Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mixed integer optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Integrated Transmission and Distribution Systems Restoration with Distributed Generation Scheduling

The self-healing smart grids enable system operators to quickly and efficiently recover transmission and distribution systems from outages and blackouts. The current restoration procedure solves the transmission and distribution system restoration problems separately without considering their impacts on each other, which may prolong the restoration process. However, with the emerging active distribution networks, distributed generators can contribute into the bottom-up restoration strategy. The interaction between the restoration of two interconnected systems should be taken into account. In this paper, a hybrid model of transmission and distribution systems restoration (HTDSR) is proposed by exchanging data of power and voltage between two separate optimization problems. The effectiveness of the HTDSR algorithm is demonstrated through case studies of the integrated IEEE 13-bus distribution network and IEEE 39-bus transmission grid. Simulation results demonstrate that the integrated restoration strategy with optimal scheduling of distributed generation sources can expedite the restoration process.

Distributed generation↗

Parallel PIPS-SBB: multi-level parallelism for stochastic mixed-integer programs

PIPS-SBB is a distributed-memory parallel solver with a scalable data distribution paradigm. It is designed to solve MIPs with a dual-block angular structure, which is characteristic of deterministic-equivalent Stochastic Mixed-Integer Programs (SMIPs). In this paper, we present two different parallelizations of Branch & Bound (B&B), implementing both as extensions of PIPS-SBB, thus adding an additional layer of parallelism. In the first of the proposed frameworks, PIPS-PSBB, the coordination and load-balancing of the different optimization workers is done in a decentralized fashion. This new framework is designed to ensure all available cores are processing the most promising parts of the B&B tree. The second, ug[PIPS-SBB,MPI], is a parallel implementation using the Ubiquity Generator (UG), a universal framework for parallelizing B&B tree search that has been sucessfully applied to other MIP solvers. We show the effects of leveraging multiple levels of parallelism in potentially improving scaling performance beyond thousands of cores.

97 MATHEMATICS AND COMPUTING↗

Model predictive control for optimal dispatch of chillers and thermal energy storage tank in airports

Cost of energy consumption is one of the biggest operational cost for airports, and it is increasing from time to time as airports expand to support growing number of passengers. Various factors affect the energy consumption including efficiency of airport Heating Ventilation and Air conditioning (HVAC) systems, which in turn depends on the efficiency of individual subsystems. Here, in this paper, we present an optimal scheduling method for the central plant system at Dallas Fort Worth airport, involving chillers, pumps, and a thermal energy storage (TES) system. A model predictive control (MPC) problem is formulated to minimize both energy and demand charge costs while satisfying the cooling needs of the airport. The proposed Mixed-Integer Nonlinear Programming (MINLP) formulation includes performance curve based models for chillers and pumps and a simplified state of charge model for TES. The formulation also includes predictions of cooling load and chilled water return temperature. Simulation results for a month in summer show savings around 10% compared to the baseline. Initial recommendations based on insights from simulation results to the manual operation procedures resulted in significant savings. Field test results show a 7% chiller efficiency improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Supply chain optimization of sustainable aviation fuel from carinata in the Southeastern United States

We report carinata is a purpose-grown oilseed feedstock for renewable fuels, including sustainable aviation fuel (SAF) that can replace conventional aviation fuel (CAF). Given carinata is a new crop in the Southeastern United States, it is crucial to analyze its sustainability from a supply chain perspective. This study developed a mixed-integer linear programming (MILP) model and simulated it for 20 years, starting from a farm (county-level data) and ending at the airport. About 2.06 million ha in Alabama, Florida, and Georgia combined were found suitable for carinata production. Given the three-year rotation period, about 0.69 million hectares can be cultivated annually, approximately 65% of which was in Georgia. About 2.4% of the combined SAF annual demand of four major airports (about 210 thousand t) in the study area is satisfied at that level of carinata cultivation. However, all available SAF was supplied to the Atlanta airport as this decision minimizes the supply chain cost. A total of 1343 storage units, one oil extraction mill, and one biorefinery were needed to meet the overall demand. We found that SW Georgia is the top supplier of carinata seeds. The unit cost of production and carbon intensity were estimated to be $\$$0.89 L -1 (or $\$$26.79 GJ -1 ) and 0.91 kg CO 2 e L -1 (or 27.28 kg CO 2 e GJ -1 ), respectively. This carbon intensity of carinata-based SAF was 67.8% lower than that of CAF. With variations included in SAF demand, yield, and soil carbon sequestration, carbon savings remained between 66.5% and 67.8%. Given the GHG advantage of SAF over CAF, there is justification for subsidies required to make SAF competitive.

