Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reaction Control System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

The Successful Implementation of NASA Orbital Debris Requirements for the Retirement of TDRS-1

TDRS-1 was decommissioned on October 28th 2009 following more than 26 years of operation. The Grand Old Dame of the TDRSS constellation wa s launched aboard the maiden voyage of the Space Shuttle Challenger ( STS-6) in April 1983. TDRS-1 survived a malfunction of the Inertial Upper Stage eventually utilizing its own propulsion system to success fully reach its assigned station in geosynchronous orbit. The anomalo us beginning of the TDRS-1 mission was not without lasting consequenc es as the primary reaction control system (A-side) was completely di sabled with an apparent propellant leak and the secondary system (B-s ide) suffered damage to its negative roll thruster rendering the thru ster inoperable. Following decommissioning the challenge to completin g a successful TDRS-1 end-of-mission (EOM) was the implementation of the stringent orbital debris requirements of NPR 8715.6 with a parti ally functioning spacecraft not originally designed to meet those req uirements. The TDRS-1 EOM had three key goals: 1) removal of the spac ecraft from geosynchronous orbit; 2) depletion of the remaining prope llant; and 3) passivation of all other sources of energy storage or generation. The TDRS-1 EOM approach was one of minimizing risks while accomplishing the goals above. The orbit raising portion of EOM was accomplished using deltavelocity operations already proven during pre vious stationchanging maneuvers. The propellant depletion approach wa s necessarily more aggressive as over 20 hours of burn time was requ ired to deplete the remaining fuel. A novel approach utilizing a spin ning, thrusting, passively controlled spacecraft configuration was ut ilized to achieve reasonable burn durations that met schedule constra ints. This nonstandard configuration required careful analysis of ele ctrical, thermal, and communication subsystems. The configuration wa s thoroughly simulated prior to the start of operations and carefully characterized during the initial spin period and first burn. Passiva tion was by definition a unique operation not previously performed wi thin the TDRS 1-7 constellation. Use was made of a TDRS spacecraft si mulator to verify the operational procedure to mitigate risks and pro vide crew training. TDRS-1 orbit raising maneuvers commenced on June 5th 2010 and completed on June 14th with an apogee 370 km and a peri gee 352 km above geosynchronous altitude. 127 kg of propellant were e stimated to be remaining in the tanks at the completion of orbit rais ing. TDRS-1 was placed in its spinning orientation on June 16th and the first fuel depletion burn was performed the following day. A seri es of 10 depletion burns were performed ending on June 26th when both propellant tank pressures experienced dramatic drops. Final passivat ion was performed on June 27 th deactivating electronics, removing t he batteries from the bus and solar arrays, and disabling the space-t o-ground communications equipment. The Second TDRS Ground Terminal (S TGT) continued to open loop track TDRS-1 for several days attempting command reacquisition several times a day. All attempts were unsucce ssful confirming passivation was achieved. The TDRS-1 orbit at passiv ation was an orbital debris compliant 36,319 x 36,128 km in height. W hile differing spacecraft designs may preclude mimicking the exact TD RS-1 EOM approach, the TDRS-1 campaign serves to demonstrate that pr e-NPR 8715.6 designs can be made to meet the requirements resulting i n a reduced orbit debris environment for future missions

Mirczak, Walter↗

Centaur D-1T propulsion and propellant systems

A description is presented of the propulsion and propellant systems of the Centaur D-1T, an improved version of the Centaur high energy upper state. The primary change to the propulsion system to provide three-burn capability was the addition of radiation shielding to the propellant duct. The redundant valves and feed paths were added to the H202 supply and reaction control system to increase system tolerance to the most probable causes of failure. Other changes were made to enhance mission capability of the Centaur, and represent an increase in inherent reliability of the vehicle through reduction of single failure points and by substitution of more reliable components.

Goette, W. E.↗

Aerothermodynamic Environments Definition for the Mars Science Laboratory Entry Capsule

An overview of the aerothermodynamic environments definition status is presented for the Mars Science Laboratory entry vehicle. The environments are based on Navier-Stokes flowfield simulations on a candidate aeroshell geometry and worst-case entry heating trajectories. Uncertainties for the flowfield predictions are based primarily on available ground data since Mars flight data are scarce. The forebody aerothermodynamics analysis focuses on boundary layer transition and turbulent heating augmentation. Turbulent transition is expected prior to peak heating, a first for Mars entry, resulting in augmented heat flux and shear stress at the same heatshield location. Afterbody computations are also shown with and without interference effects of reaction control system thruster plumes. Including uncertainties, analysis predicts that the heatshield may experience peaks of 225 W/sq cm for turbulent heat flux, 0.32 atm for stagnation pressure, and 400 Pa for turbulent shear stress. The afterbody heat flux without thruster plume interference is predicted to be 7 W/sq cm on the backshell and 10 W/sq cm on the parachute cover. If the reaction control jets are fired near peak dynamic pressure, the heat flux at localized areas could reach as high as 76 W/sq cm on the backshell and 38 W/sq cm on the parachute cover, including uncertainties. The final flight environments used for hardware design will be updated for any changes in the aeroshell configuration, heating design trajectories, or uncertainties.

