Search NASA⌕ Search

SEARCH · Search NASA

Results for “SERVICE MODULE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

The MSAT spacecraft of Telesat Mobile Inc.

The MSAT spacecraft of the Canadian mobile satellite operator, Telesat Mobile Inc. (TMI) is described. When launched in 1994, the large geostationary MSAT spacecraft which is currently under construction by Hughes Aircraft Co. and Spar Aerospace Ltd. will enable TMI to provide mobile and transportable communications services to its customers even in the most remote parts of the North American continent. The main elements of TMI's mobile satellite system (described in a companion paper) are the space segment and the ground segment. TMI's space segment will employ one of two nearly identical satellites, one of which will be owned and operated by TMI, the other by the U.S. mobile satellite operator, American Mobile Satellite Corporation (AMSC). The two companies are participating in a joint spacecraft procurement in order to reduce the nonrecurring costs and to ensure system compatibility between the two systems; and they have also agreed to provide in-orbit backup to each other in the event of a catastrophic satellite failure. The program status, performance requirements, main parameters, and configuration of the MSAT spacecraft are reviewed. The major features of the communications subsystem are discussed in some detail, and a brief summary is presented of the spacecraft service module. Key technology items include the L-band RF power amplifier, which must operate with a high DC to RF power efficiency and generate low intermodulation when loaded with multi-carrier signals; and the large diameter deployable L-band antenna. The development status and expected performance of these spacecraft components is examined.

Bertenyi, E.↗

Soyuz-TM-based interim Assured Crew Return Vehicle (ACRV) for the Space Station Freedom

The concept of using the available Soyuz-TM Assured Crew Return Vehicle (ACRV) spacecraft for the assurance of the safety of the Space Station Freedom (SSF) crew after the departure of the Space Shuttle from SSF was proposed by the NPO Energia and was accepted by NASA in 1992. The ACRV will provide the crew with the capability to evacuate a seriously injured/ill crewmember from the SSF to a ground-based care facility under medically tolerable conditions and with the capability for a safe evacuation from SSF in the events SSF becomes uninhabitable or the Space Shuttle flights are interrupted for a time that exceeds SSF ability for crew support and/or safe operations. This paper presents the main results of studies on Phase A (including studies on the service life of ACRV; spacecraft design and operations; prelaunch processing; mission support; safety, reliability, maintenance and quality and assurance; landing, and search/rescue operations; interfaces with the SSF and with Space Shuttle; crew accommodation; motion of orbital an service modules; and ACRV injection by the Expendable Launch Vehicles), along with the objectives of further work on the Phase B.

Yu P Semenov↗

STS-96 Crew Interview: Julie Payette

Live footage of a preflight interview with (French Canadian) Mission Specialist Julie Payette is seen. The interview addresses many different questions including why Payette wanted to be an astronaut, the events that led to her interest, and her career path. Other interesting information that this one-on-one interview discusses is this logistics and supply mission, why it is important to send equipment to the International Space Station (ISS) before the astronauts, and the Integrated Cargo Carrier. Payette mentions Discovery's anticipated docking with the ISS, the space walk with Mission Specialists Tamara E. Jernigan, and Daniel T. Barry and her responsibility as IV (intra-vehicular) crewmember. She also mentions plans for the supply and equipment transfers, the change out of battery chargers, her involvement in the installation of mufflers, the Canadian Space Vision Systems, and the future automatic docking of the Service Module to the Zarya Module of the ISS. A fly-around mission, and the deployment of the Student Tracked Atmospheric Research Satellite for Heuristic International Networking Equipment (STARSHINE) are also discussed.

Source record↗

STS-96 Crew Interview: Valery Tokarev

Live footage of a preflight interview with the Russian Cosmonaut Valery Ivanovich Tokarev is presented. The interview addresses many different questions including why Tokarev wanted to be a cosmonaut, and the events that led to his interest. Other interesting information that this one-on-one interview discusses is this logistics and supply mission, and why it is important to send equipment to the International Space Station (ISS) before the astronauts. Tokarev compares both the Russian and United States space programs, and space shuttles. He mentions the logistics and supply mission, plans to transfer the supply, his involvement with the installation of mufflers, and the undocking of Discovery. The future automatic docking of the Service Module to the Zarya Module of the ISS, and the role that the ISS will play in future space flight and exploration are also discussed.

