Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource Reporting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Continuous Security and Configuration Monitoring of HPC Clusters

Continuous security and configuration monitoring of information systems has been a time consuming and laborious task for system administrators at the High Performance Computing (HPC) center. Prior to this project, system administrators had to manually check the settings of thousands of nodes, which required a significant number of hours rendering the old process ineffective and inefficient. This paper explains the application of Splunk Enterprise, a software agent, and a reporting tool in the development of a user application interface to track and report on critical system updates and security compliance status of HPC Clusters. In conjunction with other configuration management systems, the reporting tool is to provide continuous situational awareness to system administrators of the compliance state of information systems. Our approach consisted of the development, testing, and deployment of an agent to collect any arbitrary information across a massively distributed computing center, and organize that information into a human-readable format. Using Splunk Enterprise, this raw data was then gathered into a central repository and indexed for search, analysis, and correlation. Following acquisition and accumulation, the reporting tool generated and presented actionable information by filtering the data according to command line parameters passed at run time. Preliminary data showed results for over six thousand nodes. Further research and expansion of this tool could lead to the development of a series of agents to gather and report critical system parameters. However, in order to make use of the flexibility and resourcefulness of the reporting tool the agent must conform to specifications set forth in this paper. This project has simplified the way system administrators gather, analyze, and report on the configuration and security state of HPC clusters, maintaining ongoing situational awareness. Rather than querying each cluster independently, compliance checking can be managed from one central location.

97 MATHEMATICS AND COMPUTING↗

Cybersecurity Standards for Distributed Energy Resources: Gaps and Harmonization Strategy

This report examines cybersecurity standards for Distributed Energy Resources (DERs) in light of their rapid growth and increasing integration into energy systems. It identifies critical gaps in existing frameworks, including inadequate coverage of DER-specific challenges, complexities in implementing comprehensive standards, integration issues with legacy systems, adoption hurdles for newer standards, and a lack of harmonization across regulatory landscapes. The analysis highlights vulnerabilities such as data integrity risks, unauthorized device control, and denial-of-service attacks across various DER technologies like solar PV, wind turbines, energy storage systems, and hydrogen fuel cells. The report proposes a harmonization strategy to address these deficiencies by developing unified cybersecurity requirements, certification programs, and training resources while fostering collaboration among stakeholders such as government agencies, industry groups, DER operators, manufacturers, and research institutions. A phased roadmap is outlined to refine and implement these measures through pilot testing and widespread adoption. Ultimately, the report underscores the urgent need for coordinated efforts to enhance DER cybersecurity and ensure the reliable operation of future energy systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Preliminary design of a lunar construction utility vehicle

Construction of a lunar base, prior to manned occupancy, is one of the most demanding technological challenges facing space system designers today. A flexible lunar construction machine is needed that can be operated remotely and that can perform a variety of construction tasks over a wide range of lunar conditions. A preliminary lunar construction utility vehicle (LCUV) design has been developed as part of a capstone design course at Old Dominion University and is described in this summary report. The design requirements are taken from a 1988 USRA Summer Design Report entitled The Lunar Split Mission: A Robotic Constructed Lunar Base Scenario, and from the proceedings of a workshop hosted by United Technologies Corporation entitled Report of the In Situ Resources Utilization Workshop. The first report describes a bootstrap base concept in which a minimum of essential surface elements are delivered and configured such that minimum EVA is required to bring the initial base on-line. The base is to be built in three phases, the first of which will be unmanned, while the second and third will be manned. The key to these concepts is the development of a semiautonomous, telerobotic lunar construction utility vehicle (LCUV). The tasks required of this robotic vehicle during the phase 1 build-up are as follows: (1) surface element transportation, handling, and assembly; (2) soil excavation and movement for site preparation; (3) radiation protection and materials processing; and (4) repair and maintenance of surface elements. In order to meet the stated requirements, the LCUV must be: (1) transformable to perform a wide variety of tasks; (2) self supporting; (3) designed to allow for telerobotic control as well as autonomous operation; (4) able to transport one fully configured space station common module (SSCM); (5) upgradable to allow for future growth; and (6) easy to maintain.

Bryant, C. A.↗

Solar Resource and Infrastructure Assessment for the Town of Blandford

This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Wendell

This report is a solar resource and infrastructure assessment for the town of Wendell, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Wendell. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Wendell are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. It appears that National Grid is planning an upgrade to the Wendell Depot substation, which might then allow in-process projects are to proceed, and potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Westhampton

This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

GeoRePORT Protocol Volume I: Background Document

The U.S. Department of Energy’s (DOE’s) Geothermal Technologies Office (GTO) uses various metrics to track and measure impacts of its funding meant to catalyze innovation and private investment. As an example, one GTO goal is to “accelerate development of…undiscovered hydrothermal resources” (Williams et al. 2008a). For goals to be useful, however, it is important to be able to develop and measure baseline values, as well as incremental improvements, both at the individual project and aggregated portfolio levels. This need was the driving force behind the development of the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT).

