Search NASA⌕ Search

SEARCH · Search NASA

Results for “building technologies program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

CNCC Craig Campus Geothermal Project: 82-well closed loop GHP well field to provide geothermal energy as a common utilitiy for a new community college campus

Colorado Northwestern Community College (CNCC) is working collaboratively with recipient vendor Chevron Energy Solutions, an energy services company (ESCO), to develop an innovative GHP project at the new CNCC Campus constructed in 2010/2011 in Craig, Colorado. The purpose of the CNCC Craig Campus Geothermal Program scope was to utilize an energy performance contracting approach to develop a geothermal system with a shared closed-loop field providing geothermal energy to each building's GHP mechanical system. Additional benefits to the project include promoting good jobs and clean energy while reducing operating costs for the college. The project has demonstrated that GHP technology is viable for new construction using the energy performance contracting model. The project also enabled the project team to evaluate several options to give the College a best value proposition for not only the initial design and construction costs but build high performance facilities that will save the College for many years to come. The design involved comparing the economic feasibility of GHP by comparing its cost to that of traditional HVAC systems via energy model, financial life cycle cost analysis of energy savings and capital cost, and finally by evaluating the compatibility of the mechanical design for GHP compared to traditional HVAC design. The project shows that GHP system design can be incorporated into the design of new commercial buildings if the design teams, architect, contractor, and owner coordinate carefully during the early phases of design. The public also benefits because the new CNCC campus is a center of education for the much of Northwestern Colorado, and students in K-12 programs (Science Spree 2010) through the CNCC two-year degree programs are already integrating geothermal and GHP technology. One of the greatest challenges met during this program was coordination of multiple engineering and development stakeholders. The leadership of Principle Investigator Pres. John Boyd of CNCC met this challenge by showing clear leadership in setting common goals and resolving conflicts early in the program.

15 GEOTHERMAL ENERGY↗

Development of a Training Program for Commercial Building Technicians

This project focused on developing and deploying a comprehensive program of 22 training modules, including certification requirements, and accreditation standards for commercial building technicians, to help achieve the full savings potential of energy efficient buildings, equipment, and systems. This curriculum extended the currently available commercial building technician programs -- training a labor force in a growing market area focused on energy efficiency. The program helps to remove a major market impediment to low energy/zero energy commercial building system acceptance, namely a lack of operating personnel capable of handling more complex high efficiency systems. The project developed a training curriculum for commercial building technicians, with particular focus on high-efficiency building technology, and systems. In Phase 1, the project team worked collaboratively in developing a draft training syllabus to address project objectives. The team identified energy efficiency knowledge gaps in existing programs and plans and plans to address the gaps with either modified or new curricula. In Phase 2, appropriate training materials were developed to meet project objectives. This material was developed for alternative modes of delivery, including classroom lecture materials, e-learning elements, video segments, exercises, and hands-on training elements. A Certification and Accreditation Plan and a Commercialization and Sustainability Plan were also investigated and developed. The Project Management Plan was updated quarterly and provided direction on the management approaches used to accomplish the expected project objectives. GTI project management practices tightly coordinate project activities using management controls to deliver optimal customer value. The project management practices include clear scope definition, schedule/budget tracking, risk/issue resolution and team coordination.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Personal Insights and Anecdotes about the Weatherization Assistance Program Process Field Study

