New Tricks - 12593

Waste disposition campaigns have been an industry and government focus area since the mid- 1970's. With increased focus on this issue, and a lot of hard work, most waste packaging and transportation issues have been addressed. The material has been successfully shipped and dis-positioned. DOE has successfully de-inventoried materials from multiple sites to meet material consolidation, footprint reduction, nonproliferation, and regulatory obligations with cost savings from reduced maintenance and regulatory compliance. There has been a wide range of certified shipping packagings for the transportation of hazardous materials to meet most of the waste needs. The remaining materials are problematic, generally low volume, and do not meet the certified content of the existing inventory of packaging. Designing, testing and certifying new packaging designs can be a long and expensive process and for small volumes of material it is cost prohibitive. One very cost effective option is to lease and use a certified packaging to overpack waste containers. There are many robust certified packagings available with the capability to envelope the waste content. The capability to use inner containers, inside the current fleet of certified casks or packaging, to address specific content problems of additional shielding (e.g., U-233) or containment (e.g., sodium bonded nuclear material) has successfully expanded the capability for timely cost effective shipment of unique contents. This option has been used successfully in the NAC-LWT, T-3 and other packagings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brownfields to Brightfields: A Sustainability Initiative at DOE'S East Tennessee Technology Park Cleanup - 16120

As DOE works toward completing their cleanup mission at the East Tennessee Technology Park (ETTP), the ultimate goal is to return property no longer needed for government use to the community for beneficial re-use. The vision for ETTP is to transform the former gaseous diffusion facility into a commercial industrial park, leveraging the site's infrastructure to attract businesses to the site. While hundreds of acres at ETTP have been transferred for re-use, areas within the former production footprint of the site have future use restricted due to the presence of residual contamination, underground structures and utilities and/or physical features that limit their reuse potential. Brownfield redevelopment with solar energy generation has proven to be an excellent option for beneficial reuse and sustainability thanks to the flexible nature of solar photovoltaic technology and design that can address the restrictions and limitations of the site. Developing a solar project on a cleanup site can be challenging due to a large number of stakeholders and regulatory compliance issues of the environmental legacy at DOE cleanup sites; however, the challenges can be offset by the available infrastructure and low cost property. The requirement for large amounts of land or surface area is a major constraint to the growth of photovoltaic solar systems. An average solar generating facility requires 2 or more hectares (5 acres) for each megawatt (MW) of power generated. Re-using land that is otherwise un-developable provides a cost effective site for renewable energy generation to innovative solar developers. At ETTP, DOE's Oak Ridge Office of Environmental Management and the community reuse organization (Community Reuse Organization of East Tennessee - CROET) supported a local small business (Restoration Services, Inc. - RSI) familiar with the site and environmental regulations to secure a power purchase agreement with the regional electric provider (Tennessee Valley Authority - TVA) for a 1 MW utility-scale photovoltaic solar facility. The solar facility, Powerhouse Six, was developed through a commercial partnership (RSI and Vis Solis, Inc.) that worked closely with the lead ETTP site cleanup contractor (URS-CH2M Oak Ridge LLC - UCOR) and the local government. The selected site at ETTP had limitations on subsurface disturbance to 10 feet below ground surface because of utility ducts and residual contamination. Near surface relics (facility foundation remnants) were also found to prohibit ground penetration. A photovoltaic solar design using a ballasted ground mount system was developed to conform to the restrictions. The ballasted system could follow existing land contours, eliminating the need for any extensive site preparation and avoiding the risk of ground penetration. The lead cleanup contractor's role in facilitating the completion of this project included making the necessary environmental assessment documentation available to obtain the construction notice to proceed from the regional electric provider. They accelerated the transfer of ETTP power lines and electric demand to the city electric department to accommodate connection to the electric grid and supplied the communication connection required for metering the electric power generation. DOE's support along with their cleanup contractor's re-industrialization program and power integration group provided regular communication with the project stakeholders for more than six months to facilitate the early transfer of the utility infrastructure. Powerhouse Six sustainability benefits: - Generates enough clean energy to power more than 100 homes or prevents pollution equivalent to removing 240 cars from the road annually (1,141 metric tons of carbon dioxide); - Provides Brownfield reuse/redevelopment at ETTP; - Eliminates the generation of wastes through excavation and saves money to cleanup other areas for re-use; - Supports regional electric provider's renewable energy initiative; - Offers community economic development/ jobs and property tax income to the City of Oak Ridge; - Demonstrates benefit of ETTP re-industrialization; - Provides long-term lease payments to the community reuse organization; - Supports DOE renewable energy goals; - Demonstrates collaboration between DOE and a public utility for renewable energy development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Chlorinated Solvents in Groundwater Beneath an Occupied Building at The Young - Rainey STAR Center (Science, Technology, and Research Center) - 16342

