Search NASA⌕ Search

SEARCH · Search NASA

Results for “REFUELING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

OTV orbital tanking systems

Orbital transfer of cryogenic propellants could benefit spacecraft and Orbital Transfer Vehicle (OTV) missions in the 1980s by supplying main propulsion, attitude control, or other fluid systems. The Space Shuttle can operate as a tanker when equipped with cryogenic propellant storage and orbital transfer systems. The key technologies are multilayer insulation, capillary propellant acquisition, zero-g gaging, orbital chilldown, and possibly large flight weight dewars. The technologies and operations could be realistically demonstrated using a Centaur that has been integrated with the Shuttle. Orbital refueling capability can enhance the usefulness of the whole Shuttle program

Heald, D. A.↗

Fog dispersion

A study of economically viable techniques for dispersing warm fog at commercial airports is presented. Five fog dispersion techniques are examined: evaporation suppression, downwash, mixing, seeding with hygroscopic material, thermal techniques, and charged particle techniques. Thermal techniques, although effective, were found to be too expensive for routine airport operations, and detrimental to the environment. Seeding or helicopter downwash are practical for small-scale or temporary fog clearing, but are probably not useful for airport operations on a routine basis. Considerable disagreement exists on the capability of charged particle techniques, which stems from the fact that different assumptions and parameter values are used in the analytical models. Recommendations resulting from the review of this technique are listed, and include: experimental measurements of the parameters in question; a study to ascertain possible safety hazards, such as increased electrical activity or fuel ignition during refueling operations which could render charged particle techniques impractical; and a study of a single charged particle generator.

Frost, W.↗

Orbiter based construction equipment

Many orbiter based activities need equipment to hold a payload steady while it is being worked on. This work may be construction, updating, repair, services, check out, or refueling operations in preparation for return to Earth. The Handling and Positioning Aid (HPA) is intended for use as general purpose equipment. The HPA provides a wide choice of work station positions, both immediately above the orbiter cargo bay and beyond. It can act in a primary docking role and, if required, can assist actively in the berthing process. From an analysis of ten reference missions, it was determined that two types of HPA mobility are needed; a tilt table, which simply swings out of the cargo bay, pivoting about an athwartships y axis, and an articulated arm. Illustration of the aid are provided.

Goodwin, C. J.↗

Capability of the manned maneuvering unit to support satellite servicing operations

Features, capabilities, and projected performances and missions of the Manned Maneuvering Unit (MMU) are described. A zero gravity, autonomous, six degree of freedom mobility system using gaseous nitrogen for propulsion, the MMU is equipped with jets for attitude and rotational control, 24 thrusters total, with each providing 7.5 N thrust. The unit is controled from hand controllers used by the pilot, in addition to an automatic attitude control using outputs from a gyroscope pack in the control electronics assembly. EVA periods of 6 hrs are possible with the 150 kg MMU and its fuel complement of 12 kg of gaseous N. Refueling is allowed through an Orbiter interface at the same location the MMU is stowed. The MMU has a delta-V capability of 20 m/sec, with a thrust duration of 7085 N-sec, implying the EVA suit limit will be reached before propellant can be exhausted. The results of various mission simulations for the MMU are reported.

Bergonz, F. H.↗

Searching for Clear-Air Turbulence

System for determining potential location and severity of clear-air turbulence based on passive microwave sensor. Horn antenna for prototype clearair-turbulence warning system rotatable through plus or minus 45 degrees. Permits safer more comfortable flights for commercial airplanes and enables safer inflight refueling for military airplanes.

Gary, B. L.↗

Fluids management technology

Various techniques and methods in fluid management are discussed. Propellant on-orbit transfer efficiency from the space shuttle orbiter to orbital transfer vehicle is discussed. Techniques such as refueling, residuals recovery and propellant storage are described.

Mcgee, J. M.↗

Flight test experience with pilot-induced-oscillation suppressor filters

Digital flight control systems are popular for their flexibility, reliability, and power; however, their use sometimes results in deficient handling qualities, including pilot-induced oscillation (PIO), which can require extensive redesign of the control system. When redesign is not immediately possible, temporary solutions, such as the PIO suppression (PIOS) filter developed for the Space Shuttle, have been proposed. To determine the effectiveness of such PIOS filters on more conventional, high-performance aircraft, three experiments were performed using the NASA F-8 digital fly-by-wire and USAF/Calspan NT-33 variable-stability aircraft. Two types of PIOS filters were evaluated, using high-gain, precision tasks (close formation, probe-and-drogue refueling, and precision touch-and-go landing) with a time delay or a first-order lag added to make the aircraft prone to PIO. Various configurations of the PIOS filter were evaluated in the flight programs, and most of the PIOS filter configurations reduced the occurrence of PIOs and improved the handling qualities of the PIO-prone aircraft. These experiments also confirmed the influence of high-gain tasks and excessive control system time delay in evoking pilot-induced oscillations.

