Search NASA⌕ Search

SEARCH · Search NASA

Results for “REACTOR PROTECTION SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

An integrated approach for the verification of fresh mixed oxide fuel (MOX) assemblies at light water reactor MOX recycle reactors

This paper presents an integrated approach for the verification of mixed oxide (MOX) fuel assemblies prior to their being loaded into the reactor. There is a coupling of the verification approach that starts at the fuel fabrication plant and stops with the transfer of the assemblies into the thermal reactor. The key measurement points are at the output of the fuel fabrication plant, the receipt at the reactor site, and the storage in the water pool as fresh fuel. The IAEA currently has the capability to measure the MOX fuel assemblies at the output of the fuel fabrication plants using a passive neutron coincidence counting systems of the passive neutron collar (PNCL) type. Also. at the MOX reactor pool, the underwater coincidence counter (UWCC) has been developed to measure the MOX assemblies in the water. The UWCC measurement requires that the fuel assembly be lifted about two meters up in the storage rack to avoid interference from the fuel that is stored in the rack. This paper presents a new method to verify the MOX fuel assemblies that are in the storage rack without the necessity of moving the fuel. The detector system is called the Underwater MOX Verification System (UMVS). The integration and relationship of the three measurements systems is described.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrating Human Performance and Technology

Human error is a significant factor in the cause and/or complication of events that occur in the commercial nuclear industry. In recent years, great gains have been made using Human Performance (HU) tools focused on targeting individual behaviors. However, the cost of improving HU is growing and resistance to add yet another HU tool certainly exists, particularly for those tools that increase the paperwork for operations. Improvements in HU that are the result of leveraging existing technology, such as hand-held mobile technologies, have the potential to reduce human error in controlling system configurations, safety tag-outs, and other verifications. Operator rounds, valve line-up verifications, containment closure verifications, safety & equipment protection, and system tagging can be supported by field-deployable wireless technologies. These devices can also support the availability of critical component data in the main control room and other locations. This research pilot project reviewing wireless hand-held technology is part of the Light Water Reactor Sustainability Program (LWRSP), a research and development (R&D) program sponsored by the U. S. Department of Energy (DOE). The project is being performed in close collaboration with industry R&D programs to provide the technical foundations for licensing, and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRSP vision is to develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current nuclear reactor fleet.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dismantling Structures and Equipment of the MR Reactor and its Loop Facilities at the National Research Center 'Kurchatov Institute' - 12051

In 2008 a design of decommissioning of research reactors MR and RFT has been developed in the National research Center 'Kurchatov institute'. The design has been approved by Russian State Authority in July 2009 year and has received the positive conclusion of ecological expertise. In 2009-2010 a preparation for decommissioning of reactors MR and RFT was spent. Within the frames of a preparation a characterization, sorting and removal of radioactive objects, including the irradiated fuel, from reactor storage facilities and pool have been executed. During carrying out of a preparation on removal of radioactive objects from reactor sluice pool water treating has been spent. For these purposes modular installation for clearing and processing of a liquid radioactive waste 'Aqua - Express' was used. As a result of works it was possible to lower volume activity of water on three orders in magnitude that has allowed improving essentially of radiating conditions in a reactor hall. Auxiliary systems of ventilation, energy and heat supplies, monitoring systems of radiating conditions of premises of the reactor and its loop-back installations are reconstructed. In 2011 the license for a decommissioning of the specified reactors has been received and there are begun dismantling works. Within the frames of works under the design the armature and pipelines are dismantled in a under floor space of a reactor hall where a moving and taking away pipelines of loop facilities and the first contour of the MR reactor were replaced. A dismantle of the main equipment of loop facility with the gas coolant has been spent. Technologies which were used on dismantle of the radioactive contaminated equipment are presented, the basic works on reconstruction of systems of maintenance of on the decommissioning works are described, the sequence of works on the decommissioning of reactors MR and RFT is shown. Dismantling works were carried out with application of means of a dust suppression that, in aggregate with standard means at such works of individual protection of the personnel and devices of radiating control, has allowed to lower risk of action of radiation on the personnel, the population and environment at the expense of reduction of volume activity of radioactive aerosols in air. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Test and Evaluation of Radiofrequency Tamper Indicating Devices for Remote Monitoring of Advanced/Small Modular Reactors