Groundwater contamination, consisting of two dissolved-phase plumes originating from chlorinated solvent source areas, in the southeastern portion of the Young- Rainey Star Center (also known as the Pinellas County, Florida, Site) in Largo, Florida, has migrated beyond the property boundary, beneath the roadways, and beneath adjacent properties to the south and east. Groundwater contamination will persist as long as the onsite contaminant source remains. The origin of the contamination appears to be multiple long-term point sources beneath Building 100, a 4.5 ha (11 acre) building that housed manufacturing facilities during US DOE operations at the site. The site is now owned by Pinellas County, and most of the space inside the building is leased to private companies, so DOE chose not to conduct characterization or remediation through the floor of the building, instead choosing to conduct all work from outside the building. Injection of emulsified soybean oil and a microbial culture has been used at other areas of the site to accelerate naturally occurring bacterial processes that degrade groundwater contaminants to harmless compounds, and that same approach was chosen for this task. The technical approach consisted of installing horizontal wells from outside the building footprint, extending through and around the identified subsurface treatment areas, and terminating beneath the building. Two 107 m (350 ft) long wells, two 122 m (400 ft) long wells, and four 137 m (450 ft) long wells have been installed to intersect the inferred source areas and confirmed contaminant plumes beneath the building. DOE then injected emulsified vegetable oil and a microbial culture into the horizontal wells at each of several target areas beneath the building where the highest groundwater contaminant concentrations have been detected. The target areas are the northwest corner of the building between the old drum storage pad locations and monitoring well PIN12-S35B, the vicinity of former monitoring well PIN12-S57B, and hydraulically up-gradient from the south plume and the east plume at the points where they exit from beneath the building. We describe the details of designing and constructing horizontal injection wells for bioremediation beneath a large, occupied industrial production facility, including lessons learned; technical, logistical, and environmental challenges; community relations; and regulatory relations. Because of the expected lag in biological acclimation and response, distance between the treatment areas and associated monitoring points, and low groundwater velocity, it will likely be years before the full impact of the project will be realized. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Major Achievements of the Springfields Decommissioning Program - 16512

