Search NASA⌕ Search

SEARCH · Search NASA

Results for “building system optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Modeling Electrolytic O2 Recovery from Metabolic CO2 for Advanced Closed Loop Life Support Systems in Extraterrestrial Human Missions

The International Space Station (ISS) is currently equipped with a complex, heavy, and power consuming system that recovers approximately 50% of O2 from metabolic CO2. Future long duration human missions to the Moon and Mars will necessitate a sustainable and highly efficient metabolic oxygen recovery system capable of yielding a minimum of 75% O2 recovery. A Macrofluidic Electrochemical Reactor (MFECR) technology development effort is currently underway at NASA Marshall Space Flight Center (MSFC) to significantly increase current metabolic O2 recovery efficiency, expand mission sustainability, and reduce complexity of the system. The novel design combines CO2 conversion to O2 along with C2H4 as byproduct and water electrolysis (currently conducted in two separate units) into a single compact unit that runs at standard conditions and is theoretically capable of generating O2 with a theoretical maximum metabolic CO2 conversion of 73% while consuming less than metabolic water. This paper presents a comprehensive multi-physic 3D model developed at MSFC on CO2 conversion to O2 and C2H4 at standard conditions via MFECR. The 3D spatial domain of the model is a replica of the actual MFECR’s 3D drawing generated for the MFECR fabrication and operated to recover O2 from CO2 yielding C2H4 as byproduct. Electrochemical (EC) physics that includes EC multicomponent reaction mechanisms, mass transport, and electrical current density distributions is coupled in the model with all the other physics phenomena involved in the MFECR’s process, such as two-phase flow, free and porous fluid regimes, multicomponent mass transfer, heat transfer, and DC electrical current generation along with Joule heating effect. The EC reaction sections of the MFECR consists of two porous gas diffusion electrodes (GDE) and an electrolyte serpentine channel sandwiched in the middle. The CO2 feeds the cathode serpentine channel and part of the O2 product is fed back to the anode serpentine chamber. An alkaline solution feeds the electrolyte serpentine chamber wetting the GDEs of both, the anode and cathode allowing the OH- ionic transport between them. The EC reactions in the cathode’s GDE yield C2H4 from CO2 and H2 from water while the EC reaction in the anode’s GDE yields O2. The authors will present in this paper the validation of the model using experimental data and the utilization of the validated model in building a reliable simulator that will not only assist the authors on the MFECR design but also the optimization of its operation in the ISS and future spatial human missions.

Jesus A Dominguez↗

Operational Impact of the Baseline Integrated Arrival, Departure, and Surface System Field Demonstration

To address the Integrated Arrival, Departure, and Surface (IADS) challenge, NASA is developing and demonstrating trajectory-based departure automation under a collaborative effort with the FAA and industry known as Airspace Technology Demonstration 2 (ATD-2). ATD-2 builds upon and integrates previous NASA research capabilities that include the Spot and Runway Departure Advisor (SARDA), the Precision Departure Release Capability (PDRC), and the Terminal Sequencing and Spacing (TSAS) capability. The ATD-2 field demonstration is organized into three phases. Phase I illustrates a Baseline IADS demonstration and includes all components of ATD-2 running in operational environments. Subsequent phases will fuse together strategic scheduling components as well as take into account metroplex considerations. This paper describes the baseline IADS system that was deployed at the end of 2017 and is continuing to run as part of the ATD-2 demonstration taking place at Charlotte-Douglas International Airport (CLT). The primary areas of deployment and system use are in the CLT Air Traffic Control Tower, CLT TRACON, CLT American Airlines ramp tower, Washington Center facility and American Airlines Integration Operations Center (IOC). In addition to describing the functions and capabilities that are part of the baseline IADS system, this paper also provides metrics regarding operational use as well as initial benefits metrics. Benefit metrics continue to be collected and aggregated across the areas of system delay, throughput, taxi time, fuel burn savings, and emissions savings. Furthermore, benefits as a result of common awareness of delays and the impact of takeoff and departure restrictions stemming from traffic flow management initiatives are described. The overall benefit of improved predictability and efficiency as a result of the baseline IADS system demonstration is also discussed.

