Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Station Payloads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Graphical timeline editing

NASA's Experiment Scheduling Program (ESP), which has been used for approximately 12 Spacelab missions, is being enhanced with the addition of a Graphical Timeline Editor. The GTE Clipboard, as it is called, was developed to demonstrate new technology which will lead the development of International Space Station Alpha's Payload Planning System and support the remaining Spacelab missions. ESP's GTE Clipboard is developed in C using MIT's X Windows System X11R5 and follows OSF/Motif Style Guide Revision 1.2.

Meyer, Patrick E.↗

Quench Module Insert (QMI) and the Diffusion Module Insert (DMI) Furnace Development

The Quench Module Insert (QMI) and the Diffusion Module Insert (DMI) are microgravity furnaces under development at Marshall Space Flight Center. The furnaces are being developed for the first Materials Science Research Rack (MSRR-1) of the Materials Science Research Facility (MSRF), one of the first International Space Station (ISS) scientific payloads. QMI is a Bridgman furnace with quench capability for studying interface behavior during directional solidification of metallic and alloy materials. DMI will be a Bridgman-Stockbarger furnace to study diffusion processes in semiconductors. The design for each insert, both QMI and DMI, is driven by specific science, operations and safety requirements, as well as by constraints arising from resource limitations, such as volume, mass and power. Preliminary QMI analysis and testing indicates that the design meets these requirements.

Crouch, Myscha R.↗

Charter for Systems Engineer Working Group

This charter establishes the International Space Station Program (ISSP) Mobile Servicing System (MSS) Systems Engineering Working Group (SEWG). The MSS SEWG is established to provide a mechanism for Systems Engineering for the end-to-end MSS function. The MSS end-to-end function includes the Space Station Remote Manipulator System (SSRMS), the Mobile Remote Servicer (MRS) Base System (MBS), Robotic Work Station (RWS), Special Purpose Dexterous Manipulator (SPDM), Video Signal Converters (VSC), and Operations Control Software (OCS), the Mobile Transporter (MT), and by interfaces between and among these elements, and United States On-Orbit Segment (USOS) distributed systems, and other International Space Station Elements and Payloads, (including the Power Data Grapple Fixtures (PDGFs), MSS Capture Attach System (MCAS) and the Mobile Transporter Capture Latch (MTCL)). This end-to-end function will be supported by the ISS and MSS ground segment facilities. This charter defines the scope and limits of the program authority and document control that is delegated to the SEWG and it also identifies the panel core membership and specific operating policies.

Suffredini, Michael T.↗

Satellite Servicing's Autonomous Rendezvous and Docking Testbed on the International Space Station

The Space Servicing Capabilities Project (SSCP) at NASA's Goddard Space Flight Center (GSFC) has been tasked with developing systems for servicing space assets. Starting in 2009, the SSCP completed a study documenting potential customers and the business case for servicing, as well as defining several notional missions and required technologies. In 2010, SSCP moved to the implementation stage by completing several ground demonstrations and commencing development of two International Space Station (ISS) payloads-the Robotic Refueling Mission (RRM) and the Dextre Pointing Package (DPP)--to mitigate new technology risks for a robotic mission to service existing assets in geosynchronous orbit. This paper introduces the DPP, scheduled to fly in July of 2012 on the third operational SpaceX Dragon mission, and its Autonomous Rendezvous and Docking (AR&D) instruments. The combination of sensors and advanced avionics provide valuable on-orbit demonstrations of essential technologies for servicing existing vehicles, both cooperative and non-cooperative.

Naasz, Bo J.↗

Introduction to ISS Crew Displays

The International Space Station (ISS) began payload operations in earnest in 2000 with the arrival of the Expedition 1. To date, ISS has offered Principal Investigators (PIs) a reliable platform for microgravity research, having hosted thousands of onboard science experiments. Most of this research is supported by experiment hardware and software and many include a crew‐operated Graphical User Interface (GUI). The purpose of this article is to share information with PIs and Payload Developer (PD) teams about the processes, standards, and guidelines applicable to crew GUI design that must be complied with when planning payload software. The goal is not to enumerate all of the ISS display standards, but rather to highlight design guidelines and the ISS Program milestones for verification and approval of onboard crew displays.

