Search NASA⌕ Search

SEARCH · Search NASA

Results for “Source Recovery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Higher Order Mode Damping in a Five-cell Superconducting RF Cavity with a PBG Coupler Cell

We present a study of higher order mode (HOM) damping in the first multi-cell superconducting radio frequency (SRF) cavity with a photonic band gap (PBG) coupler cell. Achieving higher average beam currents is particularly desirable for future light sources and particle colliders based on SRF energy-recovery-linacs (ERLs). Beam current in ERLs is limited by the beam break-up instability, caused by parasitic HOMs interacting with the beam in accelerating cavities. A PBG cell incorporated in an accelerating cavity can reduce the negative effect of HOMs by providing a frequency selective damping mechanism, thus allowing significantly higher beam currents. The five-cell cavity with a PBG cell was designed and optimized for HOM damping. Monopole and dipole HOMs were simulated. The SRF cavity was fabricated and tuned. External quality factors for some HOMs were measured in a cold test. The measurements agreed well with the simulations.

43 PARTICLE ACCELERATORS↗

STRENGTH OF N- AND P-TYPE SKUTTERUDITES

The failure stress distributions of developmental Yb0.27Co4Sb12.08 (n-type) and Ce0.86Co1.02Fe2.98Sb11.97 (p type) skutterudites were measured as a function of temperature. These thermoelectric materials are attractive candidates for use in devices under consideration for power generation sourced from intermediate to high-temperature waste heat recovery. A self-aligning, high-temperature-capable, three-point-bend fixture was developed and used to test specimens whose cross-sectional dimensions were equivalent to those typically used in thermoelectric device legs. The strength of the n-type skutterudite was approximately 115 MPa and independent of temperature to 500 C. The strength of the p-type skutterudite was equivalent to that of the n type material and independent of temperature to at least 200 C, but its strength dropped by ~20% at 400 C. Compared to other skutterudites, the herein tested compositions have equivalent or even superior strength.

36 MATERIALS SCIENCE↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Final Radiological Assessment of External Exposure for CLEAR-Line Americium Recovery Operations

Los Alamos National Laboratory is currently planning to implement an americium recovery program. The americium, ordinarily isotopically pure 241Am, would be extracted from existing Pu materials, converted to an oxide and shipped to support fabrication of americium oxide-beryllium neutron sources. These operations would occur in the currently proposed Chloride Extraction and Actinide Recovery (CLEAR) line of glove boxes. This glove box line would be collocated with the currently-operational Experimental Chloride Extraction Line (EXCEL). The focus of this document is to provide an in-depth assessment of the currently planned radiation protection measures and to determine whether or not further design work is required to satisfy design-goal and ALARA requirements. Further, this document presents a history of americium recovery operations in the Department of Energy and high-level descriptions of the CLEAR line operations to provide a basis of comparison. Under the working assumptions adopted by this study, it was found that the evaluated design appears to mitigate doses to a level that satisfies the ALARA-in-design requirements of 10 CFR 835 as implemented by the Los Alamos National Laboratory procedure P121. The analyses indicate that extremity doses would also meet design requirements. Dose-rate calculations were performed using the radiation transport code MCNP5 and doses were estimated using a time-motion study developed in consort with the subject matter expert. A copy of this report and all supporting documentation are located on the Radiological Engineering server at Y:\Rad Engineering\2013 PROJECTS\TA-55 Clear Line.

61 RADIATION PROTECTION AND DOSIMETRY↗

Measuring the effects of pore-pressure changes on seismic amplitude using crosswell continuous active-source seismic monitoring (CASSM)

Monitoring of time-varying reservoir properties, such as the state of stress, is a primary goal of geophysical investigations, including for geological sequestration of CO 2 , enhanced hydrocarbon recovery (EOR), and other subsurface engineering activities. In this work, we used Continuous Active-Source Seismic Monitoring (CASSM), with cross-well geometry, to measure variation in seismic coda amplitude, as a consequence of effective stress change (in the form of changes in pore fluid pressure). To our knowledge, the presented results are the first in-situ example of such crosswell measurement at reservoir scale and in field conditions. Data compliment the findings of our previous work which investigated the relationship between pore fluid pressure and seismic velocity (velocity-stress sensitivity) using the CASSM system at the same field site (Marchesini et al., 2017, in review). We find that P-wave coda amplitude decreases with decreasing pore pressure (increasing effective stress).

