Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating Experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Lepton-flavor-violating ALP signals with TeV-scale muon beams

We explore the feasibility of using TeV-energy muons to probe lepton-flavor-violating (LFV) processes mediated by an axion-like particle (ALP) a with mass O(10 GeV). We focus on µτ LFV interactions and assume that the ALP is coupled to a dark state χ, which can be either less or more massive than a. Such a setup is demonstrated to be consistent with χ being a candidate for dark matter, in the experimentally relevant regime of parameters. We consider the currently operating NA64-µ experiment and proposed FASERν2 detector as both the target and the detector for the process µA → τA a, where A is the target nucleus. We also show that a possible future active muon fixed-target experiment operating at a 3 TeV muon collider or in its preparatory phase can provide an impressive reach for the LFV process considered, with future FASERν2 data providing a pilot study towards that goal. The implications of the muon anomalous magnetic moment (g - 2) µ measurements for the underlying model, in case of a positive signal, are also examined, and a sample UV completion is outlined.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Avoiding compressor surge during emergency shutdown hybridturbine systems

A new emergency shutdown procedure for a direct-fired fuel cell turbine hybrid power system was evaluated using a hardware-based simulation of an integrated gasifier/fuel cell/turbine hybrid cycle (IGFC), implemented through the Hybrid Performance (Hyper) project at the National Energy Technology Laboratory, U.S. Department of Energy (NETL). The Hyper facility is designed to explore dynamic operation of hybrid systems and quantitatively characterize such transient behavior. It is possible to model, test, and evaluate the effects of different parameters on the design and operation of a gasifier/fuel cell/gas turbine hybrid system and provide a means of quantifying risk mitigation strategies. An open-loop system analysis regarding the dynamic effect of bleed air, cold air bypass, and load bank is presented in order to evaluate the combination of these three main actuators during emergency shutdown. In the previous Hybrid control system architecture, catastrophic compressor failures were observed when the fuel and load bank were cut off during emergency shutdown strategy. Improvements were achieved using a nonlinear fuel valve ramp down when the load bank was not operating. Experiments in load bank operation show compressor surge and stall after emergency shutdown activation. The difficulties in finding an optimal compressor and cathode mass flow for mitigation of surge and stall using these actuators are illustrated.

20 FOSSIL-FUELED POWER PLANTS↗

The Promethian Exchange: Bringing Expert Tools and Diagnostic Experience to Operations

Operators need a variety of diagnostic tools in order to make their lives easier. Sometimes it becomes necessary to add or improve the suite of diagnostics in order to do new or different jobs, or to improve upon existing methods in one's accelerator. This talk will attempt to outline various methods by which specific diagnostic improvements have been achieved in the CEBAF accelerator at Jefferson lab and abstract methods of process which can be applied to any lab/setting.

McCaughan, Michael↗

Final results of an experiment in operational forecasting of sea breeze thunderstorms using a mesoscale numerical model

Sea breeze thunderstorms during quiescent synoptic conductions account for 40 percent of Florida rainfall, and are the dominant feature of April-October weather at the Kennedy Space Center (KSC). An effort is presently made to assess the feasibility of a mesoscale numerical model in improving the point-specific thunderstorm forecasting accuracy at the KSC, in the 2-12 hour time frame. Attention is given to the Applied Regional Atmospheric Modeling System.

Lyons, Walter A.↗

Physics of Colloids in Space (PCS): Microgravity Experiment Completed Operations on the International Space Station

Immediately after mixing, the two-phase-like colloid-polymer critical point sample begins to phase separate, or de-mix, into two phases-one that resembles a gas and one that resembles a liquid, except that the particles are colloids and not atoms. The colloid-poor black regions (colloidal gas) grow bigger, and the colloid-rich white regions (colloidal liquid) become whiter as the domains further coarsen. Finally, complete phase separation is achieved, that is, just one region of each colloid-rich (white) and colloid-poor (black) phase. This process was studied over four decades of length scale, from 1 micrometer to 1 centimeter.

