Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Execution Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Accelerating the Design of Space Vehicles

One of NASA's key goals is to increase the safety and reduce the cost of space transportation. Thus, a key element of NASA's new Integrated Space Transportation Plan is to develop new propulsion, structures, and operations for future generations of reusable launch vehicles (RLVs). As part of this effort to develop the next RLV, the ClCT Program's Computing, Networking, and Information Systems (CNIS) Project is developing and demonstrating collaborative software technologies that use the collective power of the NASA Grid to accelerate spacecraft design. One of these technologies, called AeroDB, automates the execution and monitoring of computational fluid dynamics (CFD) parameter studies on the NASA Grid. About the NASA Grid The NASA Grid, or Information Power Grid,. is being developed to leverage the distributed resources of NASA's many computers. instruments, simulators, and data storage systems. The goal is to use these combined resources to sdve difficult NASA challenges, such as iimulating the entire flight of a space vehicle from ascent to descent.To realize the vision of the NASA Grid, the CNIS Project is developing the software framework and protocols for building domain-specific environments and interfaces, new Grid services based on emerging industry standards, and advanced networking and computing testbeds to support new Grid-based applications such as AeroDB.

Laufenberg, Larry↗

International Space Station Configuration Analysis and Integration

Ambitious engineering projects, such as NASA's International Space Station (ISS), require dependable modeling, analysis, visualization, and robotics to ensure that complex mission strategies are carried out cost effectively, sustainably, and safely. Learn how Booz Allen Hamilton's Modeling, Analysis, Visualization, and Robotics Integration Center (MAVRIC) team performs engineering analysis of the ISS Configuration based primarily on the use of 3D CAD models. To support mission planning and execution, the team tracks the configuration of ISS and maintains configuration requirements to ensure operational goals are met. The MAVRIC team performs multi-disciplinary integration and trade studies to ensure future configurations meet stakeholder needs.

Anchondo, Rebekah↗

Panel Session 11: Featured Country Canada - Remediation of Contaminated Sites

Canada has several unique sites requiring environmental remediation of radiological contaminants. This panel was designed to outline the remediation of contaminated sites across Canada from several perspectives. Remote legacy uranium mining operations, small scale residential locations, and large impacted soil sites all pose different challenges, however there are some common solutions and keys to success. This panel addressed several of those challenges and provided lessons learned on how to successfully plan and execute large scale environmental remediation in both remote and residential locations. This panel focused on the cleaning up several contaminated sites in Canada and monitoring the long-term performance of sites that have already been remediated. Panelists addressed the technical and social challenges associated with various cleanup initiatives North of the 49. Parallel and the solutions that have been adopted to enable these projects to move forward. The panel offered the perspectives of owners, contractors and regulators on current projects and how they are leveraging past experience and learning from others to ensure future undertakings are successful. Presentations proposed include: 1 - Regulating Environmental Remediation in Canada (Michael Rinker, Canadian Nuclear Safety Commission (Canada)); 2 - Integration of Local Knowledge and Engagement/Capacity Building Legacy Uranium Mine Sites (Joe Muldoon, Saskatchewan Research Council (Canada)); 3 - The Path to Institutional Control - Safe, Secure and Stable (R. Liam Mooney, Cameco Corporation (Canada)); 4 - Port Hope Area Initiative: Project Challenges (Scott Parnell, Canadian Nuclear Laboratories (Canada))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ECP Software Technology Capability Assessment Report V3.0

The Exascale Computing Project (ECP) Software Technology (ST) focus area is responsible for (1) developing critical software capabilities that will enable the successful execution of ECP applications and (2) providing key components of a productive and sustainable exascale computing ecosystem that will position the US Department of Energy (DOE) and the broader high-performance computing (HPC) community with a firm foundation for future extreme-scale computing capabilities. This ECP ST Capability Assessment Report (CAR) provides an overview and assessment of current ECP ST capabilities and activities, giving stakeholders and the broader HPC community information that can be used to assess ECP ST progress and plan their own efforts accordingly. ECP ST leaders commit to updating this document on regular basis (every 6–12 months). Highlights from this version of the report are presented here. This version of the CAR contains the following updates relative to the previous revision: (1) This report highlights the progress with the Extreme-scale Scientific Software Stack (E4S) efforts. In particular, this report discusses how E4S continues to gain traction as a first-class entity in the HPC ecosystem, enabling new conversations with users, facilities, vendors, other US agencies, and international partners. (2) The several-page summaries of each ECP Level 4 project were updated to reflect recent progress and next steps (Section 4). Of particular note are the experiences of our teams on early-access systems for Frontier. (3) The E4S is described further. E4S is now updated via quarterly releases. E4S is the primary integration and delivery vehicle for ECP ST capabilities (Section 2.1.1). (4) The ECP ST software development kit (SDK) effort further refined its groupings (Section 2.1.2). The ECP ST focus area represents the key bridge between exascale systems and the scientists developing applications that will run on those platforms. ECP ST efforts contribute to approximately 70 software products (Section 2.1.3) in six technical areas (Table 1). Since publishing the previous revision of the CAR, the team has continued to evolve the product dictionary of official product names, which enables more rigorous mapping of ECP ST deliverables to stakeholders (Section 2.1.4).