Advanced and small modular reactors (A/SMRs), due to their versatile nature, are likely to be used in remote locations to provide electrical power or other services in regions that are difficult to access or have limited transportation infrastructure. This will result in limited on-site staff, therefore driving A/SMR vendors to consider remote monitoring as a solution to support nuclear security. Maintaining Continuity of Knowledge (CoK) of nuclear material quantities and locations is vital to nuclear security, and remote monitoring of active tamper indicating devices (TIDs) has been well established as a component of International Atomic Energy Agency (IAEA) Safeguards since the early 2000s. Active TIDs, such as radiofrequency TIDs (RFTIDs), immediately alarm upon unauthorized access attempts, promoting timely detection. In contrast, passive TIDs require a surveillance regime and offer delayed detection. Active TIDs deter insiders and enable prompt detection of malicious acts. They can be used on nuclear material containers and controlled entry points like vaults and toolboxes. Therefore, the implementation of RFTIDs into security programs bolsters overall nuclear material control, and provides a visible deterrent, with primary efficacy in mitigating the insider threat and potentially allowing for Security by Design considerations. They are a strong candidate technology for maintaining nuclear security of A/SMRs but need to be evaluated for feasibility and implementation into the wider physical protection system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Response Time Analysis and Test of Protection System Instrument Channels for APR1400 and OPR1000

Safety limits are required to maintain the integrity of physical barriers designed to prevent the uncontrolled release of radioactive materials in nuclear power plants. The safety analysis establishes two critical constraints that include an analytical limit in terms of a measured or calculated variable, and a specific time after the analytical limit is reached to begin protective action. Keeping with the nuclear regulations and industry standards, satisfying these two requirements will ensure that the safety limit will not be exceeded during the design basis event, either an anticipated operational occurrence or a postulated accident. Various studies on the setpoint determination methodology for the safety-related instrumentation have been actively performed to ensure that the requirement of the analytical limit is satisfied. In particular, the protection setpoint methodology for the advanced power reactor 1400 (APP1400) and the optimized power reactor 1000 (OPR1000) has been recently developed to cover both the design basis event and the beyond design basis event. The developed setpoint methodology has also been quantitatively validated using specific computer programs and setpoint calculations. However, the safety of nuclear power plants cannot be fully guaranteed by satisfying the requirement of the analytical limit. In spite of the response time verification requirements of nuclear regulations and industry standards, it is hard to find the studies on the systematically integrated methodology regarding the response time evaluation. In cases of APR1400 and OPR1000, the response time analysis for the plant protection system is partially included in the setpoint calculation and the response time test is separately performed via the specific plant procedure. The test technique has a drawback which is the difficulty to demonstrate completeness of timing test. The analysis technique has also a demerit of resulting in extreme times that not actually possible. Thus, the establishment of the systematic response time evaluation methodology is needed to justify the conformance to the response time requirement used in the safety analysis. This paper proposes the response time evaluation methodology for APR1400 and OPR1000 using the combined analysis and test technique to confirm that the plant protection system can meet the analytical response time assumed in the safety analysis. In addition, the results of the quantitative evaluation performed for APR1400 and OPR1000 are presented in this paper. The proposed response time analysis technique consists of defining the response time requirement, determining the critical signal path for the trip parameter, allocating individual response time to each component on the signal path, and analyzing the total response time for the trip parameter, and demonstrates that the total analyzed response time does not exceed the response time requirement. The proposed response time test technique is composed of defining the response time requirement, determining the critical signal path for the trip parameter, determining the test method for each component on the signal path, performing the response time test, and demonstrates that the total test result does not exceed the response time requirement. The total response time should be tested in a single test that covers from the sensor to the final actuation device on the instrument channel. When the total channel is not tested in a single test, separate tests on groups of components or single components including the total instrument channel shall be combined to verify the total channel response. For APR1400 and OPR1000, the ramp test technique is used for the pressure and differential pressure transmitters and the step function testing technique is applied to the signal processing equipment and final actuation device. As a result, it can be demonstrated that the response time requirement is satisfied by the combined analysis and test technique. Therefore, the proposed methodology in this paper plays a crucial role in guaranteeing the safety of the nuclear power plants systematically satisfying one of two critical requirements from the safety analysis. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Systems and Tools to Facilitate Aging Management Inspections of Used Nuclear Fuel Dry Storage Systems - 18382