Shafer, M. F.↗

An alternate concept for expanding man's presence in space

A logical next step after shuttle is a manned orbital service system (MOSS) consisting of a two-man crew module mated with a propulsion module. The resulting spacecraft would remain in low Earth orbit for months or years at a time conducting civil or military satellite servicing, experimental, or applications missions while being periodically supplied and refueled by Shuttle flights from the ground. The system would accumulate experience invaluable to the design of future large and more expensive spacecraft. Key features of the vehicle are versatility and mobility. With Centaur-type propulsion and a large payload, the MOSS could leave an initial orbit of 370 km (200 nmi) altitude and inclinations up to 56 deg, make a plane change of up to + or - 14 deg, reach altitudes to 5500 km (2970 nmi), and then return the payload to the original orbit altitude and inclination. Obviously, the size of the performance envelope varies with the payload and propulsion-unit selected. The MOSS can reach orbits and perform tasks not possible with Shuttle alone or with the much larger space stations currently being proposed.

Hook, W. R.↗

Flight test experience with pilot-induced-oscillation suppression filters

Digital flight control systems are popular for their flexibility, reliability, and power; however, their use sometimes results in deficient handling qualities, including pilot-induced oscillation (PIO), which can require extensive redesign of the control system. When redesign is not immediately possible, temporary solutions, such as the PIO suppression (PIOS) filter developed for the Space Shuttle, have been proposed. To determine the effectiveness of such PIOS filters on more conventional, high-performance aircraft, three experiments were performed using the NASA F-8 digital fly-by-wire and USAF/Calspan NT-33 variable-stability aircraft. Two types of PIOS filters were evaluated, using high-gain, precision tasks (close formation, probe-and-drogue refueling, and precision touch-and-go landing) with a time delay or a first-order lag added to make the aircraft prone to PIO. Various configurations of the PIOS filter were evaluated in the flight programs, and most of the PIOS filter configurations reduced the occurrence of PIOs and improved the handling qualities of the PIO-prone aircraft. These experiments also confirmed the influence of high-gain tasks and excessive control system time delay in evoking pilot-induced oscillations.

Shafer, M. F.↗

Space Station needs, attributes and architectural options: Summary briefing

Computerized data sorting and analysis techniques were used with a data base accumulated in over 20 years of space station studies to evaluate candidate missions and select a final model of 88 missions. The social, cultural, scientific, technical, and commercial benefits to be accrued from each mission were identified. Requirements were determined for satellite servicing; payload placement and retrieval; refueling; repair; testing; assembly; and construction. Missions drivers determined include crew, remote manipulating system, external parts, instrumentation, extravehicular activity/manned maneuvering unit, and voice/video equipment. User interest for commercial applications were determined. Variable architecture based on a modular concept with multi-use elements is proposed.

Source record↗

Space station needs, attributes and architectural options study. Briefing material: Final review and executive summary

Advantages and disadvantages were assessed for configuration options for a modular 14' diameter space station, a modular aft cargo carrier and a shuttle derived vehicle. Early, intermediate, and mature configurations were defined as well as power requirements, heat rejection, hydrazine usage, and the external scavenging concept. Subsystems were analyzed for propulsion, attitude control, data processing, and communications. Areas of uncertainties, associated costs and benefits, and the cost by phase of the modular and shuttle derived vehicle configurations were identified. Technologies assessed included solar vs nuclear; gravity gradient vs active control; heat pipe radiators vs fluid loops; distributed processors vs centralized, and modular vs shuttle derived configuration. It was determined that the early space station architecture should include: (1) reusable OTV with aerobraking; (2) TMS with telepresence services; (3) OTV/TMS refueling and servicing capability; and (4) attached research laboratories for life sciences and materials processing.

Source record↗

Manned geosynchronous mission requirements and systems analysis study extension

Turnaround requirements for the manned orbital transfer vehicle (MOTV) baseline and alternate concepts with and without a space operations center (SOC) are defined. Manned orbital transfer vehicle maintenance, refurbishment, resupply, and refueling are considered as well as the most effective combination of ground based and space based turnaround activities. Ground and flight operations requirements for abort are identified as well as low cost approaches to space and ground operations through maintenance and missions sensitivity studies. The recommended turnaround mix shows that space basing MOTV at SOC with periodic return to ground for overhaul results in minimum recurring costs. A pressurized hangar at SOC reduces labor costs by approximately 50%.