Doherty, Michael P.↗

Cigeo, The French Geological Disposal Facility Project: Preliminary Design (APS) Phase - 16038

The Cigeo project has been in the works for 25 years. Numerous studies have been conducted, increasingly associated with the Meuse/Haute-Marne site, with further specific research thanks to direct access to the Callovo-Oxfordian clay formation from the underground laboratory of Bure-Saudron. These studies and research initially aimed to demonstrate the feasibility of the repository. They also helped gain a high level of understanding of phenomena to support design studies and demonstrate safety. Transition to the industrial phase began with the development of a plan for delivering waste to the facility for disposal. The plan introduced sequencing for the various types of waste to be disposed of, and was optimised to determine the size of inspection, transfer and handling facilities. In describing the life of the repository and therefore the vision for its operation, it has become obvious that our generation should not impose choices on future generations. We must provide them with reference technical solutions, with the financial resources to implement them. It is also our duty to begin the construction and initial operating phases. However, because the facility will operate over several generations, we must leave a degree of flexibility so that they may reassess the options that we define and adopt their own solutions, as necessary. They will also benefit from operational experience gathered as facility operations develop. This is the context in which the preliminary design phase is being finalised in preparation for the detailed design phase, with the aim of gradual commissioning during the latter part of the next decade. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SAMS Acceleration Measurements on Mir from June to November 1995

The NASA Microgravity Science and Applications Division (MSAD) sponsors science experiments on a variety of microgravity carriers, including sounding rockets, drop towers, parabolic aircraft, and Orbiter missions. The MSAD sponsors the Space Acceleration Measurement System (SAMS) to support microgravity science experiments with acceleration measurements to characterize the microgravity environment to which the experiments were exposed. The Principal Investigator Microgravity Services project at the NASA Lewis Research Center supports principal investigators of microgravity experiments as they evaluate the effects of varying acceleration levels on their experiments. In 1993, a cooperative effort was started between the United States and Russia involving science utilization of the Russian Mir space station by scientists from the United States and Russia. MSAD is currently sponsoring science experiments participating in the Shuttle-Mir Science Program in cooperation with the Russians on the Mir space station. Included in the complement of MSAD experiments and equipment is a SAMS unit In a manner similar to Orbiter mission support, the SAMS unit supports science experiments from the U.S. and Russia by measuring the microgravity environment during experiment operations. The initial SAMS supported experiment was a Protein Crystal Growth (PCG) experiment from June to November 1995. SAMS data were obtained during the PCG operations on Mir in accordance with the PCG Principal Investigator's requirements. This report presents an overview of the SAMS data recorded to support this PCG experiment. The report contains plots of the SAMS 100 Hz sensor head data as an overview of the microgravity environment, including the STS-74 Shuttle-Mir docking.

DeLombard, Richard↗

Space processing economics

Two types of space processing operations may be considered economically justified; they are manufacturing operations that make profits and experiment operations that provide needed applied research results at lower costs than those of alternative methods. Some examples from the Skylab experiments suggest that applied research should become cost effective soon after the space shuttle and Spacelab become operational. In space manufacturing, the total cost of space operations required to process materials must be repaid by the value added to the materials by the processing. Accurate estimates of profitability are not yet possible because shuttle operational costs are not firmly established and the markets for future products are difficult to estimate. However, approximate calculations show that semiconductor products and biological preparations may be processed on a scale consistent with market requirements and at costs that are at least compatible with profitability using the Shuttle/Spacelab system.

