Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRESERVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

The Effect of Temperature on the Preservation of Volatile-Rich Lunar Samples

Introduction. The Moon’s south pole is a high-priority target for human exploration and scientific study. This interest is, in part, due to the presence of Permanently Shadowed Regions (PSRs), which could contain high concentrations of unique volatiles at cryogenic temperatures [1]. Returned samples from PSRs may include a unique combination of rocks, regolith, and volatile species, providing unprecedented insights into the history of the Solar System and the potential for resource utilization on the Moon. However, because PSR samples are cryogenic up-on collection, lunar polar sample return will eventually require cold stowage for the journey from the Moon to Earth. Without cold stowage, PSR sample return will likely result in phase changes and chemical reactions within the volatile component of the sample, which would negatively impact the resulting scientific studies of those samples. This abstract summarizes the initial results from an ongoing characterization of analog PSR samples at a range of temperatures, with the goal of defining the temperatures needed for a flight cold stowage freezer. Background. Based on remote sensing observations of the Moon [2], south polar PSRs range in temperature from ~120K for small and/or shallow PSRs to ~20K at the most extreme locations in large, deep PSRs. A range of volatiles have been hypothesized to exist at the surface or subsurface of the lunar poles [3-5 and others]. This hypothesis was verified when the LCROSS mission impacted the <50-K PSR in the crater Cabeus, detecting a range of volatiles from water to low condensation temperature species such as H2S and methane [6]. Species such as H2S and ammonia (also detected by LCROSS) are also highly reactive, and increase the likelihood of chemical reactions at elevated (non-cryogenic) temperatures. At the Johnson Space Center’s Planetary Exploration and Astromaterials Research Laboratory (JSC-PEARL), we have developed a volatile-bearing lunar simulant that incorporates several of the species detected by LCROSS [Table 1] mixed cryogenically with the USGS Lunar Highlands Type (LHT) regolith simulant. The new volatile-regolith simulant will be used to assess the degree of sample alteration at room temperature, -20°C, -80°C, and -196°C (liquid nitro-gen), over a two-week period. Room temperature samples represent those likely to be returned during initial missions without cold stowage, -20°C provides an analog to Apollo cold curated samples, -80°C is the temperature of multiple flight payload freezers (e.g., MELFI), and -196°C is analogous to lunar PSRs. Two weeks is an approximation of the time between sample collection and Earth return for initial Artemis missions. Over this period of time, sample head-space gases will be analyzed using a Universal Gas Analyzer (UGA, a type of mass spectrometer) coupled with a Baratron pressure sensor. After testing, the regolith component of the simulant will be purged of volatiles and preserved for future electron beam and/or FTIR analysis. Experimental Procedure. Volatile-regolith simulants will be produced as an initial homogenous batch; this batch will then be distributed into aliquots (gas chromatography/GC vials or cryo vials), ensuring that each sample has the same starting composition and conditions [Fig. 1]. In addition to the “full” simulant shown in Table 1, less complex simulant compositions will be used as baseline and control samples [Table 2]. Aliquots will be produced in triplicate for each simulant composition, storage temperature, and date of sampling. Headspace gases in all Day 0 samples will be analyzed by the UGA immediately. Cold storage samples for future analytical days will be placed in freezers appropriate to their target temperatures (-20°C, -80°C, -196°C). For ambient-temperature samples, regolith and regolith-water samples will be stored in a fume hood, while the full simulant will be stored in a sealed Parr vessel for safety; no other simulants (RWCM/ RWCM+) will be stored at ambient temperature for this test. Samples will be analyzed by UGA in this manner on each Analysis Day outlined in Table 2. Analytical Data. The UGA measures the partial pressures in a single sample aliquot over a set mass range of 0-105 atomic mass units (AMU) [Figure 2]; this set range was selected to slightly exceed the mass of the highest-mass expected reaction product (H2SO4). The Baratron complements the UGA by measuring the total pressure in the headspace of a sample vial. Coupled together, the quantitative abundances of gases will be monitored throughout the test. UGA analyses of the triplicate samples for each storage temperature, day, and simulant composition will be averaged, and standard deviations for each will be calculated. The compositions of starting species (shown in Table 1) will be characterized as a function of time, and the presence of any new compounds (reaction products) will be monitored as well. Total pressures will be recorded for each sample analysis, and any samples that show signs of leakage (e.g., a significant reduction in pressure or simulant volatiles) will be discarded. Anticipated Results. Testing is planned to begin in January 2022. The resulting data will allow compositional and phase changes in the volatile component of the simulants to be determined. Both the reduction in initial compounds and the addition of reaction products are expected to be observed. In addition, the relative efficacy of the different temperatures at pre-serving the initial composition of the simulants will be quantified. Finally, the regolith component of each sample will be argon-purged and stored in a controlled environment for future laboratory analysis. Compositional and morphological changes in the regolith are expected for samples above 0°C. This test will be repeated three times over the course of 2022. Understanding the effect of temperature on both the volatile and regolith components of analog lunar materials will allow requirements for a cold stowage freezer to be developed. The implementation of cold stowage for lunar polar missions will maximize the preservation of returned samples, enabling ground-breaking lunar and Solar System volatiles science for decades to come.

