Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

DEVELOPMENT AND DEMONSTRATION TESTBED FOR THE REMOTE OPERATIONS AND MONITORING OF MICROREACTORS

The nuclear industry is rapidly developing many advanced-reactor concepts for near-term deployment in both traditional and non-traditional nuclear-powered applications. One such category of advanced reactor is the microreactor, a class of reactor with less than 20MWth power output, intended for applications where the economics or logistics of traditional power sources are difficult. This includes applications such as remote communities, mining sites, defense installations, or humanitarian and disaster-relief missions. One key enabling feature for the successful deployment of microreactors is a remote operations capability. Remote operations provide monitoring and control capabilities which can significantly reduce staffing costs by eliminating the need for licensed operators at each reactor facility and improve the economic viability for microreactor deployment. A remote concept of operations is not currently an established capability in the nuclear industry. In addition, no demonstration microreactor is expected to complete construction or go critical until at least 2026. This leaves two major capability gaps: the successful demonstration of a remote concept of operations for microreactors and a test bed suitable for said demonstration. Both gaps must be addressed in order to advance the remote concepts of nuclear operation and, more broadly, microreactors themselves from paper to reality. This paper aims to fill these gaps and describes a test bed that would support development and deployment of a remote concept of nuclear operations, initial experimental results from that test bed, and the application of the test bed and experimental results for a digital-twin-based remote concept of operations underdevelopment at Idaho National Laboratory (INL). The platform chosen as a remote concept of nuclear operations test bed is the Single Primary Heat Extraction and Removal Emulator, known as SPHERE, located at INL. SPHERE is a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The small-scale and non-nuclear nature of SHPERE limit safety concerns associated with remote operations while still providing the physical response representative of a microreactor. A network connection was added to SPHERE that enables remote-monitoring capability. This allows for real-time data streaming to networked workstations, data historians, and human-machine interfaces (HMIs). These are all critical components in a remote concept of operations, thus providing a robust development and demonstration platform. An initial experiment was performed using the SPHERE remote operations testbed. This included running a comprehensively instrumented SPHERE through a series of steady-state and transient operating scenarios in both normal and abnormal operating conditions, all while streaming live test data to a remote HMI and data warehouse. This initial experiment served three purposes: (1) characterizing the response of SPHERE, (2) demonstrating the remote connection to SPHERE, and (3) providing a baseline data set for development of a digital-twin-based remote concept of operations that is under development at INL.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

A Computuerized Operator Support System Prototype

A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Computuerized Operator Support System Prototype

A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Synthesis of historical reservoir operations from 1980 to 2020 for the evaluation of reservoir representation in large-scale hydrologic models

Abstract. All the major river systems in the contiguous United States (CONUS) (and many in the world) are impacted by dams, yet reservoir operations remain difficult to quantify and model due to a lack of data. Reservoir operation data are often inaccessible or distributed across many local operating agencies, making the acquisition and processing of data records quite time-consuming. As a result, large-scale models often rely on simple parameterizations for assumed reservoir operations and have a very limited ability to evaluate how well these approaches match actual historical operations. Here, we use the first national dataset of historical reservoir operations in the CONUS domain, ResOpsUS, to analyze reservoir storage trends and operations in more than 600 major reservoirs across the US. Our results show clear regional differences in reservoir operations. In the eastern US, which is dominated by flood control storage, we see storage peaks in the winter months with sharper decreases in the operational range (i.e., the difference between monthly maximum and minimum storage) in the summer. In the more arid western US where storage is predominantly for irrigation, we find that storage peaks during the spring and summer with increases in the operational range during the summer months. The Lower Colorado region is an outlier because its seasonal storage dynamics more closely mirrored those of flood control basins, yet the region is classified as arid, and most reservoirs have irrigation uses. Consistent with previous studies, we show that average annual reservoir storage has decreased over the past 40 years, although our analyses show a much smaller decrease than previous work. The reservoir operation characterizations presented here can be used directly for development or evaluation of reservoir operations and their derived parameters in large-scale models. We also evaluate how well historical operations match common assumptions that are often applied in large-scale reservoir parameterizations. For example, we find that 100 dams have maximum storage values greater than the reported reservoir capacity from the Global Reservoirs and Dams database (GRanD). Finally, we show that operational ranges have been increasing over time in more arid regions and decreasing in more humid regions, pointing to the need for operating policies which are not solely based on static values.

