Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operator Support System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Assessment of the Impacts of ACLS on the ISS Life Support System using Dynamic Simulations in V-HAB

The Advanced Closed Loop System (ACLS) is currently under development by Airbus Defense and Space and is slated for launch to the International Space Station (ISS) in 2017. The addition of new hardware into an already complex system such as the ISS life support system (LSS) always poses operational risks. It is therefore important to understand the impacts ACLS will have on the existing systems to ensure smooth operations for the ISS. This analysis can be done by using dynamic computer simulations and one possible tool for such a simulation is Virtual Habitat (V-HAB). Based on Matlab (Registered Trademark) V-HAB has been under development at the Institute of Astronautics of the Technical University Munich (TUM) since 2006 and in the past has been successfully used to simulate the ISS life support systems. The existing V-HAB ISS simulation model treated the interior volume of the space station as one large ideally-stirred container. This model was improved to allow the calculation of the atmospheric composition inside the individual modules of the ISS by splitting it into ten distinct volumes. The virtual volumes are connected by a simulation of the inter-module ventilation flows. This allows for a combined simulation of the LSS hardware and the atmospheric composition aboard the ISS. A dynamic model of ACLS is added to the ISS simulation and different operating modes for both ACLS and the existing ISS life support systems are studied to determine the impacts of ACLS on the rest of the system. The results suggest that the US, Russian and ACLS CO2 systems can operate at the same time without impeding each other. Furthermore, based on the results of this analysis, the US and ACLS Sabatier systems can be operated in parallel as well to achieve the highest possible CO2 recycling together with a low CO2 concentration.

Puetz, Daniel↗

Assessment of the Impacts of ACLS on the ISS Life Support System Using Dynamic Simulations in V-HAB

The Advanced Closed Loop System (ACLS) is currently under development by Airbus Defense and Space and is slated for launch to the International Space Station (ISS) in 2017. The addition of new hardware into an already complex system such as the ISS life support system (LSS) always poses operational risks. It is therefore important to understand the impacts ACLS will have on the existing systems to ensure smooth operations for the ISS. This analysis can be done by using dynamic computer simulations and one possible tool for such a simulation is the Virtual Habitat (V-HAB). Based on MATLAB, V-HAB has been under development at the Institute of Astronautics of the Technical University of Munich (TUM) since 2004 and in the past has been successfully used to simulate the ISS life support systems. The existing V-HAB ISS simulation model treated the interior volume of the space station as one large, ideally-stirred container. This model was improved to allow the calculation of the atmospheric composition inside individual modules of the ISS by splitting it into twelve distinct volumes. The virtual volumes are connected by a simulation of the inter-module ventilation flows. This allows for a combined simulation of the LSS hardware and the atmospheric composition aboard the ISS. A dynamic model of ACLS is added to the ISS Simulation and several different operating modes for both ACLS and the existing ISS life support systems are studied and the impacts of ACLS on the rest of the system are determined. The results suggest that the US, Russian and ACLS CO2 systems can operate at the same time without impeding each other. Furthermore, based on the results of this analysis, the US and ACLS Sabatier systems can be operated in parallel as well to a achieve a very low CO2 concentration in the cabin atmosphere.