The Used Nuclear Fuel (UNF) dry storage systems (DSSs) are currently used at almost all the nuclear plants in the USA for the storage of their UNF as the spent fuel pools are running out of capacity to store any additional discharged fuel. Even though these DSSs are supposed to be at the reactor site for a short amount of time, they are expected to be at the reactor sites for an extended duration due to the unavailability of Interim Storage Facilities (ISF) or a permanent disposal sites like Yucca Mountain. Maintaining the integrity of the DSS canisters and storage overpacks so they can safely protect the fuel and maintain the integrity of UNF is of utmost importance during storage at reactor site ISFSI or at the ISF. Comprehensive and robust Aging Management Program (AMP) is an important aspect for DSSs to satisfy these requirements. In order to address this industry need, TN Americas have developed an enhanced NUHOMS{sup R} DSS licensed by NRC under 10 CFR Part 72 regulations and a comprehensive AMP development which includes prevention, inspection, monitoring and mitigation of any corrosion or degradation of DSS components. For DSC and HSM inspection, two remotely operating delivery systems have been developed using non-destructive examination (NDE) methods including robotic crawler and inspection ring system. This paper describes details of these developments and status of their deployment for implementation at various utility ISFSI sites. TN Americas completed the detailed design of the DSC inspection system and conducted functional tests of the inspection system on a DSC mockup and the system is ready for deployment at any NUHOMS{sup R} ISFSI site. TN Americas is committed to offer the most robust and comprehensive AMP systems, tools and services to the industry to assure the safety of the deployed DSS at the utility sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fluoride-Cooled High-Temperature Pebble-Bed Reactor Reference Plant Model Updates

This work presents the latest improvements to, and investigations performed with, the Fluoride-Cooled High-Temperature Pebble-Bed Reactor reference plant models for the United States Nuclear Regulatory Commission. These models, developed with the Comprehensive Reactor Analysis Bundle, or BlueCRAB, serve as the foundation for the future development of detailed design evaluation models based on license applications. BlueCRAB is the code suite proposed for non-light-water reactor systems safety analyses, and it incorporates various simulation tools developed by the Nuclear Energy Advance Modeling and Simulation program, including the Griffin code for reactor physics, the Pronghorn and SAM codes for core thermal fluids, the BISON code for solid conduction and fuel performance, and the SAM code for system analysis. The primary objective of this work is to assess the level of readiness of BlueCRAB for modeling fluoride-cooled high-temperature pebble-bed reactors. We first developed numerical models in BlueCRAB that include the key physics for this technology, ensuring an adequate level of fidelity for modeling the core performance during accident scenarios. This was followed by simulation of transient scenarios, two loss-of-forced-cooling events (one protected and one unprotected), and two control rod withdrawal events (one delayed and one prompt supercritical reactivity insertion). The analysis includes comparisons between the 2-D thermal fluid porous media models in Pronghorn and SAM, comparisons between coupled Pronghorn-Griffin and coupled SAM-Griffin models for two loss-of-forced cooling events and one control rod withdrawal event, and comparisons between SAM single-solve and domain-overlapping approaches for multi-scale thermal fluid coupling. In addition, we performed comparisons between 3-D, 2-D, and 0-D neutronic models for the two control rod withdrawal scenarios with Pronghorn-Griffin. The results show that the BlueCRAB models led to physically intuitive solutions for the scenarios examined. The changes in the various scalar and vector fields such as the neutron flux, power, temperatures, densities, pressures, and velocities are all within the expected ranges, and their distributions can be explained from the system response of the transients and the geometric and material variations. Several comparisons suggest that the porous media models in Pronghorn and SAM can lead to similar solutions, even though they are based on different methodologies. The simulations demonstrate that there are differences between the various levels of fidelity, and it is advisable to have flexible tools that can cover the breadth and depth of needs that may arise in future technical evaluations. We believe that BlueCRAB’s capabilities represent a significant asset for confirmatory analyses aimed at resolving important safety questions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Multi-Phased, Post-Accident Support of the Fukushima Dai-Ichi Nuclear Power Plant - 12246