58 GEOSCIENCES↗

Benefits and Costs of Aggressive Energy Efficiency Programs and the Impacts of Alternative Sources of Funding: Case Study of Massachusetts

Increased interest by state (and federal) policymakers and regulatory agencies in pursuing aggressive energy efficiency efforts could deliver significant utility bill savings for customers while having long-term implications for ratepayers (e.g. potential rate impacts). Equity and distributional concerns associated with the authorized recovery of energy efficiency program costs may necessitate the pursuit of alternative program funding approaches. In 2008, Massachusetts passed the Green Communities Act which directed its energy efficiency (EE) program administrators to obtain all cost-effective EE resources. This goal has translated into achieving annual electric energy savings equivalent to a 2.4% reduction in retail sales from energy efficiency programs in 2012. Representatives of electricity consumer groups supported the new portfolio of EE programs (and the projected bill savings) but raised concerns about the potential rate impacts associated with achieving such aggressive EE goals, leading policymakers to seek out alternative funding sources which can potentially mitigate these effects. Utility administrators have also raised concerns about under-recovery of fixed costs when aggressive energy efficiency programs are pursued and have proposed ratemaking policies (e.g. decoupling) and business models that better align the utility's financial interests with the state's energy efficiency public policy goals. Quantifying these concerns and identifying ways they can be addressed are crucial steps in gaining the support of major stakeholder groups - lessons that can apply to other states looking to significantly increase savings targets that can be achieved from their own ratepayer-funded energy efficiency programs. We use a pro-forma utility financial model to quantify the bill and rate impacts on electricity customers when very aggressive annual energy efficiency savings goals ({approx}2.4%) are achieved over the long-term and also assess the impact of different cost recovery approaches that integrate alternative revenue sources. We also analyze alternative lost fixed cost recovery approaches to better understand how to mitigate the erosion of utility shareholder returns in states that have adopted (and achieved) very aggressive savings targets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Material Design Strategies for Recovery of Critical Resources from Water

Population growth, urbanization, and decarbonization efforts are collectively straining the supply of limited resources that are necessary to produce batteries, electronics, chemicals, fertilizers, and other important products. Securing the supply chains of these critical resources via the development of separation technologies for their recovery represents a major global challenge to ensure stability and security. Surface water, groundwater, and wastewater are emerging as potential new sources to bolster these supply chains. Recently, a variety of material-based technologies have been developed and employed for separations and resource recovery in water. Judicious selection and design of these materials to tune their properties for targeting specific solutes is central to realizing the potential of water as a source for critical resources. Here, the materials that are developed for membranes, sorbents, catalysts, electrodes, and interfacial solar steam generators that demonstrate promise for applications in critical resource recovery are reviewed. In addition, a critical perspective is offered on the grand challenges and key research directions that need to be addressed to improve their practical viability.

36 MATERIALS SCIENCE↗

Spatial and temporal characterization of municipal solid waste based on resource recovery pathways

This study presents a two-year, quarterly assessment of MSW across four source sectors (residential, schools, restaurants, and grocery stores) from sixteen sites across five U.S. states. MSW was manually sorted into 27 categories and aggregated into pathway fractions: high-moisture (HM) organics, low-moisture (LM) organics, recyclable (RC) materials, and residuals for disposal. Organics represented 89 % of the MSW stream. The largest fraction was HM organics consisting of food waste (31 %) and yard waste (3 %), with large coefficient of variations (CV), 79 and 278 %, respectively, reflecting high seasonal and site variability that varied significantly (p < 0.01) across sampling periods. The HM fraction showed properties favorable for anaerobic digestion, with moisture content ranging from 56 to 95 % and volatile solids ranges of 86-95 %. In contrast, the LM and RC fractions remained more stable (plastics CV = 41 %; paper CV = 53 %) with heating values up to 26.9 MJ/kg across sources, reflecting suitability for gasification. Microstructural analysis revealed less porosity in residential waste sampled at the landfill, which can influence preprocessing efficiency and microbial accessibility. Pathway informed allocations showed that 35 % of MSW is suitable for anaerobic digestion, 36 % for gasification, and 18 % for recycling, leaving 11 % requiring landfill disposal. These results provide quantitative evidence to determine feedstock allocation, waste-to-energy system design, and the development of data-driven sustainability and resource recovery strategies within a circular bioeconomy.