Source record↗

Spacecraft servicing demonstration plan

A preliminary spacecraft servicing demonstration plan is prepared which leads to a fully verified operational on-orbit servicing system based on the module exchange, refueling, and resupply technologies. The resulting system can be applied at the space station, in low Earth orbit with an orbital maneuvering vehicle (OMV), or be carried with an OMV to geosynchronous orbit by an orbital transfer vehicle. The three phase plan includes ground demonstrations, cargo bay demonstrations, and free flight verifications. The plan emphasizes the exchange of multimission modular spacecraft (MMS) modules which involves space repairable satellites. Three servicer mechanism configurations are the engineering test unit, a protoflight quality unit, and two fully operational units that have been qualified and documented for use in free flight verification activity. The plan balances costs and risks by overlapping study phases, utilizing existing equipment for ground demonstrations, maximizing use of existing MMS equipment, and rental of a spacecraft bus.

Bergonz, F. H.↗

Remotely-Controlled Docking System

Spring-loaded drogue cones tolerate and correct misalinement. Attachment Mechanism equipped with spring-loaded latches, shock-absorbing springs, and self-alining conical mating surfaces. Docking system includes three attachment mechanisms plus television camera that views set of crosshairs for alinement of vehicle and payload. Originally developed for Space Shuttle, mechanism adapted for robot manipulator arms, trailer hitches, and docking devices for in-flight refueling of airplanes.

Chandler, J. A.↗

Propellant transfer: Tethered depot

Spacebasing of orbital transfer vehicles at a space station requires a depot that safely and efficiently stores and transfers the resupply propellants. In order to transfer propellants, a method effectively acquire only liquid and vent only gas must exist. A method that produces a low gravity to settle propellants would bypass these weaknesses, while allowing ground-like operations. This low gravity can be passively produced using gravity gradient techniques. A satellite with a large length to diameter ratio, such as a depot attached to a space station with a tether, stabilizes along on Earth radial because of an outward acceleration proportional to the distance from the satellite's center of gravity. Analysis indicates that liquid can be setteled with relatively short tether lengths. The feasibility, design requirements, and operational limitations of a tethered refueling depot were investigated with special emphasis on slosh control.

Kroll, K.↗

Development of medical electronic devices in the APL space department

Several electronic devices for automatically correcting specific defects in a body's physiologic regulation and allowing approximately normal functioning are described. A self-injurious behavior inhibiting system (SIBIS) is fastened to the arm of a person with chronic self-injurious behavior patterns. An electric shock is delivered into the arm whenever the device senses above-threshold acceleration of the head such as occur with head-bangers. Sounding a buzzer tone with the shock eventually allows transference of the aversive stimulus to the buzzer so shocks are no longer necessary. A programmable implantable medication system features a solenoid pump placed beneath the skin and refueled by hypodermic needle. The pump functions are programmable and can deliver insulin, chemotherapy mixes and/or pain killers according to a preset schedule or on patient demand. Finally, an automatic implantible defibrillator has four electrodes attached directly to the heart for sensing electrical impulses or emitting them in response to cardiac fibrillation.

Newman, A. L.↗

Orbital Maneuvering Vehicle (OMV) missions applications and systems requirements

The routine delivery of large payloads to low earth orbit has become a reality with the Space Transportation System (STS). However, once earth orbit has been achieved, orbit transfer operations represent an inefficient use of the Space Shuttle. The Orbital Maneuvering Vehicle (OMV) will add a new and needed dimension to STS capabilities. Utilized in a reusable manner, the OMV is needed to deliver and retrieve satellites to and from orbital altitudes or inclinations beyond the practical limits of the Space Shuttle and to support basic Space Station activities. The initial OMV must also be designed to permit the addition of future mission kits to support the servicing, module changeout, or refueling of satellites in Low Earth Orbit (LEO) and Geostationary Earth Orbit (GEO), and the retrieval and deorbit of space debris. This paper addresses the mission needs along with the resulting performance implications, design requirements and operational capabilities imposed on the OMV planned for use in the late 1980s.

Huber, W. G.↗

US gravity utilization of tethers activity

The feasibility, requirements, and limitations of fluid transfer on a tethered system is evaluated. The study is conducted to simplify fluid transfer and to improve safety. The effects of gravity on these factors is also noted. Tether orbital refueling is used to settle fluid and to overcome the surface tension forces that are in space with the gravity level. It also allows a separation, when on the space station, from contamination and also from explosion hazards. Once the cryogenic propellant is settled the most important thing is the fluid slosh. Future plans of a gravity laboratory and a demonstration of gravity utilization using a TSS type of deployer are considered.

Kroll, K.↗