Since the 1940's, Springfields has manufactured fuel products for the UK's nuclear power stations and for international customers. The early operations were in support of the atomic weapons program, closely followed by fuel manufacture for electricity generation via the Magnox power stations commencing in the late 1950's. In 2005, responsibility for the assets and liabilities of Springfields was transferred to the Nuclear Decommissioning Authority (NDA). A new company, Springfields Fuels Limited, was created to run the site, which was managed and operated by Westinghouse Electric UK Ltd on the NDA's behalf. On April 1, 2010, Westinghouse entered into an agreement with the NDA for a long-term lease of the Springfields site, which transferred responsibility for the commercial fuel manufacturing business and Springfields Fuels Limited to Westinghouse. Today, the main Springfields activities include: - Oxide fuels for Advanced Gas-cooled and Light Water Reactors, as well as intermediate fuel products, such as powders, granules and pellets, - Manufacture of Uranium Hexafluoride (now in Care and Maintenance), - Processing and recovery of Uranium residues, - Decommissioning and demolition of redundant plants and buildings. Some 120 plant buildings and support facilities have been successfully decommissioned and demolished in the period 1996 to date. These range from 1940's buildings, subsequently converted for nuclear fuel manufacture, together with some of the formerly sealed chemical agent manufacture and storage facilities. Decommissioning of the now redundant Magnox manufacturing facilities is ongoing at Springfields without compromising the other site operations. Westinghouse is managing all activities related to the whole lifecycle, planning, design, safety case, radiation protection, Post Operational Clean Out (POCO), service diversions, characterization, decommissioning all phases through to ground remediation, waste disposal and agreed end states. Decommissioning of process plants starts with the removal of the majority of radiological activity or hazard contained within the plant. This is known as Post Operational Clean Out. Once this is complete, the plant may be dismantled. Work is scoped and defined within packages (at plant or cell level) to aid control and commercial monitoring as the decommissioning is progressed. This package approach also enables clean or lightly contaminated items to be removed separately to aid potential re-cycling and minimize decontamination and waste disposal costs. Westinghouse is further optimising work package delivery by planning parallel POCO and Decommissioning work phases within plant at a cell level to systematically remove redundant plant and reduce hazard earlier, whilst optimising use of both internal and external resources to reduce total project cost. Waste and Residues from all phases are disposed of via authorized disposal routes and in accordance with our environmental authorizations. On completion of decommissioning and removal of plant and equipment the building is re-assessed radiologically, categorized and appropriate remediation work progressed to render it safe for conventional demolition. The major elements of the success achieved to date can be attributed to the following elements: - Overall programme management with extensive experience of planning, cost, and risk management. Integration of the programme within a major commercial site without compromising safety or operations. - Complete site EHS management working within a complex regulatory framework including the Nuclear Site Licenses, Environmental Authorisations and Security requirements. - Avoiding safety complacency by use of rigorous and systematic process to emphasise safety over competing goals. Including structured use of Human Performance and Corrective Action and Learning processes. - Unique safety experiences attained through complex hazard reduction across a broad range of uranium manufacturing and chemical hazard/agent facilities. - Project leadership and excellence utilizing a core site team to deploy repeatable processes and safe practices to deliver complex scope within budget and schedule. - Optimised use of internal and external resources, with extensive use of Operating Experience to drive continuous improvement and problem resolution. - Management of Contractors from initial selection, pre-qualification, tender assessment and Performance using varied contract forms across delivery phases. - Use of Westinghouse expertise for safety case, waste management, uranium recovery, health physics and design. - Implementation of a work package to ensure gated discreet manageable packages. Underpinned by package specific method statements, with appropriate hold points to maintain management and control of the works. - Continuous local safety focus via safety planning, induction, plant specific training, proactive risk assessment, and a defined approach to decoupling operating plant safety cases enabling focussed and usable documentation. This paper will provide an overview of the latest decommissioning activities achieved on the Springfields site and will focus on best practices that allowed Westinghouse to maintain the program on time and on budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming - 16614

By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17 sites remediated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) to the current inventory of 90 sites that it manages. Among the new sites are ones where federal public lands occur within the proposed long-term care boundary, the boundary determined by the Nuclear Regulatory Commission and LM as necessary to maintain site protectiveness for the entombed uranium mill tailings and residual groundwater contamination. For these sites, public land withdrawals for land and minerals will need to be established. LM's primary mission at UMTRCA sites is to protect the public and the environment from exposure to contamination at the sites. For the sites with public lands or federally controlled minerals that will be transferring to LM, the Office will apply to the Department of the Interior (DOI) Bureau of Land Management (BLM) for new, public land and mineral withdrawals. At most current LM UMTRCA sites that involved public lands and minerals, DOI granted DOE 'full administrative jurisdiction' and permanent withdrawals. Hence, these withdrawals are, permanently, no longer subject to public land, mining, and mineral-leasing laws and regulations. LM is coordinating with DOI/BLM in Wyoming to permanently withdraw full and partial jurisdiction at future UMTRCA Title II sites in that state. This approach would allow LM to fully administer surface lands and minerals, where necessary, and DOI and LM to administer surface lands and leasable minerals where it would not jeopardize sites' radiological safety and long-term public and environmental protection. This 'shared-jurisdiction approach' will meet LM's strategic goal of protecting human health and the environment but also allow BLM to fulfill their mission to 'manage and conserve the lands under the mandate of multiple-use and sustained yield'. In addition, LM could also fulfill the fourth goal of its Strategic Plan, to optimize land use and assets. The portions of the sites where LM will ask for full jurisdiction are those that contain the disposal cell and any adjacent lands and minerals required to maintain and protect it. It is anticipated that the shared jurisdiction portion of the withdrawal would largely coincide with land where known or projected contaminated groundwater from the past ore processing exists or will migrate over time. Examples of BLM-authorized activities on the shared jurisdiction portions of the withdrawals may include livestock grazing, wildlife habitat improvement projects, recreation, and rights of ways for roads, pipelines, utilities, and communication sites. In addition, BLM could authorize subsurface uses such as oil and gas, coal, or geothermal development or groundwater pumping from deeper aquifers if the proposal would not disturb groundwater contamination. For areas of the withdrawal where the agencies will share jurisdictional authority, DOE LM and BLM will develop an interagency agreement (IA) to define acceptable uses and associated roles and responsibilities. To ensure maximum protection of human health and the environment, each site's IA will include a provision allowing DOE LM the right of first refusal against any action it believes might affect radiological safety at the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE Grand Junction Office Marks 75 Years of Contribution to the Nation's Defense Program - 18380