J L Mitchell↗

Mars Sample Receiving Facility Research and Development to Enable Preservation, Safe Containment, and Scientific Research of Martian Samples on Earth

NASA and ESA are working together to plan a joint campaign to potentially bring back the first Martian samples to Earth in the early 2030s. On the surface of Mars, the Mars 2020Perseverance Rover is selecting and packaging samples that could be returned to Earth for careful examination by an international team of scientists. In preparation for this historic sample return, advance planning is underway to design and build a Mars Sample Receiving Facility (SRF) in the mid-2020s. In 2022, a Mars Sample Receiving Facility Assessment Study(MSAS) will be conducted to further define construction modality and capability options for a facility in the conterminous United States. Since Mars Sample Return (MSR) is currently categorized as a planetary protection restricted Earth return, this new facility would feature biosafety level 4 (BSL-4)-like high containment to protect Earth’s biosphere from any potential hazard. In addition, the facility also requires integration of cleanroom technologies to mitigate against terrestrial contamination and preserve sample integrity for science investigations. The integration of both clean handling and high containment requires significant technology research and development (R&D) by the mid-2020s to support the definition and planning of a SRF before commencing the site specific design phase. The SRF project will need to solidify the inorganic, organic, and biological contamination control (CC) requirements for the facility. This could entail a translation of Mars 2020 mission CC requirements for geologic material to engineering requirements for surfaces and airborne molecular contamination inside isolators and cleanrooms. In tandem, the project will need to determine precision cleaning and sterilization approaches for cleanrooms, isolators, equipment, and tools. Initial material selections for the facility construction materials, cleanrooms, isolators, and BSL-4 suits/garments are an important activity. The recent construction of the OSIRIS-REx and Hayabusa2 curation cleanroom laboratories greatly benefited from early materials testing, before the design phase, to reduced organic outgassing and particulate shedding inside the laboratory. While the early biohazard investigations in the SRF may deem the samples safe to release to laboratories throughout the world, sterilization methods need to be defined to safely release Martian samples. One key aspect of enabling simultaneous sample containment and cleanliness is the concept of a Double-Walled Isolator (DWI) that ESA has been pursuing. Further R&D is needed about DWIs, sample handling, and instrumentation interfaces before beginning the SRF site specific design phase. A working isolator/DWI engineering model should be developed and fabricated. Isolator sizes, connections, pass-through antechambers, and configurations and basic interfaces with instruments and tools as well as the use of robotic, mechanical, and/or human manipulation need to be considered. Inert high purity gas supply (one-pass or recirculation) and other isolator utilities must be determined. Special accommodations for large instruments (e.g., XCT,SEM, etc.) need to be developed. Techniques for opening the sample tubes packaged by M2020and extracting the headspace gas while keeping samples pristine will be challenging, requiring additional R&D, and engagement of the M2020 project. In addition, careful micromanipulation for subdivision and packaging of samples will also need to be included. These combined R&D activities are important before commencing the SRF design phase to ensure safe biohazard containment, sample preservation, and science integrity for the samples that would be studied in the SRF and in laboratories around the world.