97 MATHEMATICS AND COMPUTING↗

Integrated emergency control board including design extended conditions for Krsko NPP - 297

In the aim of implementing post-Fukushima safety measures, Krsko Nuclear Power Plant is developing a Safety Upgrade Program. Krsko NPP is upgrading the remote shutdown capabilities and implementing ways to prevent and mitigate the consequences of potential Severe Accidents. This modification enhances remote shutdown capabilities of the plant to prevent potential severe accidents and improve the ways to mitigate their consequences. Within the set of plant design modifications, addressed the design, construction, and commissioning, of a new Emergency Control Room (EMCB. Tecnatom is the responsible of the design modification of the plant together with Idom, that participates with Tecnatom in the project as a joint venture, who provides a new set of field instrumentation, including its design and the corresponding wiring. EMCB integrates Human- System Interface throughout centralizing capabilities to safety shutdown and cooldown the plant as well as to control the new Design Extension Systems. The process relies on a Human Factors Engineering (HFE) analysis applying a specific methodology based on NUREG-0711 . Tecnatom has developed a specific HFE Program Management Plan to proceed with the analysis in a documented, traceable and reliable way. HFE activities ends with an Integrated System Validation in the actual full scope simulator involving MCR crews. This paper describes different phases of the project, the integrated schedule between HFE and I and C activities, benefits of upgrading main and emergency control rooms beyond design bases and addresses Tecnatom lessons learned obtained during the project execution. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Solar thermal power systems point-focusing thermal and electric applications projects. Volume 1: Executive summary

The activities of the Point-Focusing Thermal and Electric Applications (PETEA) project for the fiscal year 1979 are summarized. The main thrust of the PFTEA Project, the small community solar thermal power experiment, was completed. Concept definition studies included a small central receiver approach, a point-focusing distributed receiver system with central power generation, and a point-focusing distributed receiver concept with distributed power generation. The first experiment in the Isolated Application Series was initiated. Planning for the third engineering experiment series, which addresses the industrial market sector, was also initiated. In addition to the experiment-related activities, several contracts to industry were let and studies were conducted to explore the market potential for point-focusing distributed receiver (PFDR) systems. System analysis studies were completed that looked at PFDR technology relative to other small power system technology candidates for the utility market sector.

Marriott, A.↗

Preventing Premature Death in the M&S Lifecycle: Lessons Learned from Resurrection and Modernization of a Space System Contamination Model

Models and simulations (M&S) are often developed to meet specific needs and unique requirements for a particular situation. Once the M&S is implemented for a specific case and questions are answered, the M&S may go dormant until a similar need arises again at a later time, perhaps months to years later. Possible modification of the M&S may be required, and issues may arise if the M&S is not well documented, captured, or available. This can severely limit the useful life of the M&S and hinder future development or enhancements. This situation occurred with an M&S tool that had been developed to determine the impact to space system performance due to the presence of molecular contaminant films accumulating on key spacecraft surfaces. The challenges and issues encountered when resurrecting, executing, and modernizing the tool will be presented as a case study. To stay ahead of tomorrow’s challenges, resources to create M&S tools must be utilized efficiently. Lessons learned from this case study will aid M&S developers and users in planning for proper maintenance, transfer, and capture of key M&S tools and knowledge to avoid increased cost, increased development time, and wasted resources for projects relying on M&S.

Seasly, Elaine↗

openECA Platform and Analytics Alpha Test Results

The objective of the Open and Extensible Control and Analytics (openECA) Platform for Phasor Data project is to develop an open source software platform that significantly accelerates the production, use, and ongoing development of real-time decision support tools, automated control systems, and off-line planning systems that (1) incorporate high-fidelity synchrophasor data and (2) enhance system reliability while enabling the North American Electric Reliability Corporation (NERC) operating functions of reliability coordinator, transmission operator, and/or balancing authority to be executed more effectively.