The present report is based on the research conducted for the Process Field Study between March and September 2011. The Process Field Study documents how Weatherization Assistance Program (WAP) services were delivered to clients, and the quality with which those services were delivered. The assessments were conducted by visiting 19 agencies in 19 states around the country interviewing agency managers, staff, and contractors; observing program intake along, with 43 audits, 45 measure installation and 37 final inspections; and conducting debriefing interviews with clients and weatherization staff following the observation of service delivery. In this report, we turn to detailed observations of a few field interactions. The client stories from our observations illustrate some of the ways clients and crew interact to build the success of the program, but shows there will always be unanticipated obstacles to building trust and getting the program to the public. Stories of staff and crew career paths indicate that weatherization technology and techniques are being learned and used by technicians out of the new home construction industry and that their new knowledge provides them with technical tools and methods that many hope to take back into the construction industry if and when they return. This report is organized according to the four stages of weatherization: intake, audit, installation, and inspection. It contributes to our understanding of the area where policy, environment, culture, and individual decisions influence social innovation. The anecdotes reveal the realities of implementing programs for the benefit of the greater good at minimal cost and sacrifice in times of ever restricting budgets. As the authors revisited their field notes and compiled memorable narratives to communicate the essence of the weatherization experience, they identified three key takeaways that summarize the major issues. First, in WAP as in all services there will always be challenges to reaching the community needing to be served. Second, crew and staff learn new skills and gain experience that can be and are applied in jobs elsewhere. Finally, in the best cases, changes from the weatherization experience permeate communities in unanticipated ways.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Dense Batteries Based on Highly Conductive Solid Electrolyte and Cathode Materials

Solid Power’s Phase II program builds on promising Phase I results to further develop, scale, and integrate Oakridge National Laboratory’s (ORNL) material technologies into prototype cells relevant to electric vehicle applications. These cells will provide excellent energy density, specific energy, safety, and low cost compared to conventional Li-ion. The optimal material system is targeted for integration into >10 Ah pouch cells to demonstrate the ability to reach the United State Advanced Battery Consortium (USABC) performance targets and the specific targets of Solid Power’s automotive OEM stakeholders.

25 ENERGY STORAGE↗

Brookfield Homes Passive House Performance Evaluation

TO4 3.1.3: Brookfield Homes Short-Term Results TO5 3.1.3: Brookfield Passive House Monitoring To further define its market position on high performance homebuilding, Brookfield worked with IBACOS and the Building America program to design and construct a Passive House (PH) certified model home in Denver, CO to evaluate advanced building technologies and to use as a marketing tool for potential homebuyers. Brookfield used a new architect and a new floor plan as a standard production model and constructed it to the PH standard as an upgrade option. This PH was completely built and certified in August 2013.

Array↗

Graduate Research Assistant Program for Professional Development at Oak Ridge National Laboratory (ORNL) Global Nuclear Security Technology Division (GNSTD)

The southeast is a highly suitable environment for establishing a series of nuclear safety, security and safeguards 'professional development' courses. Oak Ridge National Laboratory (ORNL) provides expertise in the research component of these subjects while the Y-12 Nuclear Security Complex handles safeguards/security and safety applications. Several universities (i.e., University of Tennessee, Knoxville (UTK), North Carolina State University, University of Michigan, and Georgia Technology Institute) in the region, which offer nuclear engineering and public policy administration programs, and the Howard Baker Center for Public Policy make this an ideal environment for learning. More recently, the Institute for Nuclear Security (INS) was established between ORNL, Y-12, UTK and Oak Ridge Associate Universities (ORAU), with a focus on five principal areas. These areas include policy, law, and diplomacy; education and training; science and technology; operational and intelligence capability building; and real-world missions and applications. This is a new approach that includes professional development within the graduate research assistant program addressing global needs in nuclear security, safety and safeguards.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Entrepreneurial talent building for 21st century agricultural innovation.

Agricultural innovation is a key component of the global economy and enhances food security, health, and nutrition. Current innovation efforts focus mainly on supporting the transition to sustainable food systems, which is expected to harness technological advances across a range of fields. In this Nano Focus, we discuss how such efforts would benefit from not only supporting farmer participation in deciding transition pathways but also in fostering the interdisciplinary training and development of entrepreneurial-minded farmers, whom we term "AgTech Pioneers", to participate in cross-sector agricultural innovation ecosystems as cocreators and informed users of developing and future technologies. Toward this goal, we discuss possible strategies based on talent development, cross-disciplinary educational and training programs, and innovation clusters to build an AgTech Pioneer ecosystem, which can help to reinvigorate interest in farming careers and to identify and address challenges and opportunities in agriculture by accelerating and applying advances in nanoscience, nanotechnology, and related fields.