Geology↗

A Rinsing Effluent Evaporator for Dismantling Operations - 13271

Between 1958 and 1997, the UP1 plant at Marcoule - located in the south of France - reprocessed and recycled nearly 20,000 MT of used fuel from special defense applications reactors, as well as fuel from the first generation of electricity generating reactors in France (natural uranium fuel, CO{sub 2}-cooled, graphite-moderated). Decommissioning and Dismantling of the UP1 plant and its associated units started in 1998. Since 2005, the UP1 facility has been operated by AREVA as the Marcoule Management and Operation contractor for French Atomic Energy Commission (CEA). An important part of this decommissioning program deals with the vitrification facility of Marcoule. This facility includes 20 tanks devoted to interim storage of highly active solutions, prior to vitrification. In 2006, a rinsing program was defined as part of the tank cleanup strategy. The main objective of the rinsing phases was to decrease activity in order to limit the volume of 'long-life active' waste produced during the decommissioning operations, so the tanks can be dismantled without the need of remote operations. To enable this rinsing program, and anticipating large volumes of generated effluent, the construction of an evaporation unit proved to be essential. The main objective of this unit was to concentrate the effluent produced during tank rinsing operations by a factor of approximately 10, prior to it being treated by vitrification. The evaporator design phase was launched in September 2006. The main challenge for the Project team was the installation of this new unit within a nuclear facility still in operation and in existing compartments not initially designed for this purpose. Cold operating tests were completed in 2008, and in May 2009, the final connections to the process were activated to start the hot test phase. During the first hot test operations performed on the first batches of clean-up effluent, the evaporator had a major operating problem. Extremely large quantities of foam were produced, affecting the evaporator operation, and creating the risk of a reduction in its capacity and throughput performance. A task force of AREVA process, operations, and safety experts from Marcoule and the La Hague reprocessing complex was assembled. New operating parameters were defined and tested to improve the process. Since then, the evaporator has performed very satisfactorily. The foam buildup phenomenon has been brought under complete control. All the different types of effluents produced during cleanup operations have been concentrated, and the results obtained in terms of quality and throughput, have ensured a consistent supply to the vitrification unit. The evaporator was operated until the end of April 2012, and enabled the production of 500 cubic meters of very high activity effluent, concentrating the fission products rinsed from the storage tanks. The evaporator will now be deactivated and decommissioned, with the first rinsing and cleanup operations scheduled to begin in 2014. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Non-Operational Property Evaluation for the Hanford Site River Corridor - 12409

The Hanford Site River Corridor consists of the former reactor areas of the 100 Areas and the former industrial (fuel processing) area in the 300 Area. Most of the waste sites are located close to the decommissioned reactors or former industrial facilities along the Columbia River. Most of the surface area of the River Corridor consists of land with little or no subsurface infrastructure or indication of past or present releases of hazardous constituents, and is referred to as non-operational property or non-operational area. Multiple lines of evidence have been developed to assess identified fate and transport mechanisms and to evaluate the potential magnitude and significance of waste site-related contaminants in the non-operational area. Predictive modeling was used for determining the likelihood of locating waste sites and evaluating the distribution of radionuclides in soil based on available soil concentration data and aerial radiological surveys. The results of this evaluation indicated: 1) With the exception of stack emissions, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas, 2) Stack emissions that may have been associated with Hanford Site operations generally emitted short-lived and/or gaseous radionuclides, and (3) the likelihood of detecting elevated radionuclide concentrations or other waste sites in non-operational area soils is very small. The overall conclusions from the NPE evaluation of the River Corridor are: - With the exception of stack emissions to the air, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas. While pathways such as windblown dust, overland transport and biointrusion have the potential for dispersing waste site contaminants, the resulting transport is unlikely to result in substantial contamination in non-operational areas. - Stack emissions that may have been associated with Hanford Site operations generally emitted short-lived and/or gaseous radionuclides; these radionuclides either would have decayed and would be undetectable in soil, or likely would not have deposited onto Hanford Site soils. A small fraction of the total historical emissions consisted of long-lived particulate radionuclides, which could have deposited onto the soil. Soil monitoring studies conducted as part of surveillance and monitoring programs do not indicate a build-up of radionuclide concentrations in soil, which might indicate potential deposition impacts from stack emissions. Aerial radiological surveys of the Hanford Site, while effective in detecting gamma-emitting nuclides, also do not indicate deposition patterns in soil from stack emissions. - The surveillance and monitoring programs also have verified that the limited occurrence of biointrusion observed in the River Corridor has not resulted in a spread of contamination into the non-operational areas. - Monitoring of radionuclides in ambient air conducted as part of the surveillance and monitoring programs generally show a low and declining trend of detected concentrations in air. Monitoring of radionuclides in soil and vegetation correspondingly show declining trends in concentrations, particularly for nuclides with short half lives (Cs-137, Co-60 and Sr-90). - Statistical analysis of the geographical distribution of waste sites based on man -made features and topography describes the likely locations of waste sites in the River Corridor. The results from this analysis reinforce the findings from the Orphan Site Evaluation program, which has systematically identified any remaining waste sites within the River Corridor. - Statistical analysis of the distribution of radionuclide concentrations observable from aerial surveys has confirmed that the likelihood of detecting elevated radionuclide concentrations in non-operational area soils is very small; the occurrences and locations where potentially elevated concentrations may be found are discussed below. In addition, statistical analysis showed that there is a relatively high probability (>50%) that concentrations of Cs-137 higher than background (3.9 Bq/kg or 1.05 pCi/g) are located outside of the operational portion of the 100-BC, 100-K, and 100-N Areas. This observation is based on modeled concentrations in soil derived from aerial radiography data. However, the extent is limited to a few meters from the respective facilities fence lines or known operational activities. Evaluation of the extent of contamination is being conducted as part of the RI process for each decision area. No unanticipated waste sites were identified either from the OSE program or statistical analysis of waste site proximity to known features. Based on the evaluation of these multiple lines of evidence, the likelihood of identifying waste sites or contaminant dispersal from Hanford site operations into non-operational areas can be considered very small. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Localized excitations from localized unitary operators