On July 26, 2016, the former US Department of Energy (DOE) Grand Junction Office was listed on the National Register of Historic Places in recognition of its important, historic roles in the Manhattan Project and the Cold War. The work done from Grand Junction, Colorado, was an important component of the nation's defense program; however, because of the classified nature of the work, little of this history was originally available to the public. In 1943, the privately-owned site that later became the Grand Junction Office was purchased by the US government for the Colorado Area Office for the US Army Corps of Engineers Manhattan Engineer District (MED). The Colorado Area Office's mission was to procure and process uranium as part of a nationwide effort to build an atomic bomb. This race to build a bomb ahead of Nazi Germany became known as the Manhattan Project. Approximately 14% of the uranium obtained for the Manhattan Project was from Colorado Plateau ore-the largest source of domestic uranium ore known at the time. Uranium extracted from vanadium mill tailings was concentrated into uranium oxide, or 'yellowcake,' and shipped by rail to a facility in Tonawanda, New York, for further refinement. At the conclusion of World War II, the military MED mission ended, and the Grand Junction site became the principal US Atomic Energy Commission (AEC) office for acquiring and exploring for domestic uranium. The Colorado Raw Materials Office's primary objective was to increase the stockpile of fissionable material as rapidly as possible. To do that, AEC incentivized private industry and invited individual prospectors to locate uranium ores on public lands of the Colorado Plateau. Seemingly overnight, the small city of Grand Junction was transformed into a booming, modern metropolis and the national center of uranium exploration. Program operations in Grand Junction later included those of the National Uranium Resource Evaluation (NURE) program, the Uranium Mill Tailings Radiation Control Act (UMTRCA), vicinity properties cleanup, decontamination and decommissioning, and long-term surveillance and maintenance of legacy sites. In 2001, DOE transferred most of the original Grand Junction 55.7-acre site to the Riverview Technology Corporation, a business-development nonprofit sponsored by Mesa County and the City of Grand Junction. The US Department of Energy Office of Legacy Management continues to operate from leased facilities onsite. The Office of Legacy Management will host the 2018 Long-Term Stewardship Conference in Grand Junction on August 20-23. Conference attendees are invited to participate in a special 75. anniversary celebration at the Grand Junction Office where they will have the opportunity to learn more about the office's historic past, its ongoing and expanding work, and its goals of informing future generations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Stewardship Challenges at the Piqua, Ohio, Decommissioned Reactor Site - 19578

This paper describes the site history following the decommissioning of the Piqua, Ohio, Nuclear Power Facility to include key features of the 1968 contract and 1969 lease agreement with the City of Piqua still in effect today. Long-term stewardship challenges facing the US Department of Energy Office of Legacy Management (LM) and the path to find long-term solutions that are in the best interest of all parties are described. Lastly, the applications of lessons learned to other LM legacy sites are also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Calculating Dose Release Factors to Obtain the Worst-Case Maximally Exposed Location by Sector