Edquist, Karl T.↗

Operator procedure verification with a rapidly reconfigurable simulator

Generating and testing procedures for controlling spacecraft subsystems composed of electro-mechanical and computationally realized elements has become a very difficult task. Before a spacecraft can be flown, mission controllers must envision a great variety of situations the flight crew may encounter during a mission and carefully construct procedures for operating the spacecraft in each possible situation. If, despite extensive pre-compilation of control procedures, an unforeseen situation arises during a mission, the mission controller must generate a new procedure for the flight crew in a limited amount of time. In such situations, the mission controller cannot systematically consider and test alternative procedures against models of the system being controlled, because the available simulator is too large and complex to reconfigure, run, and analyze quickly. A rapidly reconfigurable simulation environment that can execute a control procedure and show its effects on system behavior would greatly facilitate generation and testing of control procedures both before and during a mission. The How Things Work project at Stanford University has developed a system called DME (Device Modeling Environment) for modeling and simulating the behavior of electromechanical devices. DME was designed to facilitate model formulation and behavior simulation of device behavior including both continuous and discrete phenomena. We are currently extending DME for use in testing operator procedures, and we have built a knowledge base for modeling the Reaction Control System (RCS) of the space shuttle as a testbed. We believe that DME can facilitate design of operator procedures by providing mission controllers with a simulation environment that meets all these requirements.

Iwasaki, Yumi↗

Towards a machine learning framework for acquiring and exploiting monitoring and diagnostic knowledge

In this paper we address the problem of detecting and diagnosing faults in physical systems, for which neither prior expertise for the task nor suitable system models are available. We propose an architecture that integrates the on-line acquisition and exploitation of monitoring and diagnostic knowledge. The focus of the paper is on the component of the architecture that discovers classes of behaviors with similar characteristics by observing a system in operation. We investigate a characterization of behaviors based on best fitting approximation models. An experimental prototype has been implemented to test it. We present preliminary results in diagnosing faults of the Reaction Control System of the Space Shuttle. The merits and limitations of the approach are identified and directions for future work are set.

Manganaris, Stefanos↗

The Plume Impingement Contamination II Experiment: Motivation, Design, and Implementation Plan

The International Space Station (ISS) will have a long service life during which it must be able to serve as a capable platform for a wide variety of scientific investigations. In order to provide this capability, the ISS has, at the system level, a design requirement of no more than 100 Angstroms of contaminant deposition per year from "non-quiescent" sources. Non-quiescent sources include the plumes resulting from the firing of reaction control system (ReS) engines on space vehicles visiting the ISS as well as the engines on the ISS itself. Unfortunately, good general plume contamination models do not yet exist. This is due both to the complexity of the problem, making the analytic approach difficult, and to the difficulty in obtaining empirical measurements of contaminant depositions. To address this lack of flight data, NASA Johnson Space Center is planning to fly an experiment, Plume Impingement Contamination-II, to measure the contamination deposition from the Shuttle Orbiter's primary RCS engines as a function angle from plume centerline. This represents the first direct on-orbit measurement of plume impingement contamination away from the nozzle centerline ever performed, and as such is extremely important in validating mathematical models which will be used to quantify the cumulative plume impingement contamination to the ISS over its lifetime. The paper will elaborate further upon the motivation behind making these measurements as well as present the design and implementation plan of this planned experiment.

Lumpkin, Forrest E., III↗

Large Payload Ground Transportation and Test Considerations

During test and verification planning for the Altair lunar lander project, a National Aeronautics and Space Administration (NASA) study team identified several ground transportation and test issues related to the large payload diameter. Although the entire Constellation Program-including Altair-has since been canceled, issues identified by the Altair project serve as important lessons learned for payloads greater than 7 m diameter being considered for NASA's new Space Launch System (SLS). A transportation feasibility study found that Altair's 8.97 m diameter Descent Module would not fit inside available aircraft. Although the Ascent Module cabin was only 2.35 m diameter, the long reaction control system booms extended nearly to the Descent Module diameter, making it equally unsuitable for air transportation without removing the booms and invalidating assembly workmanship screens or acceptance testing that had already been performed. Ground transportation of very large payloads over extended distances is not generally permitted by most states, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA's Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure-roads, bridges, airframes, and buildings-necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications.

