Search NASA⌕ Search

SEARCH · Search NASA

Results for “Remote manipulator system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

STS-114 Flight Day 9 Highlights

The highlight of Day 9 is the third extravehicular activity (EVA) of the STS-114 mission (Commander Eileen Collins, Pilot James Kelly, Mission Specialists Soichi Noguchi, Stephen Robinson, Andrew Thomas, Wendy Lawrence, and Charles Camarda). Astronauts Noguchi and Robinson are seen preparing for the EVA in the closed payload bay of Space Shuttle Discovery; on the EVA they install on the International Space Station (ISS) a Materials on the International Space Station Experiments (MISSE) unit, an External Stowage Platform (ESP-2), and a wireless antenna. The astronauts are seen working on the ISS under different lighting conditions, and use a pistol-grip tool to remove ESP-2 from the shuttle payload bay. The Space Station Remote Manipulator System then carries Robinson to the underside of the Discovery orbiter, where he communicates with Mission Control during the delicate and unprecedented removal of gap fillers from between the shuttle's tiles. Before and the after the EVA the video includes views of a damaged thermal blanket beneath the shuttle cockpit window. Other views of the shuttle include pans along the underside and topside by the Orbiter Boom Sensor System. The video also includes a view from orbit of Kazakhstan.

Source record↗

STS-114 Flight Day 10 Highlights

On Flight Day 10 of the STS-114 mission the International Space Station (ISS) is seen in low lighting while the Space Station Remote Manipulator System (SSRMS), also known as Canadarm 2 grapples the Raffaello Multipurpose Logistics Module (MPLM) in preparation for its undocking the following day. Members of the shuttle crew (Commander Eileen Collins, Pilot James Kelly, Mission Specialists Soichi Noguchi, Stephen Robinson, Andrew Thomas, Wendy Lawrence, and Charles Camarda) and the Expedition 11 crew (Commander Sergei Krikalev and NASA ISS Science Officer and Flight Engineer John Phillips) of the ISS read statements in English and Russian in a ceremony for astronauts who gave their lives. Interview segments include one of Collins, Robinson, and Camarda, wearing red shirts to commemorate the STS-107 Columbia crew, and one of Collins and Noguchi on board the ISS, which features voice over from an interpreter translating questions from the Japanese prime minister. The video also features a segment showing gap fillers on board Discovery after being removed from underneath the orbiter, and another segment which explains an experimental plug for future shuttle repairs being tested onboard the mid deck.

Source record↗

STS-114: Discovery Day 8 Mission Status Briefing

Paul Hill, STS 114 Lead Shuttle Flight Director, David Wolf, Extravehicular Activity (EVA) Branch Chief, JSC from the Astronaut Office, and Kelly Beck, STS-114 Team 4 Flight Director are seen on the 8th day of the Space Shuttle Discovery Mission. Paul Hill presents and explains charts of the Gap Fillers that Steve Robinson will be pulling off during his EVA. The charts include: 1) Protruding Gap Fillers; 2) Starboard Worksite Access; 3) Protruding Chine Gap Filler; 4) Port Gap Filler Space Shuttle Remote Manipulator System (SSRMS) Position; and 5) Port Gap Filler Close-up View. Kelly Beck talks about how the plan for the gap fillers were arranged, and presents the tools and techniques that Steve Robinson will be using during the EVA. David Wolf demonstrates how the EVA will be performed using forceps and a hacksaw to remove the gap fillers. The presentation ends with a question and answer period from the news media.

Source record↗

Transition Report for Dr. Ken Fernandez, NASA Marshall Space Flight Center

The primary objective proposed during my tenure with the NASA Administrator's Fellowship Program (NAFP) was the use of ROBOSIM, a NASA developed robot simulation software package, to introduce the first robotics class to the School of Engineering at Alabama A&M University. The students participating in the spring of 2004 chose as their class project a simulation of the Shuttle, the Shuttle Remote Manipulator System, and the inspection boom which may be used to inspect the Shuttle's tiles on-orbit. In addition to meeting this primary objective and fulfilling other activities that were required by NAFP participants, several other accomplishments are reported. Participation with the faculty of Alabama A&M in the planning and execution of the First and Second Annual Michael P. Anderson Memorial Summer Programs for minority high school students was completed. This program, funded by NASA, provided supervised "hands- on" group activities in various engineering disciplines, including robotics. A third major accomplishment during the NAFP tenure was the granting of a U.S. patent for the NASA 3-D Luggage Scanning System. International patents are also pending on this device. The device uses stereographic imaging similar to that used by NASA on the Mars Rover to enhance the contents of luggage and other items being inspected. It is believed that this device can greatly improve the efficiency and accuracy of security checkpoint screening.