Graphical User Interface↗

A study of space station needs, attributes and architectural options, volume 2, technical. Book 3: Economic benefits, costs and programmatics

The economic benefits, cost analysis, and industrial uses of the manned space station are investigated. Mission payload costs are examined in relation to alternative architectures and projected technological evolution. Various approaches to industrial involvement for financing, development, and marketing of space station resources are described.

Source record↗

Telescience Resource Kit Software Capabilities and Future Enhancements

The Telescience Resource Kit (TReK) is a suite of PC-based software applications that can be used to monitor and control a payload on board the International Space Station (ISS). This software provides a way for payload users to operate their payloads from their home sites. It can be used by an individual or a team of people. TReK provides both local ground support system services and an interface to utilize remote services provided by the Payload Operations Integration Center (POIC). by the POIC and to perform local data functions such as processing the data, storing it in local files, and forwarding it to other computer systems. TReK can also be used to build, send, and track payload commands. In addition to these features, work is in progress to add a new command management capability. This capability will provide a way to manage a multi- platform command environment that can include geographically distributed computers. This is intended to help those teams that need to manage a shared on-board resource such as a facility class payload. The environment can be configured such that one individual can manage all the command activities associated with that payload. This paper will provide a summary of existing TReK capabilities and a description of the new command management capability. For example, 7'ReK can be used to receive payload data distributed

Schneider, Michelle↗

Jet Propulsion Laboratory/Kennedy Space Center telerobotic inspection and manipulation demonstration

The goal of this effort is to demonstrate telerobotic inspection and mainpulation of space shuttle payloads in the presence of substantial communications time delays between the operator station and the robotic work space. The processing of space shuttle payloads provides a variety of tasks which are typical of both space shuttle ground operations and Space Station in-flight operations, and communications time delays are inevitable in space operations where the operator station will be light-seconds away from the telerobot. With this demonstration we hope to show the efficacy and safety of robotic technology for ground and space operations. Our approach is to develop an experimental telerobotic system with the remote sensing, actuation and reflex portions located at KSC in Florida, while the operator control station will be located at Jet Propulsion Laboratory (JPL) in California. The JPL portion of the system includes a high-level operator interface, intelligent spatial planning and machine vision, while the KSC portion includes the robot arm, end effectors, cameras and proximity sensors, and the necessary control and communications computers and software. The communications between JPL and KSC are over a limited-bandwidth network channel (19200 baud) with unpredictable and unrepeatable time delays. In FY89 we integrated a basic version of the robotic, communications, and computer hardware, and we developed the software to perform an operator-supervised inspection of a PAM-D satellite upper stage rocket motor and its shuttle support cradle. The demonstration, though severely limited by the bulk of the available computer arm, showed the potential of telerobotics for inspection tasks. In the future, we plan to develop additional capabilities which will allow manipulation tasks to be performed, including removal of dust covers and lens caps, insertion of connectors and batteries, and installation of payload objects.

Wilcox, Brian↗

Long life feasibility study for the shuttle infrared telescope facility

A study was conducted to assess the feasibility of designing an Infrared Telescope of the 1 meter class which would operate effectively as a Shuttleborne, 14-day Spacelab payload and then be adapted with little modification to work as a 6 month Space station or free flyer payload. The optics configuration and requirements from a previous study were used without modification. In addition, an enhancement to 2 year mission lengths was studied. The cryogenic system selected was a hybrid design with an internal solid Hydrogen tank at 8 Kelvin and an internal superfluid tank at 2K. In addition to the cryogenic design, a detailed look at secondary mirror actuators for chopping, focus and decenter was conducted and analysis and cryo test reported.

Source record↗

Modular space station phase B extension preliminary system design. Volume 7: Ancillary studies

Sortie mission analysis and reduced payloads size impact studies are presented. In the sortie mission analysis, a modular space station oriented experiment program to be flown by the space shuttle during the period prior to space station IOC is discussed. Experiments are grouped into experiment packages. Mission payloads are derived by grouping experiment packages and by adding support subsystems and structure. The operational and subsystems analyses of these payloads are described. Requirements, concepts, and shuttle interfaces are integrated. The sortie module/station module commonality and a sortie laboratory concept are described. In the payloads size analysis, the effect on the modular space station concept of reduced diameter and reduced length of the shuttle cargo bay is discussed. Design concepts are presented for reduced sizes of 12 by 60 ft, 14 by 40 ft, and 12 by 40 ft. Comparisons of these concepts with the modular station (14 by 60 ft) are made to show the impact of payload size changes.