Putz, Daniel↗

LEED: A Lightwave Energy-Efficient Datacenter

The Lightwave Energy-Efficient Datacenter (LEED) program is a disruptive “green-field” approach that provides a quantum leap in the energy efficiency of datacenters. LEED’s fundamental value proposition is that a novel and re-architected optical network—RotorNet— can deliver “more bandwidth per buck” as well as unique system-level attributes that significantly improve overall datacenter energy efficiency and performance. LEED has developed three system-level testbeds. The first testbed uses calibrated hardware and software power measurements to determine server energy efficiency as a function of network bandwidth and workload. These measurements have shown that increasing network communications bandwidth dramatically increases server energy efficiency providing a realistic path to the overall ENLITENED program goal of doubling the number of transactions per joule. The second testbed demonstrates key hardware: a prototype low-loss, high-port count optical “selector switch”. This switch was fabricated, racked, and tested. Measured switch characteristics include loss, bandwidth, crosstalk, switch time, system-level switch time (including the transceivers), and bit error rate. The third testbed demonstrates a fully working and manufactured pinwheel design which dramatically lowers the cost of design, while delivering high switch radix and low reconfiguration times. The LEED project has tied these three novel photonic switch prototypes together with production servers and software through the development of a novel FPGA-based NIC platform called Corundum. Corundum ensures that the packet-switched protocols supported by commodity operating systems and devices can interface with the Rotor switch design. The LEED group has used this combined hardware and software prototype to characterize applications running at a commercially relevant scale. The project has used a combination of enhanced optical modulation amplitude (OMA) modulators, broadband multiplexers and demultiplexers, avalanche photodiodes, and a novel burst-mode receivers to enable the insertion of LEED-developed optical switches without the need for expensive optical amplification. Our modeling has shown that measured LEED-developed device characteristics can achieve link characteristics of 2 pJ/bit including both transceivers and the Rotor switch. In summary, the LEED program has demonstrated a credible and practical path, through novel hardware and software, to realize the program objectives of ENLITENED. The net result will ensure that the United States maintains its strength in the crucial sector of Information Technology, which is vital to both our economic security and our national security.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Concepts in distributed planning, scheduling, and control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling, and control must allow for: (1) interactive real-time remote operations; (2) responsive scheduling and rescheduling; (3) support of the full range of distributed science, application and commercial users; (4) interaction and cooperation among distributed users; and (5) efficient use of often onboard, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe approaches to distributed planning, scheduling and control functions that are based on resources and on a distributed knowledge hierarchy. We describe the scheduling functions as the component of the integrated space-ground Operations Management System. We include the integration of the planning and scheduling functions with the real-time operations control system, and we discuss automated scheduling assistants. These suggested approaches, taken from the users' point-of-view, have resulted in two prototype systems: Operations and Science Instrument Support package and Science User Resource Planning and Scheduling System.

Hansen, Elaine↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares I-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

McArthur, J. Craig↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares 1-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

Davis, Daniel J.↗

Proposed ground-based control of accelerometer on Space Station Freedom

This paper describes the innovative control of an accelerometer to support the needs of the scientists operating science experiments that are on-board Space Station Freedom (SSF). Accelerometers in support of science experiments on the shuttle have typically been passive, record-only devices that present data only after the mission or that present limited data to the crew or ground operators during the mission. With the advent of science experiment operations on SSF, the principal investigators will need microgravity acceleration data during, as well as after, experiment operations. Because their data requirements may change during the experiment operations, the principal investigators will be allocated some control of accelerometer parameters. This paper summarizes the general-purpose Space Acceleration Measurement System (SAMS) operation that supports experiments on the shuttle and describes the control of the SAMS for Space Station Freedom. Emphasis is placed on the proposed ground-based control of the accelerometer by the principal investigators.

Delombard, Richard↗

Proposed ground-based control of accelerometer on Space Station Freedom

This paper describes the innovative control of an accelerometer to support the needs of the scientists operating science experiments that are on-board Space Station Freedom (SSF). Accelerometers in support of science experiments on the shuttle have typically been passive, record-only devices that present data only after the mission or that present limited data to the crew or ground operators during the mission. With the advent of science experiment operations on SSF, the principal investigators will need microgravity acceleration data during, as well as after, experiment operations. Because their data requirements may change during the experiment operations, the principal investigators will be allocated some control of accelerometer parameters. This paper summarizes the general-purpose Space Acceleration Measurement System (SAMS) operation that supports experiments on the shuttle and describes the control of the SAMS for Space Station Freedom. Emphasis is placed on the proposed ground-based control of the accelerometer by the principal investigators.

Delombard, Richard↗

System for Anomaly and Failure Detection (SAFD) system development

The System for Anomaly and Failure Detection (SAFD) algorithm was developed as an improvement over the current redline system used in the Space Shuttle Main Engine Controller (SSMEC). Simulation tests and execution against previous hot fire tests demonstrated that the SAFD algorithm can detect engine failures as much as tens of seconds before the redline system recognized the failure. Although the current algorithm only operates during steady state conditions (engine not throttling), work is underway to expand the algorithm to work during transient conditions. This task assignment originally specified developing a platform for executing the algorithm during hot fire tests at Technology Test Bed (TTB) and installing the SAFD algorithm on that platform. Two units were built and installed in the Hardware Simulation Lab and at the TTB in December 1991. Since that time, the task primarily entailed improvement and maintenance of the systems, additional testing to prove the feasibility of the algorithm, and support of hot fire testing. This document addresses the work done since the last report of June 1992. The work on the System for Anomaly and Failure Detection during this period included improving the platform and the algorithm, testing the algorithm against previous test data and in the Hardware Simulation Lab, installing other algorithms on the system, providing support for operations at the Technology Test Bed, and providing routine maintenance.