operational system↗

Clinical Decision Support - Concepts of Operation

We are entering a new era in space exploration to return to the moon and explore Mars. These ambitious goals will require significant changes to in-flight and habitat medical care due to constraints on mass, volume, power, crew time and medical evacuation capabilities. These constraints make it absolutely necessary to develop transformative solutions using new technologies. The Exploration Medical Capability (ExMC) Element of the Human Research Program (HRP) pushes the boundary of space medical systems to advance the care of astronauts on future exploration missions beyond low Earth orbit by identifying and testing next-generation medical care and crew health maintenance technologies. The Clinical Decision Support (CDS) project addresses the gap Medical-701 within the Inflight Medical Conditions risk: Enhance medical capabilities within an exploration medical system. For long-duration, deep space missions, computational and data resources will play an important role in maintaining crew health, wellness and performance where the crew will need to be more self-reliant. The aim of the CDS project is to develop and provide recommended requirements for an in-vehicle CDSS that acts as an assistant for delivering optimal health and performance and medical care during exploration missions. The CDSS is envisioned as a software-based tool that will augment a crewmembers’ knowledge, skills and abilities to assist in decision-making and crew health and performance (CHP) management thus increasing CHP systems capabilities. The human interface will be context aware and lessen the cognitive load to assimilate and use information as well as combine large disparate data sets in such a manner that provides the crew with actionable insight to decisions related to crew medical, health and performance management. Crew autonomy will be provided through a CDS that presents knowledge and data in a context aware manner to augment a crew members’ knowledge, skills and abilities during the process of observation, orientation, decisions and action. The CDS project addresses the need for crew members to operate independently during long duration space exploration missions that require medical Levels of Care (LoC) V, the highest level specified by NASA-STD-3001 and described in more detail by the ExMC interpretation of LoC document (NASA/TM-2017-219290), where significant changes to in-flight and habitat medical care necessitate increasing crew autonomy in decision making and task performance. The CDS project will develop and test a series of iterative and increasingly more complex system prototypes. These annual demonstrations of the data system integration with the crew health and performance domain will inform exploration medical system requirements for an on-board Clinical Decision Support System (CDSS) through a series of use cases that guide CDS prototype functionality. CDS concepts are based on ExMC Concept of Operations documents (presented separately) and will highlight architecture extensibility to other more complex analyses and tests using core crew health and performance integrated data management, processing and visualization capabilities. This approach also establishes how externally developed analyses and approaches could be added to expand a clinical decision support system and thus highlight how a comprehensive system can be commercially and/or globally developed. The CDS project will build upon the concept of an integrated data management approach based on the Medical Data Architecture (MDA) project to more fully address challenges associated with in-flight and habitat medical, health and performance care due to constraints on mass, volume, power, crew time and medical evacuation capabilities required for medical LoC V. These requirements will be derived through systems engineering approaches and software prototype developments over the course of the multi-year CDS project to address crew health and performance decision-making and task performance, often autonomously executed by the crew, in a manner that is consistent with the appropriate medical level of care for the mission. This presentation will provide an overview of the vision for the CDS project and highlight the initial accomplishments in project planning, implementation and requirements identification in fiscal year 2020.

clinical decision support↗

Clinical Decision Support - Overview and Update

We are entering a new era in space exploration to return to the moon and explore Mars. These ambitious goals will require significant changes to in-flight and habitat medical care due to constraints on mass, volume, power, crew time and medical evacuation capabilities. These constraints make it absolutely necessary to develop transformative solutions using new technologies. The Exploration Medical Capability (ExMC) Element of the Human Research Program (HRP) pushes the boundary of space medical systems to advance the care of astronauts on future exploration missions beyond low Earth orbit by identifying and testing next-generation medical care and crew health maintenance technologies. The Clinical Decision Support (CDS) project addresses the gap Medical-701 within the Inflight Medical Conditions risk: Enhance medical capabilities within an exploration medical system. For long-duration, deep space missions, computational and data resources will play an important role in maintaining crew health, wellness and performance where the crew will need to be more self-reliant. The aim of the CDS project is to develop and provide recommended requirements for an in-vehicle CDSS that acts as an assistant for delivering optimal health and performance and medical care during exploration missions. The CDSS is envisioned as a software-based tool that will augment a crewmembers’ knowledge, skills and abilities to assist in decision-making and crew health and performance (CHP) management thus increasing CHP systems capabilities. The human interface will be context aware and lessen the cognitive load to assimilate and use information as well as combine large disparate data sets in such a manner that provides the crew with actionable insight to decisions related to crew medical, health and performance management. Crew autonomy will be provided through a CDS that presents knowledge and data in a context aware manner to augment a crew members’ knowledge, skills and abilities during the process of observation, orientation, decisions and action. The CDS project addresses the need for crew members to operate independently during long duration space exploration missions that require medical Levels of Care (LoC) V, the highest level specified by NASA-STD-3001 and described in more detail by the ExMC interpretation of LoC document (NASA/TM-2017-219290), where significant changes to in-flight and habitat medical care necessitate increasing crew autonomy in decision making and task performance. The CDS project will develop and test a series of iterative and increasingly more complex system prototypes. These annual demonstrations of the data system integration with the crew health and performance domain will inform exploration medical system requirements for an on-board Clinical Decision Support System (CDSS) through a series of use cases that guide CDS prototype functionality. CDS concepts are based on ExMC Concept of Operations documents (presented separately) and will highlight architecture extensibility to other more complex analyses and tests using core crew health and performance integrated data management, processing and visualization capabilities. This approach also establishes how externally developed analyses and approaches could be added to expand a clinical decision support system and thus highlight how a comprehensive system can be commercially and/or globally developed. The CDS project will build upon the concept of an integrated data management approach based on the Medical Data Architecture (MDA) project to more fully address challenges associated with in-flight and habitat medical, health and performance care due to constraints on mass, volume, power, crew time and medical evacuation capabilities required for medical LoC V. These requirements will be derived through systems engineering approaches and software prototype developments over the course of the multi-year CDS project to address crew health and performance decision-making and task performance, often autonomously executed by the crew, in a manner that is consistent with the appropriate medical level of care for the mission. This presentation will provide an overview of the vision for the CDS project and highlight the initial accomplishments in project planning, implementation and requirements identification in fiscal year 2020.

clinical decision support system↗

NASA's Efforts to Commercialize Communications Services for Mission in Near-Earth Space