Bredt, J. H.↗

Analysis of Loss-of-Offsite-Power Events 1987-2018

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1987 through 2018. LOOP events during critical operation that do not result in a reactor trip are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. No significant trends in critical operation LOOP frequencies over the most recent 10-year period are identified. Adverse trends in LOOP durations are identified for switchyard-centered and grid-related LOOPs, as well as overall LOOPs during critical operation and overall LOOPs during shutdown operation. Both grid-related and weather-related LOOP events are found to show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1987–1996 time period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Small-Body Proximity Operations & TAG: Navigation Experiences & Lessons Learned from the OSIRIS-REx Mission

On October 20th, 2020, the nearly two-year proximity operations campaign for the Origins, Spectral Interpretation, Resource Identification, and Security–Regolith Explorer (OSIRIS-REx)mission at the near-Earth asteroid (101955) Bennu culminated in a successful Touch-and-Go (TAG) sample collection event. Navigation performance was a significant driver for flight activities at Bennu, which consisted of multiple phases geared towards characterizing the asteroid, selecting a sample site, and safely guiding the spacecraft to and from the surface in order to collect at least 60 g of pristine regolith. The entire operations team gained a tremendous amount of experience operating in the challenging small body environment and overcame many challenges. In this paper, we summarize navigation-focused experiences and lessons learned from OSIRIS-REx proximity operations at Bennu that are applicable to future missions to small asteroids, comets, and planetary moons. Areas of focus include staffing and organization, ground system infrastructure, mission phase planning, navigation operations, and spacecraft and payload considerations.

Kenneth M. Getzandanner↗

Beam energy scan with asymmetric collision at RHIC

A beam energy scan of deuteron-gold collision, with center-of-mass energy at 19.6, 39, 62.4 and 200.7 GeV/n, was performed at the Relativistic Heavy Ion Collider in 2016 to study the threshold for quark-gluon plasma (QGP) production. The lattice, RF, stochastic cooling and other subsystems were in different configurations for the various energies. The operational challenges changed with every new energy. The operational experience at each energy, the operation performance, highlights and lessons of the beam energy scan are reviewed in this report.

43 PARTICLE ACCELERATORS↗

A Saturn launched X-ray astronomy experiment. Volume 1: S-027

The S-027 X-Ray Astronomy Experiment originally proposed in early 1966, was developed to detect X-rays in the 2 keV to 10 keV range. Both a prototype unit and flight unit were constructed with the prototype unit also serving as the engineering model, the qualification test unit, and after refurbishment, as the back-up flight unit. Two Ground Support Equipment consoles were built to verify the experiment operation. A photograph of one experiment package with its Ground Support Equipment is shown. The S-027 experiment was scheduled for launch in 1968/69 and although both units were completed and tested to the extent that either would be ready for the scheduled launch, delays in the space program resulted in a launch date slip of several years. When the 1968/69 launch delay became official, provisions were made for storage of the two experiment packages at SCI Electronics in Huntsville, Alabama until a new launch date could be established.

Source record↗

Maximally Expressive Task Modeling

Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiment activities for the Space Station. The equipment used in these experiments is some of the most complex hardware ever developed by mankind, the information sought by these experiments is at the cutting edge of scientific endeavor, and the procedures for executing the experiments are intricate and exacting. Scheduling is made more difficult by a scarcity of space station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling space station experiment operations calls for a "maximally expressive" modeling schema. Modeling even the simplest of activities cannot be automated; no sensor can be attached to a piece of equipment that can discern how to use that piece of equipment; no camera can quantify how to operate a piece of equipment. Modeling is a human enterprise-both an art and a science. The modeling schema should allow the models to flow from the keyboard of the user as easily as works of literature flowed from the pen of Shakespeare. The Ground Systems Department at the Marshall Space Flight Center has embarked on an effort to develop a new scheduling engine that is highlighted by a maximally expressive modeling schema. This schema, presented in this paper, is a synergy of technological advances and domain-specific innovations.

Japp, John↗

Maximally Expressive Modeling of Operations Tasks

Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiments for the International Space Station. In these experiments, the equipment used is among the most complex hardware ever developed, the information sought is at the cutting edge of scientific endeavor, and the procedures are intricate and exacting. Scheduling is made more difficult by a scarcity of station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling International Space Station experiment operations calls for a "maximally expressive" modeling schema.

Jaap, John↗