Rucker, Michelle A.↗

Nonintrusive Flowmeter

The results of analytical and experimental work performed in the design, fabrication, and test of a prototype nonintrusive gaging system for use in monitoring the consumption of earth-storable fuels and oxidants in either a one-g or a zero-g environment are explained. The design specifications were those applicable to the reaction control system and to the orbital maneuvering system (OMS) fuel and oxidant on the space shuttle while in orbit. The major requirement was for the measurement of flow pulses with sufficient accuracy to provide a continuous knowledge of the fuel and oxidant remaining in the OMS system to within 1% or better. An ultrasonic frequency chirp technique was used having a high inherent rejection for signals traversing stray paths, and for random noise generated by the flowing liquid. A detailed analysis of the frequency chirp approach for two modes of operation (period and phase changes), including an error analysis are reported.

Greene, M. W.↗

Thermal, Avionics, and Power Considerations for Designing a Nuclear Thermal Propulsion Flight Demonstrator

As part of the Appropriations Bill passed by the US Congress in February 2019, NASA was instructed to develop a nuclear thermal propulsion (NTP) flight demonstrator by 2024. [4] In response to this directive, the Advanced Concepts Office (ACO) at Marshall Space Flight Center (MSFC) was tasked with beginning concept studies for the flight demonstration (FD) mission. During the NTP study formulation, two philoso- phies emerged with regards to FD concept design. The first, Flight Demo 1 (FD1), strictly observes the 2024 schedule requirement at the expense of lower engine performance than expected of theoretical NTP engines. The second concept, Flight Demo 2 (FD2), relaxes the schedule requirement to allow for higher engine performance and more traceability to future operational systems. Both the FD1 and FD2 concepts present considerable challenges for subsystem design, specifically in the areas of thermal control, avionics, and power. To guard against undesired graveyard orbits, a requirement to keep the NTP engine and the reaction control system (RCS) separate was put in place. As a result of this requirement, the avionics subsystem must provide separate command and data handling (CDH) and instrumentation for each propulsion system. In-space instrumentation and monitoring of a NTP system has never been done before, necessitating the development of novel strategies and unique hardware. The heating rates produced by the NTP engine are extremely high, leading to difficulties with thermal control. The FD1 concept utilizes high-pressure gaseous hydrogen (GH2), which is largely insensitive to temperature fluctuations. The FD2 concept, however, utilizes cryogenic liquid hydrogen (LH2) which must be kept stable near 20 Kelvin. A high-performance thermal control system (TCS) will be required to ensure all components and subsystems are maintained within their operational temperature ranges. This paper will highlight the thermal, avionics, and power solutions required for the full scope of challenges for a NTP flight demonstrator.

Johnson, W. E.↗

Instrument pointing system applicability and orbiter stabilization for EVAL missions. Application studies

Related aspect of the Earth Viewing Applications Laboratory (EVAL) shuttle missions were investigated. The applicability of the gimballed Instrument Pointing System (IPS) to EVAL missions by comparing the IPS capabilities with the EVAL requirements was evaluated, and a means of stabilizing the shuttle orbiter attitude in earth viewing orientations for prolonged periods without use of the orbiter gas reaction control system was assessed.

Spector, V. A.↗

Apollo 15 mission report. Supplement 3: Ascent propulsion system final flight evaluation

The results are presented of the postflight analysis of the ascent propulsion system (APS) performance during the Apollo 15 Mission. The information presented includes: (1) calculated performance values for the APS lunar liftoff burn; (2) disucssion of analysis techniques, problems and assumptions; (3) comparison of postflight analysis and preflight prediction; (4) reaction control system (RCS) duty cycle included in the APS performance analysis; (5) transient performance analysis; and (6) the APS propellant consumption values.