Source record↗

Aerospace Safety Advisory Panel Annual Report for 1999

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for the calendar year 1999.This was a year of notable achievements and significant frustrations. Both the Space Shuttle and International Space Station (ISS) programs were delayed.The Space Shuttle prudently postponed launches after the occurrence of a wiring short during ascent of the STS-93 mission. The ISS construction schedule slipped as a result of the Space Shuttle delays and problems the Russians experienced in readying the Service Module and its launch vehicle. Each of these setbacks was dealt with in a constructive way. The STS-93 short circuit led to detailed wiring inspections and repairs on all four orbiters as well as analysis of other key subsystems for similar types of hidden damage. The ISS launch delays afforded time for further testing, training, development, and contingency planning. The safety consciousness of the NASA and contractor workforces, from hands-on labor to top management, continues high. Nevertheless, workforce issues remain among the most serious safety concerns of the Panel. Cutbacks and reorganizations over the past several years have resulted in problems related to workforce size, critical skills, and the extent of on-the-job experience. These problems have the potential to impact safety as the Space Shuttle launch rate increases to meet the demands of the ISS and its other customers. As with last year's report, these work- force-related issues were considered of sufficient import to place them first in the material that follows. Some of the same issues of concern for the Space Shuttle and ISS arose in a review of the launch vehicle for the Terra mission that the Panel was asked by NASA to undertake. Other areas the Panel was requested to assess included the readiness of the Inertial Upper Stage for the deployment of the Chandra X-ray Observatory and the possible safety impact of electromagnetic effects on the Space Shuttle. The findings and recommendations in this report do not highlight any major, immediate issues that might compromise the safe pursuit of the various NASA programs. They do, however, cover concerns that the Panel believes should be addressed in the interest of maintaining NASA's excellent safety record.The Panel is pleased to note that remedial efforts for some of the findings raised are underway. Given appropriate funding and cooperative efforts among the Administration, the Congress and the various contractors, the Panel is convinced that safety problems can be avoided or solved resulting in lower risk for NASA's human space and aeronautics programs. Section II of this report contains specific findings and recommendations generated by Panel activities during the calendar year 1999. Section III presents more detailed information in support of these findings and recommendations. A current roster of Panel members, consultants, and staff is included as Appendix A. Appendix B contains NASA's response to the findings and recommendations from the 1998 annual report. It has been augmented this year to include brief explanations of why the Panel classified the NASA response as " open,""continuing," or "closed." Appendix C lists the fact-finding activities of the Panel in 1999.

Blomberg, Richard D.↗

STS-106 Crew Interviews: Scott D. Altman

Live footage of a preflight interview with Pilot Scott D. Altman is seen. The interview addresses many different questions including why Altman became a pilot, the events that led to his interest, his career path through the Navy, and then finally, his selection by NASA as an astronaut. Other interesting information discussed in this one-on-one interview was his work on the movie set of "Top Gun," the highlights of his Navy career, and possible shorter time frame turnarounds for missions. Altman also mentions the scheduled docking with the new International Space Station (ISS) after the arrival of the Zvezda Service Module.

Source record↗

STS-106 Crew Interviews: Richard A. Mastracchio

Live footage of a preflight interview with Mission Specialist Richard A. Mastracchio is seen. The interview addresses many different questions including why Mastracchio became interested in the space program, the events that led to his interest, his 14 year career path through the Johnson Space Center (JSC) as an engineer before finally getting selected into the astronaut program. Other interesting information that this one-on-one interview discusses is the main goal of the STS-106 mission, and its scheduled docking with the new International Space Station (ISS) since the arrival and connection of the Zvezda Service Module. Mastracchio also mentions his responsibility during the much-anticipated docking and scheduled space-walk.