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN)Program enables high speed, robust, secure and cost-effective space communications and navigation services to current and future science and exploration missions. Consistent with National Space Policy, NASA is pursuing the use of demonstrated commercial services for all its future near-Earth requirements through a flexible, multi-provider approach that minimizes risks to the user missions and ensures costs to user missions are reasonable. Progress toward this goal is advancing in multiple key areas including direct to Earth (DTE), space-based relay, technology investments, required spectrum regulatory changes and mission engagement and infusion. The transition to commercial DTE services is already underway, with a target for transition by 2024. The primary functions to execute SCaN’s DTE strategy include increasing commercial service allocations by leveraging current commercial network providers and enabling seamless onboarding of additional providers into the network. Furthermore, moving away from government DTE services will allow operational costs to be optimized. A more gradual approach is planned for the transition to commercial space-based relay services to allow for demonstration and operationalization of commercial services for future users by 2030. In June of 2022, six American SATCOM vendors were awarded a combined $278.5 million through Funded Space Act Agreements (FSAAs) for the first cycle of demonstration and validation activities. The end-to-end service capabilities being targeted are based on existing NASA mission operational needs. Accordingly, each company has proposed a technical approach to lower costs, increase flexibility, and improve performance for a broad range of missions. Successful user mission transition to commercial services, both DTE and space-based relay, are dependent on the technologies and capabilities that address gaps in commercial capability. NASA is investing in technology development and pursuing a new strategic approach to the creation or adoption of space communications standards to move the agency toward a commercial paradigm. Wideband and multi-lingual user terminals are being developed to bridge differences in industry services. Building on ground demonstrations completed in 2021, the Johns Hopkins Applied Physics Lab (APL) will be flight testing a multi-lingual wideband terminal (payload) and demonstrating connectivity to both government and commercial relay services. NASA holds a leadership role in multiple civil space standards bodies and international coordination groups to ensure that standards supporting interoperability are developed with defined functions, interfaces, and performance. However, to successfully meet commercialization objectives, NASA seeks to collaborate with industry, and as applicable adopt or adapt to commercially defined standards. As such, NASA joined the 3rd Generation Partnership Project (3GPP) as an official member in 2021 to advocate for the inclusion of space missions as a unique user segment in future 5G non-terrestrial networks, and to better understand the scope of 3GPP releases and implications for space users. Further, engagement in Spectrum regulatory bodies is being undertaken to augment existing space-Earth and inter-satellite frequency allocations available for both government and commercial space systems. This paper addresses the recent progress toward NASA’s commercial space communications transition objectives and how key challenges are being navigated.

Gregory W Heckler↗

Asteroid Redirect Crewed Mission Space Suit and EVA System Maturation

The Asteroid Redirect Crewed Mission (ARCM) requires a Launch/Entry/Abort (LEA) suit capability and short duration Extra Vehicular Activity (EVA) capability from the Orion spacecraft. For this mission, the pressure garment that was selected, for both functions, is the Modified Advanced Crew Escape Suit (MACES) with EVA enhancements and the life support option that was selected is the Exploration Portable Life Support System (PLSS). The proposed architecture was found to meet the mission constraints, but much more work is required to determine the details of the required suit upgrades, the integration with the PLSS, and the rest of the tools and equipment required to accomplish the mission. This work has continued over the last year to better define the operations and hardware maturation of these systems. EVA simulations have been completed in the NBL and interfacing options have been prototyped and analyzed with testing planned for late 2014. For NBL EVA simulations, in 2013, components were procured to allow in-house build up for four new suits with mobility enhancements built into the arms. Boots outfitted with clips that fit into foot restraints have also been added to the suit and analyzed for possible loads. Major suit objectives accomplished this year in testing include: evaluation of mobility enhancements, ingress/egress of foot restraint, use of foot restraint for worksite stability, ingress/egress of Orion hatch with PLSS mockup, and testing with two crew members in the water at one time to evaluate the crew's ability to help one another. Major tool objectives accomplished this year include using various other methods for worksite stability, testing new methods for asteroid geologic sampling and improving the fidelity of the mockups and crew equipment. These tests were completed on a medium fidelity capsule mockup, asteroid vehicle mockup, and asteroid mockups that were more accurate for an asteroid type EVA than previous tests. Another focus was the design and fabrication of the interface between the MACES and the PLSS. The MACES was not designed to interface with a PLSS, hence an interface kit must accommodate the unique design qualities of the MACES and provide the necessary life support function connections to the PLSS. A prototype interface kit for MACES to PLSS has been designed and fabricated. Unmanned and manned testing of the interface will show the usability of the kit while wearing a MACES. The testing shows viability of the kit approach as well as the operations concept. The design will be vetted through suit and PLSS experts and, with the findings from the testing, the best path forward will be determined. As the Asteroid Redirect Mission matures, the suit/life support portion of the mission will mature along with it and EVA Tools & Equipment can be iterated to accommodate the overall mission objectives and compromises inherent in EVA Suit optimization. The goal of the EVA architecture for ARCM is to continue to build on the previously developed technologies and lessons learned, and accomplish the ARCM EVAs while providing a stepping stone to future missions and destinations.

Bowie, Jonathan T.↗

Operational Impact of the Baseline Integrated Arrival, Departure and Surface System Field Demonstration

To address the Integrated Arrival, Departure, and Surface (IADS) challenge, NASA is developing and demonstrating trajectory-based departure automation under a collaborative effort with the FAA (Federal Aviation Administration) and industry known Airspace Technology Demonstration 2 (ATD-2). ATD-2 builds upon and integrates previous NASA research capabilities that include the Spot and Runway Departure Advisor (SARDA), the Precision Departure Release Capability (PDRC), and the Terminal Sequencing and Spacing (TSAS) capability. As trajectory-based departure scheduling and collaborative decision making tools are introduced in order to reduce delays and uncertainties in taxi and climb operations across the National Airspace System, users of the tools across a number of roles benefit from a real time system that enables common situational awareness. A real time dashboard was developed to inform and present users notifications and integrated information regarding airport surface operations. The dashboard is a supplement to capabilities and tools that incorporate arrival, departure, and surface air-traffic operations concepts in a NextGen environment. In addition to shared situational awareness, the dashboard offers the ability to compute real time metrics and analysis to inform users about capacity, predictability, and efficiency of the system as a whole. This paper describes the architecture of the real time dashboard as well as an initial proposed set of metrics. The potential impact of the real time dashboard is studied at the site identified for initial deployment and demonstration in 2017: Charlotte-Douglas International Airport (CLT). The architecture of implementing such a tool as well as potential uses are presented for operations at CLT. Metrics computed in real time illustrate the opportunity to provide common situational awareness and inform users of system delay, throughput, taxi time, and airport capacity. In addition, common awareness of delays and the impact of takeoff and departure restrictions stemming from traffic flow management initiatives are explored. The potential of the real time tool to inform users of the predictability and efficiency of using a trajectory-based departure scheduling system is also discussed.

