Search NASA⌕ Search

SEARCH · Search NASA

Results for “Secondary Payloads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Comment on 'Time-optimal orbit transfer trajectory for solar sail spacecraft'

An analytic proof is presented to show that the orbital transfer times of an earth-to-Mars solar-sail propelled spacecraft trajectory as calculated by Jayaraman (1980) are incorrect. In particular, different boundary conditions are defined, which indicate that a minimization of the Hamiltonian, which Jayaraman used, can yield the wrong stationary solution. Transfer times are calculated using a neighboring extremal algorithm based on numerical differentiation in conjunction with Krogh's variable order, variable step size integrator, resulting in a transfer time of 322 days at 2 mm/sec-sq, with endpoint restraints satisfied to within 1/1 billion. Finally, it is concluded that minimization of flight time is secondary in importance to maximization of delivered payload and minimization of overall mission cost and risk.

Wood, L. J.↗

Crew Launch Vehicle (CLV) Upper Stage Configuration Selection Process

The Crew Launch Vehicle (CLV), a key component of NASA's blueprint for the next generation of spacecraft to take humans back to the moon, is being designed and built by engineers at NASA s Marshall Space Flight Center (MSFC). The vehicle s design is based on the results of NASA's 2005 Exploration Systems Architecture Study (ESAS), which called for development of a crew-launch system to reduce the gap between Shuttle retirement and Crew Exploration Vehicle (CEV) Initial Operating Capability, identification of key technologies required to enable and significantly enhance these reference exploration systems, and a reprioritization of near- and far-term technology investments. The Upper Stage Element (USE) of the CLV is a clean-sheet approach that is being designed and developed in-house, with element management at MSFC. The USE concept is a self-supporting cylindrical structure, approximately 115' long and 216" in diameter, consisting of the following subsystems: Primary Structures (LOX Tank, LH2 Tank, Intertank, Thrust Structure, Spacecraft Payload Adaptor, Interstage, Forward and Aft Skirts), Secondary Structures (Systems Tunnel), Avionics and Software, Main Propulsion System, Reaction Control System, Thrust Vector Control, Auxiliary Power Unit, and Hydraulic Systems. The ESAS originally recommended a CEV to be launched atop a four-segment Space Shuttle Main Engine (SSME) CLV, utilizing an RS-25 engine-powered upper stage. However, Agency decisions to utilize fewer CLV development steps to lunar missions, reduce the overall risk for the lunar program, and provide a more balanced engine production rate requirement prompted engineers to switch to a five-segment design with a single Saturn-derived J-2X engine. This approach provides for single upper stage engine development for the CLV and an Earth Departure Stage, single Reusable Solid Rocket Booster (RSRB) development for the CLV and a Cargo Launch Vehicle, and single core SSME development. While the RSRB design has changed since the CLV Project's inception, the USE design has remained essentially a clean-sheet approach. Although a clean-sheet upper stage design inherently carries more risk than a modified design, it does offer many advantages: a design for increased reliability; built-in extensibility to allow for commonality/growth without major redesign; and incorporation of state-of-the-art materials, hardware, and design, fabrication, and test techniques and processes to facilitate a potentially better, more reliable system. Because consideration was given in the ESAS to both clean-sheet and modified USE designs, this paper will highlight the advantages and disadvantages of both approaches and provide a detailed discussion of trades/selections made that led to the final upper stage configuration.

Davis, Daniel J.↗

Starprobe thermal shield system design concepts

The mission goals, flight trajectory, and material durability requirements for the NASA Starprobe spacecraft are reviewed. The spacecraft will use a Jovian gravity assist to pass within four solar radii of the sun to study fields and particles near the sun, perform experiments dealing with relativity and gravity, and observe the structure of the solar atmosphere from the photosphere to the corona. Constraints on the system size and mass design are given, and the system is noted to be required to withstand 2500 K at perihelion, thermally insulate the instrument payload, have a tube for optical measurements, and provide protection from meteorite damage. A secondary shield is also required to dispense thermal radiation that passes the primary shield and could endanger the payload. Design options are discussed, along with temperature control requirements and a conical carbon-carbon primary shield with mass-loss rate characteristics sufficient to meet a 2.5 mg/sec criterion.