09 BIOMASS FUELS↗

Lithium manganese oxide (LiMn{sub 2}O{sub 4}) nanoparticles synthesized by hydrothermal method as adsorbent of lithium recovery process from geothermal fluid of Lumpur Sidoarjo

Lumpur Sidoarjo is one of geothermal fluid types which has a great potential as source of lithium. Adsorption method with Lithium Manganese Oxide (LiMn{sub 2}O{sub 4}) as an adsorbent has been chosen for lithium recovery process due to low production cost and environmental friendly. LiMn{sub 2}O{sub 4} was synthesized by hydrothermal method at 200 °C for 24 hrs, 48 hrs, and 72 hrs. As prepared LiMn{sub 2}O{sub 4} powder is treated by acid treatment with 0.5 M HCl solution for 24 hrs. XRD test result reveals that all of as-prepared samples are indexed as spinel structure of LiMn{sub 2}O{sub 4} (JCPDS card no 35-0782) with no impurity peaks detected. SEM images show that LiMn{sub 2}O{sub 4} has nanoparticles morphology with particle size around 25 nm. The highest adsorption efficiency of adsorbent is obtained by sample hydrothermal for 72 hrs with 42.76%.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Vacuum system of the compact Energy Recovery Linac

The compact Energy Recovery Linac (cERL), a test accelerator to establish important technologies demanded for future ERL-based light sources, was constructed in late 2013 at KEK. The accelerator was successfully commissioned in early 2014, and demonstrated beam circulation with energy recovery. In the cERL vacuum system, low-impedance vacuum components are required to circulate high-intensity, low-emittance and short-bunch electron beams. We therefore developed ultra-high-vacuum (UHV)-compatible flanges that can connect beam tubes seamlessly, and employed retractable beam monitors, namely, a movable Faraday cup and screen monitors. In most parts of the accelerator, pressures below 1×10{sup −7} Pa are required to mitigate beam-gas interactions. Particularly, near the photocathode electron gun and the superconducting (SC) cavities, pressures below 1×10{sup −8} Pa are required. The beam tubes in the sections adjoining the SC cavities were coated with non-evaporable getter (NEG) materials, to reduce gas condensation on the cryo-surfaces. During the accelerator commissioning, stray magnetic fields from the permanent magnets of some cold cathode gauges (CCGs) were identified as a source of the disturbance to the beam orbit. Magnetic shielding was specially designed as a remedy for this issue.

43 PARTICLE ACCELERATORS↗

American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 282 Renewable Energy Opportunities at Fort Gordon, Georgia

This document provides an overview of renewable resource potential at Fort Gordon, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the American Recovery and Reinvestment Act (ARRA) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Gordon took place on March 9, 2010.

15 GEOTHERMAL ENERGY↗

Antarctica Radiological Source Removals (Final Report)