air traffic optimization↗

NASA's Design and Development of a Field Goniometer Instrument Using Solid Works

With NASA suffering severe funding cutbacks, engineers at NASA are required to produce state-of-the-art hardware with limited personnel and financial resources. In light of these constraints, the new NASA mandate is to build better, faster and cheaper. In April of 1998, Stennis Space Center's Commercial Remote Sensing Program contracted to the Systems Engineering Division at NASA Ames Research Center to develop a device known as a Field Goniometer. A Field Goniometer is a device that measures bi-directional reflectance of a target, such as vegetation, relative to the sun and an imaging system in an aircraft or spacecraft. The device is able to provide a spectral fingerprint of the surface it is measuring in wavelengths from 350nm-2500nm using a hyperspectral imager. To accomplish this project, several obstacles had to be overcome. First, the design had to be completed in less than four months. Second, due to the complexity of the design, the use of solid modeling was highly desirable but most of the group's solid modelers were assigned to other jobs. Third, the amount of funding available from the customer was one half to one third the funding typically expended for a job of this nature. Our choices for this project were to design with standard 2-D CAD systems currently used in-house or train additional engineers on our existing solids package or purchase a new solid model package. The use of a 2D CAD system was very undesirable due to the complexity of the design. Using our existing solids modeler would have required a learning curve for our engineers that would be incompatible with our schedule. Prior to this project, a member of our design group researched the solid modeling industry and decided to purchase SolidWorks. After examining the product for ease of use, modeling capability, training time required and cost, we decided our highest probability of success would be to design with Solidworks. During the design phase, our fabrication group was able to provide input at the very early stages, which added significant benefit to the final product. Fabrication cost and schedule savings have been realized by having complex part geometries translated directly from the SolidWorks design models to Surfcam and other computer-aided manufacturing (CAM) software. This direct model translation capability optimized the fabrication processes. The end result was that we were able to successfully complete the project on time and on budget. Other advantages of using SolidWorks, as cited by the design team, include a rapid negotiation of the initial learning curve, the ability to develop solid model hardware prototypes (used to communicate the design intent to both the customer and the fabricator), and the ability to work as a team collaborating on a large, complex model. These types of tools and efforts represent our response to NASA's challenge to produce higher quality products within shorter design and fabrication times.

Turner, Mark↗

SMEX-Lite Modular Solar Array Architecture

For the most part, Goddard solar arrays have been custom designs that are unique to each mission. The solar panel design has been frozen prior to issuing an RFP for their procurement. There has typically been 6-9 months between RFP release and contract award, followed by an additional 24 months for performance of the contract. For Small Explorer (SMEX) missions, with three years between mission definition and launch, this has been a significant problem. The SMEX solar panels have been sufficiently small that the contract performance period has been reduced to 12-15 months. The bulk of this time is used up in the final design definition and fabrication of flight solar cell assemblies. Even so, it has been virtually impossible to have the spacecraft design at a level of maturity sufficient to freeze the solar panel geometry and release the RFP in time to avoid schedule problems with integrating the solar panels to the spacecraft. With that in mind, the SMEX-Lite project team developed a modular architecture for the assembly of solar arrays to greatly reduce the cost and schedule associated with the development of a mission- specific solar array. In the modular architecture, solar cells are fabricated onto small substrate panels. This modular panel (approximately 8.5" x 17" in this case) becomes the building block for constructing solar arrays for multiple missions with varying power requirements and geometrical arrangements. The mechanical framework that holds these modules together as a solar array is the only mission-unique design, changing in size and shape as required for each mission. There are several advantages to this approach. First, the typical solar array development cycle requires a mission unique design, procurement, and qualification including a custom qualification panel. With the modular architecture, a single qualification of the SMEX-Lite modules and the associated mechanical framework in a typical configuration provided a qualification by similarity to multiple missions. It then becomes possible to procure solar array modules in advance of mission definition and respond quickly and inexpensively to a selected mission's unique requirements. The solar array modular architecture allows the procurement of solar array modules before the array geometry has been frozen. This reduces the effect of procurement lead-time on the mission integration and test flow by as much as 50%. Second, by spreading the non-recurring costs over multiple missions, the cost per unit area is also reduced. In the case of the SMEX-Lite procurement, this reduction was by about one third of the cost per unit area compared to previous SMEX mission-unique procurements. Third, the modular architecture greatly facilitates the infusion of new solar cell technologies into flight programs as these technologies become available. New solar cell technologies need only be fabricated onto a standard-sized module to be incorporated into the next available mission. The modular solar array can be flown in a mixed configuration with some new and some standard cell technologies. Since each module has its own wiring terminals, the array can be arranged as desired electrically with little impact to cost and schedule. The solar array modular architecture does impose some additional constraints on systems and subsystem engineers. First, they must work with discrete solar array modules rather than size the array to fit exactly within an available envelope. The array area is constrained to an integer multiple of the module area. Second, the modular design is optimized for space radiation and thermal environments not greatly different from a typical SMEX LEO environment. For example, a mission with a highly elliptical orbit (e.g., Polar, SMEX/FAST) would require thicker coverglasses to protect the solar cells from the more intense radiation environment.

