Search NASA⌕ Search

SEARCH · Search NASA

Results for “Options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Adjustable, self-locking ladder includes optional work platform

Height-adjustable ladder with a self-locking platform at its top makes elevated locations more accessible, increases the quantity and size of tools handled there, and decreases the risk of disturbance or damage to components. The retractable platform adapts the ladder to normal use.

Webster, R. E.↗

Computer program for mass optional solutions of some endpoint trajectory problems

Optimization of trajectories for propellant comsumption is achieved by incorporating a coast arc device into a three-dimensional fixed end-point steepest ascent computer program. It calculates a trajectory between any two points in space defined by initial and final position vectors, without restrictions on thrust or orbit characteristics.

Bennett, A. G.↗

Ray tracing program with options for diffraction gratings

Diffraction theory, developed in vectorial form and coded into ray tracing routines, permits tracing rays of any wavelength through surfaces that are plane, spherical, conical, or aspheric polynomial. Ruled diffraction gratings may run in either X-direction or Y-direction, where Z is optical axis.

Howell, B. J.↗

The quasi-inertial and wide-deadband modes as backup attitude options for the Skylab mission

The quasi-inertial (QI) and wide deadband (WDB) modes were investigated as alternatives to the solar inertial (SI) mode in case two control moment gyros fail during the Skylab mission. Both modes provide a substantial reduction in propellant requirements from the solar interial hold requirement with either the orbital assembly/thruster attitude control system or service module reaction control system. Spacecraft motion in the QI mode is produced by a command rate and results in a small amplitude oscillation (17 deg, maximum) about the SI orientation. In the WDB mode a somewhat similar, but larger amplitude motion (35 deg maximum) about the SI orientation is developed by appropriate choice of controller deadbands and switch line slopes.

Elrod, B. D.↗

Navigation analysis for Viking 1979, option B

A parametric study performed for 48 trans-Mars reference missions in support of the Viking program is reported. The launch dates cover several months in the year 1979, and each launch date has multiple arrival dates in 1980. A plot of launch versus arrival dates with case numbers designated for reference purposes is included. The analysis consists of the computation of statistical covariance matrices based on certain assumptions about the ground-based tracking systems. The error model statistics are listed in tables. Tracking systems were assumed at three sites: Goldstone, California; Canberra, Australia; and Madrid, Spain. The tracking data consisted of range and Doppler measurements taken during the tracking intervals starting at E-30(d) and ending at E-10(d) for the control data and ending at E-18(h) for the knowledge data. The control and knowledge covariance matrices were delivered to the Planetary Mission Analysis Branch for inputs into a delta V dispersion analysis.

Mitchell, P. H.↗

The Satellite Nuclear Power Station - An option for future power generation.

A new concept in nuclear power generation is being explored which essentially eliminates major objections to nuclear power. The Satellite Nuclear Power Station, remotely operated in synchronous orbit, would transmit power safely to the ground by a microwave beam. Fuel reprocessing would take place in space and no radioactive materials would ever be returned to earth. Even the worst possible accident to such a plant should have negligible effect on the earth. An exploratory study of a satellite nuclear power station to provide 10,000 MWe to the earth has shown that the system could weigh about 20 million pounds and cost less than $1000/KWe. An advanced breeder reactor operating with an MHD power cycle could achieve an efficiency of about 50% with a 1100 K radiator temperature. If a hydrogen moderated gas core reactor is used, its breeding ratio of 1.10 would result in a fuel doubling time of a few years. A rotating fluidized bed or NERVA type reactor might also be used. The efficiency of power transmission from synchronous orbit would range from 70% to 80%.

Williams, J. R.↗

Programmatic effects of utilizing various space tug options

The results are summarized of the computerized (DORCA) analyses of a number of NASA/Non-NASA and DoD payload mission models that have been used in conjunction with studies of the Space Transportation System (STS). The first analysis performed was on the 1971 NASA/Non-NASA and DoD mission models. Subsequent to that, analyses of the June 1972 excursion to the 1971 NASA/Non-NASA mission models were performed. The mission models have two basic versions; i.e., one employing expendable payloads and another employing a best mix of expendable and reusable payloads. Both versions of the models have the same payload deployment schedule. However, in the best mix version, payloads are retrieved from orbit and whenever possible, refurbished payloads are deployed. The analyses were performed to determine the relative merits to different Tug configurations and of Tug combinations employed in several phased development schemes.

Stricker, L. T.↗

Pioneer Mars 1979 mission options

A preliminary investigation of lower cost Mars missions which perform useful exploration objectives after the Viking/75 mission was conducted. As a study guideline, it was assumed that significant cost savings would be realized by utilizing Pioneer hardware currently being developed for a pair of 1978 Venus missions. This in turn led to the additional constraint of a 1979 launch with the Atlas/Centaur launch vehicle which has been designated for the Pioneer Venus missions. Two concepts, using an orbiter bus platform, were identified which have both good science potential and mission simplicity indicative of lower cost. These are: (1) an aeronomy/geology orbiter, and (2) a remote sensing orbiter with a number of deployable surface penetrometers.

Friedlander, A. L.↗

Pioneer Mars 1979 mission options

Two mission concepts utilizing modified Pioneer Venus hardware are presented as relatively low-cost alternatives for scientific exploration of Mars in 1979. Mission A would perform in situ aeronomy measurements in the Martian ionosphere and include several remote sensing instruments capable of geological surface mapping at low altitudes. The initial high eccentricity orbit would be allowed to decay in an adaptive mode. Mission B would sequentially deploy (from an orbiter bus), four, nondestructing surface penetrometers carrying instrumentation to investigate soil density, composition and chemistry, subsurface water, and perhaps seismology. Mission B is more expensive than mission A, since it requires more extensive hardware modifications and systems development.

Niehoff, J. C.↗

Pioneer probe mission with orbiter option

A spacecraft is described which is based on Pioneer 10 and 11, and existing propulsion technology; it can transport and release a probe for entry into Jupiter's atmosphere, and subsequently maneuver to place the spacecraft in orbit about Jupiter. Orbital operations last 3 years and include maneuvers to provide multiple close satellite encounters which allow the orbit to be significantly changed to explore different parts of the magnetosphere. A mission summary, a guide to related documents, and background information about Jupiter are presented along with mission analysis over the complete mission profile. Other topics discussed include the launch, interplanetary flight, probe release and orbit deflection, probe entry, orbit selection, orbit insertion, periapsis raising, spacecraft description, and the effects of Jupiter's radiation belt on both orbiter and the probe.

Source record↗

Comparison and evaluation of nuclear power plant options for geosynchronous power stations

The suitability of eleven types of nuclear fission reactors in combination with five potential energy conversion systems for use in geosynchronous power plants is evaluated. Gas turbine, potassium Rankine liquid metal MHD, and thermionic energy conversion systems are considered. The existing technology of reactors in near-term, intermediate-term, and long-term classes is discussed, together with modifications for use in large-scale power production in space. Unless the temperature is high enough for MHD, reactors which heat gases are generally more suitable for use with gas turbines. Those which heat liquid metals will be more useful for potassium Rankine or liquid metal MHD conversion systems.

Williams, J. R.↗

Supply options

The use of captive hydrogen (produced and consumed on site) and merchant hydrogen (externally supplied) is considered. A low-merchant-captive ratio market and a high-merchant-captive ratio market are described and compared.

Source record↗