Source record↗

STS-106 Crew Interviews: Yuri Malenchenko

This NASA Johnson Space Center (JSC) video production presents an STS-106 pre-launch interview with Russian Cosmonaut/Mission Specialist Yuri Malenchenko, Col. Russian Air Force. Among other topics, Malenchenko discusses his 125-day space mission on Russian Space Station MIR in 1994, and his planned spacewalk to complete the connection between the Russian service module Svezda and the International Space Station (ISS). STS-106 is International Space Station assembly flight ISS-2A.2b and will utilize the SPACEHAB Double Module and the Integrated Cargo Carrier (ICC) to take supplies to the station. The mission will also include 2 spacewalks.

Source record↗

STS-106 Crew Activities Report/Flight Day 05 Highlights

On this fifth day of the STS-106 Atlantis mission, the flight crew, Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov are seen participating in several activities. Malenchenko and Wilcutt are seen opening the hatches of the Zvezda Service Module and the Zarya Control Module, and finally, the transfer chamber of Zvezda, Progress. Burbank and Mastracchio are seen transferring food and equipment, and removing the manual docking system of Zarya. Lu, Burbank and Malenchenko are also seen checking the hatch interfaces. Footage also shows the entire interior of the International Space Station (ISS) complex.

Source record↗

STS-106 Crew Activities Report/Flight Day 06 Highlights

On this sixth day of the STS-106 Atlantis mission, the flight crew, Commander Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov are seen participating in several outfitting and transferring activities. Burbank and Morukov replace batteries in Zarya, while Lu and Malenchenko install three batteries and electrical equipment inside the Zvezda Service Module. Footage of Wilcutt participating in an interview concludes the events of the day.

Source record↗

Evolution of International Space Station GN&C System Across ISS Assembly Stages

The Guidance Navigation and Control (GN&C) system for the International Space Station is initially implemented by the Functional Cargo Block (FGB) which was built by the Khrunichev Space Center under direct contract to Boeing. This element (Stage 1A/R) was launched on 20 November 1998 and is currently operating on-orbit. The components and capabilities of the FGB Motion Control System (MCS) are described. The next ISS element, which has GN&C functionality will be the Service Module (SM) built by Rocket Space Corporation-Energia. This module is scheduled for launch (Stage 1R) in early 2000. Following activation of the SM GN&C system, the FGB MCS is deactivated and no longer used. The components and capabilities of the SM GN&C system are described. When a Progress vehicle is attached to the ISS it can be used for reboost operations, based on commands provided by the Mission Control Center-Moscow. When a data connection is implemented between the SM and the Progress, the SM can command the Progress thrusters for attitude control and reboosts. On Stage 5A, the U.S. GN&C system will become activated when the U.S. Laboratory is de loyed and installed (launch schedule is currently TBD). The U.S. GN&C system provides non-propulsive control capabilities to support micro-gravity operations and minimize the use of propellant for attitude control, and an independent capability for determining the ISS state vector, attitude, attitude rate. and time.. The components and capabilities of the U.S. GN&C system are described and the interactions between the U.S. and Russian Segment GN&C systems are also described.

Lee, Roscoe↗

STS-106 Crew News Conference

The crew of STS-106, Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov are seen during an in-flight press conference. The crew answers questions about their mission, future work, and the Zvezda Service Module.

Source record↗

A Low Cost GPS System for Real-Time Tracking of Sounding Rockets

This paper describes the development as well as the on-ground and the in-flight evaluation of a low cost Global Positioning System (GPS) system for real-time tracking of sounding rockets. The flight unit comprises a modified ORION GPS receiver and a newly designed switchable antenna system composed of a helical antenna in the rocket tip and a dual-blade antenna combination attached to the body of the service module. Aside from the flight hardware a PC based terminal program has been developed to monitor the GPS data and graphically displays the rocket's path during the flight. In addition an Instantaneous Impact Point (IIP) prediction is performed based on the received position and velocity information. In preparation for ESA's Maxus-4 mission, a sounding rocket test flight was carried out at Esrange, Kiruna, on 19 Feb. 2001 to validate existing ground facilities and range safety installations. Due to the absence of a dedicated scientific payload, the flight offered the opportunity to test multiple GPS receivers and assess their performance for the tracking of sounding rockets. In addition to the ORION receiver, an Ashtech G12 HDMA receiver and a BAE (Canadian Marconi) Allstar receiver, both connected to a wrap-around antenna, have been flown on the same rocket as part of an independent experiment provided by the Goddard Space Flight Center. This allows an in-depth verification and trade-off of different receiver and antenna concepts.