Maag, C. R.↗

Payload Fairing Acoustic Trade Study: Fill Effect Modeling

A review of acoustic fill effect was conducted using vibroacoustic models of the NASA Space Launch System Block 1B 8.4-meter Payload Fairing. Fill effect is the term used to describe how sound pressure levels (SPLs) inside of a launch vehicle’s payload cavity change when a payload is present, compared to that of an unfilled cavity. Several vibroacoustic models with various payload shapes were developed and the deviation in output from an unfilled cavity model were compared to an analytical fill effect calculation. The analytical expression for the fill effect correction factor, known as the fill factor, is published in NASA-STD-7001B. The development and validation of the NASA fill factor is discussed to provide context for this study and define important variables including the volume fill percentage and the fairing-payload separation gap. The fill factor is reviewed from two perspectives; a global perspective which defines the volume ratio with respect to the entire fairing cavity, and a local perspective which defines the volume ratio with respect to a zone of interest dependent on the payload’s height. The global perspective was considered because it allows a decoupling of the volume ratio and fairing-payload separation gap variables. Both the global and local fill factor methods have difficulty capturing low frequency SPL because of a breakdown in the underlying assumptions of a diffuse acoustic field. Spatial variation in the pressure field at low frequency showed that axially oriented standing waves may be of concern for sensitive payload components; radial variation in SPL was found to be less significant. Further, a novel secondary derivation of the theoretical fill factor is posed for future work in which the absorption characteristics of the payload and fairing surfaces are considered. This work is supported by the NASA Glenn Research Center and the Space Launch System Payload Fairing Working Group.

Spacecraft environments↗

STS-47 Space Shuttle mission report

The STS-47 Space Shuttle Program Mission Report provides a summary of the Orbiter, External Tank (ET), Solid Rocket Booster/Redesigned Solid Rocket Motor (SRB/RSRM), and the Space Shuttle main engine (SSME) subsystem performance during the fiftieth Space Shuttle Program flight and the second flight of the Orbiter Vehicle Endeavour (OV-105). In addition to the Endeavour vehicle, the flight vehicle consisted of the following: an ET which was designated ET-45 (LWT-38); three SSME's which were serial numbers 2026, 2022, and 2029 and were located in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-053. The lightweight/redesigned RSRM that was installed in the left SRB was designated 360L026A, and the RSRM that was installed in the right SRB was 360W026B. The primary objective of the STS-47 flight was to successfully perform the planned operations of the Spacelab-J (SL-J) payload (containing 43 experiments--of which 34 were provided by the Japanese National Space Development Agency (NASDA)). The secondary objectives of this flight were to perform the operations of the Israeli Space Agency Investigation About Hornets (ISAIAH) payload, the Solid Surface Combustion Experiment (SSCE), the Shuttle Amateur Radio Experiment-2 (SAREX-2), and the Get-Away Special (GAS) payloads. The Ultraviolet Plume Instrument (UVPI) was flown as a payload of opportunity.

Fricke, Robert W., Jr.↗

Mission peculiar equipment /MPE/ for Spacelab Mission 1 payload

A variety of payload integrator-furnished, Mission Peculiar Equipment (MPE) has been incorporated by the Spacelab Mission 1 payload complement in order to satisfy each payload developer's interface and service requirements. Attention is given to the design features of secondary structures, the NASA Experiment Power Branching Distributor and ESA Junction Box, module cabling and vent lines, and passive thermal protection. A major task to be fulfilled during payload integration is the satisfaction of all instrument and facility servicing requirements without mutual interference.

