Search NASA⌕ Search

SEARCH · Search NASA

Results for “Path Forward”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

A Charge-Agnostic Design for 6D Muon Ionization Cooling

A muon collider presents a compelling path forward for high-energy physics, offering both energy reach and precision. The notable challenge in realizing the target luminosities for a muon collider is in the development of a sufficiently fast cooling scheme — one capable of several orders of magnitude in emittance reduction with minimal decay losses. Ionization cooling is presently considered the only scheme to fit this criterion. Traditional ionization cooling channels are characterized by a solenoid-based lattice for beam focusing and a low-Z absorbing material wherein the beam deposits energy via ionization. Dipole fields are used to generate dispersion such that higher-momentum muons pass through more absorbing material, enabling 6D cooling by leveraging emittance exchange. The problem with this approach is the charge-specificity of the dispersion function, necessitating separate channels for $\mu^+$ and $\mu^-$. Here, the Helical FOFO Snake (HFOFO) is presented as an alternative approach to 6D cooling that agnostically treats both signs of muon, enabling a single cooling channel for both.

Riggall, Caroline [Tennessee U.] (ORCID:0009000849↗

INITIAL STUDIES OF CAVITY FAULT PREDICTION AT JEFFERSON LABORATORY

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory is a CW recirculating linac that utilizes over 400 superconducting radio-frequency (SRF) cavities to accelerate electrons up to 12 GeV through 5-passes. Recent work has shown that, given RF signals from a cavity during a fault as input, machine learning approaches can accurately classify the fault type. In this paper we report on initial results of predicting a fault onset using only data prior to the failure event. A data set was constructed using time-series data immediately before a fault (’unstable’) and 1.5 seconds prior to a fault (’stable’) gathered from over 5,000 saved fault events. The data was used to train a binary classifier. The results gave key insights into the behavior of several fault types and provided motivation to investigate whether data prior to a failure event could also predict the type of fault. We discuss our method using a sliding window approach and report on initial results. Recent modifications to the low-level RF control system will provide access to streaming signals and we outline a path forward for leveraging deep learning on streaming data

Vidyaratne, Lasitha↗

PERLE: A High Power Energy Recovery Facility

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab is the first large high power CW recirculating electron accelerator to make use of SRF accelerating structures. The structures are configured in two anti-parallel linacs connected by arcs. Each linac consists of twenty C20/C50 cryomodules each containing eight 5-cell cavities and five C100 upgrade cryomodules each containing eight 7-cell cavities. Accurately classifying the source of cavity faults is critical for improving accelerator performance. A cavity fault triggers a waveform acquisition process where 17 waveform records sampled at 5 kHz are recorded for each of the 8 cavities in the affected cryomodule. The waveform record length is sufficiently long for transient microphonic effects to be observable. This data combined with archived signals sampled at 10 Hz are used to classify faults. Significant time is required for a subject matter expert to analyze and identify the intra-cavity signatures of imminent faults. This paper describes a path forward that utilizes machine learning for automatic fault classification. Post-training identification of the physical origins of faults are discussed, as are potential machine-trained model-free implementations of trip avoidance procedures. These methods should provide new insights into cavity fault mechanisms and facilitate intelligent optimization of cryomodule performance

Kaabi, W.↗

SRF Cavity Fault Classification Using Machine Learning At CEBAF

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab is the first large high power CW recirculating electron accelerator to make use of SRF accelerating structures. The structures are configured in two anti-parallel linacs connected by arcs. Each linac consists of twenty C20/C50 cryomodules each containing eight 5-cell cavities and five C100 upgrade cryomodules each containing eight 7-cell cavities. Accurately classifying the source of cavity faults is critical for improving accelerator performance. A cavity fault triggers a waveform acquisition process where 17 waveform records sampled at 5 kHz are recorded for each of the 8 cavities in the affected cryomodule. The waveform record length is sufficiently long for transient microphonic effects to be observable. This data combined with archived signals sampled at 10 Hz are used to classify faults. Significant time is required for a subject matter expert to analyze and identify the intra-cavity signatures of imminent faults. This paper describes a path forward that utilizes machine learning for automatic fault classification. Post-training identification of the physical origins of faults are discussed, as are potential machine-trained model-free implementations of trip avoidance procedures. These methods should provide new insights into cavity fault mechanisms and facilitate intelligent optimization of cryomodule performance

Solopova, A.↗

Multiplexed targeted mass spectrometry assays for prostate cancer-associated urinary proteins