mars sample return↗

Preservation of Organic Carbon in Dolomitized Cambrian Stromatolites and Implications for Microbial Biosignatures in Diagenetically Replaced Carbonate Rock

Stromatolites have been a major focus in the search for ancient microbial life, however, the organic carbon biosignatures of dolomitized stromatolites have not yet been fully characterized or correlated with their dolomitizing conditions. Although dolomitization rarely preserves microbial morphology, the presence of organic carbon can provide valuable information for characterization of fossils’ biogenicity, syngenicity, and indigeneity to their host rock. The Cambrian Allentown Formation in New Jersey, USA, is an excellent example of dolomitized stromatolites and thrombolites containing diagenetically modified microbial biosignatures. Based on XRD and EPMA data, the dolomite composition is typically stoichiometric, with varying degrees of cationic ordering. The outcrop underwent early dolomitization in a marginal-marine setting and later burial diagenesis resulting in multi-generational dolomite formation: (1) 2 microspar dolomite formed by early diagenetic replacement at or near the surface, (2) zoned dolomite formed penecontemporaneously with the microspar phase as rhombohedral crystals by infilling primary pore spaces within the microspar matrix. The rhombic crystals continued to grow outward in alternating stages of Fe-enriched and -depleted fluids, which were preserved in zoned rims and revealed by cathodoluminescence, and (3) saddle dolomite formed during late stage deep burial with Fe- and Mn-rich fluids, and occurs as a void-filling, high-temperature phase. Organic carbon, characterized using confocal Raman microscopy, has an exclusive distribution within the microspar dolomite, and the D and G bands’ characteristics reveal similar thermal alteration to the host rock, indicating that the mapped organic carbon is indigenous and syngenetic with the Cambrian carbonates. The findings presented in this study reveal organic matter found within microspar of various dolomitized facies deriving from different source pools of organic carbon. This study sheds light on biosignatures in secondary dolostones and may aid biosignature detection in older carbonate rocks on Earth and Mars.

Dolomitization↗

The Impact of Dimensionality Reduction of Ion Counts Distributions on Preserving Moments, With Applications to Data Compression

The field of space physics has a long history of utilizing dimensionality reduction methods to distill data, including but not limited to spherical harmonics, the Fourier Transform, and the wavelet transform. Here, we present a technique for performing dimensionality reduction on ion counts distributions from the Multiscale Mission/Fast Plasma Investigation (MMS/FPI) instrument using a data-adaptive method powered by neural networks. This has applications to both feeding low-dimensional parameterizations of the counts distributions into other machine learning algorithms, and the problem of data compression to reduce transmission volume for space missions. The algorithm presented here is lossy, and in this work, we present the technique of validating the reconstruction performance with calculated plasma moments under the argument that preserving the moments also preserves fluid-level physics, and in turn a degree of scientific validity. The method presented here is an improvement over other lossy compressions in loss-tolerant scenarios like the Multiscale Mission/Fast Plasma Investigation Fast Survey or in non-research space weather applications.

D. da Silva↗

Moment-Preserving SN Discretizations for the One-Dimensional Fokker-Planck Equation

The Fokker-Planck equation: (1) Describes the transport and interactions of charged particles, (2) Many small-angle scattering collisions, (3) Asymptotic limit of the Boltzmann equation (Pomraning, 1992), and (4) The Boltzmann collision operator becomes the angular Laplacian. SN angular discretization: (1) Angular flux is collocated at the SN quadrature points, (2) The second-order derivatives in the Laplacian term must be discretized, and (3) Weighted finite-difference method preserves zeroth and first moments (Morel, 1985). Moment-preserving methods: (1) Collocate the Fokker-Planck operator at the SN quadrature points, (2) Develop several related and/or equivalent methods, and (3) Motivated by discretizations for the angular derivative appearing in the transport equation in one-dimensional spherical coordinates.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Archiving Data from New Survey Technologies: Lessons Learned on Enabling Research with High-Precision Data While Preserving Participant Privacy: Preprint

