Search NASA⌕ Search

SEARCH · Search NASA

Results for “PERSONNEL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

ETF Grout Expansion: Evaluation of MgO Additions and Struvite Precipitation Protocol for Potential Expansion

The ETF ammonia tolerant grout waste form was developed by the Vitreous State Laboratory (VSL) to stabilize ammonium and thereby prevent emission of ammonia vapor during solidification of an ammonium-rich, concentrated sulfate aqueous waste stream generated at the Hanford Effluent Treatment Facility (ETF). VSL did not observe expansion in samples prepared during the waste form development work. However, Savannah River National Laboratory (SRNL) personnel did encounter expansion, in some cases up to 20+ volume percent expansion in ETF grout samples while preforming work scope to evaluate compositional ranges for ETF brine and of the precipitation and solidification reagent. The work requests can be found in Washington River Protection Services (WRPS) Statement of Work (SOW), Requisitions #: 339922 Revisions 0 and 1, March 11, 2021, and November 2021. Additional evaluation was requested by WRPS SOW Requisitions #: 356730, Revision 1, February 1, 2022, to determine whether differences in the slags or differences in sample preparation protocols used by VSL and SRNL were the cause of the expansion observed in the SRNL samples. G. Chen, WRPS, arranged a materials exchange between VSL and SRNL and coordinated the VSL protocol for grouting and curing 1L of Base Case ETF simulant. Materials were exchanged between VSL and SRNL and both laboratories performed the VSL struvite precipitation-solidification protocol and cured samples for at least 28 days. VSL and SRNL encountered expansion, at varying degrees, in all samples prepared under the material exchange and grouting protocol. Additional material exchange testing between VSL and SRNL and alternative materials evaluation to further investigate the causes of grout expansion and differentiate the effects of various dry materials, grouting procedures, and curing containers was requested by WRPS SOW Requisitions #: 356730, Revision 2, January 10, 2023. Pacific Northwest National Laboratory (PNNL) assembled and distributed materials to both laboratories for testing. Observations from this study indicated variations in MgO additions, water-to-dry mix (dm) ratios and curing containers did not correlate to ETF ammonia grout expansion. In comparison to previous work, SRNL observed the addition rate of NaOH to be a potential factor for the final pH in the struvite precipitation step. In the current testing NaOH was added in bulk (5-10 mL at one time) during the precipitation step. The resulting pH was 7.57-9.15 which is slightly higher than pH observed at a slower addition rate. Additional testing is needed to identify the presence and/or struvite stability in high-pH struvite precipitant ETF ammonia grout samples. Therefore, based on current data, it is unknown if NaOH addition rate is the fundamental cause of grout expansion.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SPC-70646 Specification for Reactor Supplemental Shielding for Use in DOME

NRIC is developing the Demonstration of Microreactor Experiments (DOME) test bed at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC): to allow for testing of advanced reactors in support of future licensing and commercial operations. One such need is a neutron and photon radiation shielding system to protect personnel and equipment from harsh neutron and photon fluxes during reactor operations and post shut down operations, disassembly, and decommissioning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Explainable Artificial Intelligence Technology for Predictive Maintenance