Biomarkers for effective early diagnosis and prognosis of prostate cancer are still lacking. Multiplexed assays for cancer-associated proteins could be useful for identifying biomarkers for cancer detection and stratification. Herein, we report the development of sensitive targeted mass spectrometry assays for simultaneous quantification of 10 prostate cancer-associated proteins in urine. The diagnostic utility of these markers was evaluated with an initial cohort of 20 clinical urine samples. Individual marker concentration was normalized against the measured urinary prostate-specific antigen level as a reference of prostate-specific secretion. The areas under the receiver-operating characteristic curves for the 10 proteins ranged from 0.75 for CXCL14 to 0.87 for CEACAM5. Furthermore, MMP9 level was found to be significantly higher in patients with high Gleason scores, suggesting a potential of MMP9 as a marker for risk level assessment. Taken together, our work illustrated the feasibility of accurate multiplexed measurements of low-abundance cancer-associated proteins in urine and provided a viable path forward for preclinical verification of candidate biomarkers for prostate cancer.

Environmental Molecular Sciences Laboratory↗

Ranchero Armature Test LA-43-CT-2: PBXN-110 Explosive with no smoothing layer. Lower Slobovia, 6/13/13

This test, documented as LA-43-CT-2, was performed to verify calculations which indicate that the smoothing layer employed for Ranchero Armatures is not required when the slapper point spacing is 18 mm (“On the efficacy of an acrylic layer in the Ranchero armature,” Bob Watt, published in “Ranchero Status Report” LA-14463). [Naming this test –CT-2 acknowledges the previous test performed during 1/11 as the initial test in the series, and we will refer to that test as LA-43-CT-1 in the future.] In addition, higher velocity is achieved when the volume occupied by the smoother is replaced by HE. Two framing cameras were used on the shot, and a 20 point PDV array was fielded to ascertain armature performance in specific conditions. The conclusions are that the armature is smooth enough, and the terminal velocity is increased from ~3.1 mm/μs to ~3.3 mm/μs. The armature tested had casting voids in the HE that were observed in pre-test inspections, and were expected to cause ruptures. (See Appendix 3 of the Ranchero Status Report.) Such “blowouts” were observed in all three locations identified in pre-shot inspection. In addition, ruptures occurred in locations having no pre-shot indication of a problem. These unpredicted blowouts have a difference in appearance from those typically seen. Further visual examination of the inspection radiographs do not reveal the cause, and that is a serious concern for future efforts with such castings. A path forward will include attempting to digitize the inspection x-rays for the charge tested, to see if the cause of the “new” ruptures can be found via computer enhancement. In addition, there are two additional armatures from the same casting lot, and these might also be tested to see if there is some problem with the HE or the armature material in this batch. For now, this plan is on hold, pending the outcome of tests and cost estimates related to using PBX-9501 in place of the PBXN-110. Casting issues would be eliminated in such configurations.

42 ENGINEERING↗

Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to study routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines. Based on Platts electrical transmission line data, a total of 101 existing intersections with national trails on federal land were found, and 20 proposed intersections. Transmission lines and pipelines are proposed in Alaska; however there are no locations that intersect national trails. Source data did not indicate any planned transmission lines or pipelines in Hawaii. A map atlas provides more detailed mapping of the topics investigated in this study, and the accompanying GIS database provides the baseline information for further investigating locations of interest. In many cases the locations of proposed transmission lines are not accurately mapped (or a specific route may not yet be determined), and accordingly the specific crossing locations are speculative. However since both national trails and electrical transmission lines are long linear systems, the characteristics of the crossings reported in this study are expected to be similar to both observed characteristics of the existing infrastructure provided in this report, and of the new infrastructure if these proposed projects are built. More focused study of these siting challenges is expected to mitigate some of potential impacts by choosing routes that minimize or eliminate them. The current study primarily addresses a set of screening-level characterizations that provide insights into how the National Trail System may influence the siting of energy transport facilities in the states identified under Section 368(b) of the Energy Policy Act of 2005. As such, it initializes gathering and beginning analysis of the primary environmental and energy data, and maps the contextual relationships between an important national environmental asset and how this asset intersects with energy planning activities. Thus the current study sets the stage for more in-depth analyses and data development activities that begin to solve key transmission siting constraints. Our recommendations for future work incorporate two major areas: (1) database development and analytics and (2) modeling and scenario analysis for energy planning. These recommendations provide a path forward to address key issues originally developed under the Energy Policy Act of 2005 that are now being carried forward under the President’s Climate Action Plan.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Maine Tidal Power Initiative: Environmental Impact Protocols For Tidal Power

The Maine Tidal Power Initiative (MTPI), an interdisciplinary group of engineers, biologists, oceanographers, and social scientists, has been conducting research to evaluate tidal energy resources and better understand the potential effects and impacts of marine hydro-kinetic (MHK) development on the environment and local community. Project efforts include: 1) resource assessment, 2) development of initial device design parameters using scale model tests, 3) baseline environmental studies and monitoring, and 4) human and community responses. This work included in-situ measurement of the environmental and social response to the pre-commercial Turbine Generator Unit (TGU®) developed by Ocean Renewable Power Company (ORPC) as well as considering the path forward for smaller community scale projects.