Localized unitary operators are basic probes of locality and causality in quantum systems: localized unitary operators create localized excitations in entangled states. Working with an explicit form, we explore properties of these operators in quantum mechanics and quantum field theory. We show that, unlike unitary operators, local non-unitary operators generically create non-local excitations. We present a local picture for quantum systems in which localized experimentalists can only act through localized Hamiltonian deformations, and therefore localized unitary operators. We demonstrate that localized unitary operators model certain quantum quenches exactly. We show how the Reeh–Schlieder theorem follows intuitively from basic properties of entanglement, non-unitary operators, and the local picture. We show that a recent quasi-particle picture for excited-state entanglement entropy in conformal field theories is not universal for all local operators. We prove a causality relation for entanglement entropy and connect our results to the AdS/CFT correspondence. - Highlights: • Local unitary operators create local excitations. • Local non-unitary operators generically create non-local excitations. • Reeh–Schlieder follows intuitively from non-locality of local operator excitations. • Local operators of definite conformal dimension create local excitations. • Quasi-particle picture for entanglement entropy fails for some local operators.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Idaho National Laboratory Radioisotope Power Systems Nuclear Operations: Readiness Assessments Supporting a Nuclear-enabled NASA Mission

Idaho National Laboratory Radioisotope Power Systems Nuclear Operations: Preparations, Documentation, Readiness Assessments and Conduct of Operations Supporting a Nuclear-enabled NASA Mission Kelly L. Lively, Eric S. Clarke, Robert P. Gomez Idaho National Laboratory, Idaho Falls, ID 83415 208-533-7388; Kelly.Lively@inl.gov Abstract. The Radioisotope Power Systems (RPS) Program, located at Idaho National Laboratory (INL), is responsible for assembling, testing, and delivering plutonium oxide-fueled RPSs for use in powering missions in remote, harsh environments such as deep space. An informative presentation will be given discussing the preparations, documents, readiness assessments, human capital and conduct of operations involved in performing nuclear operations to support providing these systems to end users for the Department of Energy (DOE). DOE is the start-up authority for performing nuclear operations. Readiness for start-up is determined through independent assessment against established acceptance criteria to ensure activities can be performed safely and within a well defined nuclear safety envelope. There is also an RPS Program approval element requiring additional readiness review before nuclear operations can begin. The programmatic readiness review is performed to ascertain readiness to proceed with nuclear operations from the perspective of product quality. The assessments and reviews are conducted in series in the following order of progression: Management Self Assessment (MSA), Contractor Readiness Assessment (CRA), DOE Readiness Assessment (DOE RA) and lastly, the Programmatic Production Readiness Review (PRR). The CRA, DOE RA, and PRR requires an independent technical review team. Twelve assessment criteria are reviewed and a selection of the criteria is identified for review on a graded approach. Typically, the assessments/review criteria requires, at a minimum, review of operating instructions to ensure technical safety requirements are adequately identified, review of training records to ensure personnel are adequately trained to perform the specified work scope, personnel are interviewed to determine adequacy of level of knowledge for work scope, and a high-fidelity performance of the operation to ensure the operating instructions and conduct of operations are adequate to perform the work scope. As each assessment/review is conducted a formal report delineating any issues in the form of findings, observations, and noteworthy practices will be issued. Before start-up approval is obtained all issues must be resolved to the satisfaction of the individual teams. Start-up notification is formally communicated by memorandum from DOE. Programmatic approval is documented in a Segmented Readiness Review where vested Program representatives in the RPS community (to include DOE NE 75 and DOE ID representatives) ensure personnel, documentation, and materials are in place to perform the activity. The four assessments/reviews can be completed in a 16-week period of time, provided ample resources and a relatively small work scope is identified. RPS assembly and testing operations to support the Mars 2020 Mission, the next planned space mission using a nuclear power system, will require about of year of assessments/reviews before the nuclear operations are performed. Keywords: INL, Operations, Assessments, DOE