The aim of this project was to update the SRS Dose Release Factors (DRF's) for the Maximally Exposed Individual (MEI) for 20 area release points onsite. To update, potential MEIs now include onsite locations and modeled stack heights were updated to match onsite operations. The DRF's and MEI locations are used to ensure DOE and EPA compliance is met for dose standards. The Environmental Protection Agency (EPA) requires the use of the computer model CAP88 to estimate doses for demonstrating compliance with 40 CFR 61, the National Emission Standard for Hazardous Air Pollutants (NESHAP). The location of the maximally exposed individual (MEI) by sector and distance is required for execution of CAP88. The worst-case sector is the sector and distance where an offsite individual would receive the highest dose due to a potential release from a designated release location at a facility. The worst-case sector analysis addresses potential ground-level and stack-height releases from 20 areas of Savannah River Site (SRS). Weather patterns were analyzed at each of these areas relative to sixteen compass points. The analysis makes use of recently updated distance data and meteorological data. The computer model, CAP88 is EPA's software system used by the Department of Energy (DOE) to calculate the receptor dose due to routine atmospheric releases via a gaussian plume at the Savannah River Site (SRS). The dose-release factors (DRFs) are used to estimate the offsite and onsite dose from facility-specific releases and represent the dose to a receptor exposed to 1 Ci of a specified radionuclide being released into the atmosphere. The DRFs are simply a ratio of the TED to the release rate and, therefore, are directly scalable. The DRF values listed in the Appendix can be applied to expected release values from each area to estimate the potential dose to an individual adult at each location. NESHAP DRFs have been supplied to Environmental Compliance and Area Closure Projects (EC and ACP) for many years and are periodically updated to include changes in Cap88. estimate the potential dose to an individual adult at each location DRF in mrem Ci{sup -1} are estimated by modeling the total effective dose (TED) in mrem yr{sup -1} assuming an annual atmospheric release rate of 1 Ci yr-1 of the associated radionuclides. TED = Effective Dose (ED) + Committed Effective Dose (CED). TED = DRF/RR. Approach and Methods: Determine possible MEI locations Onsite/Offsite including buildings and farms; Determine the distances from the release area to the possible MEI location and the direction from the release to the MEI location; Using the most recent meteorological data (2007-2011) and parameters, run CAP88 for each release area for each compass sector and previously calculated distances to MEI locations using a 1 Ci release rate for tritium; Use the calculated the air concentration values to determine the MEI for each sector from CAP88. The relationship between air concentration and received dose is directly proportional and can be used to determine which locations to calculate DRF's and a dose for an MEI; The DRFs are found for each compass sector from 20 SRS release areas using CAP88-PC Version 4.0; Each location is calculated with ground level releases evaluated for each area for a list of radionuclides, some with and some without progenies; Compare the DRFs of the potential onsite MEIs to offsite MEIs. Based on the 2018 MEI Report, the Site worst case sector MEI is located 593 mW of B-Area. This MEI location represents a point along the main road that travels through a tract of land leased to the SC National Guard. While this location is estimated to have the highest exposure, minimal radioactivity is released from B-Area. In 2017, SRS requested and was approved by the EPA to change the location for modeling site releases from the Center of Site to H-Area, and to use six stack heights. H-Area emission account for approximately 90% of all radioactive operations onsite. The MEI for H-Area was found to be 11,458 m NNE which locates the Savannah River Ecology Lab Conference Center. Comparisons for 2018 data and 2014 shows the new methods of calculation are more conservative yet still remain well below the DOE 100 mrem limit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Role of Pentaerythritol Tetranitrate (PETN) Aging in Determining Detonator Firing Characteristics

Pentaerythritol tetranitrate (PETN) is one of the most commonly used explosives for both military and mining applications. PETN is used in EBW (exploding bridge wire) and EFI (exploding foil initiator) detonator devices. Due the widespread usage of PETN, studies focusing on how the explosive changes with age, primarily its function in detonators has received particular interest. Aging studies have identified several factors that affect PETN detonator function over time, most notably the specific surface area of the explosive powder. Though small-scale studies have been performed on specific detonator systems with isolated batches of material, what is missing is a large statistically-significant study focusing on PETN aging characteristics - such as powder coarsening - and their influence on detonator performance. Herein we report the first large statistically viable PETN aging study focusing on four batches of PETN powder from the same stock of PETN using two stabilizers, polysaccharide and TriPEON. PETN was aged both as a free-flowing powder as well as in modified EBW RP-2 detonators, for one month at 75 °C. The PETN powder has been analyzed chemically using Fisher specific surface area analysis, SEM imaging and light scattering particle size analysis. Additionally the detonators were tested for performance through voltage-sweep threshold testing and function time measurements. Findings from the study indicate that aging at 75 °C for one month significantly changes the specific surface area and particle size of unstabilized PETN, leading to increases in detonator function time, but not detonator threshold values. Powders stabilized with TriPEON displayed less significant increases in function time, while powder stabilized with polysaccharide exhibited no aging effects, despite the high temperature aging.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Identification of Blue Discoloration in PBX 9404 using Ultrahigh Pressure Liquid Chromatography with Quadrupole Time-of-Flight Mass Spectrometry