Lyons, John↗

Flat H Frangible Joint Evolution

Space vehicle staging and separation events require pyrotechnic devices. They are single-use mechanisms that cannot be tested, nor can failure-tolerant performance be demonstrated in actual flight articles prior to flight use. This necessitates the implementation of a robust design and test approach coupled with a fully redundant, failure-tolerant explosive mechanism to ensure that the system functions even in the event of a single failure. Historically, NASA has followed the single failure-tolerant (SFT) design philosophy for all human-rated spacecraft, including the Space Shuttle Program. Following the end of this program, aerospace companies proposed building the next generation human-rated vehicles with off-the-shelf, non-redundant, zero-failure-tolerant (ZFT) separation systems. Currently, spacecraft and launch vehicle providers for both the Orion and Commercial Crew Programs (CCPs) plan to deviate from the heritage safety approach and NASA's SFT human rating requirements. Both programs' partners have base-lined ZFT frangible joints for vehicle staging and fairing separation. These joints are commercially available from pyrotechnic vendors. Non-human-rated missions have flown them numerous times. The joints are relatively easy to integrate structurally within the spacecraft. In addition, the separation event is debris free, and the resultant pyro shock is lower than that of other design solutions. It is, however, a serious deficiency to lack failure tolerance. When used for critical applications on human-rated vehicles, a single failure could potentially lead to loss of crew (LOC) or loss of mission (LOM)). The Engineering and Safety & Mission Assurance directorates within the NASA Johnson Space Center took action to address this safety issue by initiating a project to develop a fully redundant, SFT frangible joint design, known as the Flat H. Critical to the ability to retrofit on launch vehicles being developed, the SFT mechanisms must fit within the same three-dimensional envelope as current designs as well as meet structural loads requirements. There is increased mass associated with the redundant design, and the goal is to minimize the weight impact as much as possible. These requirements presented significant challenges, both technically and financially; these challenges will be explored in this paper. Perhaps greater than the technical issues confronted during this design process, were the financial considerations. These were a significant part of the story of this design and development plan. Insufficient financial and labor resources were formidable barriers to completing this project. Nevertheless, JSC personnel successfully conducted several test series at JSC with very useful results. The many lessons learned drove design improvements, performance efficiency, and increased functional reliability. This paper examines the significant technical and financial challenges that these requirements posed to the project team. It discusses the evolution of the SFT frangible joint design, including optimization, testing, and successful partnering of the Johnson Space Center (JSC) engineering and JSC safety organizations, to enhance the flight safety margin for America's next generation of human-rated space vehicles.

Diegelman, Thomas E.↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

MESSENGER at Mercury: Early Orbital Operations

The MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) spacecraft, launched in August 2004 under NASA's Discovery Program, was inserted into orbit about the planet Mercury in March 2011. MESSENGER's three flybys of Mercury in 2008-2009 marked the first spacecraft visits to the innermost planet since the Mariner 10 flybys in 1974-1975. The unprecedented orbital operations are yielding new insights into the nature and evolution of Mercury. The scientific questions that frame the MESSENGER mission led to the mission measurement objectives to be achieved by the seven payload instruments and the radio science experiment. Interweaving the full set of required orbital observations in a manner that maximizes the opportunity to satisfy all mission objectives and yet meet stringent spacecraft pointing and thermal constraints was a complex optimization problem that was solved with a software tool that simulates science observations and tracks progress toward meeting each objective. The final orbital observation plan, the outcome of that optimization process, meets all mission objectives. MESSENGER's Mercury Dual Imaging System is acquiring a global monochromatic image mosaic at better than 90%coverage and at least 250 m average resolution, a global color image mosaic at better than 90%coverage and at least 1 km average resolution, and global stereo imaging at better than 80%coverage and at least 250 m average resolution. Higher-resolution images are also being acquired of targeted areas. The elemental remote sensing instruments, including the Gamma-Ray and Neutron Spectrometer and the X-Ray Spectrometer, are being operated nearly continuously and will establish the average surface abundances of most major elements. The Visible and Infrared Spectrograph channel of MESSENGER's Mercury Atmospheric and Surface Composition Spectrometer is acquiring a global map of spectral reflectance from 300 to 1450 nm wavelength at a range of incidence and emission angles. Targeted areas have been selected for spectral coverage into the ultraviolet with the Ultraviolet and Visible Spectrometer (UVVS). MESSENGER's Mercury Laser Altimeter is acquiring topographic profiles when the slant range to Mercury's surface is less than 1800 km, encompassing latitudes from 201S to the north pole. Topography over the remainder of the southern hemisphere will be derived from stereo imaging, radio occultations, and limb profiles. MESSENGER's radio science experiment is determining Mercury's gravity field from Doppler signals acquired during frequent downlinks. MESSENGER's Magnetometer is measuring the vector magnetic field both within Mercury's magnetosphere and in Mercury's solar wind environment at an instrument sampling rate of up to 20 samples/s. The UVVS is determining the three-dimensional, time-dependent distribution of Mercury's exospheric neutral and ionic species via their emission lines. During each spacecraft orbit, the Energetic Particle Spectrometer measures energetic electrons and ions, and the Fast Imaging Plasma Spectrometer measures the energies and mass per charge of thermal plasma components, both within Mercury's magnetosphere and in Mercury's solar-wind environment. The primary mission observation sequence will continue for one Earth year, until March 2012. An extended mission, currently under discussion with NASA, would add a second year of orbital observations targeting a set of focused follow-on questions that build on observations to date and take advantage of the more active Sun expected during 2012-2013. MESSENGER's total primary mission cost, projected at $446 M in real-year dollars, is comparable to that of Mariner 10 after adjustment for inflation.