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Improving Operational Efficiency, Compliance and Community Perception with Real-time Data - 19260

The nuclear and medical radiation industry has always faced a significant burden in effectively balancing exposure and productivity. Maintenance operations and development of new techniques require significant staffing resources to monitor and review personnel exposures and changes in operational radiation levels. Currently utilised monitoring technology and review techniques remain unchanged since the 1950's, relying upon mostly analogue instrumentation and paper reporting. After utilising isolated-area monitoring during a reactor decommissioning project it became apparent that current systems created false assurance as the units continually failed without warning due to 'dirty' power. These instrument failures could have easily led to an unnecessary exposure while operators continued to assume they were being safely monitored. This paper is a philosophical discussion on how current shortcomings could be addressed, security increased, and exposure risks minimised, by utilising real-time monitoring and automated reporting. The community and media expectations of reported data and nuclear monitoring systems continue to be coloured by sensational technology seen in movies and emerging technology available through smart homes and smart cities initiatives. For the general public to be more engaged with real radiation levels and effects, the nuclear industry needs to more effectively communicate safe levels. Organisations can have regain control of exposure levels discussions through the controlled release of background and expected exposure level data. An increase in real world monitoring data communicated in a controlled and more effective way will aid in the general public accepting, and being educated about, the minimal increase above natural background levels of the nuclear industry and other radiation facilities. This is particularly as Australia is in the process of implementing its Nuclear Waste Facility, with community acceptance the number one inhibitor of being able to move forward. Storage, mobile assets, and processing all present unique management, security, exposure, and telemetry challenges for a facility operations manager. Active monitoring and automated review of the monitoring data can alert operators to any unexpected events before any resultant increases in radiation levels cause an unplanned exposure to operators or the environment. Integration of radiation monitoring data with global positioning telemetry enables better organisational awareness of mobile asset location and early detection of any potential shifting and reduction in shielding integrity of sources and encapsulated waste during transport. Additionally, the real-time monitoring can be set-up to enhance an organisations' or nation's security capabilities. For instance, the real time monitor will send an automated alert in the case of an unexpected movement of a source through a monitored facility or for an unscheduled movement of a monitored vehicle. There are further benefits to be gained in control, ALARA principles and effluent management by increasing real-time monitoring capabilities through the stages of the waste cycle. Increasing operational effectiveness while delivering operational cost savings sounds like an attractive proposition. With increased access to operational area radiation data comes drastically improved real-time management of exposures for new, and experimental practices. Increased live data can be utilised to identify optimum practices for reducing operational and environmental exposures or releases. This increased operational data effectively comes with the added benefit of a reduction in the required health physics personnel resources for general operations. By reducing exposure and the detachment of required health physics resources from routine operations, there is greater availability for these resources to support maintenance operations and project-based work. The review of this increased data will create internal capability to identify low-- and high-risk activities, resulting in the ability to reduce the number of highly skilled workers in an industry where the availability of this talent is declining. During my time as the Radiation Safety and Nuclear Security Manager at a research facility, I implemented a real-time monitoring system. The system identified a secondary risk that had previously been unidentified and posed a higher exposure and security risk than the radiation practice being monitored. What stops industry from implementing technology that encourages agile work practices, while minimising security risks and personnel exposure? (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling for a Digital Twin-Based Remote Operation System Framework

New reactor designs and technologies are being developed to grow and advance the nuclear industry. Microreactors are one of the many new concepts for advancing the industry. Microreactors are very small reactors generally designed to have an operating power of 20 MWth or less. They are ideal for many applications in which it would not be feasible to have a large-scale reactor, such as powering remote communities, military bases, and mining sites. Many of these applications currently rely on diesel generators for power, and replacing those generators with the carbon-free energy of a microreactor is a major driving factor for microreactor development. However, most of the use cases for microreactors are in isolated locations where construction and labor costs are much higher. Microreactors will need to be comparable to other energy production methods for their deployment to be successful. Remotely operating the microreactor has a great potential to benefit the economics and make it more cost competitive. With remote operations, the operation facility location could be strategically chosen based on factors such as construction costs, workforce size, etc. The benefits of remote operations could be leveraged even more if the remote operation system is semi-autonomous. If the remote operation system is semi-autonomous, more microreactors could be operated and monitored from one remote operation facility. Additionally, with the system handling some tasks for the human operator, it could reduce the number of operating staff necessary for the microreactor. Digital twins can be used to introduce a level of automation to the remote operation system. Digital twins are capable of component monitoring, system operation and control, and predictive performance [1]. All of those features are important for a successful semi-autonomous remote operation system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

Evaluating OpenSHMEM Explicit Remote Memory Access Operations and Merged Requests