10 SYNTHETIC FUELS↗

The nth-plant scenario for blended feedstock conversion and preprocessing nationwide: biorefineries and depots

The sustainability of the biofuel industry depends on the development of a mature conversion technology on a national level that can take advantage of the economies of scale: the nth-plant. Defining the future location and supply logistics of conversion plants is imperative to ultimately transform the nation’s renewable biomass resources into cost-competitive, high-performance feedstock for production of biofuels and bioproducts. Since the US has put restrictions on production levels of conventional biofuels from edible resources, the nation needs to plan for the widespread accessibility and development of the cellulosic biofuel scenario. Conventional feedstock supply systems will be unable to handle cellulosic biomass nationwide, making it essential to expand the industry with an advanced feedstock supply system incorporating a distributed network of preprocessing depots and conversion plants, or biorefineries. Current studies are mostly limited to designing supply systems for specific regions of the country. We developed a national database with potential locations for depots and biorefineries to meet the nation’s target demand of cellulosic biofuel. Blended feedstock with switchgrass and corn stover (harvested by either a two- or three-pass method) are considered in a Mixed Integer Linear Programming model to deliver on-spec biomass that considers both, a desired quantity and quality at the biorefinery. A total delivered feedstock cost that is less than $79.07/dt (2016$) is evaluated for years 2022, 2030, and 2040. In 2022, 124 depots and 59 biorefineries could be supplied with 42.8 million dt of corn stover and switchgrass. In 2030 and 2040, the total accessible biomass could increase to 215% and 393% respectively when compared to 2022. However, an $8/dry tons reduction in targeted delivery cost could reduce total accessible biomass by 67%. Kansas, Nebraska, South Dakota and Texas were identified as potential states with a strong biofuel economy given that they had six or more biorefineries located in all scenarios. In some scenarios, Colorado, Alabama, Georgia, Minnesota, Mississippi and South Carolina would greatly benefit from a depot network as these could only deliver to a biorefinery in a nearby state. To elaborate the impact of a nationwide consideration, the findings were compared with existing literature for different US regions. We also present results for biorefinery capacities that are double, triple, and quadruple in size.

09 BIOMASS FUELS↗

Heuristic solutions to the single depot electric vehicle scheduling problem with next day operability constraints

This study focuses on the single depot electric vehicle scheduling problem (SDEVSP) within the broader context of the vehicle scheduling problem (VSP). By developing an effective scheduling model using mixed-integer linear programming, we generate bus blocks that accommodate electric vehicles (EVs), ensuring successful completion of each block while considering recharging requirements between blocks and during off-hours. Next day operability constraints are also incorporated, allowing for seamless repetition of blocks on subsequent days. The SDEVSP is known to be computationally complex, deriving optimal solutions unattainable for large-scale problems within reasonable timeframes. To address this, we propose a two-step solution approach: first solving the single depot VSP, and then addressing the block chaining problem (BCP) using the blocks generated in the first step. The BCP focuses on optimizing block combinations to facilitate recharging between consecutive blocks, considering operational constraints. Further, a case study conducted reveals that nearly 100% electrification for Chicago, IL and Austin, TX transit buses is viable yet requires 1.6 EVs at 150-mile range per diesel vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

Strategic Placement and Sizing of Distributed Generation for Resilience Enhancement of Distribution Grids With Microgrid Formation