Planetary Science↗

MESSENGER at Mercury: Early Orbital Operations

The MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) spacecraft, launched in August 2004 under NASA's Discovery Program, was inserted into orbit about the planet Mercury in March 2011. MESSENGER's three flybys of Mercury in 2008-2009 marked the first spacecraft visits to the innermost planet since the Mariner 10 flybys in 1974-1975. The unprecedented orbital operations are yielding new insights into the nature and evolution of Mercury. The scientific questions that frame the MESSENGER mission led to the mission measurement objectives to be achieved by the seven payload instruments and the radio science experiment. Interweaving the full set of required orbital observations in a manner that maximizes the opportunity to satisfy all mission objectives and yet meet stringent spacecraft pointing and thermal constraints was a complex optimization problem that was solved with a software tool that simulates science observations and tracks progress toward meeting each objective. The final orbital observation plan, the outcome of that optimization process, meets all mission objectives. MESSENGER's Mercury Dual Imaging System is acquiring a global monochromatic image mosaic at better than 90% coverage and at least 250 m average resolution, a global color image mosaic at better than 90% coverage and at least 1 km average resolution, and global stereo imaging at better than 80% coverage and at least 250 m average resolution. Higher-resolution images are also being acquired of targeted areas. The elemental remote sensing instruments, including the Gamma-Ray and Neutron Spectrometer and the X-Ray Spectrometer, are being operated nearly continuously and will establish the average surface abundances of most major elements. The Visible and Infrared Spectrograph channel of MESSENGER's Mercury Atmospheric and Surface Composition Spectrometer is acquiring a global map of spectral reflectance from 300 to 1450 nm wavelength at a range of incidence and emission angles. Targeted areas have been selected for spectral coverage into the ultraviolet with the Ultraviolet and Visible Spectrometer (UVVS). MESSENGER's Mercury Laser Altimeter is acquiring topographic profiles when the slant range to Mercury's surface is less than 1800 km, encompassing latitudes from 20 deg. S to the north pole. Topography over the remainder of the southern hemisphere will be derived from stereo imaging, radio occultations, and limb profiles. MESSENGER's radio science experiment is determining Mercury's gravity field from Doppler signals acquired during frequent downlinks. MESSENGER's Magnetometer is measuring the vector magnetic field both within Mercury's magnetosphere and in Mercury's solar wind environment at an instrument sampling rate of up to 20 samples/s. The UVVS is determining the three-dimensional, time-dependent distribution of Mercury's exospheric neutral and ionic species via their emission lines. During each spacecraft orbit, the Energetic Particle Spectrometer measures energetic electrons and ions, and the Fast Imaging Plasma Spectrometer measures the energies and mass per charge of thermal plasma components, both within Mercury's magnetosphere and in Mercury's solar-wind environment. The primary mission observation sequence will continue for one Earth year, until March 2012. An extended mission, currently under discussion with NASA, would add a second year of orbital observations targeting a set of focused follow-on questions that build on observations to date and take advantage of the more active Sun expected during 2012-2013. MESSENGER's total primary mission cost, projected at $446 M in real-year dollars, is comparable to that of Mariner 10 after adjustment for inflation.

mercury↗

Computationally Guided Development of Components for High Energy Density Solid-State Lithium-Sulfur Batteries

All electric vertical take-off and landing vehicles (eVTOL) for urban air mobility (UAM) concepts face numerous challenging technical barriers before their introduction into the consumer marketplace. The most challenging of these technical barriers to overcome is developing an energy storage system capable of meeting the rigorous aerospace safety and performance criteria1. The performance metrics for eVTOL craft, such as specific energy, specific power, and safety, exceed those of electric automobiles by a factor of two to four. Current state-of-the-art (SOA) lithium-ion batteries are incapable of meeting the key performance criteria of energy and safety for eVTOL. Therefore, next generation advanced chemistries and designs must be developed to meet required performance metrics for electric aviation2. Beyond lithium-ion chemistries, such as lithium-sulfur, show promise in their high energy, while limitations exist in their power and cyclability due to low electrical conductivity and high intermediate solubility in organic liquid electrolytes. Several strategies to overcome the low electrical conductivity involve the use of selenium as a dopant in the active sulfur material, along with the incorporation of 2-dimensional electron-conducting holey-graphene to improve the composite cathodes electronic conductivity. Furthermore, combining this chemistry with a solid-electrolyte avoids the components’ dissolution issues3. However, the development of composite solid-state cathodes is non-trivial as several components must be intimately mixed so that the active component has sufficient access to both electrons and lithium ions to undergo full electrochemical conversion. Mathematical modeling of battery components can assist experimental design through a robust and rigorous combination of computational modeling techniques covering multiple length scales. The objective is to leverage modern computational materials methods combined with battery multiphysics tools to develop radically advanced compatible cathode and electrolyte materials, build and test solid state lithium-sulfur cells and packs. A NASA-based cross-organizational team of high-powered experts combined integrated computational predictive modeling, fundamental chemistry analysis, advanced material science, and battery cell development to tackle this very challenging, multidisciplinary problem. This presentation will show a multiscale computational modeling approach that has produced a novel particle dynamics method called Solid Electrolyte Sphere Approximation Model (SESAM). SESAM modeling targets the 1-10 µm scale structures and provides electromechanical and grain interactions for predictive design guidelines for the manufacturing of solid-state components. Parameters such as particle size and volume fraction of the constituent materials were modeled and experimentally fabricated to optimize electrochemical performance through improved microstructure design. Experimental feedback was provided through ionic and electronic conductivity assessment and structural analysis of developed materials and cell components.