The OpenSHMEM Library Specification has evolved consid- erably since version 1.0. Recently, non-blocking implicit Remote Memory Access (RMA) operations were introduced in OpenSHMEM 1.3. These provide a way to achieve better overlap between communication and computation. However, the implicit non-blocking operations do not pro- vide a separate handle to track and complete the individual RMA opera- tions. They are guaranteed to be completed after either a shmem quiet(), shmem barrier() or a shmem barrier all() is called. These are global com- pletion and synchronization operations. Though this semantic is expected to achieve a higher message rate for the applications, the drawback is that it does not allow fine-grained control over the completion of RMA operations. In this paper, first, we introduce non-blocking RMA operations with requests, where each operation has an explicit request to track and com- plete the operation. Second, we introduce interfaces to merge multiple requests into a single request handle. The merged request tracks multiple user-selected RMA operations, which provides the flexibility of tracking related communication operations with one request handle. Lastly, we explore the implications in terms of performance, productivity, usability and the possibility of defining different patterns of communication via merging of requests. Our experimental results show that a well designed and implemented OpenSHMEM stack can hide the overhead of allocating and managing the requests. The latency of RMA operations with requests is similar to blocking and implicit non-blocking RMA operations. We test our implementation with the Scalable Synthetic Compact Applications (SSCA #1) benchmark and observe that using RMA operations with requests and merging of these requests outperform the implementation using blocking RMA operations and implicit non-blocking operations by 49% and 74% respectively.

Boehm, Swen↗

Hydropower Operations in the Colorado River Basin: Institutional Analysis of Opportunities and Constraints

The Colorado River Basin is facing an unprecedented drought. In ongoing drought management efforts, limited attention has been paid to hydropower generation. While some studies do exist on hydropower, they are quantitative in nature and focus on calculating the reduction in megawatts generated at dams in the Basin with declining water availability. These studies simplify the complex process of hydropower generation; water availability is but one factor that impacts hydropower generation. At a more fundamental level, formal institutional arrangements, that is, laws, policies, and rules create the framework within which dams are operated and hydropower is generated. This paper conducts a comparative institutional analysis of water, environment, and energy laws and policies and changes therein to understand the constraints and opportunities faced by hydropower generation in the Colorado River Basin. To tease out the nuances in how institutional arrangements affect dam operations and hydropower generation, the comparative analysis focuses on the two largest and strategically important dams in the Basin: Hoover and Glen Canyon. This paper uses Elinor Ostrom’s Institutional Analysis and Development Framework to analyze laws and policies at three levels: constitutional-choice, collective-choice, and operational levels. Constitutional-choice level laws and policies apply to the entire Basin, whereas collective-choice level and operational level laws and policies are dam specific. Hoover and Glen Canyon Dams face similar biophysical challenges by the virtue of their location in the same river basin. Yet, despite the similarity in the biophysical setting, the analysis in this study finds that the differences in the applicability of constitutional-choice level laws along with the differences in dam specific collective-choice and operational level institutional arrangements produce a distinct set of constraints for hydropower generation at Hoover and Glen Canyon Dams. Even without a drought, water and environmental laws at both the constitutionalchoice and collective-choice levels as well as power contracts constrain hydropower generation and limit the flexibility with which Glen Canyon Dam can be operated. Water and environmental laws also impose specific water release requirements that, at times, require off-peak power generation at Glen Canyon Dam. On the other hand, even with a drought, Hoover Dam faces limited hydropower generation constraints and can operate flexibly. This is because constitutional-choice level laws and dam-specific collective-choice and operational level laws pose limited constraints for flexible daily operations at Hoover. The result is that Hoover Dam can generate hydropower at the same level as it did three decades ago and operate flexibly to provide ancillary services and peaking generation. While water and environmental laws and policies pose constraints for hydropower generation, the analysis in this study further finds that specific historic provisions within energyrelated institutional arrangements and recent changes within power contracts have maintained and even enhanced the value of hydropower to power customers. Historic institutional provisions ensure that hydropower is sold ‘at cost’ making this resource economically competitive with wholesale electricity market rates. Recent power contract modifications have resulted in the amendment of an older resale prohibition clause to expand the flexibility available to power customers in using their capacity and/or energy allocation in RTOs, ISOs, and bulk power markets. This amendment has opened up an opportunity for customers, especially Hoover power customers, to use flexible generation and ancillary services in a market environment. In addition, the extension of power contract duration to the legally maximum term has enhanced the reliability and stability of this resource for customers. In the Colorado River Basin, despite the enduring economic responsibility of power customers—where laws require customers to pay for a large portion of construction and O&M costs whether or not they actually receive hydropower— the persistent threat of a drought-induced water shortage, and constraints imposed by water and environmental laws and policies, power customers continue to invest in this resource as energy-related institutional arrangements and power contract provisions protect the reasons why they value hydropower. Lastly, the analysis in this study finds that the consequences of changes in hydropower generation for energy users, irrigators, and environmental programs in the Basin depend on how specific institutional arrangements tie electricity revenues to irrigation aid and environmental programs, and how the power contracts themselves are set up. Collective-choice level institutional arrangements create a higher level of financial dependency of irrigation aid and environmental programs on electricity revenues in the Upper Basin—the legal subdivision of Colorado River where Glen Canyon Dam is located—compared to the Lower Basin—the legal subdivision of Colorado River where Hoover Dam is located. Therefore, changes in hydropower generation or the way its revenue is collected and used will have far reacting detrimental consequences for the Upper Basin. Likewise, differences in the nature of power contracts for Glen Canyon and Hoover Dams also creates differences in the financial impact incurred by energy users when there is a reduction in hydropower generation. While this study identifies the types of impacts on resource users as a result of specific institutional arrangements, the calculation of extent of impact warrants further attention. Hydropower in the United States is in a unique position today. The strategic importance of this resource for the nation’s electricity sector is rapidly growing even as its contribution to overall electricity generation remains fairly small. This strategic importance, however, is built hydropower’s ability to operate flexibly in order to support the integration of intermittent renewable generating sources and the expansion of electricity markets. As this study shows, such flexibility may not be available at certain plants not due to the lack of water availability but because of institutional constraints. Institutional arrangements may also require dam operators to first consider high priority water uses (such as irrigation or environmental needs), which in turn may limit the ability to generate hydropower when it is most valuable or useful. Engineering and quantitative models, such as production cost models, recognize policy constraints for hydropower operations but often inadequately capture or assume away such constraints in the models. A failure to account for policy constraints in these models runs the risk of inaccurate representation of the operational flexibility and capacity available at specific hydropower plants, which can result in over/underestimation of hydropower’s ability to support the integration of variable renewable resources and address grid reliability concerns. Against this background, this paper and the analysis herein serves as an example of how we can systematically identify institutional constraints (and opportunities) that influence the flexibility in not only generating electricity at specific dams but also using this hydropower once it is generated.