Fernandez, Ken R.↗

Evolution of the Space Station Robotic Manipulator

The Space Station Remote Manipulator System (SSRMS), Canadarm2, was launched in 2001 and deployed on the International Space Station (ISS). The Canadarm2 has been instrumental in ISS assembly and maintenance. Canadarm2 shares its heritage with the Space Shuttle Arm (Canadarm). This article explores the evolution from the Shuttle Canadarm to the Space Station Canadarm2 design, which incorporates a 7 degree of freedom design, larger joints, and changeable operating base. This article also addresses phased design, redundancy, life and maintainability requirements. The design of Canadarm2 meets unique ISS requirements, including expanded handling capability and the ability to be maintained on orbit. The size of ISS necessitated a mobile manipulator, resulting in the unique capability of Canadarm2 to relocate by performing a walk off to base points located along the Station, and interchanging the tip and base of the manipulator. This provides the manipulator with reach and access to a large part of the Station, enabling on-orbit assembly of the Station and providing support to Extra-Vehicular Activity (EVA). Canadarm2 is evolving based on on-orbit operational experience and new functionality requirements. SSRMS functionality is being developed in phases to support evolving ISS assembly and operation as modules are added and the Station becomes more complex. Changes to sustaining software, hardware architecture, and operations have significantly enhanced SSRMS capability to support ISS mission requirements. As a result of operational experience, SSRMS changes have been implemented for Degraded Joint Operations, Force Moment Sensor Thermal Protection, Enabling Ground Controlled Operations, and Software Commutation. Planned Canadarm2 design modifications include: Force Moment Accommodation, Smart Safing, Separate Safing, and Hot Backup. In summary, Canadarm2 continues to evolve in support of new ISS requirements and improved operations. It is a tribute to the design that this evolution can be accomplished while conducting critical on-orbit operations with minimal hardware changes.

Razvi, Shakeel↗

EVA Assembly of Large Space Structure Neutral Buoyancy, Zero-Gravity Simulation: NASA-LaRC Nestable Columns and Joints

The film depicts an extravehicular activity (EVA) that involved the assembly of six "space-weight" columns into a regular tetrahedral cell by a team of two "space"-suited test subjects. This cell represents the fundamental "element" of a tetrahedral truss structure. The tests were conducted under simulated zero-gravity conditions, achieved by neutral buoyancy in water. The cell was assembled on an "outrigger" assembly aid off the side of a mockup of the Shuttle Orbiter cargo bay. Both manual and simulated remote manipulator system (RMS) modes were evaluated. The simulated RMS was used only to transfer stowed hardware from the cargo bay to the work sites. Articulation limits of the pressure suit and zero gravity could be accommodated by work stations with foot restraints. The results of this study have confirmed that astronaut EVA assembly of large, erectable space structur is well within man's capabilities.

TESTS↗

Grapple fixture for use with electromagnetic attachment mechanism

An electromagnetic attachment mechanism for use as an end effector of a remote manipulator system. A pair of electromagnets 15A,15B, each with a U-shaped magnetic core with a pull-in coil 34 and two holding coils 35,36 are mounted by a spring suspension system 38,47 on a base plate 25 of the mechanism housing 30 with end pole pieces 21,22 adapted to move through openings in the base plate when the attractive force of the electromagnets is exerted on a strike plate 65 of a grapple fixture 20 affixed to a target object 14. The pole pieces are spaced by an air gap from the strike plate when the mechanism first contacts the grapple fixture. An individual control circuit and power source is provided for the pull-in coil and one holding coil of each electromagnet. A back-up control circuit connected to the two power sources and a third power source is provided for the remaining holding coils. When energized, the pull-in coils overcome the suspension system and air gap and are automatically de-energized when the pole pieces move to grapple and impose a preload force across the grapple interface. A battery back-up 89A,89B is a redundant power source for each electromagnet in each individual control circuit and is automatically connected upon failure of the primary power source. A centerline mounted camera 31 and video monitor 70 are used in cooperation with a target pattern 19 on the reflective surface 67 of the strike plate to effect targeting and alignment.

Monford, Jr., Leo G.↗

Magnetic attachment mechanism

A magnetic attachment mechanism adapted for interfacing with the manipulator arm (11) of a remote manipulator system and comprising a pair of permanent magnets (31,32) of rare earth material which are arranged in a stator-rotor relationship. The rotor magnet (32), is journalled for rotation about its longitudinal axis between pole plates (35,36) of the stator magnet (31), each of which includes an adhering surface (35a,36a). In a first rotary position corresponding to the ON condition, each of the poles of the rotor magnet (32) is closely adjacent a stator magnet pole plate of like polarity whereby the respective magnet fields are additive for producing a strong magnetic field emanating from the adhering surfaces (35a,36a) for attracting a ferrous magnetic plate 20, or the like, affixed to the payload (20 or 50). When the rotor magnet (32) is rotated to a second position corresponding to the OFF condition, each of the poles of the rotor magnet (31) is disposed closely adjacent a pole plate of unlike polarity whereby the magnetic fields of the magnets are in cancelling relationship at the adhering surfaces (35a,36a) which permits the release of a payload. An actuator (51 or 70) for selectively rotating the rotor magnet (32) between the ON and OFF positions is provided for interfacing and connecting the magnetic attachment mechanism with a manipulator arm. For effecting an optimal rigidized attachment the payload is provided with guides (91,92) cooperable with guides (96,16,17) on the housing of the mechanism for directing adhering surfaces (35a,36a) of the polar plates to the ferrous plate (20).