Sims, J. H.↗

STS-75 Flight Day 1

On this first day of the STS-75 mission, the flight crew, Cmdr. Andrew Allen, Pilot Scott Horowitz, Payload Cmdr. Franklin Chang-Diaz, Payload Specialist Umberto Guidoni (Italy), and Mission Specialists Jeffrey Hoffman, Maurizio Cheli (ESA) and Claude Nicollier (ESA), were shown performing pre-launch and launching activities. This international space mission's primary objective is the deployment of the Tethered Satellite System Reflight (TSS-1R) to a 12 mile length from the shuttle, a variety of experiments, and the satellite retrieval. These experiments include: Research on Orbital Plasma Electrodynamics (ROPE); TSS Deployer Core Equipment and Satellite Core Equipment (DCORE/SCORE); Research on Electrodynamic Tether Effects (RETE); Magnetic Field Experiments for TSS Missions (TEMAG); Shuttle Electrodynamic Tether Systems (SETS); Shuttle Potential and Return Electron Experiment (SPREE); Tether Optical Phenomena Experiment (TOP); and Observations at the Earth's Surface of Electromagnetic Emissions by TSS (OESSE). The mission's secondary objectives were those experiments found in the United States Microgravity Payload-3 (USMP-3), which include: Advanced Automated Directional Solidification Furnace (AADSF); Material pour l'Etude des Phenomenes Interessant la Solidification sur Terre et en Orbite (MEPHISTO); Space Acceleration Measurement System (SAMS); Orbital Acceleration Research Experiment (OARE); Critical Fluid Scattering Experiment (ZENO); and Isothermal Dendritic Growth Experiment (IDGE).

Source record↗

NASA/USRA advanced space design program: The laser powered interorbital vehicle

A preliminary design is presented for a low-thrust Laser Powered Interorbital Vehicle (LPIV) intended for cargo transportation between an earth space station and a lunar base. The LPIV receives its power from two iodide laser stations, one orbiting the earth and the other located on the surface of the moon. The selected mission utilizes a spiral trajectory, characteristic of a low-thrust spacecraft, requiring 8 days for a lunar rendezvous and an additional 9 days for return. The ship's configuration consists primarily of an optical train, two hydrogen plasma engines, a 37.1 m box beam truss, a payload module, and fuel tanks. The total mass of the vehicle fully loaded is 63300 kg. A single plasma, regeneratively cooled engine design is incorporated into the two 500 N engines. These are connected to the spacecraft by turntables which allow the vehicle to thrust tangentially to the flight path. Proper collection and transmission of the laser beam to the thrust chambers is provided through the optical train. This system consists of the 23 m diameter primary mirror, a convex parabolic secondary mirror, a beam splitter and two concave parabolic tertiary mirrors. The payload bay is capable of carrying 18000 kg of cargo. The module is located opposite the primary mirror on the main truss. Fuel tanks carrying a maximum of 35000 kg of liquid hydrogen are fastened to tracks which allow the tanks to be moved perpendicular to the main truss. This capability is required to prevent the center of mass from moving out of the thrust vector line. The laser beam is located and tracked by means of an acquisition, pointing and tracking system which can be locked onto the space-based laser station. Correct orientation of the spacecraft with the laser beam is maintained by control moment gyros and reaction control rockets. Additionally an aerobrake configuration was designed to provide the option of using the atmospheric drag in place of propulsion for a return trajectory.

Source record↗

Laser powered interorbital vehicle

A preliminary design of a low-thrust Laser Powered Interorbital Vehicle (LPIV) intended for cargo transportation between an Earth space station and a lunar base is presented. The selected mission utilizes a spiral trajectory, characteristic of a low-thrust spacecraft, requiring eight days for a lunar rendezvous and an additional nine days for return. The ship's configuration consists primarily of an optical train, two hydrogen plasma engines, a 37.1 m box-beam truss, a payload module, and propellant tanks. The total mass of the vehicle, fully loaded, is 63,300 kg. A single plasma, regeneratively cooled engine design is incorporated into the two 500 N engines. These are connected to the spacecraft by turntables that allow the vehicle to thrust tangential to the flight path. Proper collection and transmission of the laser beam to the thrust chambers is provided through the optical train. This system consists of a 23-m-diameter primary mirror, a convex parabolic secondary mirror, a beam splitter, and two concave parabolic tertiary mirrors. The payload bay is capable of carrying 18,000 kg of cargo and is located opposite the primary mirror on the main truss. Fuel tanks carrying a maximum of 35,000 kg of liquid hydrogen are fastened to tracks that allow the tanks to be moved perpendicular to the main truss. This capability is required to prevent the center of mass from moving out of the thrust vector line. The laser beam is located and tracked by means of an acquisition, pointing, and tracking system that can be locked onto the space-based laser station. Correct orientation of the spacecraft with the laser beam is maintained by control moment gyros and reaction control rockets. In addition, an aerobrake configuration was designed to provide the option of using the atmospheric drag in place of propulsion for a return trajectory.