Oreilly, D.↗

Exploration Technologies for Operations

Although the International Space Station (ISS) assembly has been completed, the Operations support teams continue to seek more efficient and effective ways to prepare for and conduct the ISS operations and future exploration missions beyond low earth orbit. This search for improvement has led to a significant collaboration between the NASA research and advanced software development community at NASA Ames Research Center and the Mission Operations community at NASA Johnson Space Center. Since 2001, NASA Ames Research Center has been developing and applying its advanced intelligent systems and human systems integration research to mission operations tools for several of the unmanned Mars missions operations. Since 2006, NASA Ames Research Center has also been developing and applying its advanced intelligent systems and human systems integration research to mission operations tools for manned operations support with the Mission Operations Directorate at NASA Johnson Space Center. This paper discusses the completion of the development and deployment of a variety of intelligent and human systems technologies adopted for manned mission operations. The technologies associated with the projects include advanced software systems for operations and human-centered computing. Human-centered computing looks to the processes and procedures that people do to perform any given job, then attempts to identify opportunities to improve these processes and procedures. In particular, for mission operations, improvements are quantified by specifically identifying how a tool can increase a persons efficiency, enhance a persons functional capability, andor improve the assurance of a persons decisions. The Ames development team has collaborated with the Mission Operations team to identify areas of efficiencies through technology infusion applications in support of the Plan, Train, and Fly activities of human-spaceflight mission operations. The specific applications discussed in this paper are in the areas of mission planning systems, mission operations design modeling and workflow automation, advanced systems monitoring, mission control technologies, search tools, training management tools, spacecraft solar array management, spacecraft power management, and spacecraft attitude planning. We discuss these specific projects between the Ames Research Center and the Johnson Space Centers Mission Operations Directorate, and how these technologies and projects are enhancing the mission operations support for the International Space Station. We also discuss the challenges, problems, and successes associated with long-distance and multi-year development projects between the research team at Ames and the Mission Operations customers at Johnson Space center. Finally, we discuss how these technology infusion applications and underlying technologies might be used in the future to support on-board operations of the crew and spacecraft systems as human exploration expands beyond low earth orbit to destinations in the solar system where communications delays will require more on-board autonomy and planning by the crew. Longer communications delays will require that the ground mission operations support will be primarily strategic in nature, while the tactical level of planning, systems monitoring and control, and failure analysisisolationrecovery will be the responsibility of both the spacecraft autonomous systems and the crew. Our expectation is that the technologies

mission operations↗

Diagnosing Near-Surface Model Errors with Candidate Physics Parameterization Schemes for the Multiphysics Rapid Refresh Forecast System (RRFS) Ensemble during Winter over the Northeastern United States and Southern Great Plains

Abstract During the winter of 2020/21 an ensemble of FV3-LAM forecasts was produced over the contiguous United States for the Winter Weather Experiment using five physics suites. These forecasts are evaluated with the goal of optimizing physics parameterizations within the future operational Rapid Refresh Forecast System (RRFS) in the Unified Forecast System (UFS) realm and for selecting suitable physics suites for a multiphysics RRFS ensemble. The five physics suites have different combinations of land surface models (LSMs), planetary boundary layer (PBL) parameterizations, and surface layer schemes, chosen from those used in current and possible future operational systems and likely to be supported in the operational UFS. Full-season evaluation reveals a persistent near-surface cold bias in the U.S. Northeast from one suite and a nighttime warm bias in the southern Great Plains in another suite, while other suites have smaller biases. A representative case is chosen to diagnose the cause for each of these biases using sensitivity simulations with different physics combinations or modified parameters and verified with additional mesonet observations. The cold bias in the Northeast is attributed to aspects of the Noah-MP LSM over snow cover, where Noah-MP simulates lower soil water content, and thus lower thermal conductivity than other LSMs, leading to less upward ground heat flux during nighttime and consequently lower surface temperature. The nighttime warm bias found in the southern Great Plains is attributed to overestimation of vertical mixing in the K -profile-based eddy-diffusivity mass-flux (K-EDMF) PBL scheme and insufficient land–atmospheric coupling from the GFS surface layer scheme over short vegetation. A few key parameters driving these systematic biases are identified.

