Search NASA⌕ Search

SEARCH · Search NASA

Results for “certification testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Electron/proton spectrometer certification documentation analyses

A compilation of analyses generated during the development of the electron-proton spectrometer for the Skylab program is presented. The data documents the analyses required by the electron-proton spectrometer verification plan. The verification plan was generated to satisfy the ancillary hardware requirements of the Apollo Applications program. The certification of the spectrometer requires that various tests, inspections, and analyses be documented, approved, and accepted by reliability and quality control personnel of the spectrometer development program.

Gleeson, P.↗

Space shuttle redesigned solid rocket motor Certificate of Qualification (COQ) data report

The Space Shuttle Redesigned Solid Rocket Motor (RSRM) Certification Program provides confidence that the RSRM and its components/subsystems meet or exceed Mission Oriented Requirements when manufactured per design requirements and specified/approved processes. Certification is based on documented results of tests, analyses, inspections, similarity, and demonstrations. Evidencing information is provided to certify that each RSRM component/subsystem satisfies design, mission related requirements and objectives.

Duersch, Fred, Jr.↗

Certification of windshear performance with RTCA class D radomes

Superposition testing of detection range performance forms a digital signal for input into a simulation of signal and data processing equipment and algorithms to be employed in a sensor system for advanced warning of hazardous windshear. For suitable pulse-Doppler radar, recording of the digital data at the input to the digital signal processor furnishes a realistic operational scenario and environmentally responsive clutter signal including all sidelobe clutter, ground moving target indications (GMTI), and large signal spurious due to mainbeam clutter and/or RFI respective of the urban airport clutter and aircraft scenarios (approach and landing antenna pointing). For linear radar system processes, a signal at the same point in the process from a hazard phenomena may be calculated from models of the scattering phenomena, for example, as represented in fine 3 dimensional reflectivity and velocity grid structures. Superposition testing furnishes a competing signal environment for detection and warning time performance confirmation of phenomena uncontrollable in a natural environment.

Mathews, Bruce D.↗

Space Based Range Demonstration and Certification (SBRDC)

This viewgraph presentation describes the development, utilization and testing of technologies for range safety and range user systems. The contents include: 1) Space Based Range (SBR) Goals and Objectives; 2) Today s United States Range; 3) Future Range; 4) Another Vision for the Future Range; 5) STARS Project Goals; 6) STARS Content; 7) STARS Configuration Flight Demonstrations 1 & 2; 8) Spaceport And Range Technologies STARS Objectives and Results; 9) Spaceport And Range Technologies STARS FD2 Objectives; 10) Range Safety Hardware; 11) Range User Hardware; and 12) Past/Future Flight Demo Plans

Sakahara, Robert↗

Towards Thermal Protection System Certification by Analysis: Identification and Implication of Features

The thermal protection systems (TPS) to be used for upcoming sample return missions (e.g., Mars Sample Return) and future crewed missions to the Moon and Mars are subject to stringent reliability criteria. The certification of TPS is conducted through extensive testing, which can include Arc Jet testing to understand ablative behavior and non-destructive evaluation (NDE) to identify features that could lead to sub-optimal performance during entry. Unexpected features observed during fabrication of large-scale articles often require additional testing to certify, which in the very worst cases can impact schedule and contribute to cost.

J. B. Haskins↗

Quality assurance and risk management: Perspectives on Human Factors Certification of Advanced Aviation Systems