In the wake of the March 11 earthquake and tsunami and the subsequent flooding of several of the Fukushima Dai-Ichi reactors, Japan and the Japanese utility TEPCO faced a crisis situation with incredible challenges: substantial amounts of radioactive mixed seawater and freshwater accumulated in the basements of four reactor and other buildings on the site. This water held varying levels of contamination due to the fact that it had been in contact with damaged fuel elements in the cores and with other contaminated components. The overall water inventory was estimated at around 110,000 tons of water with contamination levels up to the order of 1 Ci/l. Time was of the essence to avoid overflow of this accumulated water into the ocean. AREVA proposed, designed and implemented a water treatment solution using a proven chemical coprecipitation process with ppFeNi reagent, which is currently in use for effluent treatment on several nuclear sites including AREVA sites. In addition to the extremely short schedule the other challenge was to adapt the chemical treatment process to the expected composition of the Fukushima water and, in particular, to evaluate the impact of salinity on process performance. It was also necessary to define operating conditions for the VEOLIA equipment that had been selected for implementation of the process in the future facility. The operation phase began on June 17, and by the end of July more than 30,000 tons of highly radioactive saltwater had been decontaminated - the Decontamination Factor (DF) for Cesium was ∼10{sup 4}. It allowed recycling the contaminated water to cool the reactors while protecting workers and the environment. This paper focuses on the Actiflo{sup TM}-Rad water treatment unit project that was part of the TEPCO general water treatment scheme. It presents a detailed look at the principles of the Actiflo{sup TM}-Rad, related on-the-fly R and D, an explanation of system implementation challenges, and a brief summary of operation results to date. AREVA's response to the Fukushima Dai-Ichi crisis was multi-phased: emergency aid and relief supply was sent within days after the accident; AREVA-Veolia engineering teams designed and implemented a water treatment solution in record time, only 3 months; and AREVA continues to support TEPCO and propose solutions for waste management, soil remediation and decontamination of the Fukushima Dai-Ichi site. Despite the huge challenges, the Actiflo{sup TM}-Rad project has been a success: the water treatment unit started on time and performed as expected. The performance is the result of many key elements: AREVA expertise in radioactive effluents decontamination, Veolia know-how in water treatment equipments in crisis environment, and of course AREVA and Veolia teams' creativity. The project success is also due to AREVA and Veolia teams' reactivity and high level of commitment with engineering teams working 24/7 in Japan, France and Germany. AREVA and Veolia deep knowledge of the Japanese industry ensured that the multi-cultural exchanges were not an issue. Finally the excellent overall project management and execution by TEPCO and other Japanese stakeholders was very efficient. The emergency water treatment was a key step of the roadmap towards restoration from the accident at Fukushima Dai-Ichi that TEPCO designed and keeps executing with success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Expert Elicitation Based Study of the Proliferation Resistance of a Suite of Nuclear Power Plants

In 2008, a multi-laboratory research team completed a study evaluating the proliferation resistance (PR) characteristics of a diverse suite of four advanced nuclear reactor designs. The systems evaluated included: • a light water reactor (a pressurized-water reactor), • a heavy water reactor, • a high temperature gas reactor (with a prismatic-block reactor core), • a sodium-cooled fast reactor. The team used an expert elicitation assessment approach based on the Generation IV International Forum (GIF) Proliferation Resistance and Physical Protection (PR&PP) methodology. The team evaluated three general types of proliferation threats: 1) concealed diversion of material, 2) concealed misuse of the reactor to produce material, and 3) breakout. The evaluations took into account the intrinsic PR characteristics of each reactor and the extrinsic PR characteristics provided by generic safeguards the team considered appropriate for each reactor, based on the team’s experience and available conceptual design information.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Nuclear Accident at Three Mile Island a Practical Lesson in the Fundamental Importance of Effective Communications