16 TIDAL AND WAVE POWER↗

Low Emissions Burner Technology for Metal Processing Industry using Byproducts and Biomass Derived Liquid Fuels (Final Report)

This research and development efforts produced low-emission burner technology capable of operating on natural gas as well as crude glycerin and/or fatty acids generated in biodiesel plants. The research was conducted in three stages (1) Concept definition leading to the design and development of a small laboratory scale burner, (2) Scale-up to prototype burner design and development, and (3) Technology demonstration with field vefiication. The burner design relies upon the Flow Blurring (FB) fuel injection based on aerodynamically creating two-phase flow near the injector exit. The fuel tube and discharge orifice both of inside diameter D are separated by gap H. For H < 0.25D, the atomizing air bubbles into liquid fuel to create a two-phase flow near the tip of the fuel tube. Pressurized two-phase fuel-air mixture exits through the discharge orifice, which results in expansion and breakup of air bubbles yielding a spray with fine droplets. First, low-emission combustion of diesel, biodiesel and straight VO (soybean oil) was achieved by utilizing FB injector to yield fine sprays for these fuels with significantly different physical properties. Visual images for these baseline experiments conducted with heat release rate (HRR) of about 8 kW illustrate clean blue flames indicating premixed combustion for all three fuels. Radial profiles of the product gas temperature at the combustor exit overlap each other signifying that the combustion efficiency is independent of the fuel. At the combustor exit, the NOx emissions are within the measurement uncertainties, while CO emissions are slightly higher for straight VO as compared to diesel and biodiesel. Considering the large variations in physical and chemical properties of fuels considered, the small differences observed in CO and NOx emissions show promise for fuel-flexible, clean combustion systems. FB injector has proven to be very effective in atomizing fuels with very different physical properties, and it offers a path forward to utilize both fossil and alternative liquid fuels in the same combustion system. In particular, experiments show that straight VO can be cleanly combusted without the need for chemical processing or preheating steps, which can result in significant economic and environmental benefits. Next, low-emission combustion of glycerol/methane was achieved by utilizing FB injector to yield fine droplets of highly viscous glycerol. Heat released from methane combustion further improves glycerol pre-vaporization and thus its clean combustion. Methane addition results in an intensified reaction zone with locally high temperatures near the injector exit. Reduction in methane flow rate elongates the reaction zone, which leads to higher CO emissions and lower NOx emissions. Similarly, higher air to liquid (ALR) mass ratio improves atomization and fuel pre-vaporization and shifts the flame closer to the injector exit. In spite of these internal variations, all fuel mixes of glycerol with methane produced similar CO and NOx emissions at the combustor exit. Results show that FB concept provides low emissions with the flexibility to utilize gaseous and highly viscous liquid fuels, straight VO and glycerol, without preheating or preprocessing the fuels. Following these initial experiments in quartz combustor, we demonstrated that glycerol combustion can be stably sustained in a metal combustor. Phase Doppler Particle Analyzer (PDPA) measurements in glycerol/methane flames resulted in flow-weighted Sauter Mean Diameter (SMD) of 35 to 40 μm, depending upon the methane percentage. This study verified that lab-scale dual-fuel burner using FB injector can successfully atomize and combust glycerol and presumably other highly viscous liquid fuels at relatively low HRR (<10 kW). For industrial applications, a scaled-up glycerol burner design thus seemed feasible.

03 NATURAL GAS↗

Actinide Studies with Ultracold Neutrons [Slides]

First characterization of UCN-induced fission: • Previously no fission data at these energies • Initial characterizations of UCN energy dependence, material thickness. First observation of sputtering from UCN-induced fission: • Proof of principle demonstrated • Analysis of sputtered rates, angular and size distribution underway. Future plans: • Determine absolute cross sections • Develop scheme for characterizing ejected material • Explore effect of material thickness, surface preparation in more detail • Develop path forward for plutonium and other actinides.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Light Water Reactor Sustainability Program: BWR High-Fluence Material Project: Assessment of the Role of High-Fluence on the Efficiency of HWC Mitigation on SCC Crack Growth Rates

As nuclear power plants age, the increasing neutron fluence experienced by stainless steels components affects the materials resistance to stress corrosion cracking and fracture toughness. The purpose of this report is to identify any new issues that are expected to rise as boiling water reactor power plants reach the end of their initial life and to propose a path forward to study such issues. It has been identified that the efficiency of hydrogen water chemistry mitigation technology may decrease as fluence increases for high-stress intensity factors. This report summarizes the data available to support this hypothesis and describes a program plan to determine the efficiency of hydrogen water chemistry as a function of the stress intensity factor applied and fluence. This program plan includes acquisition of irradiated materials, generation of material via irradiation in a test reactor, and description of the test plan. This plan offers three approaches, each with an estimated timetable and budget.