Clarke, M. T.↗

A theoretical evaluation of aluminum gel propellant two-phase flow losses on vehicle performance

A one-dimensional model of a hydrocarbon/Al/O2(gaseous) fueled rocket combustion chamber was developed to study secondary atomization effects on propellant combustion. This chamber model was coupled with a two dimensional, two-phase flow nozzle code to estimate the two-phase flow losses associated with solid combustion products. Results indicate that moderate secondary atomization significantly reduces propellant burnout distance and Al2O3 particle size; however, secondary atomization provides only moderate decreases in two-phase flow induced I(sub sp) losses. Despite these two-phase flow losses, a simple mission study indicates that aluminum gel propellants may permit a greater maximum payload than the hydrocarbon/O2 bi-propellant combination for a vehicle of fixed propellant volume. Secondary atomization was also found to reduce radiation losses from the solid combustion products to the chamber walls, primarily through reductions in propellant burnout distance.

Mueller, Donn C.↗

The AFIT gross motion control project

The objective of the Gross Motion Control project is to study alternative control approaches that will provide payload invariant high speed trajectory tracking for nonrepetitive motions in free space. The research has concentrated on modifications to the model-based control structure. Development and evaluation is being actively pursued of both adaptive primary (inner loop) and robust secondary (output loop) controllers. In-house developments are compared and contrasted to the techniques proposed by other researchers. The case study for the evaluation is the first three links of a PUMA-560. Incorporating the principals of multiple model adaptive estimation, artificial neural networks, and Lyapunov theory into the model based paradigm has shown the potential for enhanced tracking. Secondary controllers based on Quantitative Feedback Theory, or augmented with auxiliary inputs, significantly improve the robustness to payload variations and unmodeled drive system dynamics. An overview is presented of the different concepts under investigation and a sample is provided of the latest experimental results.

Leahy, M. B., Jr.↗

The Payload and Operations of the Hera Mission

On 26 September 2022, NASA’s DART mission successfully impacted on Dimorphos, the secondary of the binary asteroid Didymos. DART released the Light Italian Cubesat for Imaging of Asteroids (LICIACube) two weeks before the impact, and LICIACube flew by the asteroids three minutes after the impact. On approach, DART took images of both asteroids, which, supported by additional imagery from LICIACube, characterized the pre-impact state of the Didymos system. DART changed the orbit of Dimorphos around Didymos, reducing its orbital period by 33 minutes. DART will be followed by a detailed investigation of the Didymos system and the outcome of the impact by ESA’s Hera mission. Hera will be launched in October 2024 and arrive at Didymos in early 2027. The presentation will focus on the payload of the Hera mission and the operations at the asteroid system. The main objectives of the Hera mission are to: - Measure the mass of Dimorphos to accurately measure the momentum transfer efficiency of the DART impact. - Characterise the change of the surface of Dimorphos by DART, including the properties (and existence!) of the DART crater, to improve our understanding of impact physics and to observe unweathered material, recently exposed at the surface. - Determine the physical properties of Dimorphos, including its internal structure, to allow scaling of the impact to different types of asteroids. - Measure the dynamical and physical state of the Didymos and Dimorphos system to constrain binary formation scenarios. Hera is equipped with the following payload: Two Asteroid Framing Cameras (AFCs) for both science and navigation. There resolution is ~10-4 rad/pixel, or 40 cm/pixel for close observations from 4 km. They will provide the target global properties as well as local geomorphology and will investigate the crater and impact site. They will also measure the mass of Dimorphos through the “wobble” motion of Didymos. The Planetary ALTimeter (PALT) will measure the distance to the target and shape and topography information complementary to that from AFC images. The Thermal InfraRed Imager (TIRI) will provide information about the thermal properties of the Didymos system and spectral information in the mid-infrared (6 bands from 7 – 14 µm). The Hyperscout-H hyperspectral imager will provide mineralogical information from 25 spectral bands between 665 and 975 nm. Milani, a 6 unit cubesat, will carry a visible to near-IR imaging spectrometer (ASPECT, 500 – 2500 nm) to derive mineralogical information on the composition of the asteroids, and a thermogravimeter (VISTA) to measure the abundance and constrain the composition of ambient dust particles. Juventas, a 6 unit cubesat, will carry a monostatic low-frequency radar (JuRa), and a gravimeter (GRASS) to derive interior and surface properties of the asteroids. The Radio Science experiment will measure the gravity field of the Didymos system. Measurements of the acceleration of the Hera spacecraft by the asteroid pair through the radio link between Earth and Hera will be used as well as the inter-satellite link between Hera and the two cubesats. We will describe how the goals of Hera will be achieved with the different payload elements.