Yoon, Bo Kyeong↗

Programming Function via Soft Materials (PFvSM) (Final Report)

The PFvSM cluster at the University of Illinois greatly deepened the science of soft materials and expanded the means for embedding within them unprecedented functionalities. We pioneered a mesoscopic approach to materials design that combined leading competencies in fundamental experimental and theoretical soft matter science and fabrication that powerfully establishes equilibrium and nonequilibrium assembly of novel and complex building blocks as a preeminent contributor to progress in materials chemistry. Our cluster’s vision was an integrated program of work centered on soft matter science with the ultimate goal of impacting important energy technologies. As elementary units we employed function-encoded colloids, nanoparticles, large mesh fibrillar gels, deterministically fabricated networks and hybrid objects. These materials were employed as building blocks for diverse model systems that allowed fundamental soft matter principles of wide relevance to be established. Their assembly into materials with useful functional behavior provided new approaches to challenging problems in basic energy science including energy harvesting, transport and storage. To achieve these goals the cluster brought together a team of recognized world-leaders in materials synthesis and processing, in-situ characterization, theory and modeling, and materials design, integration and fabrication

36 MATERIALS SCIENCE↗

Safeguards Technology Development Program 4th Quarter FY 2018 Report September 30, 2018

This is an evaluation of candidate navigation solutions for GPS free inspection tools that can be used in tours of large building interiors. In principle, COTS portable inertial motion unit (IMU) sensors with satisfactory accuracy, SWAP (size, weight, power), low error, and bias drift can provide sufficiently accurate dead reckoning navigation in a large building in the absence of GPS. To explore this assumption, the capabilities of representative IMU navigation sensors to meet these requirements will be evaluated and field tested, starting with a market survey. To test the candidate COTS IMUs drawn from the market survey, we will design and fabricate a person-portable backpack for testing. We will provide a mobile power supply and data collection port. Then, we will test the IMUs on interior building tours at LLNL, finally carrying out an analysis of these sensors’ performance using LLNL’s navigation codes.

42 ENGINEERING↗

Final Technical Report for GO17004 Regulatory Logic: Codes and Standards for the Hydrogen Economy

The objectives of this project are to: develop a robust supporting research and development program to provide critical hydrogen behavior data and a detailed understanding of hydrogen combustion and safety across a range of scenarios, needed to establish setback distances in building codes and minimize the overall data gaps in code development; support and facilitate the completion of technical specifications by the International Organization for Standardization (ISO) for gaseous hydrogen refueling (TS 20012) and standards for on-board liquid (ISO 13985) and gaseous or gaseous blend (ISO 15869) hydrogen storage by 2007; support and facilitate the effort, led by the NFPA, to complete the draft Hydrogen Technologies Code (NFPA 2) by 2008; with experimental data and input from Technology Validation Program element activities, support and facilitate the completion of standards for bulk hydrogen storage (e.g., NFPA 55) by 2008; facilitate the adoption of the most recently available model codes (e.g., from the International Code Council [ICC]) in key regions; complete preliminary research and development on hydrogen release scenarios to support the establishment of setback distances in building codes and provide a sound basis for model code development and adoption; support and facilitate the development of Global Technical Regulations (GTRs) by 2010 for hydrogen vehicle systems under the United Nations Economic Commission for Europe, World Forum for Harmonization of Vehicle Regulations and Working Party on Pollution and Energy Program (ECE-WP29/GRPE); and to Support and facilitate the completion by 2012 of necessary codes and standards needed for the early commercialization and market entry of hydrogen energy technologies.