Meteorology & Atmospheric Sciences↗

Resilience assessment and planning in power distribution systems: Past and future considerations

High impact low probability (HILP) events such as hurricanes, heat waves, and floods have instigated widespread power outages and blackouts around the globe in the past decade. With the increasing challenges concerning the threats to the power distribution systems and the growing need to mitigate the impacts of the HILP events, resilience has become a crucial requirement for the power grid infrastructures. Numerous efforts have been made to define, measure, and characterize the resilience of power distribution systems. This study thoroughly reviews the state-of-the-art methods on the existing resilience evaluation framework and metrics. Here, the desirable characteristics of resilience metrics are highlighted, and the challenges associated with formulating, developing, and calculating such metrics are discussed. Next, we detail the state-of-the-art literature on planning solutions to ensure distribution system resilience. This paper aims to extract a deep insight into this challenging and critical research area and envision future opportunities that can guide the power distribution system operators/planners to formulate more effective mitigation strategies to enhance the resilience of power distribution systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational Assessment of Apollo Lunar Surface Extravehicular Activity

Quantifying the operational variability of extravehicular activity (EVA) execution is critical to help design and build future support systems to enable astronauts to monitor and manage operations in deep-space, where ground support operators will no longer be able to react instantly and manage execution deviations due to the significant communication latency. This study quantifies the operational variability exhibited during Apollo 14-17 lunar surface EVA operations to better understand the challenges and natural tendencies of timeline execution and life support system performance involved in surface operations. Each EVA (11 in total) is individually summarized as well as aggregated to provide descriptive trends exhibited throughout the Apollo missions. This work extends previous EVA task analyses by calculating deviations between planned and as-performed timelines as well as examining metabolic rate and consumables usage throughout the execution of each EVA. The intent of this work is to convey the natural variability of EVA operations and to provide operational context for coping with the variability inherent to EVA execution as a means to support future concepts of operations.

planning and scheduling↗

Requirements for Planetary Outpost Life-Support Systems and the Possible Use of In Situ Resources

If humans are ever to live and work on the Moon or Mars for extended periods of time, the operation of regenerative life-support systems at the planetary outposts will be a critical requirement. The substantial amount of materials consumed by humans and the inevitable waste products make open-loop life-support systems and resupply missions (as used in Space Shuttle and Mir operations) impractical and expensive. Natural resources found on the Moon and Mars could be used in conjunction with regenerative life support systems to further reduce the amount of material that would need to be delivered from Earth. There have been numerous studies and experiments conducted on the production of O from regolith materials on the Moon and from the atmosphere of Mars. One or several of these processes could undoubtedly be used to produce the O required by the crews at planetary outposts. Water is required in the greatest quantities, primarily for tasks such as personal hygiene and clothes washing, and it will be the most precious consumable. Again, several process have been described to produce water on the Moon using solar-wind implanted H and O, and if water ice can be found and mined at the lunar poles, another source of water may be available.

Gruener, John E.↗

Space shuttle environmental and thermal control life support system computer program

A computer program for the design and operation of the space shuttle environmental and thermal control life support system is presented. The subjects discussed are: (1) basic optimization program, (2) off design performance, (3) radiator/evaporator expendable usage, (4) component weights, and (5) computer program operating procedures.

Source record↗

Certification of tactics and strategies in aviation

The paper suggests that the 'tactics and strategies' notion is a highly suitable paradigm to describe the cognitive involvement of human operators in advanced aviation systems (far more suitable than classical functional analysis), and that the workload and situational awareness of operators are intimately associated with the planning and execution of their tactics and strategies. If system designers have muddled views about the collective tactics and strategies to be used during operation, they will produce sub-optimum designs. If operators use unproven and/or inappropriate tactics and strategies, the system may fail. The author wants to make a point that, beyond certification of people or system designs, there may be a need to go into more detail and examine (certify?) the set of tactics and strategies (i.e., the Operational Concept) which makes the people and systems perform as expected. The collective tactics and strategies determine the information flows and situational awareness which exists in organizations and composite human-machine systems. The available infrastructure and equipment (automation) enable these information flows and situational awareness, but are at the same time the constraining factor. Frequently, the tactics and strategies are driven by technology, whereas we would rather like to see a system designed to support an optimized Operational Concept, i.e., to support a sufficiently coherent, cooperative and modular set of anticipation and planning mechanisms. Again, in line with the view of MacLeod and Taylor (1993), this technology driven situation may be caused by the system designer's and operator job designer's over-emphasis on functional analysis (a mechanistic engineering concept), at the expense of a subject which does not seem to be well understood today: the role of the (human cognitive and/or automated) tactics and strategies which are embedded in composite human-machine systems. Research would be needed to arrive at a generally accepted 'planning theory' which can elevate the analysis, description and design of tactics and strategies from today's cottage industry methods to an engineering discipline. The available infrastructure and equipment (automation) enable these information flows and situational awareness, but are at the same time the constraining factor. Frequently, the tactics and strategies are driven by technology, whereas we would rather like to see a system designed to support an optimized Operational Concept, i.e., to support a sufficiently coherent, cooperative and modular set of anticipation and planning mechanisms. Again, in line with the view of MacLeod and Taylor (1993), this technology driven situation may be caused by the system designer's and operator job designer's over-emphasis on functional analysis (a mechanistic engineering concept), at the expense of a subject which does not seem to be well understood today: the role of the (human cognitive and/or automated) tactics and strategies which are embedded in composite human-machine systems. Research would be needed to arrive at a generally accepted 'planning theory' which can evaluate the analysis, description and design of tactics and strategies from today's cottage industry methods to an engineering discipline.