Michael Küppers↗

Get the Power You Need, When and Where You Need It Aboard the International Space Station (ISS) Using the ISS Plug-In Plan (IPiP) Requirement Request Process

Trying to get your experiment aboard ISS? You likely will need power. Many enditem providers do. ISS Plug-In Plan (IPiP) supports power and data for science, Payloads (or Utilization), vehicle systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Yet limited resources and increasing requirements continue to influence decisions on deployment of ISS end items. Given the fluid launch schedule and the rapidly- increasing number of end item providers requiring power support, the focus of the Plug-In Plan has evolved from a simple FIFO recommendation to provide power to end item users, to anticipating future requirements by judicious development and delivery of support equipment (cables, power supplies, power strips, and alternating current (AC) power inverters), employing innovative deployment strategies, and collaborating on end item development. This paper describes the evolution of the ISS Program Office, Engineering Directorate, Flight Operations Directorate (FOD), International Partners and the end item provider relationship and how collaboration successfully leverages unique requirements with limited on- board equipment and resources, tools and processes which result in more agile integration, and describes the process designed for the new ISS end item provider to assure that their power requirements will be met.

Moore, Kevin D.↗

Autonomous In-space Construction, Maintenance, and Reconfiguration Using Programmable Meta-Material

NASA ARC's Coded Structures Laboratory (CSL) is developing autonomous construction, maintenance, and reconfiguration technologies to meet long-duration and deep space infrastructure needs, in accordance with long-term NASA goals of "in-space reliance" and "mass-less exploration." We seek to achieve these capabilities by utilizing a "programmable meta-material" approach that integrates emerging advances in materials (mechanical meta-materials), manufacturing (cooperative mobile robotics), and autonomy (multi-agent planning algorithms). Through the ARMADAS project, we have shown assembly of high-performance engineered cellular materials using multiple cooperating mobile robotic assemblers. In this paper, we describe how such a programmable meta-material architecture may shift the paradigm of how we design, build, manufacture, and operate future space infrastructure and assets. The core of a programmable meta-material architecture consists of 3 main technology sub-areas: the structure, the assembly agents, and the assembly algorithms. We co-design these systems to ensure an adaptable system that can create and reconfigure structures from a base set of building block components. From this core technology, we can branch out and expand the capability of the system through additional secondary component types and robotic agents to perform activities such as inspections, maintenance, repair, payload installation, or perform power and communications interconnect. As these technologies mature, future designers will be able to utilize the system to rapidly integrate and operate assets in space or on planetary surfaces from a set of well-tested part library, or create their own modules to integrate into the system. A core trait to the development of this system is the automation approach. Because of the modular and functional discrete (pixel-like) nature of the structural system, a diverse set of powerful algorithms for analysis, planning, and simulation can be adapted and leveraged to optimize construction, maintenance, and dynamic reorganization (as hardware with programmable form and function). With an ability to free the design space from launch vehicle constraints and fundamentally shift how a mission is designed and conducted, we discuss the influence of a programmable meta-material architecture on mission design, build, and operations. For the "design phase", we discuss project lifecycle effects, costs, time, and performance. For the "build phase", we discuss reusability, ISRU, manufacturing, material logistics, and scalability. And for "operations", we discuss autonomy, maintenance and upgrades, reliability, and reconfiguration. Autonomy and modularity are the primary enabling traits of this system. Engineering systems that utilize a modular and reconfiguration building block approach such as digital communication and computation systems, currently lead all other areas of technology in size and complexity scalability. NASA is extending the benefits and flexibility of digital systems to hardware systems, to optimize materials lifecycle management and expand our space exploration mission capabilities.