13 HYDRO ENERGY↗

Work Domain Analysis of a Predecessor Sodium-Cooled Reactor as Baseline for AdvSMR Operational Concepts

This report presents the results of the Work Domain Analysis for the Experimental Breeder Reactor (EBR-II). This is part of the phase of the research designed to incorporate Cognitive Work Analysis in the development of a framework for the formalization of an Operational Concept (OpsCon) for Advanced Small Modular Reactors (AdvSMRs). For a new AdvSMR design, information obtained through Cognitive Work Analysis, combined with human performance criteria, can and should be used in during the operational phase of a plant to assess the crew performance aspects associated with identified AdvSMR operational concepts. The main objective of this phase was to develop an analytical and descriptive framework that will help systems and human factors engineers to understand the design and operational requirements of the emerging generation of small, advanced, multi-modular reactors. Using EBR-II as a predecessor to emerging sodium-cooled reactor designs required the application of a method suitable to the structured and systematic analysis of the plant to assist in identifying key features of the work associated with it and to clarify the operational and other constraints. The analysis included the identification and description of operating scenarios that were considered characteristic of this type of nuclear power plant. This is an invaluable aspect of Operational Concept development since it typically reveals aspects of future plant configurations that will have an impact on operations. These include, for example, the effect of core design, different coolants, reactor-to-power conversion unit ratios, modular plant layout, modular versus central control rooms, plant siting, and many more. Multi-modular plants in particular are expected to have a significant impact on overall OpsCon in general, and human performance in particular. To support unconventional modes of operation, the modern control room of a multi-module plant would typically require advanced HSIs that would provide sophisticated operational information visualization, coupled with adaptive automation schemes and operator support systems to reduce complexity. These all have to be mapped at some point to human performance requirements. The EBR-II results will be used as a baseline that will be extrapolated in the extended Cognitive Work Analysis phase to the analysis of a selected advanced sodium-cooled SMR design as a way to establish non-conventional operational concepts. The Work Domain Analysis results achieved during this phase have not only established an organizing and analytical framework for describing existing sociotechnical systems, but have also indicated that the method is particularly suited to the analysis of prospective and immature designs. The results of the EBR-II Work Domain Analysis have indicated that the methodology is scientifically sound and generalizable to any operating environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Study of Seamless Microgrid Transition Operation Using Grid-Forming Inverters