On 18 May 2015, the research vessel Akademik Fedorov of the Russian Antarctic Expedition (RAE) delivered four radioisotope thermoelectric generators (RTGs) from Antarctica to the port of St. Petersburg, Russia. The RTGs had been previously used in the work program of the former Soviet Antarctic Expedition (SAE). From the mid-1970s, RTGs have been used to provide autonomous power at geophysical and meteorological stations located in remote regions of Antarctica. The research was completed in the early 1990s, but not all the generators had been removed when the stations were decommissioned. The remaining four unsecured RTGs, with their strontium-90 ( 90 Sr) radiological material and a combined total activity of 80,000 curies (Ci), still posed a potential risk as they could be used for nefarious purposes. Therefore, a plan of action for the removal of the RTGs from Antarctica was developed. This was done within the framework of the international program for the disposal of Russian RTGs. Financial support and technical oversight was provided by the U.S. Department of Energy (DOE), while logistical support was provided by the Russian Antarctic Expedition (RAE) of the Arctic and Antarctic Research Institute (AARI) and by subsidiaries of the Russian Federation’s Rosatom State Corporation. Recovering and repatriating the RTGs from the continent of Antarctica to the Russian Federation proved to be a very difficult task, including satisfying all the legal aspects within a very tight timeframe. This involved indemnification issues, adhering to new laws enacted after the Soviet Union era, and obtaining all the necessary permits and certifications for transport of the RTGs by air, sea, and land. It was an international, collaborative effort involving the cooperation of multiple organizations to complete the legal work and preparation of necessary documents. In addition, AARI needed to create a separate structure within its organization to manage the process, including the provision of special medical screenings, training, and certifications of its institute personnel. This was done so AARI could fulfill its obligation for the safe handling of radioactive materials while in the field. Recovery of the RTGs required overcoming several logistical hurdles. The Akademik Fedorov, which transported the RTGs back to the Russian Federation, required retrofits to accommodate the RTGs for safe and secure transport of radioactive material. The United States Project Team (USPT) inspected the vessel while it was in dry dock in Turku, Finland, being retrofitted with their design. Special sleds had to be designed to transport RTGs, as well as equipment for identifying crevasses in the glaciers, over the Antarctic packed snow and ice. Provision of adequate fuel supplies for the long trek to the interior of Antarctica to recover one of the RTGs also had to be addressed. With the successful recovery, repatriation, and disassembly of the RTGs, the Radioactive Heat Sources (RHSs) were extracted and dispositioned, thus eliminating any risk of these radioactive sources being used for terrorist purposes. Successful completion of the project also fulfilled the requirements of the Protocol on Environmental Protection to the Antarctic Treaty concerning the need to remove unused radioactive materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geochemical characterization of lithium deposition in fossil energy wastes

Lithium is a critical mineral used in rechargeable batteries for electric vehicles (EVs) and future modernization of electric grids with sensitive supply chains that are subject to volatility. Therefore, methods to recover lithium from domestic unconventional sources are actively being pursued in the United States. Herein, we report on the lithium recovery potential from four fossil energy waste feedstocks: oil and gas drill cuttings (sample number n = 16); oil and gas produced waters (n > 200) from Marcellus, Bakken and Permian basins; coal byproducts (n>20), such as coal ash; and acid mine drainage treatment solids (AMD solids). Select solid samples underwent sequential extraction to explore lithium hosting phases and simple organic and inorganic acid extraction to explore lithium recovery potential. Our preliminary results found lithium concentrations up to 440 mg/kg in select AMD treatment solids and up to 300 mg/L in Marcellus Shale produced waters, demonstrating these sources have lithium yield potentials comparable to conventionally mined lithium ores and brines. Sequential extractions revealed that lithium is mostly associated with clay and silicate phases in shale drill cuttings, whereas lithium resides in Fe,Mn-oxide reducible phases in AMD solids. Further, the lithium content in produced waters has a strong linear relationship with total dissolved solid (TDS) levels in three separate oil and gas basins. At the same TDS level, Marcellus Shale produced waters contain more lithium compared to Bakken Shale and Permian Basin waters, with higher percentages of Ca and Mg, major cations that might impact lithium recovery efficiencies. Our study demonstrates the heterogeneity of lithium hosts from different fossil energy wastes. Characterization results will inform future lithium recovery from these different feedstocks.

Stuckman, Mengling↗

Critical mineral source potential from oil & gas produced waters in the United States

The volume of produced water, a by-product of oil & gas operations and other energy processes, has been growing across the United States (U.S.) along with the need to manage or recycle this wastewater. Produced water contains many naturally occurring elements of varying concentrations, including critical minerals which are essential to the clean energy transition. However, the current understanding of critical mineral concentrations in produced water and the associated volumes across the U.S. is limited. This study has assessed available databases and literature to gain insight into the presence and concentration of five high priority critical minerals, namely cobalt, lithium, magnesium, manganese, and nickel. The U.S. Geological Survey's National Produced Waters Geochemical Database was the main data source used for determining average critical mineral concentrations in produced water from the major oil and gas reservoirs in the U.S. The volumes of produced water for these major reservoirs were coupled with these concentrations to provide insights into where critical minerals are likely to have high abundance and therefore more recovery options. The analysis indicated the highest recovery potential for lithium and magnesium from produced water in the Permian basin and the Marcellus shale region. However, these assessments should be considered conservative due to the limited availability of reliable concentration data. Finally, it is expected more critical mineral recovery options could emerge with comprehensive characterization data from more recent and representative sources of produced water.