During the past 15 years, increasing numbers of organizations and planning agencies have begun collecting high-resolution Global Positioning System (GPS) travel data. Despite the significant effort and expense to collect it, privacy concerns often lead to underutilization of the data. To address this dilemma of providing data access while preserving privacy, the National Renewable Energy Laboratory, with support from the U.S. Department of Transportation and U.S. Department of Energy, established the Transportation Secure Data Center (TSDC). Lessons drawn from best-practice examples from other data centers have helped shape the structure and operating procedures for the TSDC, which functions under the philosophy of first and foremost preserving privacy, but doing so in a way that balances security with accessibility and usability of the data for legitimate research. This paper provides details about the TSDC approach toward achieving these goals, which has included creating a secure enclave with no external access for backing up and processing raw data, a publicly accessible website for downloading cleansed data, and a secure portal environment through which approved users can work with detailed spatial data using a variety of tools and reference information. This paper also describes lessons learned from operating the TSDC with respect to improvements in GPS data handling, processing, and user support, along with plans for continual enhancements to better support the needs of both data providers and users and to thus advance the research value derived from such valuable data.

33 ADVANCED PROPULSION SYSTEMS↗

Paddys Run Streambank Stabilization Project at the Fernald Preserve, Harrison, OH

The Fernald Preserve is a former uranium-processing plant that underwent extensive remediation pursuant to CERCLA and is now managed by the US DOE Office of Legacy Management. While remediation of buildings and soil contamination was completed in 2006, aquifer remediation is ongoing. Paddys Run is a second-order stream that runs to the south along the western side of the Fernald Preserve. The Paddys Run watershed encompasses nearly 41 km2 (16 mi2), including most of the Fernald site. Field personnel conducting routine site inspections in March 2014 observed that Paddys Run was migrating east via bank erosion into the “Pit 3 Swale,” an area of known surface-water contamination. The soil there was certified pursuant to site regulatory agreements and meets all final remediation levels. However, weekly surface-water monitoring is conducted from two puddles within the swale area, when water that exceeds the final remediation levels is present. Paddys Run had migrated east approximately 4 m (13 ft) in 2 years and was approximately 29 m (95 ft) from the sample location. This rapid migration threatened existing conditions that allowed for continued monitoring of the swale area and also threatened Paddys Run water quality. Therefore, DOE and regulators determined that the east bank of Paddys Run required stabilization. This was accomplished with a design that included the following components: relocation of approximately 145 m (475 ft) of streambed 9 m (30 ft) west, installation of a rock toe along the east bank, installation of two cross-vane in-stream grade-control structures, stabilization of a portion of the east bank using soil encapsulated lifts, and regrading, seeding, and planting within remaining disturbed areas. In an effort to take advantage of low-flow conditions in Paddys Run, construction was initiated in September 2014. Weather delays and subsurface flow within the Paddys Run streambed resulted in an interim shutdown of the project area in December 2014. Construction activities resumed in April 2015, with completion in November 2015. To date, this stabilization project has been successful. The regraded bank and streambed have remained stable, and no compromise to installed cross-vanes, the rock toe, or the soil encapsulated lifts has been observed.

54 ENVIRONMENTAL SCIENCES↗

Momentum preserving film-cooling shaped holes

A system for cooling includes a surface to be cooled and at least one film-cooling hole within the surface for allowing a film cooling jet of coolant to reach the surface, each of the at least one film-cooling hole having a diameter. The at least one film-cooling hole is shaped to preserve momentum of the coolant and assist in preventing entrainment of the hot gases. A method of cooling a surface proximate hot gas includes providing coolant through a w-shaped film-cooling hole to form a cool film between the hot gas and the surface and preserving momentum of the coolant using the w-shaped film-cooling hole to assist in preventing entrainment of the hot gases.