Harwell, William D.↗

Modeling Attitude Dynamics in Simulink: A Study of the Rotational and Translational Motion of a Spacecraft Given Torques and Impulses Generated by RMS Hand Controllers

In order to study and control the attitude of a spacecraft, it is necessary to understand the natural motion of a body in orbit. Assuming a spacecraft to be a rigid body, dynamics describes the complete motion of the vehicle by the translational and rotational motion of the body. The Simulink Attitude Analysis Model applies the equations of rigid body motion to the study of a spacecraft?s attitude in orbit. Using a TCP/IP connection, Matlab reads the values of the Remote Manipulator System (RMS) hand controllers and passes them to Simulink as specified torque and impulse profiles. Simulink then uses the governing kinematic and dynamic equations of a rigid body in low earth orbit (LE0) to plot the attitude response of a spacecraft for five seconds given known applied torques and impulses, and constant principal moments of inertia.

Mauldin, Rebecca H.↗

SRMS History, Evolution and Lessons Learned

Early in the development of the Space Shuttle, it became clear that NASA needed a method of deploying and retrieving payloads from the payload bay. The Shuttle Remote Manipulator System (SRMS) was developed to fill this need. The 50 foot long robotic arm is an anthropomorphic design consisting of three electromechanical joints, six degrees of freedom, and two boom segments. Its composite boom construction provided a light weight solution needed for space operations. Additionally, a method of capturing payloads with the arm was required and a unique End Effector was developed using an electromechanical snare mechanism. The SRMS is operated using a Displays and Controls Panel and hand controllers located within the aft crew compartment of the shuttle. Although the SRMS was originally conceived to deploy and retrieve payloads, its generic capabilities allowed it to perform many other functions not originally conceived of. Over the years it has been used for deploying and retrieving constrained and free flying payloads, maneuvering and supporting EVA astronauts, satellite repair, International Space Station construction, and as a viewing aid for on-orbit International Space Station operations. After the Columbia accident, a robotically compatible Orbiter Boom Sensor System (OBSS) was developed and used in conjunction with the SRMS to scan the Thermal Protection System (TPS) of the shuttle. These scans ensure there is not a breach of the TPS prior to shuttle re-entry. Ground operations and pre mission simulation, analysis and planning played a major role in the success of the SRMS program. A Systems Engineering Simulator (SES) was developed to provide a utility complimentary to open loop engineering simulations. This system provided a closed-loop real-time pilot-driven simulation giving visual feedback, display and control panel interaction, and integration with other vehicle systems, such as GN&C. It has been useful for many more applications than traditional training. Evolution of the simulations, guided by the Math Model Working Group, showed the utility of input from multiple modeling groups with a structured forum for discussion.There were many unique development challenges in the areas of hardware, software, certification, modeling and simulation. Over the years, upgrades and enhancements were implemented to increase the capability, performance and safety of the SRMS. The history and evolution of the SRMS program provided many lessons learned that can be used for future space robotic systems.

Jorgensen, Glenn↗

Investigating the Response and Expansion of Plasma Plumes in a Mesosonic Plasma Using the Situational Awareness Sensor Suite for the ISS (SASSI)

To study the complex interactions between the space environment surrounding the International Space Station (ISS) and the ISS space vehicle, we are exploring a specialized suite of plasma sensors, manipulated by the Space Station Remote Manipulator System (SSRMS) to probe the near‐ISS mesosonic plasma ionosphere moving past the ISS. It is proposed that SASSI consists of the NASA Marshall Space Flight Center's (MSFC's) Thermal Ion Capped Hemispherical Spectrometer (TICHS), Thermal Electron Capped Hemispherical Spectrometer (TECHS), Charge Analyzer Responsive to Local Oscillations (CARLO), the Collimated PhotoElectron Gun (CPEG), and the University of Michigan Advanced Langmuir Probe (ALP). There are multiple expected applications for SASSI. Here, we will discuss the study of fundamental plasma physics questions associated with how an emitted plasma plume (such as from the ISS Plasma Contactor Unit (PCU)) responds and expands in a mesosonic magnetoplasma as well as emit and collect current. The ISS PCU Xe plasma plume drifts through the ionosphere and across the Earth's magnetic field, resulting in complex dynamics. This is of practical and theoretical interest pertaining to contamination concerns (e.g. energetic ion scattering) and the ability to collect and emit current between the spacecraft and the ambient plasma ionosphere. This impacts, for example, predictions of electrodynamic tether current performance using plasma contactors as well as decisions about placing high‐energy electric propulsion thrusters on ISS. We will discuss the required measurements and connection to proposed instruments for this study.