54 ENVIRONMENTAL SCIENCES↗

A quantitative comparison of the cost of employing EOR-coupled CSS supplemented with secondary DSF storage for two large CO2 point sources

This paper explores the impact of the temporally dynamic demand for CO2 for enhanced hydrocarbon recovery with CO2 storage. Previous evaluations of economy-wide CO2 capture and geologic storage (CCS) deployment have typically applied a simplifying assumption that 100% of the potential storage capacity for a given formation is available on the first day of the analysis, and that the injection rate impacts only the number of wells required to inject a given volume of fluid per year, making it a cost driver rather than a technical one. However, as discussed by Dahowski and Bachu [1], storing CO2 in a field undergoing CO2 flooding for enhanced oil recovery (EOR) is subject to a set of constraints to which storage in DSFs is not, and these constraints combined with variable demand for CO2 may strongly influence the ability of an EOR field to serve as a baseload storage formation for commercial scale CCS projects undertaken as a means of addressing climate change mitigation targets. This analysis assumes that CCS is being undertaken in order to reduce CO2 emissions from the industrial sources evaluated and that there is enough of a disincentive associated with venting CO2 to the atmosphere that any CO2 not used within the EOR field will be stored in a suitable nearby deep saline formation (DSF). The authors have applied a CO2 demand profile to two cases chosen to illustrate the differences in cost impacts of employing EOR-based CCS as a part of a given source’s CCS portfolio. The first scenario is a less-than-ideal case in which a single EOR field is used for storage and all CO2 not demanded by the EOR project is stored in a DSF; the second scenario is designed to optimize costs by minimizing storage in the DSF and maximizing lower-cost EOR-based storage. Both scenarios are evaluated for two facilities emitting 3 and 6 MtCO2/y, corresponding to a natural gas processing facility and an IGCC electric power plant, respectively. Annual and lifetime average CO2 transport and storage costs are presented, and the impact of added capture and compression costs on overall project economics is examined.

02 PETROLEUM↗

Thermoelectric coatings for waste heat recovery and photo-thermal power

An energy harvesting system for collecting energy from sources of thermal energy that exist in the environment and convert the energy to electricity. The system has N-P junctions mounted on the outer surface of a conduit, pipe or flue. A hot medium flows through the conduit, pipe or flue. The p-n junctions operate as thermoelectric power generators. Heat absorbed at the p-n junctions increases the kinetic energy of charge carriers causing migration of the charge carriers. This thermally-driven migration of charge carriers is used to drive an electrical current in an external circuit.

Farmer, Joseph C.↗

Performance Evaluation of Drain Water Heat Recovery Exchangers for Heat Pump Water Heaters

Water heating constitutes approximately 18% of energy consumption and is the second largest energy expenses in United States homes. Heat pump water heaters (HPWHs) are energy efficient technologies with lower carbon footprints as compared to conventional water heating technologies, such as gas and electrical resistance heaters. The performance of water-source HPWHs can be improved by recovering heat from blackwater using drain heat recovery heat exchangers. Depending on water draw patterns of single family and multifamily residences, the operation and heat transfer performance of these heat exchangers are highly transient. This paper examines the thermo-hydraulic performance of a drain heat recovery heat exchanger during its transient and steady-state operations. The heat recovery performance of the exchanger was evaluated at different inlet temperatures and flow rates ranging from 9°C to 36°C and 0.03 kg/s to 0.28 kg/s, respectively. The obtained effectiveness varies from 45%–85% depending on the operating conditions. The test facility, steady-state and transient experimental procedures are reported in detail. Further, the effect of operating conditions on the effectiveness is discussed. The experimental approach and results of the study will provide insights into the transient operation of drain recovery heat exchangers as well as, guide sizing for various steady state conditions.

Krishnan, Easwaran↗