Shih, Tom I-P↗

A Privacy-Preserving Strategy for the Trust Layer of the Energy Grid of Things Distributed Energy Resource Management System

Emergent from the shadows of the traditional grid flaws, the Smart Grid (SG) idea was born and led by government mandates toward cleaner energy production. The SG represents the next generation of electricity distribution systems that subsume recent technological innovations. It uses digital communication between its components and entities to attain more automation, self-sufficiency, and reliability. Unfortunately, this relatively new concept is not flawless; the intrinsic reliance on increased digital communication spreads open attack paths for adversaries. Therefore, finding solutions that address information exchange vulnerabilities has become imperative. The Energy Grid of Things (EGoT) is Portland State University’s (PSU’s) implementation of a Distributed Energy Resource Management System (DERMS). The EGoT DERMS requires access to customers’ information to achieve operational objectives. The system’s access to customers’ information needs to be restricted such that it does not violate customers’ privacy. Applying privacy protection models such as K-anonymity to EGoT DERMS sub-components safeguards that privacy. This thesis work proposes a strategy to ensure communication in the EGoT DERMS is privacy-preserving and secure. Specifically, it provides an approach to applying the Mondrian Algorithm to ensure data within the system excludes Personally Identifiable Information (PII) and provides means for securing the communication according to industry standards (IEEE 2030.5). Results suggest that the generalization hierarchy derived for the EGoT DERMS exhibits an Identical Generalization Hierarchy structure. Guarantees of sameness manifested in the test feeder topology would not hold in real-world scenarios. This thesis work proposes a strategy to ensure communication in the EGoT DERMS is privacy-preserving and secure. Specifically, it provides an approach to applying the Mondrian Algorithm to ensure data within the system excludes Personally Identifiable Information (PII) and provides means for securing the communication according to industry standards (IEEE 2030.5). Results suggest that the generalization hierarchy derived for the EGoT DERMS exhibits an Identical Generalization Hierarchy structure. Guarantees of sameness manifested in the test feeder topology would not hold in real-world scenarios.

Alsiad, Mohammed↗

Preserving spherical symmetry in axisymmetric coordinates for diffusion problems

Persevering symmetric solutions, even in the under-converged limit, is important to the robustness of production simulation codes. We explore the symmetry preservation in both a continuous nodal and a mixed finite element method. In their standard formulation, neither method preserves spherical solution symmetry in axisymmetric (RZ) coordinates. We propose two methods, one for each family of finite elements, that recover spherical symmetry for low-order finite elements on linear or curvilinear meshes. This is a first step toward understanding achieving symmetry for higher-order elements. (authors)

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Groundwater Treatment at the Fernald Preserve: Status and Path Forward for the Water Treatment Facility - 12320

Operating a water treatment facility at the Fernald Preserve in Cincinnati, Ohio-to support groundwater remediation and other wastewater treatment needs-has become increasingly unnecessary. The Fernald Preserve became a U.S. Department of Energy Office of Legacy Management (LM) site in November 2006, once most of the Comprehensive Environmental Response, Compensation, and Liability Act environmental remediation and site restoration had been completed. Groundwater remediation is anticipated to continue beyond 2020. A portion of the wastewater treatment facility that operated during the CERCLA cleanup continued to operate after the site was transferred to LM, to support the remaining groundwater remediation effort. The treatment facility handles the site's remaining water treatment needs (for groundwater, storm water, and wastewater) as necessary, to ensure that uranium discharge limits specified in the Operable Unit 5 Record of Decision are met. As anticipated, the need to treat groundwater to meet uranium discharge limits has greatly diminished over the last several years. Data indicate that the groundwater treatment facility is no longer needed to support the ongoing aquifer remediation effort. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of a facility in a historical reactor at SRS: achieving both historical significance preservation and effective in-situ decommissioning - 15275