24 POWER TRANSMISSION AND DISTRIBUTION↗

openECA Platform and Analytics Beta Demonstration Results

The objective of the Open and Extensible Control and Analytics (openECA) Platform for Phasor Data project is to develop an open source software platform that significantly accelerates the production, use, and ongoing development of real-time decision support tools, automated control systems, and off-line planning systems that (1) incorporate high-fidelity synchrophasor data and (2) enhance system reliability while enabling the North American Electric Reliability Corporation (NERC) operating functions of reliability coordinator, transmission operator, and/or balancing authority to be executed more effectively.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SCALE Enhancements for Detailed Cask Dose Rate Analysis - Paper 37

The Nuclear Fuels Storage and Transportation Planning Project and the Used Fuel Disposition Campaign, both under the US Department of Energy (DOE) Office of Nuclear Energy, require the ability to predict k{sub eff}, heat generation and temperature distributions, and external dose rates from any combination of commercial spent nuclear fuel assemblies loaded into any type of licensed cask. Work in the Reactor and Nuclear Systems Division at Oak Ridge National Laboratory has begun to develop the UNF-ST[and]DARDS system (Used Nuclear Fuel Storage, Transportation and Disposal Analysis Resource and Data System) that uses many of the nuclear analysis codes from the SCALE package, a comprehensive database of used nuclear fuel inventories from utilities, and a library of model template files to produce complete input files for the various types of UNF computational analyses. UNF-ST[and]DARDS uses the template files and input parameters that are applicable to a safety analysis to assemble and execute a complete input file, collect the output files and relevant information for subsequent calculations, and illustrate calculation results as a function of decay time and other relevant analysis parameters. This paper will focus on the shielding aspects and the ability to predict external dose rates from as-loaded casks. Realistic dose rate values based on actual canister fuel contents may be used in developing appropriate plans, procedures, and methods to keep personnel radiation exposures as low as reasonably achievable during cask repackaging and transportation operations, as well as in performing total system analyses and transportation risk evaluations. The MAVRIC shielding sequence of the SCALE package was created for the US Nuclear Regulatory Commission for analyzing dose rates outside of storage, transfer, or transportation casks loaded with spent nuclear fuel. MAVRIC contains automated variance reduction capabilities based on the CADIS and FW-CADIS methods that are effective for optimizing deep penetration Monte Carlo shielding problems for achieving low relative uncertainties in short computing times. MAVRIC uses the Denovo discrete ordinates code to compute importance maps and biased source terms for the Monaco fixed-source Monte Carlo code, which can use multi-group or continuous-energy cross section data. ORIGEN (Oak Ridge Isotope Generation and Depletion) is the SCALE computer code for calculating time-dependent isotopic concentrations during irradiation and decay for more than 2,200 nuclides that can be produced by nuclear fuel irradiation and activation. A series of SCALE enhancements was implemented to enable automatic decay heat and radiation source term generation and shielding safety analysis of as-loaded casks. The enhancements to SCALE made under this project will be a part of the SCALE 6.2 release expected in fall 2014. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Availability of state-level climate change projection resources for use in site-level risk assessment

In recent years, incorporating climate change considerations has become an important focus of organizations’ resilience planning and risk assessment efforts, including United States federal agencies. This has led to an increasing demand for higher-resolution and higher-quality climate projection information that is easy to understand for non-expert users. In particular, there is a demand for information about how climate change may affect high-impact, low-frequency (HILF) hazards that are central to risk assessments focused on infrastructure. While national-level resources like the National Climate Assessment provide information on climate impacts for different sectors and regions in the United States, downscaled information with location-specific context is often required for site-level resilience planning. As higher-resolution and higher-quality climate resources continue to be developed at the state level, it is imperative to understand ongoing and planned efforts, as well as key drivers for developing these state-level resources. Based primarily on stakeholder input from climate experts from 31 states, we identify key state-level climate resources, as well as drivers accelerating the development of these resources. We assess the availability of climate change resources, specifically those with information about HILF events that have been developed at the state level and can support users in conducting site-level resilience planning. We identify three key drivers or predictors for the development of climate change resources at the state level: (1) existence of state laws, mandates, Executive Orders, and other state policies, (2) existence of university partnerships; and (3) the makeup of the stakeholder groups (in terms of dominant discipline/expertise) participating in the effort. The diverse state strategies and resources surveyed in this study could support the incorporation of higher-resolution climate information into site-level planning.