Gilchrist, Brian E.↗

Clearance Analysis of Node 3 Aft CBM to the Stowed FGB Solar Array

In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.

Liddle, Donn↗

Tendon-Actuated Lightweight In-Space MANipulator (TALISMAN)

The robotic architecture of State-of-the-Art (SOA) space manipulators, represented by the Shuttle Remote Manipulator System (SRMS), inherently limits their capabilities to extend reach, reduce mass, apply force and package efficiently. TALISMAN uses a new and innovative robotic architecture that incorporates a combination of lightweight truss links, a novel hinge joint, tendon-articulation and passive tension stiffening to achieve revolutionary performance. A TALISMAN with performance similar to the SRMS has 1/10th of its mass and packages in 1/7th of its volume. The TALISMAN architecture allows its reach to be scaled over a large range; from 10 to over 300 meters. In addition, the dexterity (number of degrees-of-freedom) can be easily adjusted without significantly impacting manipulator mass because the joints are very lightweight.

Dorsey, John T.↗

MAGIK Animation of Robotic Operations for Flight SpaceX-21 to ISS

The MAGIK Robotic analysis team provides kinematic feasibility assessments for the ISS and has produced an animation to evaluate Extravehicular Robotics (EVR) activities for SpaceX (SpX)-21 flight. Flight SpX-21 includes a Dragon 2 vehicle docked to Node 2 Zenith (N2Z) International Docking Adapter (IDA) and consists of the delivery of the NanoRacks Airlock Assembly (NRAL). Robotic operations shown include Space Station Remote Manipulator System (SSRMS) Trunk extraction of the NRAL and maneuvering through the ISS Port Corridor to Node 3 Port (N3P). Extravehicular Activities not shown will complete the install to N3P. There is no disposal payload for this flight.

Alexander Radford Fryer↗

MAGIK Animation of Robotic Operations for Flight SpaceX-22 to ISS

The MAGIK Robotic analysis team provides kinematic feasibility assessments for the ISS and has produced an animation to evaluate Extravehicular Robotics (EVR) activities for the SpaceX (SpX)-22 flight. The animation also displays the current ISS configuration at the time of the flight. Flight SpX-22 includes a SpaceX Cargo Dragon vehicle docked to Node 2 Zenith (N2Z) International Docking Adapter (IDA) and consists of the delivery of the ISS Power Augmentation (IPA) Carrier. Robotic operations shown include the Space Station Remote Manipulator System (SSRMS) Trunk extraction of the IPA Carrier and maneuvering to the install position on the Payload ORU (Orbital Replacement Unit) Accommodation (POA). There is no disposal payload for this flight.

Alexander Radford Fryer↗

IROSA 2B/4B EVA Robotics

The MAGIK Robotic analysis team provides kinematic feasibility assessments and robotic visualizations for the ISS. This animation was created with configurations provided by the CX Team and showcases the robotics for the IROSA install 2B and 4B EVAs. The ExtraVehicular Activities (EVAs) shown include the extraction of the two ISS Roll-Out Solar Arrays (IROSAs) from the ISS Power Augmentation (IPA) carrier by an astronaut on the end of the Space Station Remote Manipulator System (SSRMS) and subsequent handoff to a second astronaut on the ISS port side truss. Extravehicular activities not shown will complete the install of the IROSAs.

Alexander Radford Fryer↗

SpaceX-26 Animation - Operations from MAGIK AI-4177: SpX-26 (Launch-6)

The MAGIK Robotic analysis team provides kinematic feasibility assessments for the ISS and has produced an animation to evaluate Extravehicular Robotics (EVR) activities for the SpaceX (SpX)-26 flight. The animation also displays the current ISS configuration at the time of the flight. Flight SpX-26 includes a SpaceX Cargo Dragon vehicle docked to Node 2 Zenith (N2Z) International Docking Adapter (IDA) and consists of the delivery of the ISS Roll Out Solar Array (IROSA) mounted to an ISS Power Augmentation (IPA) Carrier. Robotic operations shown include the Space Station Remote Manipulator System (SSRMS) Trunk extraction of the IPA Carrier and maneuvering to the install position on the Payload ORU (Orbital Replacement Unit) Accommodation (POA). There is no disposal payload for this flight.

ISS↗