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, where Management and Operations are performed by Savannah River Nuclear Solutions, LLC (SRNS). In 2004, US DOE recognized SRS as a structure within the Cold War Historic District of national, state and local significance because it is composed of the first generation of facilities constructed and operated from 1950 through 1989 to produce plutonium and tritium for our nation's defense. US DOE agreed to manage the SRS 105-C Reactor Facility as a potentially historic property due to its significance in supporting the U.S. Cold War Mission and for potential for future interpretation. The Disassembly Basin (DB) in C Reactor was evaluated for action under CERCLA. Data indicated there were over 830 curies of radioactivity associated with the basin sediments and approximately 9.1 million (M) liters (L) of contaminated water, not including a large quantity of activated reactor equipment, scrap metal, and debris on the basin floor. The release of DB water could potentially migrate to the aquifer and contaminate groundwater. The need for an action was identified to reduce risks to personnel in the facility and to eliminate the possible release of contaminants into the environment. In-situ decommissioning was selected as the remedy. The remedial action proceeded in stages: -Above-grade modifications to the interior of DB building -Relocation of irradiated scrap and reactor components to the deepest segments of the DB - Construction of a metal building to house evaporators - Forced evaporation of the DB's radiologically contaminated water - Grouting with special hybrid grouts - Removal of the evaporators and temporary building. Since the building itself was not demolished and will remain unchanged in appearance with the exception of filling the DB with grout, this ISD removal action/methodology did not adversely impact the historical significance of the 105-C Reactor Building, in accordance with the National Historic Preservation Act, nor did it adversely affect the ability to determine the full extent and details of preservation at some later date. Both special hybrid grout materials met all requirements. Overall average 7-day compressive strength for the dry area mix was 1.54 MPa (223 psi) and for the underwater mix 2.94 MPa (427 psi).Overall 28-day compressive strength for the dry area mix was 2.88 MPa (417 psi) and for the underwater mix 4.99 MPa (724 psi). A limited amount of testing was also performed at 91 days, where the overall compressive strength for the dry area mix was found to be 9.40 MPa (1363 psi) and for the underwater mix 13.98 MPa (2028 psi). All compressive strength values far exceeded the 0.34 MPa (50 psi) minimum requirements. The special, flowable-fill grouts designed and used for P- and R-Reactor ISD and used again for this 105-C ISD removal action resulted in considerable labor, cost, and schedule savings versus conventional materials. As an added bonus/benefit, the CO{sub 2} footprint of the SRS C-Reactor DB ISD was minimized by using a small amount of cement and byproduct material to produce the structural fill materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater remediation at the Fernald preserve, Cincinnati, Ohio modeling and resulting 2014 well field operational changes - 15324

The Fernald Preserve became a US DOE Office of Legacy Management site in November 2006, for long-term surveillance and maintenance following completion (with the exception of completing groundwater cleanup) of the Comprehensive Environmental Response, Compensation, and Liability Act; environmental remediation; and site restoration. When the site was turned over to the Office of Legacy Management, approximately 76 hectares (189 acres) of the Great Miami Aquifer (GMA) remained contaminated with uranium above the final remediation level of 30 micrograms per liter. Uranium contamination is being removed from groundwater in the GMA through a pump-and-treat operation that is predicted by groundwater modeling to continue until 2033. Certifying that cleanup objectives have been met and removing the remediation infrastructure after pump-and-treat (P and T) operations are complete will require a minimum of 3 additional years. The current P and T remedy has operated well. From August 1993 through December 2013 the remedy has been used to remove 5,345 kg (11,784 lb) of uranium from the GMA. A variety of metrics are used to track how the P and T operation is progressing and are reported each year in the Site Environmental Report for the Fernald site. The metrics show that the effectiveness of uranium removal is slowly decreasing (a common observation for P and T remedies) and that operational changes needed to be considered. Several different operational changes were modeled to determine if model-predicted cleanup dates could be shortened and if the effectiveness of the groundwater remediation could be improved. With the concurrence and support of US EPA, Ohio EPA, and site stakeholders, operational changes were agreed upon and implemented in 2014 that are predicted to increase the effectiveness of the ongoing operation and shorten cleanup times for a portion of the aquifer. Although the overall predicted length of the remediation was not shortened, modeling predicts that key areas of the uranium plume will be re-mediated sooner. This paper provides a status of the groundwater remediation under way at the Fernald Preserve near Cincinnati, presents the operational changes that were implemented in 2014, and summarizes the groundwater modeling that supported the changes. This paper also illustrates the potential benefits that can be gained by pro-actively managing a pump-and-treat operation and looking for innovative ways to adjust the operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Construction of the Paddys Run Streambank Stabilization Project at the Fernald Preserve, Harrison, Ohio - 16165