Koelman, Hartmut↗

A System for Fault Management for NASA's Deep Space Habitat

NASA's exploration program envisions the utilization of a Deep Space Habitat (DSH) for human exploration of the space environment in the vicinity of Mars and/or asteroids. Communication latencies with ground control of as long as 20+ minutes make it imperative that DSH operations be highly autonomous, as any telemetry-based detection of a systems problem on Earth could well occur too late to assist the crew with the problem. A DSH-based development program has been initiated to develop and test the automation technologies necessary to support highly autonomous DSH operations. One such technology is a fault management tool to support performance monitoring of vehicle systems operations and to assist with real-time decision making in connection with operational anomalies and failures. Toward that end, we are developing Advanced Caution and Warning System (ACAWS), a tool that combines dynamic and interactive graphical representations of spacecraft systems, systems modeling, automated diagnostic analysis and root cause identification, system and mission impact assessment, and mitigation procedure identification to help spacecraft operators (both flight controllers and crew) understand and respond to anomalies more effectively. In this paper, we describe four major architecture elements of ACAWS: Anomaly Detection, Fault Isolation, System Effects Analysis, and Graphic User Interface (GUI), and how these elements work in concert with each other and with other tools to provide fault management support to both the controllers and crew. We then describe recent evaluations and tests of ACAWS on the DSH testbed. The results of these tests support the feasibility and strength of our approach to failure management automation and enhanced operational autonomy.

Fault management↗

Techno-economic assessment of distributed wellhead RO water treatment for nitrate removal and salinity reduction: A field study in small disadvantaged communities

Techno-economic analysis of distributed wellhead water treatment and desalination (DWTD) systems was carried out based on a three-year field study in three small, disadvantaged communities (DACs) to evaluate the reliability and affordability of upgrading their impaired well water. The local water supplies of the three study DACs, located in Salinas Valley, California, were contaminated with nitrate at levels (~ 12–87 mg/L NO$^{-}_{3}$ - N) ) above the California maximum contaminant level (MCL) of 10 mg/L NO$^{-}_{3}$ - N , and had elevated water salinity (~600–1,600 mg/L total dissolved solids(TDS)) above its secondary MCL (SMCL) of 500 mg/L TDS. Well water nitrate removal and salinity reduction were accomplished via reverse osmosis (RO) based DWTD systems that operated autonomously, supported by remote monitoring and supervisory cyberinfrastructure. Reliable DWTD operation provided treated water quality, with respect to nitrate and salinity, in the range of 0.5–6.3 mg/L NO$^{-}_{3}$ - N and 57–161 mg/L TDS, respectively, which were well below the respective MCL and SMCL. The levelized cost of water treatment was in the range of ~$$2/m 3 - $$2.9/m 3 which aligns with typical residential water costs in California and in the study region, and monthly residential water costs (39 dollars-74 dollars/residential unit/month) were also within the range in California. The study showcased the DWTD approach as a viable and potentially scalable solution for upgrading impaired local potable water supply of communities lacking centralized water delivery infrastructure. However, streamlined permitting processes and standardized regulatory frameworks are critical to promoting wider adoption and maximizing the socio-economic benefits of the DWT approach. Moreover, DACs are likely to require government subsidies in order to cover the CapEx of DWTD systems in addition to upgrade of site infrastructure.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