15 GEOTHERMAL ENERGY↗

Resource Assessment for Hydrogen Production

This analysis was conducted in support of the U.S. Department of Energy's H2@Scale initiative, and this report examines the resources required to meet demand for an additional 10 million metric tonnes (MMT) of hydrogen in 2040. The technical potential of hydrogen production from fossil, nuclear, and renewable energy resources is presented. Updated maps describe the geographical distribution of hydrogen production potential from renewable energy resources. The results conclude that the technical resource availability of domestic energy resources is sufficient to meet an additional 10 MMT of hydrogen demand in 2040, without placing significant pressure on existing resources. While this level of hydrogen demand could result in a significant increase in renewable energy consumption, in particular, the technical potential of each resource is estimated to be sufficient to meet the demand. Future research, to enable the large-scale integration of hydrogen in the U.S. energy and other sectors, will include analyzing the geographic distribution of resources in relation to hydrogen demand for a variety of applications. Additional techno-economic analysis is also needed to understand the economic potential of hydrogen in other industries, beyond transportation; such analysis is currently being undertaken by a multi-lab project initiated by DOE in 2016. Finally, information from techno-economic analyses should be used to continually update and inform R&D targets for energy production, hydrogen production, and hydrogen utilization technologies.

08 HYDROGEN↗

Real Time - Optimal Power Flow Based Distributed Energy Resources Management System (DERMS) (CRADA Number CRD-20-16909 Final Report)

The integration of behind-the-meter distributed energy resources (DERs) into distribution systems brings transformative changes to power systems. This requires operators and planners to find solutions to modernize electric grids and to effectively manage DERs for grid services. NREL developed novel DER management algorithms (referred to as Real-Time Optimal Power Flow, RT-OPF) through U.S. Department of Energy (DOE)-funded efforts, including Advanced Research Projects Agency–Energy (ARPA-E) Network Optimized Distributed Energy Systems (NODES) funding. This cutting-edge control technology aims to modernize distribution systems with large amounts of DER integration, which will help utilities solve issues brought by renewable integration and build resilient and renewable-based electric grids nationwide. Utilidata worked with NREL to investigate the commercialization opportunity of this RT-OPF-based distributed energy resource management system (DERMS). In this project, NREL performs the technology transfer of the RT-OPF to Utilidata to help them fully understand the RT-OPF solution, to identify potential engineering hurdles, and to assess the expected commercial value of various RT-OPF use cases and deployment. The technology transfer work includes two major tasks. First, NREL performs an in-depth knowledge transfer of the entire RT-OPF solution to Utilidata to help them gain an extensive and detailed understanding of the complete RT-OPF solution. In this task, NREL provides exhaustive information (e.g., documentation, code packages, laboratory and field trial data, performance results) while conducting in-depth training sessions to provide a thorough explanation of the entire solution. NREL hosts meetings to present different topics related to the RT-OPF solution, and question-and-answer sessions are included in each meeting to better explain the RT-OPF-related work. Second, the RT-OPF simulations are performed in a laboratory environment. The main objectives of this task are to walk through with Utilidata engineers how to set up a simulation of RT-OPF, identifying each RT-OPF code block/component in operation, learning how these components interact with each other, and eventually running RT-OPF simulations under various system conditions. This task helps Utilidata engineers understand performance limitations and constraints while also quantifying the commercial value of the RT-OPF for different use cases. Based on these two tasks, Utilidata engineers should be able to define and prioritize the next steps of RT-OPF implementation with an eye toward commercial success and scalability of the solution. The next steps are expected to be part of a new project following the conclusion of this project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Forest Resources

Forest biomass is an abundant biomass feedstock that complements the conventional forest use of wood for paper and wood materials. It may be utilized for bioenergy production, such as heat and electricity, as well as for biofuels and a variety of bioproducts, such as industrial chemicals, textiles, and other renewable materials. The resources within the 2016 Billion-Ton Report include primary forest resources, which are taken directly from timberland-only forests, removed from the land, and taken to the roadside.

Forest Resources Factsheet↗

Power Solitons in Inverter-based Electric Energy Systems: Observation, Analysis and Implications

The discovery of an unfamiliar class of nonlinear energy waves in electric energy systems with dominating coupled inverter-based energy resources has been reported in a recent research project. Whenever there are slight but persistent differences among the reference signals used by inverters in pulse-width modulation, i.e., a weak group modulation instability condition, the unfamiliar energy waves appear, which contain not only the familiar frequency components present in electric power systems but also self-organized components in the ultra-high frequency region of the energy spectrum. These components are found to be exploding solitary waves with concentrated energy masses, hence we call them power solitons. This paper explains the work of the discovery reported, and the implications of the presence of power solitons for grid integration of inverter-based resources and power system protection.

14 SOLAR ENERGY↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 13: Functional Specification Report(Deliverable D9))

This report provides functional specification for the AGGREGATE project and associated modules/ tools being developed for outage management and restoration with the Distributed Energy Resources (DERs). This report also provide initial validation of the developed modules and performance metrics. The AGGREGATE team at this stage has been collaborating with General Electric (GE) and Seattle City Light (SCL) to move forward from offline validation to online validation using commercial advanced distribution management system (ADMS). Hence, the functional specifications documents, which outline the requirement of various modules, is provided to address the integration of the modules, including 1) real-time model update and aggregation tools module, 2) observability and controllability metric module, 3) fault location solution service restoration module, 4) transmission-distribution co-simulation module, and 5) advanced distribution management system module. integration of different AGGREGATE modules and functional specification provides the foundation for online multi-scenario testing using SCL system model.

42 ENGINEERING↗