54 ENVIRONMENTAL SCIENCES↗

Review of the National Ignition Campaign 2009-2012

The National Ignition Campaign (NIC) was a multi-institution effort established under the National Nuclear Security Administration of DOE in 2005, prior to the completion of the National Ignition Facility (NIF) in 2009. The scope of the NIC was the planning and preparation for and the execution of the first 3 yr of ignition experiments (through the end of September 2012) as well as the development, fielding, qualification, and integration of the wide range of capabilities required for ignition. Besides the operation and optimization of the use of NIF, these capabilities included over 50 optical, x-ray, and nuclear diagnostic systems, target fabrication facilities, experimental platforms, and a wide range of NIF facility infrastructure. The goal of ignition experiments on the NIF is to achieve, for the first time, ignition and thermonuclear burn in the laboratory via inertial confinement fusion and to develop a platform for ignition and high energy density applications on the NIF. The goal of the NIC was to develop and integrate all of the capabilities required for a precision ignition campaign and, if possible, to demonstrate ignition and gain by the end of FY12. The goal of achieving ignition can be divided into three main challenges. The first challenge is defining specifications for the target, laser, and diagnostics with the understanding that not all ignition physics is fully understood and not all material properties are known. The second challenge is designing experiments to systematically remove these uncertainties. The third challenge is translating these experimental results into metrics designed to determine how well the experimental implosions have performed relative to expectations and requirements and to advance those metrics toward the conditions required for ignition. This paper summarizes the approach taken to address these challenges, along with the progress achieved to date and the challenges that remain. At project completion in 2009, NIF lacked almost all the diagnostics and infrastructure required for ignition experiments. About half of the 3 yr period covered in this review was taken up by the effort required to install and performance qualify the equipment and experimental platforms needed for ignition experiments. Ignition on the NIF is a grand challenge undertaking and the results presented here represent a snapshot in time on the path toward that goal. The path forward presented at the end of this review summarizes plans for the Ignition Campaign on the NIF, which were adopted at the end of 2012, as well as some of the key results obtained since the end of the NIC.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

2015 Peer Review Report

In the spring and summer of 2015, the Bioenergy Technologies Office (BETO or the Office) of the U.S. Department of Energy (DOE) implemented an external peer review of the projects in its research, development and demonstration (RD&D) portfolio. The Office manages a diverse portfolio of technologies across the spectrum of applied RD&D within the dynamic context of changing budgets and Administration priorities. The Office portfolio is organized according to the biomass-to-bioenergy supply chain—from the feedstock source to the end user (see Figure 1)—with major focus on feedstock supply and biomass conversion. The 2015 Project Peer Review took place March 23-27, 2015, outside of Washington, D.C., in Alexandria, Virginia, and evaluated most of the publicly funded projects in BETO’s portfolio. The subsequent Program Management Review took place on June 25, 2015, in Washington, D.C., and provided an Office- level assessment of strategic planning and programmatic initiatives. The peer review process enables external stakeholders to provide feedback on the responsible use of taxpayer funding and develop recommendations for the most efficient and effective ways to accelerate the development of an advanced bioenergy industry. The planning and execution of these reviews was completed over the course of 10 months, and this report includes the results of both events.