Jones, A. L.↗

Space station Simulation Computer System (SCS) study for NASA/MSFC. Volume 3: Refined conceptual design report

The results of the refined conceptual design phase (task 5) of the Simulation Computer System (SCS) study are reported. The SCS is the computational portion of the Payload Training Complex (PTC) providing simulation based training on payload operations of the Space Station Freedom (SSF). In task 4 of the SCS study, the range of architectures suitable for the SCS was explored. Identified system architectures, along with their relative advantages and disadvantages for SCS, were presented in the Conceptual Design Report. Six integrated designs-combining the most promising features from the architectural formulations-were additionally identified in the report. The six integrated designs were evaluated further to distinguish the more viable designs to be refined as conceptual designs. The three designs that were selected represent distinct approaches to achieving a capable and cost effective SCS configuration for the PTC. Here, the results of task 4 (input to this task) are briefly reviewed. Then, prior to describing individual conceptual designs, the PTC facility configuration and the SSF systems architecture that must be supported by the SCS are reviewed. Next, basic features of SCS implementation that have been incorporated into all selected SCS designs are considered. The details of the individual SCS designs are then presented before making a final comparison of the three designs.

Source record↗

Summary Presentation of the Transportation Panel

Space mission scenarios are presented in which tethering is utilized. The technical and cost benefits are considered along with practicality and operational requirements. The mission scenarios considered include: (1) space shuttle delivery of payloads to higher orbits; (2) the downward release of the external tank from a shuttle; (3) space station altitude reboost using shuttle angular momentum; (4) shuttle docking to space station tether; (5) using shuttle based tether to assist launch of upper stage to higher energy orbits; (6) using space station tether to deploy payloads to higher orbits with momentum accumulator; (7) using tethers to discard first stages or apogee motors; and (8) planetary applications of tethers.

Hunter, M. W.↗

VentureStar(trademark) Reaping the Benefits of the X-33 Program

Major X-33 flight hardware has been delivered, and assembly of the vehicle is well underway in anticipation of its flight test program commencing in the summer of 1999. Attention has now turned to the operational VentureStar(trademark), the first single-stage-to-orbit (SSTO) reusable launch vehicle. Activities are grouped under two broad categories: (1) vehicle development and (2) market/business planning, each of which is discussed. The mission concept is presented for direct payload delivery to the International Space Station and to low Earth orbit, as well as payload delivery with an upper stage to Geosynchronous Transfer Orbit (GTO) and other high energy orbits. System requirements include flight segment and ground segment. Vehicle system sizing and design status is provided including the application of X-33 traceability and lessons learned. Technology applications to the VentureStar(trademark) are described including the structure, propellant tanks, thermal protection system, aerodynamics, subsystems, payload bay and propulsion. Developing a market driven low cost launch services system for the 21 st Century requires traditional and non-traditional ways of being able to forecast the evolution of the potential market. The challenge is balancing both the technical and financial assumptions of the market. This involves the need to provide a capability to meet market segments that in some cases are very speculative, while at the same time providing the financial community with a credible revenue stream.

Sumrall, J.↗

Internet-Based System for Voice Communication With the ISS

The Internet Voice Distribution System (IVoDS) is a voice-communication system that comprises mainly computer hardware and software. The IVoDS was developed to supplement and eventually replace the Enhanced Voice Distribution System (EVoDS), which, heretofore, has constituted the terrestrial subsystem of a system for voice communications among crewmembers of the International Space Station (ISS), workers at the Payloads Operations Center at Marshall Space Flight Center, principal investigators at diverse locations who are responsible for specific payloads, and others. The IVoDS utilizes a communication infrastructure of NASA and NASArelated intranets in addition to, as its name suggests, the Internet. Whereas the EVoDS utilizes traditional circuitswitched telephony, the IVoDS is a packet-data system that utilizes a voice over Internet protocol (VOIP). Relative to the EVoDS, the IVoDS offers advantages of greater flexibility and lower cost for expansion and reconfiguration. The IVoDS is an extended version of a commercial Internet-based voice conferencing system that enables each user to participate in only one conference at a time. In the IVoDS, a user can receive audio from as many as eight conferences simultaneously while sending audio to one of them. The IVoDS also incorporates administrative controls, beyond those of the commercial system, that provide greater security and control of the capabilities and authorizations for talking and listening afforded to each user.