This paper investigates operational techniques to achieve seamless (smooth) microgrid (MG) transitions by dispatching a grid-forming (GFM) inverter. In traditional approaches, the GFM inverter must switch between grid-following (GFL) and GFM control modes during MG transition operation. Today's inverter technology allows GFM inverters to always operate in GFM control mode, so it is worth exploring how to use them to achieve smooth MG transition operation. This paper proposes three operational techniques: a traditional scheme of switching between GFL and GFM control; a new scheme of consistent GFM control and shifting the droop intercept up before islanding operation; and a new scheme of consistent GFM control and shifting the droop intercept up before synchronization operation. A full hardware setup is established to compare the three techniques and showcase their implementations in real-world applications. The results show that the third technique outperforms the others and exhibits the best transition performance because the GFM inverter maintains the same operating points during the transition operation. Therefore, we conclude that ensuring smooth MG transition operation requires that the GFM inverter(s) maintain the same operating points (v, f, P, Q, and phase angle) during the transition operation in addition to minimizes the point of common coupling power flow.

grid-forming control↗

Study of Seamless Microgrid Transition Operation Using Grid-Forming Inverters

This paper investigates operational techniques to achieve seamless (smooth) microgrid (MG) transitions by dispatching a grid-forming (GFM) inverter. In traditional approaches, the GFM inverter must switch between grid-following (GFL) and GFM control modes during MG transition operation. Today's inverter technology allows GFM inverters to always operate in GFM control mode, so it is worth exploring how to use them to achieve smooth MG transition operation. This paper proposes three operational techniques: a traditional scheme of switching between GFL and GFM control; a new scheme of consistent GFM control and shifting the droop intercept up before islanding operation; and a new scheme of consistent GFM control and shifting the droop intercept up before synchronization operation. A full hardware setup is established to compare the three techniques and showcase their implementations in real-world applications. The results show that the third technique outperforms the others and exhibits the best transition performance because the GFM inverter maintains the same operating points during the transition operation. Therefore, we conclude that ensuring smooth MG transition operation requires that the GFM inverter(s) maintain the same operating points (v, f, P, Q, and phase angle) during the transition operation in addition to minimizes the point of common coupling power flow.

grid-forming↗

Operator-sum representation for bosonic Gaussian channels

Operator-sum or Kraus representations for single-mode bosonic Gaussian channels are developed, and several of their consequences explored. The fact that the two-mode metaplectic operators acting as unitary purification of these channels do not, in their canonical form, mix the position and momentum variables is exploited to present a procedure which applies uniformly to all families in the Holevo classification. In this procedure the Kraus operators of every quantum-limited Gaussian channel can be simply read off from the matrix elements of a corresponding metaplectic operator. Kraus operators are employed to bring out, in the Fock basis, the manner in which the antilinear, unphysical matrix transposition map when accompanied by injection of a threshold classical noise becomes a physical channel, denoted D({kappa}) in the Holevo classification. The matrix transposition channels D({kappa}), D({kappa}{sup -1}) turn out to be a dual pair in the sense that their Kraus operators are related by the adjoint operation. The amplifier channel with amplification factor {kappa} and the beam-splitter channel with attenuation factor {kappa}{sup -1} turn out to be mutually dual in the same sense. The action of the quantum-limited attenuator and amplifier channels as simply scaling maps on suitable quasiprobabilities in phase space is examined in the Kraus picture. Consideration of cumulants is used to examine the issue of fixed points. The semigroup property of the amplifier and attenuator families leads in both cases to a Zeno-like effect arising as a consequence of interrupted evolution. In the cases of entanglement-breaking channels a description in terms of rank 1 Kraus operators is shown to emerge quite simply. In contradistinction, it is shown that there is not even one finite rank operator in the entire linear span of Kraus operators of the quantum-limited amplifier or attenuator families, an assertion far stronger than the statement that these are not entanglement breaking channels. A characterization of extremality in terms of Kraus operators, originally due to Choi, is employed to show that all quantum-limited Gaussian channels are extremal. The fact that almost every noisy Gaussian channel can be realized as a product of a pair of quantum-limited channels is used to construct a discrete set of linearly independent Kraus operators for these noisy Gaussian channels, including the classical noise channel, and these Kraus operators have a particularly simple structure.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Thermally Conductive Backsheets (TCB) for Reduced Operating Temperatures