The rise in frequency and severity of extreme weather events highlights the need for resilient power distribution networks. Microgrids can help improve the resilience of distribution grids by providing continuous power supply using local distribution generation (DG) when the distribution grid fails. In this paper, we propose an approach for optimal placement and sizing of DG to form multiple microgrids throughout the distribution network by restoration actions such as switching operations in case of distribution grid outages caused by extreme weather events. Considering the randomness of damaged distribution lines, the DG placement and sizing problem is formulated as a two-stage stochastic mixed-integer program, with the first stage determining the placement and size of DG, and the second stage focusing on minimizing the amount of load shedding through network restoration and microgrid formations for each scenario. Due to the large number of scenarios, the sample average approximation (SAA) method is employed to solve the problem. The results of case studies on a modified IEEE 33 bus distribution grid demonstrate the effectiveness of the proposed DG placement and sizing strategy in improving the resilience of distribution grids by allowing the formation of multiple microgrids. In addition, the robustness and accuracy of the SAA method are validated through various case studies.

Distributed generation planning↗

A stochastic biomass blending problem in decentralized supply chains

Blending biomass materials of different physical or chemical properties provides an opportunity to adjust the quality of the feedstock to meet the specifications of the conversion platform. We propose a model which identifies the right mix of biomass to optimize the performance of the thermochemical conversion process at the mini-mum cost. This is a chance-constraint programming (CCP) model which takes into account the stochastic nature of biomass quality. The proposed CCP model ensures that process requirements, which are impacted by physical and chemical properties of biomass, are met most of the time. We consider two problem settings, a centralized and a decentralized supply chain. We propose a mixed-integer linear program to model the blending problem in the centralized setting and a bilevel program to model the blending problem in the decentralized setting. We use the sample average approximation method to approximate the chance constraints, and propose solution algorithms to solve this approximation. We develop a case study for South Carolina using data provided by the Billion Ton Study. Based on our results, the blends identified consist mainly of pine and softwood residues. The blends identified and the suppliers selected by both models are different. The cost of the centralized supply chain is 2%–6% lower. The implications of these results are twofold. First, these results could lead to improved collaborations in the supply chain. Second, these results provide an estimate of the approximation error from assuming centralized decision making in the supply chain.

09 BIOMASS FUELS↗

A Scalable Approach to Minimize Charging Costs for Electric Bus Fleets

Incorporating battery electric buses into bus fleets faces three primary challenges: a BEB’s extended refuel time, the cost of charging, both by the consumer and the power provider, and large compute demands for planning methods. When BEBs charge, the additional demands on the grid may exceed hardware limitations, so power providers divide a consumer’s energy needs into separate meters even though doing so is expensive for both power providers and consumers. Prior work has developed a number of strategies for computing charge schedules for bus fleets; however, prior work has not worked to reduce costs by aggregating meters. Additionally, because many works use mixed integer linear programs, their compute needs make planning for commercial-sized bus fleets intractable. This work presents a multi-program approach to computing charge plans for electric bus fleets. The proposed method solves a series of subproblems where the solution to the charge problem becomes more refined with each problem, moving closer to the optimal schedule. The results demonstrate how runtimes are reduced by using intermediate subproblems to refine the bus charge solution so that the proposed method can be applied to large bus fleets of 100+ buses. Not only will we demonstrate that runtimes scale linearly with the number of buses but we will also show how the proposed method scales to large bus fleets of over 100 buses while managing the monthly cost of energy.

Mortensen, Daniel (ORCID:0000000276494452)↗

DEPLOYING FAST CHARGING INFRASTRUCTURE FOR ELECTRIC VEHICLES IN URBAN NETWORKS: AN ACTIVITY-BASED APPROACH

This paper explores an important problem under the domain of network modeling, the optimal configuration of charging infrastructure for electric vehicles (EVs) in urban networks considering EV users' daily activities and charging behavior. This study proposes a charging behavior simulation model considering different initial state of charge (SOC), travel distance, availability of home chargers, and the daily schedule of trips for each traveler. The proposed charging behavior simulation model examines the complete chain of trips for EV users as well as the interdependency of trips traveled by each driver. The problem of finding the optimum charging configuration is then formulated as a mixed-integer nonlinear programming problem that considers the dynamics of travel time and travel distance, the interdependency of trips made by each driver, limited range of EVs, remaining battery capacity for recharging, waiting time in queue, and detour to access a charging station. This problem is solved using a metaheuristic approach for a large-scale case network. A series of examples are presented to demonstrate the model efficacy and explore the impact of energy consumption on the final SOC and the optimum charging infrastructure.