The Fernald Preserve is a former uranium-processing plant that underwent extensive remediation pursuant to CERCLA and is now managed by the US DOE Office of Legacy Management. While remediation of buildings and soil contamination was completed in 2006, aquifer remediation is ongoing. Paddys Run is a second-order stream that runs to the south along the western side of the Fernald Preserve. The Paddys Run watershed encompasses nearly 41 km{sup 2} (16 mi{sup 2}), including most of the Fernald site. Field personnel conducting routine site inspections in March 2014 observed that Paddys Run was migrating east via bank erosion into the 'Pit 3 Swale', an area of known surface-water contamination. The soil there was certified pursuant to site regulatory agreements and meets all final remediation levels. However, weekly surface-water monitoring is conducted from two puddles within the swale area, when water that exceeds the final remediation levels is present. Paddys Run had migrated east approximately 4 m (13 ft) in 2 years and was approximately 29 m (95 ft) from the sample location. This rapid migration threatened existing conditions that allowed for continued monitoring of the swale area and also threatened Paddys Run water quality. Therefore, DOE and regulators determined that the east bank of Paddys Run required stabilization. This was accomplished with a design that included the following components: relocation of approximately 145 m (475 ft) of streambed 9 m (30 ft) west, installation of a rock toe along the east bank, installation of two cross-vane in-stream grade-control structures, stabilization of a portion of the east bank using soil encapsulated lifts, and regrading, seeding, and planting within remaining disturbed areas. In an effort to take advantage of low-flow conditions in Paddys Run, construction was initiated in September 2014. Weather delays and subsurface flow within the Paddys Run streambed resulted in an interim shutdown of the project area in December 2014. Construction activities resumed in April 2015, with completion in November 2015. To date, this stabilization project has been successful. The regraded bank and streambed have remained stable, and no compromise to installed cross-vanes, the rock toe, or the soil encapsulated lifts has been observed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned Concerning the Onsite Disposal Facility at the Fernald Preserve, Harrison, Ohio - 16176

An onsite disposal facility (OSDF) was constructed at the Fernald Preserve, Ohio, for the disposal of contaminated soil and debris generated during a Comprehensive Environmental Response, Compensation, and Liability Act site cleanup. Completed in October of 2006, the 30 ha facility contains 2.26 million m{sup 3} of waste materials, has a maximum height of approximately 19.8 m, and consists of eight individual cells. The dimensions of cells 1-7 are approximately 213 m x 122 m each, or 26,000 m{sup 2} (2.60 ha). The dimensions of cell 8 (the last cell constructed) are larger than those of the other cells (approximately 3.8 ha). Each cell was constructed with a leachate collection system (LCS) that collected rainwater and storm-water runoff during waste placement and prevented it from entering the underlying environment. Other engineered features include a multilayer composite liner system, a leak detection system (LDS) positioned beneath the primary liner, and a multilayer composite cover that was placed over each cell following the completion of waste-placement activities. The LCS and LDS layers are designed to convey (by gravity) any leachate/fluid that enters the system through pipes to the west side of the facility and into tanks located in valve houses. From there, leachate can be sampled and conveyed to treatment. Groundwater is monitored beneath each cell via monitoring wells. In November 2006, the US DOE Office of Legacy Management (LM) assumed responsibility for the long-term care and maintenance of the OSDF. LM has nine years of monitoring and maintenance experience with the Fernald OSDF. Monitoring data is reported each year in the Fernald Annual Site Environmental Report. The data collected and inspections conducted indicate that the facility is operating as designed. The past nine years has provided LM with the opportunity to evaluate how well many of the design and as-built features of the facility have functioned over time as they pertain to environmental monitoring, valve-house operation and maintenance, and leachate transmission. Lessons learned concerning the long-term care and maintenance of the OSDF at the Fernald Preserve are presented. The main lessons learned include the following: How bivariate plots can be used to address environmental monitoring challenges created by installing an engineered disposal facility in a location where contamination is above the background level but below cleanup standards. How valve-house design decisions can help to alleviate long-term monitoring challenges. How scale buildup can lead to leachate transmission issues. Some additional minor lessons learned are also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evolution of DOE/Stakeholder Relationships at the Fernald Preserve, Ohio, Site - 19559