The performance of photovoltaic (PV) modules is primarily influenced by the plane of array (POA) irradiance and their operating temperature. The lower the module operating temperature, the higher is its performance. Increasing a module’s operating temperature reduces its power output due to an increase in the semiconductor’s intrinsic carrier density, leading to a reduction in the open-circuit voltage and, subsequently, reducing the maximum power point voltage. Reducing the operating temperature lowers the levelized cost of energy (LCOE) via increased energy production (i.e., more kilowatt hour over the life of the asset) and increased service lifetime (years in the field). The module operating temperature is dictated by the weather parameters and the thermal properties of module construction materials. The primary weather parameters influencing the PV module temperature are: the ambient temperature (directly related), irradiance (directly related), and wind speed (inversely related). The primary thermal properties of module construction materials influencing the PV module temperature are: the optical transmissivity and thermal conductivity of superstrate, the thermal conductivity of substrate, the thermal conductivity of encapsulant and the efficiency of the encapsulated solar cells. The primary goal of this study is to reduce the operating temperature of PV modules using thermally conductive backsheet (TCB) substrates developed by the industry. The temperature of PV modules installed in a large multi-MW plant can also be influenced by their physical locations in the plants due to the influence of wind direction. A thermal mapping of PV plants has also been investigated and presented in this study. The most commonly used PV backsheet material has been polyvinyl fluoride (DuPont trade name “Tedlar”)-based backsheet, which typically has three layers: Tedlar–polyethylene terephthalate (PET)–Tedlar (TPT). The primary goal of this project is to reduce the module operating temperature below the benchmark TPT backsheet temperature using newly developed TCBs by the industry. The overall approach of this project involves six focus areas: i) select and procure one TPT and thirteen promising TCBs available in the industry; ii) construct a large number of 1-cell and 9-cell modules using benchmark TPT and selected TCBs [all other construction materials are fixed and they are: glass superstrate, EVA encapsulant, mono-Si cell and junction box]; iii) to identify best performing TCBs, monitor the long-term field operating temperatures of the constructed modules which are installed in three climatic conditions (hot-low wind [Mesa, AZ], hot-high wind [Maricopa County, AZ] and temperate [Cumberland County, NC]; iv) to identify the most durable TCB, perform extended accelerated reliability testing of modules constructed with best three TCBs and benchmark TPT; v) to predict module temperature, develop physical and empirical thermal models with and without thermal properties of all construction materials in the modules, respectively; and vi) to determine the influence of wind speed and direction on the module operating temperature in a plant, and perform thermal mapping of PV modules in two large PV plants [Maricopa County, AZ and Cumberland County, NC]. The key achievements of this project are listed below: Backsheet selection: 14 backsheets were procured after an extensive literature and industry search. Finally, based on the thermal and other selection criteria, 1 TPT and 4 thermally conductive backsheets were selected for this project. Fabrication of mini modules: 50 one-cell modules were fabricated in year 1 for thermal performance evaluation. The module design was changed to nine-cell module at start of year 2 to mimic commercial design. 20 nine-cell modules were fabricated in year 2 for thermal performance evaluation. 28 four-cell modules were fabricated in year 3 for accelerated stress-testing. Thermal conductivity of backsheets: Year 1 TCBs showed at least 8% higher thermal conductivities than TPT. Year 2 and 3 TCBs showed at least 20% higher thermal conductivities than TPT. Installation of mini PV modules at three sites: 6 one-cell modules and 8 nine-cell modules were installed at AZ-1 site [Mesa, AZ]. 12 one-cell modules and 6 nine-cell modules were installed at each of two powerplants (AZ-2 [Maricopa County, AZ] and NC sites). Nominal operating cell temperatures (NOCT) of mini PV modules: NOCT of TCBs were observed to be lower than TPT with differences as high as 2°C. Comparison of thermal performance: The median operating temperature of one-cell modules was found to be reduced by 2°C by using TCB_A modules compared to TPT modules on several days in a month for few months in a year. The median temperature improvement of 4oC was achieved at several instances on a few days, but not all days, in a year using multiple TCBs compared to TPT. The final project milestone of achieving median temperature improvement of 5oC was achieved at several instances on a few days, but not all days, in a year using TCB_A compared to TPT. Empirical thermal model (without the need of construction material properties): Empirical thermal model for one-cell module was developed based on the input data of irradiance, wind speed and ambient temperatures. The primary input data differentiator for temperature differences between TPT and TCBs appears to be the irradiance level (solar gain). Accelerated durability testing: 20 four-cell modules using 4 backsheets (1 TPT and 3 TCBs) were exposed to Damp Heat 1000 hours (8 modules), UV/Thermal cycling (50 cycles)/Humidity freeze (10 cycles) test sequence (8 modules) and UV Weathering for qualification (8 modules). All the modules with four selected backsheets passed the stress tests per the retest guidelines of IEC 61215 standard for the backsheet change. Simplified comparative LCOE analysis: Using backsheet-specific power degradation levels in the accelerated tests (for TCB_A and TPT only), efficiency, service lifetime and assuming same cost for all backsheets, the LCOE of modules using TCB_A is determined to be lower than TPT. Due to lower operating temperature of TCB_A-based modules compared to TPT-based modules, the operating efficiency and service life of TCB_A-based modules are calculated to be higher than TPT-based modules. Temperature mapping of PV power plants: A distinct temperature difference (as high as 4°C) has been observed between the modules located in various parts of a single PV plant.

14 SOLAR ENERGY↗