The domestic nuclear power plant fleet has relied on labor-intensive and time-consuming preventive maintenance programs, thus driving up operation and maintenance costs to achieve high-capacity factors. Artificial intelligence and machine learning can help simplify complex problems, such as diagnosing equipment degradation, to enable more effective decision-making. Benefits will be felt not only within existing analog and digital instrumentation and control, but also work processes, the integration of people with technology, and most importantly, the business case. Together, these hold promise to make nuclear power more efficient and reduce costs associated with operation and maintenance. While the artificial intelligence and machine learning technologies hold significant promise in the nuclear industry, there are challenges or barriers to their adoption. This report outlines the those different machine learning adoption barriers (categorized as historical, technical, economic, regulatory, and user) that the industry must overcome to realize the full benefits of artificial intelligence and machine learning capabilities for long-term economic sustainability. This report also provides solutions for some of these barriers by focusing on improving the explainability of machine learning to encourage trust from the end-user. Trust and explainability are essential to machine learning adoption. This report focuses on research-developed solutions to some of these barriers while analyzing a non-safety-related system, namely the circulating water system. This system frequently experiences waterbox fouling which our models preemptively diagnoses then explains to the operator how those conclusions were reached. This report presents and discusses the inherent trade-off between machine learning performance (in terms of accuracy) and explainability, where highly accurate machine learning methods (such as deep-learning) are the least explainable, and the most explainable methods (such as decision trees) are the least accurate. In addition, explainability of artificial intelligence techniques in terms of transparency and post-hoc metrics are discussed. This report outlines the importance of data novelty and value of new information in evaluating both the explainability and trustworthiness. Novelty detection helps to establish consistency or inconsistency of the new data with respect to the training data. On the other hand, value of information could be a part of the user-centric visualization recommendation system that request additional information to be collected, thereby strengthening the machine learning outcomes. During this project, a copyrighted user-centric visualization that aligns with a human-in-the-loop approach was developed. The user-centric visualization presents different levels of information and can be tailored as per user credentials to gain user confidence. One of the salient features of the user-centric visualization is it presents machine learning methods with explainability metrics. A simplified version of the user-centric visualization was presented to 32 users with varying levels of machine learning expertise. Feedback was solicited to test the hypothesis that the app contained sufficient explainability and that the users would trust the algorithm. Overall, the app was positively received, and the hypothesis was supported. This report discusses the trust-but-verify framework – a potential approach to build user trust artificial intelligence. The framework discusses trust from the human level to artificial intelligence level. The fundamental premise of the trust but verify framework is derived from an observation of nuclear safety culture (i.e., nuclear power plant personnel do not rely on a singular source of data to make a decision). This also ties back to the user-centric visualization that presents different levels of information to achieve both explainability and trustworthiness of artificial intelligence. Even so, the adoption of artificial intelligence and machine learning in the nuclear industry faces additional barriers, namely regulatory and stakeholder readiness. To overcome these challenges, new solutions must gain regulatory approval and cater to stakeholder needs. The Nuclear Regulatory Committee has a 5-year strategic plan which prepares them for reviewing artificial intelligence technologies in licensee submissions. Early and frequent engagement with the regulator is encouraged. Additionally, artificial intelligence solutions should incorporate human-in-the-loop considerations and offer explainability. Stakeholders must prepare by hiring or training staff to adapt to advancing technology in everyday plant tasks.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Robotics Plan in Support of DOME Testbed Operations

Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Studies of Reactive Amorphous Compounds and Surfaces: Their Pathways to Crystallinity and Surface Functionality

This project was originally headed by Dr. Abraham Clearfield (Texas A&M University, ret.) and focused on developing structural models of zirconium phosphate (ZrP) based materials at different stages of crystalline order using PDF techniques developed by co-PI Dr. Simon Billinge (Columbia University). When Dr. Clearfield retired, the project was taken over by Dr. Hong-Cai Zhou (Texas A&M University). The project proposed looking at defective metal-organic frameworks (MOFs) supported on the surface of the ZrP materials. During the project, the personnel conducted studies of the dispersion of different phosphate ligands in mixed organic phosphonates, and how they could be utilized to incorporate different metals within the ZrP interlayer spacing.

36 MATERIALS SCIENCE↗

First-Principles Cost Estimation of a Sodium Fast Reactor Nuclear Plant

A multi-tiered cost analysis is performed to estimate full costs of a nuclear power plant (NPP) based on sodium-cooled fast reactor (SFR) technology. To address the lack of fully transparent cost estimations from past undertakings for NPPs, we have developed a detailed and first-principles-based cost estimate for a generalized SFR NPP. Our intent is to achieve a high degree of transparency with our cost assumptions and develop a cost model that is flexible and easily extendable to variations in NPP design and other nuclear reactor types. Furthermore, we strive to achieve a clear organization of costs and complete identification of key cost drivers based on first principles. To this end, the cost results of our analysis as given in Table 24 and Table 25 are organized and categorized into a code of accounts (COA) under development at Idaho National Laboratory (INL). Varying degrees of first-principles methods are employed, such as design for manufacture and assembly® (DFMA® ), to elucidate costs in all process levels of the plant equipment, buildings and site structures, personnel, and other miscellaneous but significant cost elements. These approaches have been successfully applied in past cost analysis projects and are designed to enable rapid and flexible cost estimation. Application of these techniques for evaluating NPP costs is similar in concept to the full, detailed estimation of construction and fabrication costs determined in a later stage of NPP development. Note that our approach tries to avoid use of other past analysis results and data such as those from the legacy Energy Economic Data Base (EEDB) Program, as these resources are based on historical NPP costs and thus may not be indicative of new reactor technologies or construction and fabrication/manufacturing techniques. However, we provide a comparison of our SFR NPP cost results in Table 90 against those included in the EEDB for a representative pressurized water reactor (PWR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Tritium Safety: Self-Study Course 11952