Griffin, W. G.↗

Evaluation of Risk and Possible Mitigation Schemes for Previously Unidentified Hazards

In April 2004, the NASA Engineering and Safety Center (NESC) was commissioned by NASA's Chief Safety and Mission Assurance (S&MA) Officer to review and render a technical opinion on the probability of a catastrophic failure related to this scenario: The Space Shuttle Program (SSP) recognized a zero-fault-tolerant design related to an inadvertent firing of the primary reaction control system (RCS) jets on the Orbiter during mated operations with the International Space Station (ISS). It was determined that an un-commanded firing of an RCS jet could cause serious damage or loss of both the SSP Orbiter and the ISS. Several scenarios were suggested in which an un-commanded firing of the RCS jet is possible. These scenarios include an arc track event in the 28-volt heater circuits that could result in a wire-to-wire short to the adjacent reaction control jet wire. In this worst-case scenario, enough current and power could be applied to activate the reaction control jet valves and fire a thruster. The following report summarizes the work that was sponsored by the NESC as part of their assessment of the Orbiter inadvertent firing of a RCS thruster while attached to the ISS.

Linzey, William↗

Concepts and requirements for shuttle/payload orbital operations of the space transportation system

The results of studies and software development activities are summarized. Technical reports and memoranda are presented in a graphical history of contract activities and the expenditure of engineering manhours. Major topics and activities are: (1) flight phase standardization; (2) flight profile standardization; (3) maneuver targeting for solid rocket motors; (4) relative motion and RCS (Reaction Control System) jet flowfield plotting programs; (5) on-orbit aerodynamic models; (6) terminal approach strategy for payload retrieval/docking; (7) proximity navigation; and (8) desk-top flight simulator for proximity operations. A list of recommendations is also presented.

Wilson, S. W.↗

Performance evaluation of an entry research vehicle

The aerodynamic database upon which the missions and the proposed designs of an atmospheric entry research vehicle (ERV) would be based are discussed, along with a trajectory analysis of two missions proposed for the ERV. The ERV is intended as a means to explore reentry techniques, thermal protection systems and cross-range and orbital change maneuvers beyond the operational envelope of the Orbiter. The 25 ft long ERV would have a 13 ft wingspan, allowing it to be launched from the Orbiter bay. The ERV would have atmospheric maneuvering control surfaces and reaction control systems for orbital maneuvers. The total weight would be 12,000 lb. The aerodynamic design for the ERV was developed from wind tunnel, theoretical and Shuttle data for continuum, transition and free-molecule flight regimes. Typical flight profiles for intended missions are outlined.

Powell, R. W.↗

Liquid Oxygen/Liquid Methane Integrated Power and Propulsion

The proposed paper will cover ongoing work at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) on integrated power and propulsion for advanced human exploration. Specifically, it will present findings of the integrated design, testing, and operational challenges of a liquid oxygen / liquid methane (LOx/LCH4) propulsion brassboard and Solid Oxide Fuel Cell (SOFC) system. Human-Mars architectures point to an oxygen-methane economy utilizing common commodities, scavenged from the planetary atmosphere and soil via In-Situ Resource Utilization (ISRU), and common commodities across sub-systems. Due to the enormous mass gear-ratio required for human exploration beyond low-earth orbit, (for every 1 kg of payload landed on Mars, 226 kg will be required on Earth) increasing commonality between spacecraft subsystems such as power and propulsion can result in tremendous launch mass and volume savings. Historically, propulsion and fuel cell power subsystems have had little interaction outside of the generation (fuel cell) and consumption (propulsion) of electrical power. This was largely due to a mismatch in preferred commodities (hypergolics for propulsion; oxygen & hydrogen for fuel cells). Although this stove-piped approach benefits from simplicity in the design process, it means each subsystem has its own tanks, pressurization system, fluid feed system, etc. increasing overall spacecraft mass and volume. A liquid oxygen / liquid methane commodities architecture across propulsion and power subsystems would enable the use of common tankage and associated pressurization and commodity delivery hardware for both. Furthermore, a spacecraft utilizing integrated power and propulsion could use propellant residuals - propellant which could not be expelled from the tank near depletion due to hydrodynamic considerations caused by large flow demands of a rocket engine - to generate power after all propulsive maneuvers are complete thus utilizing previously wasted mass. Such is the case for human and robotic planetary landers. Although many potential benefits through integrated power & propulsion exist, integrated operations have yet to be successfully demonstrated and many challenges have already been identified the most obvious of which is the large temperature gradient. SOFC chemistry is exothermic with operating temperatures in excess of 1,000 K; however, any shared commodities will be undoubtedly stored at cryogenic temperatures (90-112 K) for mass efficiency reasons. Spacecraft packaging will drive these two subsystems in close proximity thus heat leak into the commodity tankage must be minimized and/or mitigated. Furthermore, commodities must be gasified prior to consumption by the SOFC. Excess heat generated by the SOFC could be used to perform this phase change; however, this has yet to be demonstrated. A further identified challenge is the ability of the SOFC to handle the sudden power spikes created by the propulsion system. A power accumulator (battery) will likely be necessary to handle these sudden demands while the SOFC thermally adjusts. JSC's current SOFC test system consists of a 1 kW fuel cell designed by Delphi. The fuel cell is currently undergoing characterization testing at the NASA JSC Energy Systems Test Area (ESTA) after which a Steam Methane Reformer (SMR) will be integrated and the combined system tested in closed-loop. The propulsion brassboard is approximately the size of what could be flown on a sounding rocket. It consists of one 100 lbf thrust "main" engine developed for NASA by Aerojet and two 10 lbf thrusters to simulate a reaction control system developed at NASA JSC. This system is also under development and initial testing at ESTA. After initial testing, combined testing will occur which will provide data on the fuel cell's ability to sufficiently handle the power spikes created by the propulsion system. These two systems will also be modeled using General-Use Nodal Network Solver (GUNNS) software. Once anchored with test data, this model will be used to extrapolate onto other firing profiles and used to size the power accumulator.