Chamberlain, James↗

Spacely's rockets: Personnel launch system/family of heavy lift launch vehicles

During 1990, numerous questions were raised regarding the ability of the current shuttle orbiter to provide reliable, on demand support of the planned space station. Besides being plagued by reliability problems, the shuttle lacks the ability to launch some of the heavy payloads required for future space exploration, and is too expensive to operate as a mere passenger ferry to orbit. Therefore, additional launch systems are required to complement the shuttle in a more robust and capable Space Transportation System. In December 1990, the Report of the Advisory Committee on the Future of the U.S. Space Program, advised NASA of the risks of becoming too dependent on the space shuttle as an all-purpose vehicle. Furthermore, the committee felt that reducing the number of shuttle missions would prolong the life of the existing fleet. In their suggestions, the board members strongly advocated the establishment of a fleet of unmanned, heavy lift launch vehicles (HLLV's) to support the space station and other payload-intensive enterprises. Another committee recommendation was that a space station crew rotation/rescue vehicle be developed as an alternative to the shuttle, or as a contingency if the shuttle is not available. The committee emphasized that this vehicle be designed for use as a personnel carrier, not a cargo carrier. This recommendation was made to avoid building another version of the existing shuttle, which is not ideally suited as a passenger vehicle only. The objective of this project was to design both a Personnel Launch System (PLS) and a family of HLLV's that provide low cost and efficient operation in missions not suited for the shuttle.

Source record↗

Booster and orbiter configurations

In the recent Future Space Transportation System (FSFS) study, a mission model was selected and a baseline vehicle which best met model requirements was shaped. This baseline was then analyzed for flight performance, structural and subsystem weight, and operation. Figures related to a payload of 150,000 lb in a 20-ft-diam by 90-ft-long envelope became the baseline. The existence of both space-based orbital transfer vehicles (OTVs) and a space station was assumed, taking into account a transfer of the payload from the launch vehicle to OTVs at the space station for final delivery to geosynchronous orbit (GEO). A computer-aided engineering system called Aerospace Vehicle Interactive Design (AVID) was employed in connection with baseline vehicle development. It was found that approximately three-fifth of the payload weight would be cryogenic propellants for OTVs. Attention is given to problems regarding the packaging of cryogenic tankage, a payload shroud, and studies of staging for two different booster propulsion units.

Wilhite, A. W.↗

A comparison of the Shuttle remote manipulator system and the Space Station Freedom mobile servicing center

The Shuttle Remote Manipulator System is a mature system which has successfully completed 18 flights. Its primary functional design driver was the capability to deploy and retrieve payloads from the Orbiter cargo bay. The Space Station Freedom Mobile Servicing Center is still in the requirements definition and early design stage. Its primary function design drivers are the capabilities: to support Space Station construction and assembly tasks; to provide external transportation about the Space Station; to provide handling capabilities for the Orbiter, free flyers, and payloads; to support attached payload servicing in the extravehicular environment; and to perform scheduled and un-scheduled maintenance on the Space Station. The differences between the two systems in the area of geometric configuration, mobility, sensor capabilities, control stations, control algorithms, handling performance, end effector dexterity, and fault tolerance are discussed.

Taylor, Edith C.↗

STS-97 Mission Highlights Resource Tape

A continuation of 'STS-97 Mission Highlights Resource Tape, Part 1 of 3' (document ID 20010020281) and 'STS-97 Mission Highlights Resource Tape, Part 2 of 3' (document ID 20010020282), the activities of flight days seven through eleven are seen. Footage includes the crew discussing repair procedures for the Solar Array Wing (SAW) with mission managers, shots of the shuttle's payload bay, the International Space Station (ISS) with Earth in the background, the Node Micrometeoroid/Orbital Debris Shield removal, the spacewalks performed by Mission Specialists Joseph Tanner and Carlos Noriega, the undocking of Endeavour and ISS, the Orbital Maneuvering System (OMS) firing, the payload bay doors closing, and the landing sequence of Endeavour. The Aurora Borealis and a night view of the French Rivera are seen from space.

Source record↗