Course Overview: Tritium is a radioactive isotope of hydrogen which has characteristics that require workers understand what should be done to work safely and responsibly around it. Tritium is used for defense applications, experimental purposes for general research, and is a byproduct of some of the work that is done at LANL. Practical guidance offered in this training will inform safe handling to minimize negative impacts on personnel, the workspace, and the surrounding environment. This course, Tritium Safety Self-Study (Course 11952), provides information on the physical, chemical, and radioactive properties of tritium; sources of tritium; uses of tritium; biological effects of tritium; radiological control methods for tritium; monitoring methods of tritium; tritium waste minimization and handling; and alarms and proper response to abnormal conditions in a tritium facility. Course Objectives: When you have completed this course, you will be able to: Identify the physical, chemical, and radioactive properties of tritium; Identify the sources of tritium; Identify the uses of tritium; Identify the modes of tritium exposure; Identify the biological effects of tritium; Identify the radiological control methods of tritium; Identify methods used to monitor for tritium; Identify tritium waste minimization and handling techniques; Identify proper response to abnormal conditions in tritium facilities.

61 RADIATION PROTECTION AND DOSIMETRY↗

Responses to International Accrediting Services (IAS) Biennial Onsite Assessment of ALAB to CA ELAP Requirements

The purpose of this assessment was to perform an evaluation of the laboratory’s quality system, capabilities, and personnel qualifications to determine the extent of conformance to the current TNI standards and the rules enacted by the 2020 California Environmental Laboratory Accreditation Program (ELAP) for accreditation of environmental laboratories. The scope of the assessment included the California Code, Health and Safety Code – HSC § 100829 and 100830, the 2016 TNI-2 requirements, published methods, and the laboratory’s Quality Management System including administrative and technical operating procedures.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Conduct of Engineering Project Engineer Qualification Standard

This document describes the training and qualification requirements for the Project Engineer (PE) position at the Los Alamos National Laboratory (LANL). Analysis indicates that the Project Engineer position is not required to meet the requirements of DOE Order 426.2, Personnel Selection, Training, Qualification, and Certification Requirements for DOE Nuclear Facilities for “Technical Staff” positions. However, Engineering Services Division (ESD) has decided to hold their Project Engineers to a higher professional standard by developing a qualification program for the PEs.

42 ENGINEERING↗

Investigation of Potential Routes for Titanium and Mercury Concentrations within Salt Waste Processing Facility

Savannah River National Laboratory (SRNL) has been requested by Savannah River Mission Completion (SRMC)/ Salt Waste Processing Facility (SWPF) personnel to investigate the potential routes for titanium and mercury accumulations within the SWPF Flowsheet. The first part of this work examined how various forms of mercury can migrate through the solvent extraction system. This entailed single stage distribution tests, a multi-stage Extraction-Scrub-Strip (ESS) test, and a detailed speciation analysis of several salt batch feed samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enterprise Risks for Scientific Software in the Post Exascale Era

The Department of Energy’s Office of Science’s Advanced Scientific Computing Research (ASCR) Office hosts three high performance computing Facilities and one high performance networking Facility. ASCR’s Facilities Division and these four Facilities established a joint working group to address the most severe threats to the software capabilities that can prevent the Facilities from supporting a diverse array of mission critical scientific research carried out by thousands of researchers from national labs, academia, and industry. This report outlines the risk categories, threat matrix calculations, and number of risks in each of the categories along with the threat levels. Two categories—programming environment/tools and system software—account for 13 out of the 20 risks encountered in the risk register. A significant risk to ASCR’s software ecosystem also arises from the possible loss of personnel and expertise past the end of the exascale computing project. The working group recommends that the software enterprise risks are reevaluated regularly, and are considered in future decision making regarding system acquisition, knowledge sharing, partnership development, and strategic planning

97 MATHEMATICS AND COMPUTING↗

Robotic Staffing Augmentation

The Robotic Augmentation & Novel Applications team at Los Alamos National Laboratory is working to produce autonomous systems to augment staffing for tasks that are tedious, dangerous, or require high precision. This is intended to reduce risks to staff, programs and facilities while also freeing up personnel resources to better support laboratory missions, particularly pit manufacturing. The primary focus of this effort is to utilize cutting edge automation to augment long duration radiation surveys, allowing RCTs to work on critical production activities.