battery↗

Austere Human Missions to Mars

The Design Reference Architecture 5 (DRA 5) is the most recent concept developed by NASA to send humans to Mars in the 2030 time frame using Constellation Program elements. DRA 5 is optimized to meet a specific set of requirements that would provide for a robust exploration program to deliver a new six-person crew at each biennial Mars opportunity and provide for power and infrastructure to maintain a highly capable continuing human presence on Mars. This paper examines an alternate architecture that is scaled back from DRA 5 and might offer lower development cost, lower flight cost, and lower development risk. It is recognized that a mission set using this approach would not meet all the current Constellation Mars mission requirements; however, this 'austere' architecture may represent a minimum mission set that would be acceptable from a science and exploration standpoint. The austere approach is driven by a philosophy of minimizing high risk or high cost technology development and maximizing development and production commonality in order to achieve a program that could be sustained in a flat-funded budget environment. Key features that would enable a lower technology implementation are as follows: using a blunt-body entry vehicle having no deployable decelerators, utilizing aerobraking rather than aerocapture for placing the crewed element into low Mars orbit, avoiding the use of liquid hydrogen with its low temperature and large volume issues, using standard bipropellant propulsion for the landers and ascent vehicle, and using radioisotope surface power systems rather than a nuclear reactor or large area deployable solar arrays. Flat funding within the expected NASA budget for a sustained program could be facilitated by alternating cargo and crew launches for the biennial Mars opportunities. This would result in two assembled vehicles leaving Earth orbit for Mars per Mars opportunity. The first opportunity would send two cargo landers to the Mars surface to preposition a habitat, supplies, and exploration equipment. The next opportunity, two years later, would send to Mars orbit 1) a lander with a Mars Ascent Vehicle (MAV) and 2) a crewed Mars Transit Habitat with an Orion CEV for Earth return. The following opportunity, two years after the first crew, would go back to cargo-only launches. This alternation of cargo and crew opportunities results in a sustainable launch rate of six Ares V launches every two years. It is notable that four of the six launches per Mars opportunity are identical, build-to-print, Tran-Mars Injection stages. This type of production rate could lend itself well to a COTStype service provider, and would make it feasible to have a live spare in place in the event of a single launch failure.

landers↗

Predictive Modeling of Carbon Ablators Using Micro and Macro-Scale Modeling

Efforts to build a Predictive Material Modeling (PMM) framework from the micro-scale to the macro-scale are presented in this abstract. To reduce the need for extensive testing, accelerate the design cycle process, and reduce uncertainty margins applied to final designs, NASA is developing simulation and modeling tools that enable characterization of material properties and response to high-enthalpy environments. The Porous Microstructure Analysis (PuMA) code has been developed for computing macroscale (volume averaged) properties of porous materials using microscale images from micro-computed tomography (micro-CT). Microscale modeling requires a realistic representation of a material microstructure; these are obtained either synthetically during the design of the material or through X-ray micro-CT. Volume averaged properties are then used to inform macroscale material response models, such as those implemented in the Porous-material Analysis Toolbox based on OpenFOAM (PATO) software, also actively developed by NASA. The computational model in PATO is a generic heat and mass transfer model for porous reactive materials containing several solid phases and a single gas phase. The detailed chemical interactions occurring between the solid phases and the gas phase are modeled at the pore scale assuming local thermal equilibrium. These tools were developed to efficiently interface with other pre-existing codes such as SPARTA (direct simulation Monte Carlo), DPLR (hypersonic CFD), NEQAIR (radiative transport) and DAKOTA (uncertainty quantification and optimization). Detailed flight data (Mars Science Laboratory [MSL] Entry Descent and Landing Instrument [MEDLI]) is critical for validating these computational tools for NASA applications. Examples of modeling ablative material response using these codes will be presented including 3D simulations of the full-scale heatshield of the MSL capsule. The simulations demonstrate the ability of the modern material response code, PATO, to handle the material response of geometrically complex and large domains, through the use of massively parallel computations.

Thermal Protection Systems↗

Predictive Modeling of Carbon Ablators

Efforts to build a Predictive Material Modeling (PMM) framework from the micro-scale to the macro-scale are presented in this abstract. To reduce the need for extensive testing, accelerate the design cycle process, and reduce uncertainty margins applied to final designs, NASA is developing simulation and modeling tools that enable characterization of material properties and response to high-enthalpy environments. The Porous Microstructure Analysis (PuMA) code has been developed for computing macroscale (volume averaged) properties of porous materials using microscale images from micro-computed tomography (micro-CT). Microscale modeling requires a realistic representation of a material microstructure; these are obtained either synthetically during the design of the material or through X-ray micro-CT. Volume averaged properties are then used to inform macroscale material response models, such as those implemented in the Porous-material Analysis Toolbox based on OpenFOAM (PATO) software, also actively developed by NASA. The computational model in PATO is a generic heat and mass transfer model for porous reactive materials containing several solid phases and a single gas phase. The detailed chemical interactions occurring between the solid phases and the gas phase are modeled at the pore scale assuming local thermal equilibrium. These tools were developed to efficiently interface with other pre-existing codes such as SPARTA (direct simulation Monte Carlo), DPLR (hypersonic CFD), NEQAIR (radiative transport) and DAKOTA (uncertainty quantification and optimization). Detailed flight data (Mars Science Laboratory [MSL] Entry Descent and Landing Instrument [MEDLI]) is critical for validating these computational tools for NASA applications. Examples of modeling ablative material response using these codes will be presented including 3D simulations of the full-scale heatshield of the MSL capsule. The simulations demonstrate the ability of the modern material response code, PATO, to handle the material response of geometrically complex and large domains, through the use of massively parallel computations.