09 BIOMASS FUELS↗

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM↗

Advanced Ultrasupercritical (AUSC) Tube Membrane Panel Development

Alstom Power Inc., a wholly owned subsidiary of the General Electric Company (GE), has completed the project “Advanced Ultrasupercritical (AUSC) Tube Membrane Panel Development” under U.S. Department of Energy (DOE) Award Number DE-FE0024076. This project was part of DOE’s Novel Crosscutting Research and Development to Support Advanced Energy Systems program. AUSC Tube Membrane Panel Development was a two and one half year project to develop and verify the manufacturability and serviceability of welded tube membrane panels made from high performance materials suitable for the AUSC steam cycles, defined as high pressure steam turbine inlet conditions of 700-760°C (1292-1400°F) and 24.5-35MPa (3500-5000psi). The difficulty of this challenge lies in the fact that the membrane-welded construction imposes demands on the materials that are unlike any that exist in other parts of the boiler. Tube membrane panels have been designed, fabricated, and installed in boilers for over 50 years with relatively favorable experience when fabricated from carbon and Cr-Mo low alloy steels. The AUSC steam cycle requires membrane tube panels fabricated from materials that have not been used in a weldment with metal temperatures in the range of 582-610°C (1080-1130°F). Fabrication materials chosen for the tubing were Grade 92 and HR6W. Grade 92 is a creep strength enhanced ferritic Cr-Mo alloy and HR6W is a high nickel alloy. Once the materials were chosen, GE performed the engineering design of the panels, prepared shop manufacturing drawings, and developed manufacturing and inspection plans. After the materials were purchased, GE manufactured and inspected the tube membrane panels, determined if post fabrication heat treatment of the tube membrane panels was needed, performed pre- and post-weld heat treatment on the Grade 92 panels, conducted final nondestructive inspection of any heat treated tube membrane panels, conducted destructive inspection of the completed tube membrane panels,and performed simulated shop repairs on the panel fabricated using Grade 92. GE executed the program as the prime contractor under the direction of Principal Investigator Mr. James Pschirer. Other participants in this project included GE Boiler Engineering, GE Chattanooga Manufacturing, GE Materials Technology Center, GE Rocky Mountain Service Center, and a Technical Consultant from Electric Power Research Institute (EPRI).

01 COAL, LIGNITE, AND PEAT↗

Light Water Reactor Sustainability Program: Digital Architecture Requirements

The Digital Architecture effort is a part of the Department of Energy (DOE) sponsored Light-Water Reactor Sustainability (LWRS) Program conducted at Idaho National Laboratory (INL). The LWRS program is performed in close collaboration with industry research and development (R&D) programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants (NPPs). One of the primary missions of the LWRS program is to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. Therefore, a major objective of the LWRS program is the development of a seamless digital environment for plant operations and support by integrating information from plant systems with plant processes for nuclear workers through an array of interconnected technologies. In order to get the most benefits of the advanced technology suggested by the different research activities in the LWRS program, the nuclear utilities need a digital architecture in place to support the technology. A digital architecture can be defined as a collection of information technology (IT) capabilities needed to support and integrate a wide-spectrum of real-time digital capabilities for nuclear power plant performance improvements. It is not hard to imagine that many processes within the plant can be largely improved from both a system and human performance perspective by utilizing a plant wide (or near plant wide) wireless network. For example, a plant wide wireless network allows for real time plant status information to easily be accessed in the control room, field workers’ computer-based procedures can be updated based on the real time plant status, and status on ongoing procedures can be incorporated into smart schedules in the outage command center to allow for more accurate planning of critical tasks. The goal of the digital architecture project is to provide a long-term strategy to integrate plant systems, plant processes, and plant workers. This include technologies to improve nuclear worker efficiency and human performance; to offset a range of plant surveillance and testing activities with new on-line monitoring technologies; improve command, control, and collaboration in settings such as outage control centers and work execution centers; and finally to improve operator performance with new operator aid technologies for the control room. The requirements identified through the activities in the Digital Architecture project will be used to estimate the amount of traffic on the network and hence estimating the minimal bandwidth needed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cassini Solstice Mission Maneuver Experience: Year Three

The Cassini spacecraft is now in its second Saturn tour extension, the Solstice Mission. By emphasizing propellant preservation over minimizing maneuver cycles, the Cassini Project is meeting the challenge of mission completion in 2017. Since June 2012, 18 of 21 maneuvers were performed to closely maintain the prescribed trajectory, saving downstream propellant. These and other maneuvers during the third year of the Solstice Mission (June 2012 to August 2013) are highlighted in this paper: 31 planned maneuvers targeted to 11 Titan flybys and the last planned Rhea encounter. An assessment of the updated maneuver execution-error models will also be presented.

Cassini↗

Risk Communications and Risk Mitigation

This topical report summarizes risk communications and risk treatment (a.k.a. mitigation) aspects of risk management workflow for the Southwest Regional Partnership on Carbon Sequestration (SWP) Phase III Demonstration Project, located near the community of Farnsworth in northernmost Texas. Detail on risk communications previously provided in an internal project report is summarized here, while detail on risk treatment is presented for the first time. A principal message is that the effective development and execution of risk treatments depends on effective communications among project staff. Farnsworth Project relied primarily on internal communications; in contrast, projects that also rely heavily on public approval will be relatively more dependent upon effective information sharing with external stakeholders. The report documents work undertaken for Tasks 7.4.2 and 7.4.3 of U.S. Department of Energy

29 ENERGY PLANNING, POLICY, AND ECONOMY↗