42 ENGINEERING↗

Integrated Issues and Risk Management: A Theoretical Framework Overview

The contractor requirements document for DOE O 226.1B, Implementation of Department of Energy Oversight Policy, requires DOE/NNSA contractors to establish an assurance system that includes, among other things, “Rigorous, risk-informed, and credible self-assessment and feedback and improvement activities. Assessment programs must be risk-informed, formally described and documented, and appropriately cover potentially high consequence activities” and “Contains an issues management process that is capable of categorizing the significance of findings based on risk and priority and other appropriate factors….” However, the term “risk-informed” is not defined in this or any other DOE order, and no formal guidance on how to integrate the two concepts currently exists. The Risk Management Guide for Defense Programs released by NA-18, Office of Systems Engineering and Integration (SE&I), states it is “a framework and general guidance to program office personnel on the effective management of program risks and issues”, however it then defines issues as “events with 100% likelihood of affecting program objectives” and states “unless specified otherwise, the term “risk” will also serve to represent issues for the remainder of this plan,” severally limiting its ability to provide adequate guidance on this topic. Outside of DOE scope, the U.S. Nuclear Regulatory Commission (U.S. NRC) imposes similar requirements. ASME NQA-1-2015 Requirement 16 states “Conditions adverse to quality shall be identified promptly and corrected as soon as practicable. In the case of a significant condition adverse to quality, the cause of the condition shall be determined, and corrective action taken to preclude recurrence. The identification, cause, and corrective action for significant conditions adverse to quality shall be documented and reported to appropriate levels of management. Completion of corrective actions shall be verified”. The purpose of this document is to provide a best-in-class framework for an integrated risk and issues management process. This process would provide a robust feedback loop between risk management and issues management to: Enhance risk identification and characterization, use risk handling principles to improve corrective action planning, and ensure regulatory compliance.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

CERBERUS: A ZEUS Configuration With HEU and Copper Reflected by Copper

The Critical Experiment Reflected By copper to bEtteR Understand Scattering (CERBERUS) experiment is a a series of measurements performed at the National Criticality Experiments Research Center (NCERC) on the Comet critical assembly machine with a thick copper (Cu) reflector around alternating layers of Cu plates and highly enriched uranium (HEU) pancake plates. The measurements were performed by personnel from Los Alamos National Laboratory (LANL): T. Cutler, K. Amundson, N. Thompson, T. Grove, K. Stolte, and Z. Lemke, along with the multiple people who supported additional measurements and material handling. The purpose of this experiment was to investigate the impact of Cu scattering cross-sections in an integral experiment using the Comet critical assembly machine. Three configurations, which differed in the amount of Cu between each HEU layer, were evaluated as benchmarks. The three configurations are 3/16 inch, 5/16 inch, and 7/16 inch, which represent the amount of Cu above and below each HEU layer. Throughout the rest of the document the units associated with the configuration will be removed from the configuration name.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Fuel Cycle Cost Basis Report: Module D1-2 LWR Pelletized MOX Fuel Fabrication

Nature of this 2021 Module update from previous AFC-CBRs: Use of U,Pu MOX life cycle cost data from late 1970s Non-proliferation Assessment Systems Analysis Program (NASAP). This archived data has been updated in 2018-2019 to reflect today’s regulatory and economic conditions and is presented in 2017. For the lower unit cost MOX fabrication case the PuO 2 from the reprocessed LWR SNF is assumed to be fabricated immediately after aqueous PUREX reprocessing, thus minimizing the time for undesirable actinide radioisotopes, from the standpoint of radiation safety, to build in. Fabricated MOX utilizing separated and multi-year stored Pu from aqueously reprocessed SNF has also been added to this Module as a second LWR MOX fabrication variant, requiring additional and more costly glovebox design and operations to protect personnel. This new NASAP-informed data augments historical data and unit cost projections appearing in the 2009 (Shropshire et al 2009), 2012 (Dixon et al 2012), and 2017 Dixon et al 2017) AFC-CBRs. The “What-it-takes” 2017 unit fabrication cost values based on the updated NASAP studies are escalated to 2020$ for this 2021 Update Report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Results for Gamma-Ray Spectroscopy Characterization of Residual Radioactivity on Personal Protective Clothing

In early 2019, Health Physics Services (HPS) personnel put together a test plan to use the shielded gamma-ray spectroscopy instruments in the Health Physics Services Technical Laboratory (HPSTL) to perform a series of measurements on laundered personal protective clothing used in radiological areas at the Savannah River Site (SRS). That test plan describes the methodology used to determine the quantities of laundry to be obtained from operational facilities, the methods for quality control checking the instruments throughout the measurement period, and the physical arrangement of samples in the counting shields. The test plan is documented in SRNS-J6700-2019-00037 (Reference 1).