The Three Mile Island Unit 2 (TMI-2) accident in March 1979 had a profound effect on the course of commercial nuclear generation in the United States and around the world. And while the central elements of the accident were matters of nuclear engineering, design and operations, its consequences were compounded, and in some respects superseded, by extraordinarily ineffective communications by all parties at all levels. Communications failures during the accident and its aftermath caused misunderstanding, distrust, and incorrect emergency response - and seeded or reinforced public opposition to nuclear power that persists to this day. There are communications lessons from TMI that have not yet been fully learned, and some that once were learned but are now gradually being forgotten. The more glaring TMI communications problems were in the arena of external interactions and communications among the plant owner, the Nuclear Regulatory Commission (NRC), the media, and the public. Confusing, fragmented, and contradictory public statements early in the accident, regardless of cause, undermined all possibility for reasonable discourse thereafter. And because the TMI accident was playing out on a world stage, the breakdown in public trust had long term and widespread implications. At the plant site, both TMI-2 cleanup and restart of the undamaged TMI-1 unit met with years of public and political criticism, and attendant regulatory pressure. Across the nation, public trust in nuclear power and those who operate it plummeted, unquestionably contributing to the 25+ year hiatus in new plant orders. There were other, less visible but equally important, consequences of ineffective communications at TMI. The unplanned 'precautionary' evacuation urged by the governor two days after the accident - a life changing, traumatic event for thousands of residents - was prompted primarily by misunderstandings and miscommunications regarding the condition of the plant. And today, nearly 30 years after the event, many in our nuclear industry have insufficient knowledge or regard for the underlying nuclear safety vulnerabilities revealed by the accident, in part because these have not been well explained. From this single, compelling experience, many lessons can be drawn. Some of these were recognized early and taken to heart by those who own and operate nuclear plants - but over time, respect for their importance has given way somewhat to the seemingly more urgent practicalities of plant cost, schedule and production goals. In other cases, the lessons have remained largely obscure. This paper will describe in greater detail the communications aspects of the TMI accident, lessons that can be drawn from them, and their implications on current and future nuclear facility operation. The paper reflects the author's personal, direct experience as part of the accident response team and subsequent cleanup operations at TMI. In summary: The Three Mile Accident was the most severe nuclear accident in U.S. history. It also is perhaps the most studied industrial accident of any kind in U.S. history. Exhaustive examinations of the public health consequences of the accident show convincingly that the effects of radioactivity releases, if any, were imperceptibly low. It is generally agreed, however, that there have been perceptible health consequences from the TMI-2 accident - those linked to stress. Stress to members of the public, particularly those living near the plant, was unquestionably high. And for some the combination of rumor, confusion, contradictory reports and uncertainty, all leading to an evacuation recommendation from the governor, took a toll. It could be argued that the ineffective internal and external communications during the course of the event were as influential to the outcome as the equipment and operational breakdowns that are now so well understood. And for that reason alone, this accident points out that communications capabilities - staffing, systems, facilities, training - can be as important to protection of the public, the plant and the environment as are the plant material and technical issues that receive constant attention. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Framework for Proliferation Resistance and Physical Protection for Nonproliferation Impact Assessments.

This report describes a framework for proliferation resistance and physical protection evaluation for the fuel cycle systems envisioned in the expansion of nuclear power for electricity generation. The methodology is based on an approach developed as part of the Generation IV technical evaluation framework and on a qualitative evaluation approach to policy factors similar to those that were introduced in previous Nonproliferation Impact Assessments performed by DOE.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced Fusion Reactors for Space Propulsion and Power Systems

In recent years the methodology proposed for conversion of light elements into energy via fusion has made steady progress. Scientific studies and engineering efforts in advanced fusion systems designs have introduced some new concepts with unique aspects including consideration of Aneutronic fuels. The plant parameters for harnessing aneutronic fusion appear more exigent than those required for the conventional fusion fuel cycle. However aneutronic fusion propulsion plants for Space deployment will ultimately offer the possibility of enhanced performance from nuclear gain as compared to existing ionic engines as well as providing a clean solution to Planetary Protection considerations and requirements. Proton triggered 11Boron fuel (p- 11B) will produce abundant ion kinetic energy for In-Space vectored thrust. Thus energetic alpha particles' exhaust momentum can be used directly to produce high Isp thrust and also offer possibility of power conversion into electricity. p-11B is an advanced fusion plant fuel with well understood reaction kinematics but will require some new conceptual thinking as to the most effective implementation.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Enhancement of the inherent self-protection of the fast sodium reactor cores with oxide fuel

With the development and research into the generation IV fast sodium reactors, great attention is paid to the enhancement of the core inherent self-protection characteristics. One of the problems dealt here is connected with the reduction of the reactivity margin so that the control rods running should not result in the core overheating and melting. In this paper we consider the possibilities of improving the core of BN-1200 with oxide fuel by a known method of introducing an axial fertile layer into the core. But unlike earlier studies this paper looks at the possibility of using such a layer not only for improving breeding, but also for reducing sodium void reactivity effect (SVRE). This proposed improvement of the BN-1200 core does not solve the problem of strong interference in control and protection system (CPS) rods of BN-1200, but they reduce significantly the reactivity margin for burn-up compensation. This helps compensate all the reactivity balances in the improved core configurations without violating constraints on SVRE value.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Intensified reactive extraction for the acid-catalyzed conversion of fructose to 5-hydroxymethyl furfural