Thermal Protection Systems↗

An Overview of Experiments and Modeling of Polysiloxane-Coated Thermal Protection Systems for Missions to Mars, Titan, and Beyond.

Phenolic Impregnated Carbon Ablator (PICA) gained heritage during the historic Stardust mission, where it successfully returned samples from a comet’s tail and has since been instrumental in delivering payloads to the surface of Mars [1-3]. Most recently, PICA enabled the safe return of samples collected from asteroid Bennu as part of the OSIRIS-REx mission. This rich legacy underscores PICA’s critical role in allowing NASA’s most ambitious exploration missions. However, the friable nature of its phenolic phase presents challenges during handling and pre-launch activities. To mitigate this issue, PICA is coated with a polysiloxane resin system, which serves to suppress particulate dispersion and thereby safeguard spacecraft components. A comprehensive understanding of the polysiloxane resin’s behavior is imperative, as it profoundly shapes the material response of PICA during atmospheric entry by influencing its thermal and oxidative stability. This influence extends to thermocouple plugs embedded within thermal protection systems. These plugs have demonstrated their significance in missions such as Mars Science Laboratory (MSL) and Mars 2020, where the MEDLI and MEDLI2 instrumentation suites delivered in-valuable insights into the performance of thermal protection systems during entry into the Martian atmosphere [4]. Looking ahead, missions such as Dragonfly, set to descend into Titan’s dense atmosphere, aim to leverage advanced sensor technologies to further refine our understanding of thermal protection response [5]. Moreover, thermocouple plugs play an essential role in validating cutting-edge material response models, such as those pioneered under NASA’s Entry Systems Modeling Project (ESM), designed, in-part, to predict the operational integrity of thermal protection systems under the extreme stresses of atmospheric entry. To achieve these modeling goals, ground-based experiments are crucial to provide the foundational data necessary for developing and refining these predictive tools. To this end, an extensive test campaign was conducted at the Hypersonic Materials Environmental Test System (HyMETS) to investigate the high-temperature behavior of the polysiloxane resin in an air environment [6]. These experiments revealed critical phenomena, including the formation of a silicon oxycarbide layer that enhances oxidation resistance, moderates surface temperatures, and alters in-depth thermal response. Building on these findings, subsequent tests were designed to simulate atmospheric entry conditions in reactive gases, such as CO2 and N2, to mimic the environments of Mars and Titan, respectively, as well as non-reactive gases representing the atmospheres of the Ice Giants (Neptune and Uranus). A heating rate dependent decomposition mechanism has been identified for the polysiloxane resin under oxidizing conditions (Fig. 1). In the initial stage, the resin and the underlying thermal protection system undergo pyrolysis, rapidly generating a thin amorphous silicon oxycarbide interwoven with carbonaceous char and residual fibers from PICA. During the second stage, the nascent oxide layer establishes a robust, oxidation-resistant thermal barrier coating, which significantly impedes heat transfer to the underlying carbonaceous char, resulting in a stagnation of the surface temperature. A key factor contributing to this thermal resistance is the low recombination efficiency of atomic oxygen (γ), which further diminishes the heat load on the material’s interior layers [7]. Moreover, as the surface temperature stagnates, the silicon oxycarbide phase separates into distinct regions of silica and free graphite. Ultimately, when the heat flux reaches a critical threshold, a third stage is triggered, leading to the breakdown of the coating through carbothermal reduction, exposing the underlying char layer. This exposure leads to a dramatic surface temperature spike, driven by highly exothermic reactions between atomic oxygen and the char layer, further accelerating material degradation. A detailed mass and heat transfer model of PICA coated with polysiloxane resin was implemented in the Porous material Analysis Toolbox based on OpenFOAM, PATO [8]. The initial stage was considered negligible in this model because the resin decomposition occurs rapidly within a thin surface layer. Instead, the coating was directly considered as an oxygen-resistant thermal barrier coating. For the second stage, the thin amorphous silicon oxycarbide was treated as a pure silica surface to simplify the thermochemical behavior. The model ac-counts for surface equilibrium processes using representative elements of the coating-environment system. For the third stage, specific boundary conditions were developed to estimate the onset and progression of the coating removal. Two-dimensional material response simulations were conducted to compare uncoated and coated PICA using boundary conditions calibrated with HyMETS data. Fig. 2 illustrates that the simulations closely align with experimental data, successfully reproducing measured temperature profiles. This work will include the latest advancements in the coating model, including the calibration of recombination of atomic oxygen at the surface during the second phase. These simulated results will be further validated against additional CO2 data points from HyMETS, reinforcing the models’ predictive capabilities. These mechanisms and their effects on thermal protection systems, including thermochemical behavior and thermocouple probe performance in extreme environments, provide crucial insights for optimizing spacecraft designs that safeguard scientific payload and ensure mission success in future planetary exploration endeavors.

Active Oxidation↗