08 HYDROGEN↗

Solid Oxide Fuel Cell Technology Stationary Power Application Project

The objectives of this program were to: (1) Develop a reliable, cost-effective, and production-friendly technique to apply the power-enhancing layer at the interface of the air electrode and electrolyte of the Siemens SOFC; (2) Design, build, install, and operate in the field two 5 kWe SOFC systems fabricated with the state-of-the-art cylindrical, tubular cell and bundle technology and incorporating advanced module design features. Siemens successfully demonstrated, first in a number of single cell tests and subsequently in a 48-cell bundle test, a significant power enhancement by employing a power-enhancing composite interlayer at the interface between the air electrode and electrolyte. While successful from a cell power enhancement perspective, the interlayer application process was not suitable for mass manufacturing. The application process was of inconsistent quality, labor intensive, and did not have an acceptable yield. This program evaluated the technical feasibility of four interlayer application techniques. The candidate techniques were selected based on their potential to achieve the technical requirements of the interlayer, to minimize costs (both labor and material), and suitably for large-scale manufacturing. Preliminary screening, utilizing lessons learned in manufacturing tubular cells, narrowed the candidate processes to two, ink-roller coating (IRC) and dip coating (DC). Prototype fixtures were successfully built and utilized to further evaluate the two candidate processes for applying the interlayer to the high power density Delta8 cell geometry. The electrical performance of interlayer cells manufactured via the candidate processes was validated. Dip coating was eventually selected as the application technique of choice for applying the interlayer to the high power Delta8 cell. The technical readiness of the DC process and product quality was successfully and repeatedly demonstrated, and its throughput and cost are amenable to large scale manufacturing. Two 5 kWe-class SOFC power systems were built and installed for the purpose of testing and evaluating state-of-the-art tubular cell and bundle technologies, advanced generator and module design features, balance-of-plant components, and cost reduction measures. Installed at the Phipps Conservatory and Botanical Gardens, a system operated for more than 17,500 hrs, delivering electrical power to the on-site grid and thermal energy in form of hot water for onsite utilization. Operation was typically autonomous, requiring minimal operator intervention, and achieved an overall availability of greater than 85%. Outages were primarily due to an unstable local grid, two weather related outages were experienced, and very few reliability issues were encountered despite harsh operating conditions. No repairs to the stack, module, or balance-of-plant were required. A second system was designed, built, delivered, and installed at a Siemens facility in Charlotte, North Carolina. Operational issues associated with the balance-of-plant were encountered during startup and prevented the system from operating.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Energy Physics Network Requirements Review (Final Report, July-October 2020)

Throughout 2020, ESnet and the Office of High Energy Physics (HEP) of the DOE SC organized an ESnet requirements review of HEP-supported activities. Preparation for this event included identification of key stakeholders: program and facility management, research groups, technology providers, and a number of external observers. These individuals were asked to prepare formal case study documents about their relationship to the HEP program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward. A series of pre-planning meetings better prepared case study authors for this task, along with guidance on how the review would proceed in a virtual fashion.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

IN2 Profile: Reducing Energy Prices for Commercial Buildings with NETenergy’s Black ICE Technology

To cool a commercial building properly and cost-effectively, the owners of NETenergy have created a thermal battery that works much like an electrical battery except instead of storing energy electrically, it stores energy thermally. Through the Wells Fargo Innovation Incubator (IN²) program, NETenergy will be able to advance modeling of their system and increase product development. The IN² program launched in October 2014 and is part of Wells Fargo’s 2020 Environmental Commitment to provide $100 million to environmentally-focused nonprofits and universities. The goal is to create an ecosystem that fosters and accelerates the commercialization of promising commercial buildings technologies that can provide scalable solutions to reduce the energy impact of buildings. According to the Department of Energy, nearly 40 percent of energy consumption in the U.S. today comes from buildings at an estimated cost of $413 billion.