Banker, Brian↗

Thermal and Pressure Characterization of a Wind Tunnel Force Balance Using the Single Vector System

Wind tunnel research at NASA Langley Research Center s 31-inch Mach 10 hypersonic facility utilized a 5-component force balance, which provided a pressurized flow-thru capability to the test article. The goal of the research was to determine the interaction effects between the free-stream flow and the exit flow from the reaction control system on the Mars Science Laboratory aeroshell during planetary entry. In the wind tunnel, the balance was exposed to aerodynamic forces and moments, steady-state and transient thermal gradients, and various internal balance cavity pressures. Historically, these effects on force measurement accuracy have not been fully characterized due to limitations in the calibration apparatus. A statistically designed experiment was developed to adequately characterize the behavior of the balance over the expected wind tunnel operating ranges (forces/moments, temperatures, and pressures). The experimental design was based on a Taylor-series expansion in the seven factors for the mathematical models. Model inversion was required to calculate the aerodynamic forces and moments as a function of the strain-gage readings. Details regarding transducer on-board compensation techniques, experimental design development, mathematical modeling, and wind tunnel data reduction are included in this paper.

Lynn, Keith C.↗

Green Propellant Test Capabilities of the Altitude Combustion Stand at the NASA Glenn Research Center

The NASA Glenn Research Center (GRC) is committed to providing simulated altitude rocket test capabilities to NASA programs, other government agencies, private industry partners, and academic partners. A primary facility to support those needs is the Altitude Combustion Stand (ACS). ACS provides the capability to test combustion components at a simulated altitude up to 100,000 ft. (approx.0.2 psia/10 Torr) through a nitrogen-driven ejector system. The facility is equipped with an axial thrust stand, gaseous and cryogenic liquid propellant feed systems, data acquisition system with up to 1000 Hz recording, and automated facility control system. Propellant capabilities include gaseous and liquid hydrogen, gaseous and liquid oxygen, and liquid methane. A water-cooled diffuser, exhaust spray cooling chamber, and multi-stage ejector systems can enable run times up to 180 seconds to 16 minutes. The system can accommodate engines up to 2000-lbf thrust, liquid propellant supply pressures up to 1800 psia, and test at the component level. Engines can also be fired at sea level if needed. The NASA GRC is in the process of modifying ACS capabilities to enable the testing of green propellant (GP) thrusters and components. Green propellants are actively being explored throughout government and industry as a non-toxic replacement to hydrazine monopropellants for applications such as reaction control systems or small spacecraft main propulsion systems. These propellants offer increased performance and cost savings over hydrazine. The modification of ACS is intended to enable testing of a wide range of green propellant engines for research and qualification-like testing applications. Once complete, ACS will have the capability to test green propellant engines up to 880 N in thrust, thermally condition the green propellants, provide test durations up to 60 minutes depending on thrust class, provide high speed control and data acquisition, as well as provide advanced imaging and diagnostics such as infrared (IR) imaging.

Testing↗

Mars 2020 Perseverance Entry Controller Design and Flight Reconstruction

On February 18th, 2021, NASA landed Perseverance on the Jezero crater (on Mars). An entry Guidance, Navigation, and Control (GNC) system delivered the vehicle to the desired landing ellipse. The navigation filter propagated position and attitude states initialized from cruise using Inertial Measurement Unit (IMU) measurements. The entry guidance modulated the lift vector through bank commands to reach the parachute deploy conditions. The entry controller commanded the propulsive Reaction Control System (RCS) to track the bank commands while doing rate damping on angle-of-attack and sideslip. This paper describes the design and the as-flown performance of the entry controller.

Way, David W.↗