Chain of Trips↗

Minimizing Energy Use of Mixed-Fleet Public Transit for Fixed-Route Service

Affordable public transit services are crucial for communities since they enable residents to access employment, education, and other services. Unfortunately, transit services that provide wide coverage tend to suffer from relatively low utilization, which results in high fuel usage per passenger per mile, leading to high operating costs and environmental impact. Electric vehicles (EVs) can reduce energy costs and environmental impact, but most public transit agencies have to employ them in combination with conventional, internal-combustion engine vehicles due to the high upfront costs of EVs. To make the best use of such a mixed fleet of vehicles, transit agencies need to optimize route assignments and charging schedules, which presents a challenging problem for large transit networks. We introduce a novel problem formulation to minimize fuel and electricity use by assigning vehicles to transit trips and scheduling them for charging, while serving an existing fixed-route transit schedule. We present an integer program for optimal assignment and scheduling, and we propose polynomial-time heuristic and meta-heuristic algorithms for larger networks. We evaluate our algorithms on the public transit service of Chattanooga, TN using operational data collected from transit vehicles. Our results show that the proposed algorithms are scalable and can reduce energy use and, hence, environmental impact and operational costs. For Chattanooga, the proposed algorithms can save $145,635 in energy costs and 576.7 metric tons of CO 2 emission annually.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A robust offering strategy for wind producers considering uncertainties of demand response and wind power

This paper proposes a risk-constrained decision-making approach for a wind power producer participating in the day-ahead market. In the developed model, a flexible demand response trading scheme between the wind power producer and different customers is employed. Through the proposed demand response mechanism, the wind power producer is able to trade demand response resource internally with different customers, and then trade energy externally with the market to increase the expected profit and the wind energy utilization. The uncertainties in the wind power and demand response are modeled by using the information gap decision theory approach from risk averse (robust) and risk-seeking (opportunistic) perspectives. The objective of the robust model is to maximize the robust level while satisfying the desired profit, whereas the opportunistic model aims to evaluate the possibility of achieving windfall profits with favorable uncertainties. The overall offering strategy problem is modeled as a bi-objective mixed integer nonlinear programming, which is linearized by proper techniques and solved efficiently by using the normal boundary intersection technique. In this work, simulation results show that utilizing demand response resource to mitigate wind power deviations can increase a wind power producer's profit and reduce potential risks. In addition, the results demonstrate that the proposed bi-objective optimization approach enables the wind power producer to select appropriate offering decisions with respect to uncertainties.

17 WIND ENERGY↗

An ℓ 0 ℓ 2 -norm regularized regression model for construction of robust cluster expansions in multicomponent systems

In this work we introduce ℓ 0 ℓ 2 -norm regularization and hierarchy constraints into linear regression for the construction of cluster expansions to describe configurational disorder in materials. The approach is implemented through mixed integer quadratic programming (MIQP). The ℓ 2 -norm regularization is used to suppress intrinsic data noise, while the ℓ 0 -norm is used to penalize the number of nonzero elements in the solution. The hierarchy relation between clusters imposes relevant physics and is naturally included by the MIQP paradigm. As such, sparseness and cluster hierarchy can be well optimized to obtain a robust, converged set of effective cluster interactions with improved physical meaning. We demonstrate the effectiveness of ℓ 0 ℓ 2 -norm regularization in two high-component disordered rocksalt cathode material systems, where we compare the cross-validation, convergence speed, and the reproduction of phase diagrams, voltage profiles, and Li-occupancy energies with those of the conventional ℓ 1 -norm regularized cluster expansion models.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Voltage positioning using co-optimization of controllable grid assets in radial networks