36 MATERIALS SCIENCE↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Pentachart: From the Earth’s Core to the Cosmos

The pentachart consists of a three-panel chart illustrating points in the following areas: Background and Motivation; Innovation; Description; Anticipated Impact; and Path Forward.

54 ENVIRONMENTAL SCIENCES↗

Ultrafast Laser Diagnostics for Energetic-Material Ignition Mechanisms: Tools for Physics-Based Model Development.

We present the results of an LDRD project to develop diagnostics to perform fundamental measurements of material properties during shock compression of condensed phase materials at micron spatial scales and picosecond time scales. The report is structured into three main chapters, which each focus on a different diagnostic devel opment effort. Direct picosecond laser drive is used to introduce shock waves into thin films of energetic and inert materials. The resulting laser - driven shock properties are probed via Ultrafast Time Domain Interferometry (UTDI), which can additionally be used to generate shock Hugoniot data in tabletop experiments. Stimulated Raman scattering (SRS) is developed as a temperature diagnostic. A transient absorption spectroscopy setup has been developed to probe shock - induced changes during shock compressio n. UTDI results are presented under dynamic, direct - laser - drive conditions and shock Hugoniots are estimated for inert polystyrene samples and for the explosive hexanitroazobenzene, with results from both Sandia and Lawrence Livermore presented here. SRS a nd transient absorption diagnostics are demonstrated on static thin - film samples, and paths forward to dynamic experiments are presented.

Kearney, Sean Patrick↗

Time-Domain Reflectometry for Tamper Indication in Unattended Monitoring Systems for Safeguards

The International Atomic Energy Agency (IAEA) continues to expand its use of unattended, remotely monitored measurement systems. An increasing number of systems and an expanding family of instruments create challenges in terms of deployment efficiency and the implementation of data authentication measures. Pacific Northwest National Laboratory (PNNL) leads a collaboration that is exploring various tamper-indicating (TI) measures that could help to address some of the long-standing detector and data-transmission authentication challenges with IAEA’s unattended systems. PNNL is investigating the viability of active time-domain reflectometry (TDR) along two parallel but interconnected paths: (1) swept-frequency TDR as the highly flexible, laboratory gold standard to which field-deployable options can be compared, and (2) a low-cost commercially available spread-spectrum TDR technology as one option for field implementation. This report describes PNNL’s progress and preliminary findings from the first year of the study, and describes the path forward.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

99 GENERAL AND MISCELLANEOUS↗

Guidelines for Building Science Education

The U.S. Department of Energy’s (DOE) residential research and demonstration program, Building America, has triumphed through 20 years of innovation. Partnering with researchers, builders, remodelers, and manufacturers to develop innovative processes like advanced framing and ventilation standards, Building America has proven an energy efficient design can be more cost effective, healthy, and durable than a standard house. As Building America partners continue to achieve their stretch goals, they have found that the barrier to true market transformation for high performance homes is the limited knowledge-base of the professionals working in the building industry. With dozens of professionals taking part in the design and execution of building and selling homes, each person should have basic building science knowledge relevant to their role, and an understanding of how various home components interface with each other. Instead, our industry typically experiences a fragmented approach to home building and design. After obtaining important input from stakeholders at the Building Science Education Kick-Off Meeting, DOE created a building science education strategy addressing education issues preventing the widespread adoption of high performance homes. This strategy targets the next generation and provides valuable guidance for the current workforce. The initiative includes: • Race to Zero Student Design Competition: Engages universities and provides students who will be the next generation of architects, engineers, construction managers and entrepreneurs with the necessary skills and experience they need to begin careers in clean energy and generate creative solutions to real world problems. • Building Science to Sales Translator: Simplifies building science into compelling sales language and tools to sell high performance homes to their customers. • Building Science Education Guidance: Brings together industry and academia to solve problems related to building science education. This report summarizes the steps DOE has taken to develop guidance for building science education and outlines a path forward towards creating real change for an industry in need. The Guidelines for Building Science Education outlined in Appendix A of this report have been developed for external stakeholders to use to certify that their programs are incorporating the most important aspects of building science at the most appropriate proficiency level for their role. The guidelines are intended to be used primarily by training organizations, universities, and certification bodies. Each guideline can be printed or saved as a stand-alone document for ease-of-use by the respective stakeholder group. In 2015, DOE, with leadership from Pacific Northwest National Laboratory (PNNL), is launching a multi-year campaign to promote the adoption of the Guidelines for Building Science Education in a variety of training settings.

42 ENGINEERING↗