Here we conduct an experimental study of fructose dehydration to 5-hydroxymethyl furfural (HMF) in a biphasic microreactor as a function of residence time, temperature, and sugar loading using methyl butyl iso-ketone (MIBK) and 2-pentanol as extracting solvents. We demonstrate stable operation with maximum HMF yields of 93% and 87% in the two solvents, respectively, at 200 °C and a residence time of 2 s for a 5 wt% fructose aqueous feed. We report the highest optimal HMF space–time yield of 60 kg/L-hr at 200 °C (10 – 2,500-fold higher than published reports). Unexpectedly, an optimum organic-to-water ratio exists that depends on the solvent. Notably, we observe experimentally an increased fructose rate and HMF yield well above the extraction thermodynamic limit and hypothesize that the solvent plays a dual role, that of an extractant to protect HMF from degradation and a modifier of the fundamental chemistry. We expose mass transfer limitations of microreactors at longer residence times and higher temperatures and provide reactivity maps for their design. We show that batch reactors are unfit for high throughput and distributed manufacturing where small, farm-based systems are necessary.

42 ENGINEERING↗

A radiological assessment of space nuclear power operations near Space Station Freedom

In order to accomplish NASA's more ambitious exploration goals, nuclear reactors may be used in the vicinity of Space Station Freedom (SSF) either as power sources for coorbiting platforms or as part of the propulsion system for departing and returning personnel or cargo vehicles. This study identifies ranges of operational parameters, such as parking distances and reactor cooldown times, which would reasonably guarantee that doses to the SSF crew from all radiation sources would be below guidelines recently recommended by the National Council of Radiation Protection and Measurements. The specific scenarios considered include: (1) the launch and return of a nuclear electric propulsion vehicle, (2) the launch and return of a nuclear thermal rocket vehicle, (3) the operation of an SP-100 class reactor on a coorbiting platform, (4) the activation of materials near operating reactors, (5) the storage and handling of radioisotope thermal generator units, and (6) the storage and handling of fresh and previously operated reactors. Portable reactor shield concepts were examined for relaxing the operational constraints imposed by unshielded (for human proximity operations) reactors and that might also be used to provide additional SSF crew protection from natural background radiation.

Stevenson, Steve↗

Seismic risk management solution for nuclear power plants

Nuclear power plants should safely operate during normal operations and maintain core-cooling capabilities during off-normal events, including external hazards (such as flooding and earthquakes). Management of external hazards to expectable levels of risk is critical to maintaining nuclear facility and nuclear power plant safety. Seismic risk is determined by convolving the seismic hazard with seismic fragilities (capacity of systems, structures, and components). Seismic isolation (SI) is one protective measure showing promise to minimize seismic risk. Current SI designs (used in commercial industry) reduce horizontal earthquake loads and protect critical infrastructure from the potentially destructive effects of large earthquakes. The benefit of SI application in the nuclear industry is being recognized and SI systems have been proposed in American Society of Civil Engineer Standard 4, ASCE-4, to be released in the winter of 2014, for light water reactors facilities using commercially available technology. The intent of ASCE-4 is to provide criteria for seismic analysis of safety related nuclear structures such that the responses to design basis seismic events, computed in accordance with this standard, will have a small likelihood of being exceeded. The U.S. nuclear industry has not implemented SI to date; a seismic isolation gap analysis meeting was convened on August 19, 2014, to determine progress on implementing SI in the U.S. nuclear industry. The meeting focused on the systems and components that could benefit from SI. As a result, this article highlights the gaps identified at this meeting.

99 GENERAL AND MISCELLANEOUS↗

Verification and Demonstration of One-Dimensional Freezing Model in SAM for Salt-Cooled Reactor Analysis Applications

This work presented the development and implementation of the one-dimensional freezing model in system analysis code, SAM, as well as code verification, and code demonstration during a postulated overcooling transient, for fluoride salt-cooled high-temperature reactor (FHR) system and safety analysis applications. The paper at first summarized the freezing model, finite element numerical method, and special numerical treatment for handling phase appearance/disappearance. Analytical solutions were derived for two cases (with and without solid walls) for code verifications purpose. As expected, numerical results predicted by the SAM code agreed very well with the analytical solution. A code demonstration was then performed on a postulated protected overcooling event transient of a generic reference PB-FHR design. The code was found to successfully predict salt freezing during such a postulated event. However, due to lack of salt freezing testing data, code validation has not been performed in this work, which will be pursued in later studies when such data becomes available.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