With increasing penetration of solar PV, some distribution feeders are experiencing highly variable net-load flows and even reverse flows. To optimize distribution systems under such conditions, the scheduling of mechanical devices, such as OLTCs and capacitor banks, needs to take into account forecasted solar PV and actual grid conditions. However, these legacy switching assets are operated on a daily or hourly timescale, due to the wear and tear associated with mechanical switching, which makes them unsuitable for real-time control. Therefore, there is a natural timescale- separation between these slower mechanical assets and the responsive nature of inverter-based resources. In this paper, we present a network admissible convex formulation for holistically scheduling controllable grid assets to position voltage optimally against solar PV. An optimal hourly schedule is presented that utilizes mechanical resources to position the predicted voltages close to nominal values, while minimizing the use of inverter-based resources (i.e., DERs), making them available for control at a faster time-scale (after the uncertainty reveals itself). A convex, inner approximation of the OPF problem is adapted to a mixed-integer linear program that minimizes voltage deviations from nominal (i.e., maximizes voltage margins). Here, the resulting OPF solution respects all the network constraints and is, hence, robust against modeling simplifications. Simulation based analysis on IEEE distribution feeders validates the approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal distribution system restoration using PHEVs

Power outages cost billions of dollars every year and jeopardise the lives of hospital patients. Traditionally, power distribution system takes a long time to recover after a major blackout, due to its top-down operation strategy. New technologies in modern distribution systems bring opportunities and challenges to distribution system restoration. As fast response energy resources, plug-in hybrid electric vehicles (PHEVs) can accelerate the load pickup by compensating the imbalance between available generation and distribution system load. This study provides a bottom-up restoration strategy to use PHEVs for reliable load pickup and faster restoration process. The optimisation problem of finding load pickup sequence to maximise restored energy is formulated as a mixed integer linear programming (MILP) problem. Moreover, the coordination between transmission and distribution restoration is developed to efficiently restore the entire system back to normal operating conditions. Simulation results on one 100-feeder test system demonstrate the efficiency of MILP-based restoration strategy and the benefit from PHEVs to restore more energy in given restoration time. The proposed restoration strategy has great potential to facilitate system operators to achieve efficient system restoration plans. It also provides incentives to deploy a large amount of PHEVs to improve system resiliency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal PV Inverter Control in Distribution Systems via Data-Driven Distributionally Robust Optimization

Distribution systems with high penetration of uncertain solar generation call for advanced control strategies of photovoltaics (PVs) inverters. This paper proposes a data-driven distributionally robust optimization (DDDRO) approach to optimally controlling the PV inverters to improve the system operation performance under solar power uncertainties. In the proposed DDDRO approach, a Wasserstein ball-based method is proposed to construct the distributional ambiguity set to model the uncertainties of PV generation through partial observations of historical data without knowing exact probability distributions. We further reformulate the computationally intractable DDDRO model to a mixed integer second order cone programming (MISOCP) problem. The effectiveness and out-of-sample performance of the proposed approach have been demonstrated on a modified IEEE 33-node system. We conduct a comparative study to compare the proposed method with traditional chance constrained programming (CCP). It shows that the proposed DDDRO approach can provide a less conservative yet robust solution to minimize the worse-case expectation of the total network loss while maintaining nodal voltages in a secure range.

Xue, Yaosuo↗

Integrated membrane material design and system synthesis

In designing membrane systems, the synergy between membrane materials and the process design is often overlooked. In this paper, we present a mixed-integer nonlinear programming (MINLP) model for synthesizing membrane systems while simultaneously designing the respective membrane materials for multicomponent gas separation. The approach considers superstructure representations for systems with: (1) same, (2) potentially different, and (3) property-targeting membrane materials. In the first two systems, the selection of membrane material is a decision, while in the final type, membrane permeances are subject to optimization. Physics-based surrogate models are used to describe permeation in crossflow and countercurrent flow permeators. We show that, through a case study of biogas upgrading, our approach obtains high quality solutions. Furthermore, we use the proposed approach while considering permeance-based production cost to find the optimal membrane.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