The Fernald Preserve, Ohio, Site is managed by the US Department of Energy (DOE) Office of Legacy Management. It is approximately 29 km (18 miles) northwest of Cincinnati, Ohio, on the site of a former uranium-processing plant established by the US Atomic Energy Commission in 1951. The production mission officially ended in 1991 when it was replaced by a remediation mission. Extensive environmental remediation was subsequently conducted under the Superfund program by the DOE Office of Environmental Management. After most of the remediation was concluded in 2006, the site was transferred to the DOE Office of Legacy Management, which continued comprehensive ecological restoration and is responsible for an ongoing aquifer remediation operation. The site was renamed the Fernald Preserve and opened to the public in 2008 as an undeveloped park, encompassing a diversity of natural habitats native to the area. The site now serves as a community asset, offering a Visitors Center with exhibits that tell the site story, hiking trails, wildlife observation opportunities, meeting spaces for community groups, educational program opportunities, and Interpretive Services personnel to engage the public. There was a long history of community mistrust about government operations at the site, beginning in the 1950's when land for the site was acquired by eminent domain, and continuing when contamination and hazardous waste management concerns were revealed in the 1980's. Resulting media coverage on possible contamination and cover-up concerns was extensive. In 1986, sitewide studies to determine the nature and extent of contamination and to consider cleanup options were instigated. In 1989, the site was placed on the National Priorities List of the Superfund program. Because of the longstanding mistrust held by many stakeholders, DOE faced a very serious challenge in achieving consensus among stakeholder groups about the cleanup levels, waste disposition, and the future uses of the site. Starting in the late 1980's, DOE, the regulators, site contractors and the community took a number of steps over many years to increase trust and achieve consensus among the many stakeholder groups. These steps included establishing a single cleanup mission, involving the community early and often as a critically important stakeholder, creating a citizens taskforce and community envoys, and providing extensive educational outreach. As a result, DOE, regulators, contractors, and community members moved from a position of very little trust to one of increased trust and collaboration among all concerned parties. The lessons learned from the Fernald site can be invaluable in the resolution of difficult environmental issues and should be considered as DOE seeks increased collaboration and consensus with stakeholders to solve other environmental remediation challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A novel conditional formulation of the Vlasov–Ampère equations: a conservative, positivity, asymptotic and Gauss law preserving scheme

We propose a novel reformulation of the Vlasov–Ampère equations for plasmas that reveals discrete symmetries that enables simultaneous conservation of mass, momentum and energy; preservation of Gauss’s law; positivity of the distribution function; and consistency with quasi-neutral asymptotics. The approach employs variable and coordinate transformations to yield a coupled system comprising a modified Vlasov equation and associated moment–field equations. The modified Vlasov equation advances a conditional distribution function that excludes mass, momentum and energy densities, which are instead evolved through moment equations enforcing the relevant symmetries, conservation laws and involution constraints. This reformulation aligns naturally with a recent slow-manifold reduction technique, which separates fast electron time scales and simplifies the treatment of the quasi-neutral limit within the reduced moment–field subsystem. Using this framework, we develop a numerical method for the reduced 1D1V subsystem that, for the first time in the literature, satisfies all key physical constraints while maintaining a quasi-neutral asymptotic behaviour. The advantages of the method are demonstrated on canonical electrostatic test problems, including the multiscale ion acoustic shock wave.

1D1V↗

Knowledge Preservation at the Fast Flux Test Facility

The Fast Flux Test Facility (FFTF) is the most recent Liquid Metal Reactor (LMR) to operate in the United States, from 1982 to 1992. The technologies employed in designing and constructing this reactor, along with information obtained from tests conducted during its operation, are currently being secured and archived by the Department of Energy's Office of Nuclear Energy. This report is one in a series documenting the overall project efforts to retrieve and preserve critical information related to advanced reactors

22 GENERAL STUDIES OF NUCLEAR REACTORS↗