Markgraf, M.↗

Aerospace Safety Advisory Panel

This annual report is based on the activities of the Aerospace Safety Advisory Panel in calendar year 2000. During this year, the construction of the International Space Station (ISS) moved into high gear. The launch of the Russian Service Module was followed by three Space Shuttle construction and logistics flights and the deployment of the Expedition One crew. Continuous habitation of the ISS has begun. To date, both the ISS and Space Shuttle programs have met or exceeded most of their flight objectives. In spite of the intensity of these efforts, it is clear that safety was always placed ahead of cost and schedule. This safety consciousness permitted the Panel to devote more of its efforts to examining the long-term picture. With ISS construction accelerating, demands on the Space Shuttle will increase. While Russian Soyuz and Progress spacecraft will make some flights, the Space Shuttle remains the primary vehicle to sustain the ISS and all other U.S. activities that require humans in space. Development of a next generation, human-rated vehicle has slowed due to a variety of technological problems and the absence of an approach that can accomplish the task significantly better than the Space Shuttle. Moreover, even if a viable design were currently available, the realities of funding and development cycles suggest that it would take many years to bring it to fruition. Thus, it is inescapable that for the foreseeable future the Space Shuttle will be the only human-rated vehicle available to the U.S. space program for support of the ISS and other missions requiring humans. Use of the Space Shuttle will extend well beyond current planning, and is likely to continue for the life of the ISS.

Source record↗

Radiation measurements on the International Space Station

The International Space Station (ISS) is becoming a reality with the docking of the Russian Service module (Zarya) with the Unity module (Zaveda). ISS will be in a nominal 51.65-degree inclination by 400 km orbit. This paper reviews the currently planned radiation measurements, which are in many instances, based on experiments previously flown on the Space Shuttle. Results to be expected based on Shuttle measurements are presented.

NASA Center JSC↗

Introduction and ISS assembly description

This introductory address provides a brief overview and a timeline for construction of the International Space Station, beginning with the July 2000 launch of the Russian Service Module, Zvezda, and ending with the Mission STS-112.

Facility Design and Construction↗

Space Station Radiator Test Hosted by NASA Lewis at Plum Brook Station

In April of 1997, the NASA Lewis Research Center hosted the testing of the photovoltaic thermal radiator that is to be launched in 1999 as part of flight 4A of the International Space Station. The tests were conducted by Lockheed Martin Vought Systems of Dallas, who built the radiator. This radiator, and three more like it, will be used to cool the electronic system and power storage batteries for the space station's solar power system. Three of the four units will also be used early on to cool the service module.

Speth, Randall C.↗

Structural Configuration Analysis of Crew Exploration Vehicle Concepts

Structural configuration modeling and finite element analysis of crew exploration vehicle (CEV) concepts are presented. In the structural configuration design approach, parametric solid models of the pressurized shell and tanks are developed. The CEV internal cabin pressure is same as in the International Space Station (ISS) to enable docking with the ISS without an intermediate airlock. Effects of this internal pressure load on the stress distribution, factor of safety, mass and deflections are investigated. Uniform 7 mm thick skin shell, 5 mm thick shell with ribs and frames, and isogrid skin construction options are investigated. From this limited study, the isogrid construction appears to provide most strength/mass ratio. Initial finite element analysis results on the service module tanks are also presented. These rapid finite element analyses, stress and factor of safety distribution results are presented as a part of lessons learned and to build up a structural mass estimation and sizing database for future technology support. This rapid structural analysis process may also facilitate better definition of the vehicles and components for rapid prototyping. However, these structural analysis results are highly conceptual and exploratory in nature and do not reflect current configuration designs being conducted at the program level by NASA and industry.

Mukhopadhyay, V.↗