25 ENERGY STORAGE↗

Building an EPA Class VI Permit Application

Summary To accelerate the commercialization of carbon capture and storage (CCS), the US Department of Energy (US DOE) is building on decades of characterization efforts and pilot-scale projects through their CarbonSAFE program. Administered through their National Energy Technology Laboratory, this program seeks to bring fully integrated projects to the sector that can store more than 50 million tonnes of CO2 over a 30-year period. The program, which was enacted before the enhancement of Internal Revenue Code Section 45Q, is in the capture assessment, characterization, and permitting phase. The objectives of this paper are to discuss (a) the injection permitting requirements of the CarbonSAFE projects; (b) information gathering in support of the permit; (c) the timelines of field development and permit-related activities; (d) the major technical components of the field development plan; and (e) early feedback from the regulators toward acceptance of the permit. In Mississippi, more than 30,000 acres have been characterized by six deep characterization wells, a deep groundwater well, and 92 line miles of 2D seismic as part of the CarbonSAFE Project ECO2S. During the acquisition of seismic data, all receiver lines were live, which resulted in the generation of a pseudo-3D seismic design. The incorporation of a 3D seismic survey was not included as part of this project due to logistical difficulties presented by the undulating, wooded surface terrain. A suite of openhole geophysical logs was taken from each well, allowing for a detailed interpretation of prospective storage reservoirs and confining intervals to complement the analysis carried out on the 290 ft of a whole core that was cut through the prospective confining zone and storage reservoir. The detailed geologic and reservoir data were assembled and entered into a 3D model to assess the injection capacity and the area of review (AoR). This information fed into the detailed corrective action, monitoring, testing, and postinjection site care (PISC) modeling. The results have been exceptional. The geologic assessment has revealed three primary storage targets, ranging in depth from 3,500 ft to 6,000 ft. These storage reservoirs net 1,300 ft of sandstone, with mean porosity and permeability of 29% and 3.6 darcies, respectively. Together, these reservoirs have storage capacities that may exceed 20 million tonnes per square mile, making this a gigatonne prospect. Forward modeling of the project resulted in an AoR of 16 sq miles, injecting about 8000 t/d, for 30 years, via two deep injection wells. The excellent confining characteristics of the caprock, relatively simple geologic structure, and lack of historical well drilling activity in this area provide excellent containment of the injected CO2. Based on this work, the project has proposed 20 years of PISC. To date, only two US CO2 injection permits have been granted. These projects relied on a singular capture point feeding a singular sequestration point (source to sink), and considerations have not been made to garner CO2 emissions from other industrial sources. The Kemper County Storage Complex is a first-of-its-kind storage hub concept that looks to develop an area capable of storing significant quantities of CO2 from the region. Also, this work will show how characterization efforts, geological and numerical modeling efforts, and plan development were constructed in support of permit and incentives acceptance.

Energy & Fuels↗

Wireless Sensor Modalities at a Nuclear Plant Site to Collect Vibration Data

One of the major contributors to the total operating costs of domestic nuclear fleet of reactors today is the operation and maintenance (O&M) costs. These include labor-intense preventive maintenance programs involving manually-performed inspection, calibration, testing, and maintenance of plant assets at periodic frequency and time-based replacement of assets at periodic frequency, irrespective of their conditions. This has resulted in a labor-centric business model to achieve high capacity factors. To build an optimal maintenance program, it’s time to transition from this labor-centric business model to a technology-centric business model. Fortunately, there are technologies (advanced sensor, data analytics, and risk assessment methodologies) that will support this transition. The technology-centric business model will result in significant plant life extension and reduction of time-based maintenance activities. This will drive down O&M costs as labor is a rising cost and technology is a declining cost. This approach will lay the foundation for real-time condition assessment of plant assets, allowing condition-based maintenance to enhance plant safety, reliability, and economics of operation. The goal of this project is to address challenges in the area of digital monitoring, i.e., the application of advanced sensor technologies (particularly wireless sensor technologies) and science-based data analytic capabilities to advance online monitoring and predictive maintenance in nuclear plants to improve plant performance (efficiency gain and economic competitiveness). To achieve the project goal, in partnership with Exelon Generating Company (Exelon), researchers from Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) are performing research and development (R&D) to demonstrate application of wireless sensors using the distributed antenna system and advanced data analytics to achieve predictive maintenance. In the report, wireless vibration sensors, vibration data and its indicator are described. The wireless vibration sensors presented in this report support three types of wireless communication, namely, Wi-Fi, cellular, and 900 MHz. These wireless vibration sensors are considered by partner plant site for installation on plant asset to enable online vibration monitoring to replace periodic measurements. These vibration data along with other plant process data will be utilized to develop diagnostic and prognostic models.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Variable-Speed Screw Chiller, Sidney Yates Building, Washington, DC

This report captures the findings from an evaluation ORNL performed on a new chiller technology as part of GSA's Proving Ground Program. Note: Appendices B&C were removed from this report while the author looks for a way to insert them without consuming over 200MB of file size.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