PBX 9404, composed of 94 wt% HMX (1,3,5,7-Tetranitro-1,3,5,7-tetrazoctane), 3 wt% NC (nitrocellulose), 2.9 wt% CEF (tris(beta-chloroethyl) phosphate) and 0.1 wt% DPA (diphenylamine), has often been observed with a slight to entire blue discoloration of the manufactured prills. This blue discoloration has been observed since the formulation development of PBX 9404 in the late 1950s. In order to determine the source of the blue discoloration in PBX 9404, ultraviolet/visible (UV/Vis) absorbance of PBX 9404 and two potential candidates for the discoloration, p-nitrosodiphenylamine (p-NDPA) and N-nitrosodiphenylamine (N-NDPA) were evaluated. An absorbance band at 590 nm in PBX 9404 sample was attributed to the blue discoloration while p-NDPA and N-NPDA had different absorbance bands. Using the knowledge gained from the UV/Vis analysis, a semi-targeted approach using ultrahigh pressure liquid chromatography coupled to UV/Vis detector and quadrupole time of flight mass spectrometry (UHPLC-UV/Vis-QTOF) was implemented. Investigating the UHPLC-UV/Vis-QTOF chromatograms at a wavelength of 590 nm, a single compound was tentatively identified as being the source of the blue discoloration. Targeted tandem mass spectrometry (MS/MS) on the compound and subsequent analysis indicated that 4,4 -{[4-(Phenylimino)-2,5-cyclohexadien-1-ylidene]methylene}bis(N-phenylaniline), also known as Spirit Blue Base, was the source of the blue discoloration, which was confirmed using a standard. Here, a theory on the formation of Spirit Blue Base in PBX 9404 involving DPA, nitric acid (HNO 3 ) / nitrogen oxide(s) NO x , and formaldehyde is proposed.

36 MATERIALS SCIENCE↗

Integration of health into urban spatial planning through impact assessment: Identifying governance and policy barriers and facilitators

This article presents the results of a review of literature examining the barriers and facilitators in integrating health in spatial planning at the local, mainly urban level, through appraisals. Our literature review covered the UK and non UK experiences of appraisals used to consider health issues in the planning process. We were able to identify four main categories of obstacles and facilitators including first the different knowledge and conceptual understanding of health by different actors/stakeholders, second the types of governance arrangements, in particular partnerships, in place and the political context, third the way institutions work, the responsibilities they have and their capacity and resources and fourth the timeliness, comprehensiveness and inclusiveness of the appraisal process. The findings allowed us to draw some lessons on the governance and policy framework regarding the integration of health impact into spatial planning, in particular considering the pros and cons of integrating health impact assessment (HIA) into other forms of impact assessment of spatial planning decisions such as environmental impact assessment (EIA) and strategic environment assessment (SEA). In addition, the research uncovered a gap in the literature that tends to focus on the mainly voluntary HIA to assess health outcomes of planning decisions and neglect the analysis of regulatory mechanisms such as EIA and SEA. - Highlights: Black-Right-Pointing-Pointer Governance and policy barriers and facilitators to the integration of health into urban planning. Black-Right-Pointing-Pointer Review of literature on impact assessment methods used across the world. Black-Right-Pointing-Pointer Knowledge, partnerships, management/resources and processes can impede integration. Black-Right-Pointing-Pointer HIA evaluations prevail uncovering research opportunities for evaluating other techniques.

54 ENVIRONMENTAL SCIENCES↗

Design and permitting considerations of a floating hydrogen production and dispensing Barge for the Port of San Francisco

This paper reports on the design of a Floating Hydrogen Production and Dispensing Barge destined for the Port of San Francisco (SF). The H 2 Barge is designed to produce renewable H 2 at the rate of ∼530 kg/day, storing 512 kg of hydrogen at 517-bar, allowing fast refueling of hydrogen fuel cell vessels and land-side hydrogen delivery trailers for distribution into the nascent SF hydrogen ecosystem. The broader considerations that impacted H 2 Barge design are also described. An account is given of a new review process formulated by the United States Coast Guard (USCG) to review this first-of-its-kind maritime implementation of hydrogen technology. Furthermore, the immediate goals of the H 2 Barge Project are to 1) demonstrate the feasibility, viability and methods of hydrogen production, storage and fueling in a maritime context, 2) help shape (where needed) and navigate the required local, state and federal regulatory gauntlet and 3) catalyze a “green hydrogen ecosystem” (both marine and landside) with locally produced renewable hydrogen at the San Francisco waterfront.

08 HYDROGEN↗