61 RADIATION PROTECTION AND DOSIMETRY↗

Quarterly Research Performance Progress Report (Q8)

As part of Task 1, we have started by testing our modeling capabilities by reproducing isothermal DFIT simulations presented in the literature. Once satisfied with the results we have started by targeting the modeling of the DFITs at conducted at well 58-32. We have a identified a specific test (cycle 4 in zone 2) as the most interesting to be model with GEOS hydraulic fracturing module. Thus, we have first produced results with an isothermal model and adjusted model parameters to get a satisfying match with field pressure data. The, we have added thermal effects and compared the modeling results with and without thermal effects to estimate how thermal effects may influence test interpretation. Models seem to suggest that, for small volumes of fluid, thermal effects are moderate. In Task 2, we have adapted GEOS phase-field formulation to be able to simulate near-wellbore hydraulic fracture nucleation and propagation. We have devised a novel formulation that, compared to other existing ones, incorporates rock strengths. We have submitted a journal publication about our work. We are currently employing this phase-field formulation to model the experiments taking place at U Pitt and help us understand the effect of various parameters. In Task 3, we have built a model of the region surround well 16A and have started modeling stage 3 stimulation because of its simpler planar geometry. After calibrating simulation parameters using known analytical solutions, we have simulated the stage 3 stimulation using our isothermal hydraulic fracturing module, varying the permeability field, the stress conditions including different physics to get a better understanding of the numerical challenges and of the effects of varying these parameters on the simulation results. In Task 4 laboratory experimentation, a set of specialized drilling and injection tools has been customized and constructed to accommodate an inclined well with an orientation of up to 30 degrees relative to material anisotropy or principal stress axes. These inclined samples have also undergone thermal stress and hydraulic fracturing at a temperature of 190 degrees Celsius. Furthermore, both vertical and deviated sampling testing setups enable an extended analysis of post-peak pressure behaviors, facilitating post-test pressure analyses such as the G-function, step rate, and fracture reopening measurements. Thus, the key components of in-situ stress estimation can be extracted and validated through our experiment, providing a solid foundation for validating existing in-situ stress estimation theories or proposing new ones. Simultaneously, we are integrating computer vision techniques with traditional experimental fracture observation methods such as multi-overcore/slicing and water-penetration fracture observation. This combination will prove beneficial in populating the hydraulic fracture patterns database, generated under challenging EGS conditions. This approach aims to deepen our understanding of the complexities in EGS reservoirs and pave the way for future data-driven investigations. Additionally, PITT has also equipped the ELE International compression machine, which is now prepared for conducting indirect tensile and fracture toughness tests. These tests will aid in characterizing how rock fabrics influence the resulting fracture patterns. Additionally, we have completed the required personnel training and gained access to Scanning Electron Microscopy (SEM) and Energy Dispersive Spectroscopy (EDS) for conducting more detailed characterization and analysis of rock fabrics, as well as the examination of thermal and hydraulically induced fracture patterns. Thus, the PITT team has effectively demonstrated the capabilities of our experimental apparatuses in exploring the thermal effects, well deviation angles, material anisotropy, and operational choices (such as circulation rate, injection fluid viscosity, and injection rate) and their impact on pressure responses and fracture trajectories under the Utah FORGE conditions.

15 GEOTHERMAL ENERGY↗

Exhibit D Scope of Work and Technical Specifications MOX Rod Reduction

PROJECT/PROGRAM GOALS AND OBJECTIVES: The Los Alamos National Laboratory (LANL), here after referred to as the CONTRACTOR, plans to provide NQA-1 service and support for the disposition of PF-4 basement inventory of Areva fuel rods. These fuel rods need to be reduced in length for proper shipping and disposition. The objective of this acquisition is to enter into an agreement with a SUBCONTRACTOR that shall provide expertise, materials, input for procurement of specialized tooling to be identified, and mockups for size reduction and FS65 disposition. Handling and size reduction of the Areva rods would take place at LANL. Physical work at LANL will be performed by the CONTRACTOR’s field execution team, portions of this work will have expertise provided by the SUBCONTRACTOR. As cited below via an add alternative and supplemental site visit(s) to LANL the CONTRACTOR may request the SUBCONTRACTOR to ship the necessary transportation, handling and packaging equipment at the SUBCONTRACTOR’s location to the CONTRACTOR’s facility for size reduction activities at LANL by the CONTRACTOR’s self-perform field execution team. In addition, the SUBCONTRACTOR shall provide subject matter expertise to CONTRACTOR personnel cutting the mockup Areva Fuel Rod at LANL as a rehearsal prior to CONTRACTOR cutting the actual MOX Fuel Rod if this add alternative is exercised.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