in space assembly↗

STS-46 Space Shuttle mission report

The STS-46 Space Shuttle Program Mission Report contains a summary of the Orbiter, External Tank (ET), Solid Rocket Booster/Redesigned Solid Rocket Motor (SRB/RSRM), and the Space Shuttle main engine (SSME) subsystem performance during the forty-ninth flight of the Space Shuttle Program, and the twelfth flight of the Orbiter vehicle Atlantis (OV-104). In addition to the Atlantis vehicle, the flight vehicle consisted of the following: an ET, designated ET-48 (LWT-41); three SSME's, which were serial numbers 2032, 2033, and 2027 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-052. The lightweight/redesigned SRM's that were installed in each SRB were designated 360W025A for the left RSRM and 360L025B for the right RSRM. The primary objective of this flight was to successfully deploy the European Retrievable Carrier (EURECA) payload and perform the operations of the Tethered Satellite System-1 (TSS-1) and the Evaluation of Oxygen Interaction with Material 3/Thermal Energy Management Processes 2A-3 (EOIM-3/TEMP 2A-3). The secondary objectives of this flight were to perform the operations of the IMAX Cargo Bay Camera (ICBC), Consortium for Material Development in Space Complex Autonomous Payload-2 and 3 (CONCAP-2 and CONCAP-3), Limited Duration Space Environment Candidate Materials Exposure (LDCE), Pituitary Growth Hormone Cell Function (PHCF), and Ultraviolet Plume Instrumentation (UVPI). In addition to summarizing subsystem performance, this report also discusses each Orbiter, ET, SSME, SRB, and RSRM in-flight anomaly in the applicable section of the report. Also included in the discussion is a reference to the assigned tracking number as published on the Problem Tracking List. All times are given in Greenwich mean time (G.m.t.) as well as mission elapsed time (MET).

Fricke, Robert W.↗

Human Mars Entry, Descent, and Landing Architecture Study: Phase 3 Summary

Over the past four years, NASA has directed the Entry, Descent and Landing Architecture Study (EDLAS) to evaluate candidate technologies to deliver human-scale vehicles (carrying 20t payloads) to the surface of Mars. The study focused on two vehicles in Phase 3 (during 2018 and 2019), one low and one mid lift-to-drag (L/D) vehicle. This paper summarizes updates to the structural and aeroshell outer mold line design for the mid-L/D Mars entry lander vehicle that occurred during EDLAS Phase 3. The design efforts used parametric optimization to arrive at a solution for total vehicle primary and secondary structure mass, and vehicle center-of-gravity location. Additionally, the end of Phase 2 provided an updated surface payload manifest that required three 22 t landers. This paper also summarizes the results of the packaging feasibility study of the updated payload configurations for those three reference missions. The study verified an arrangement of the payload elements within the mid-L/D vehicle that satisfied the center of gravity location limitations for flight.

Calderon, Damien↗

Launch Vehicle Production and Operations Cost Metrics

Traditionally, launch vehicle cost has been evaluated based on $/Kg to orbit. This metric is calculated based on assumptions not typically met by a specific mission. These assumptions include the specified orbit whether Low Earth Orbit (LEO), Geostationary Earth Orbit (GEO), or both. The metric also assumes the payload utilizes the full lift mass of the launch vehicle, which is rarely true even with secondary payloads.1,2,3 Other approaches for cost metrics have been evaluated including unit cost of the launch vehicle and an approach to consider the full program production and operations costs.4 Unit cost considers the variable cost of the vehicle and the definition of variable costs are discussed. The full program production and operation costs include both the variable costs and the manufacturing base. This metric also distinguishes operations costs from production costs, including pre-flight operational testing. Operations costs also consider the costs of flight operations, including control center operation and maintenance. Each of these 3 cost metrics show different sensitivities to various aspects of launch vehicle cost drivers. The comparison of these metrics provides the strengths and weaknesses of each yielding an assessment useful for cost metric selection for launch vehicle programs.

Watson, Michael D.↗