This paper is based on the experience of engineering psychologists advising the U.K. Ministry of Defense (MoD) on the procurement of advanced aviation systems that conform to good human engineering (HE) practice. Traditional approaches to HE in systems procurement focus on the physical nature of the human-machine interface. Advanced aviation systems present increasingly complex design requirements for human functional integration, information processing, and cognitive task performance effectiveness. These developing requirements present new challenges for HE quality assurance (QA) and risk management, requiring focus on design processes as well as on design content or product. A new approach to the application of HE, recently adopted by NATO, provides more systematic ordering and control of HE processes and activities to meet the challenges of advanced aircrew systems design. This systematic approach to HE has been applied by MoD to the procurement of mission systems for the Royal Navy Merlin helicopter. In MoD procurement, certification is a judicial function, essentially independent of the service customer and industry contractor. Certification decisions are based on advice from MoD's appointed Acceptance Agency. Test and evaluation (T&E) conducted by the contractor and by the Acceptance Agency provide evidence for certification. Certification identifies limitations of systems upon release to the service. Evidence of compliance with HE standards traditionally forms the main basis of HE certification and significant non-compliance could restrict release. The systems HE approach shows concern for the quality of processes as well as for the content of the product. Human factors certification should be concerned with the quality of HE processes as well as products. Certification should require proof of process as well as proof of content and performance. QA criteria such as completeness, consistency, timeliness, and compatibility provide generic guidelines for progressive acceptance and certification of HE processes. Threats to the validity of certification arise from problems and assumptions in T&E methods. T&E should seek to reduce the risk of specification non-compliance and certification failure.

Taylor, Robert M.↗

Certification trails and software design for testability

Design techniques which may be applied to make program testing easier were investigated. Methods for modifying a program to generate additional data which we refer to as a certification trail are presented. This additional data is designed to allow the program output to be checked more quickly and effectively. Certification trails were described primarily from a theoretical perspective. A comprehensive attempt to assess experimentally the performance and overall value of the certification trail method is reported. The method was applied to nine fundamental, well-known algorithms for the following problems: convex hull, sorting, huffman tree, shortest path, closest pair, line segment intersection, longest increasing subsequence, skyline, and voronoi diagram. Run-time performance data for each of these problems is given, and selected problems are described in more detail. Our results indicate that there are many cases in which certification trails allow for significantly faster overall program execution time than a 2-version programming approach, and also give further evidence of the breadth of applicability of this method.

Sullivan, Gregory F.↗

CORBASec Used to Secure Distributed Aerospace Propulsion Simulations

The NASA Glenn Research Center and its industry partners are developing a Common Object Request Broker (CORBA) Security (CORBASec) test bed to secure their distributed aerospace propulsion simulations. Glenn has been working with its aerospace propulsion industry partners to deploy the Numerical Propulsion System Simulation (NPSS) object-based technology. NPSS is a program focused on reducing the cost and time in developing aerospace propulsion engines. It was developed by Glenn and is being managed by the NASA Ames Research Center as the lead center reporting directly to NASA Headquarters' Aerospace Technology Enterprise. Glenn is an active domain member of the Object Management Group: an open membership, not-for-profit consortium that produces and manages computer industry specifications (i.e., CORBA) for interoperable enterprise applications. When NPSS is deployed, it will assemble a distributed aerospace propulsion simulation scenario from proprietary analytical CORBA servers and execute them with security afforded by the CORBASec implementation. The NPSS CORBASec test bed was initially developed with the TPBroker Security Service product (Hitachi Computer Products (America), Inc., Waltham, MA) using the Object Request Broker (ORB), which is based on the TPBroker Basic Object Adaptor, and using NPSS software across different firewall products. The test bed has been migrated to the Portable Object Adaptor architecture using the Hitachi Security Service product based on the VisiBroker 4.x ORB (Borland, Scotts Valley, CA) and on the Orbix 2000 ORB (Dublin, Ireland, with U.S. headquarters in Waltham, MA). Glenn, GE Aircraft Engines, and Pratt & Whitney Aircraft are the initial industry partners contributing to the NPSS CORBASec test bed. The test bed uses Security SecurID (RSA Security Inc., Bedford, MA) two-factor token-based authentication together with Hitachi Security Service digital-certificate-based authentication to validate the various NPSS users. The test bed is expected to demonstrate NPSS CORBASec-specific policy functionality, confirm adequate performance, and validate the required Internet configuration in a distributed collaborative aerospace propulsion environment.

Blaser, Tammy M.↗

Space shuttle main engine: Certification for manned space flight

SSME requirements were identified in NASA approved documents. Design verification specifications (DVS) are used to define requirements and method of verification. Detailed and complete plans provide for verification of each requirement by lab tests, component tests, and engine tests. These tests are planned to expose problems early. The culmination of the development process is engine certification. The certification consists of two certification cycles on each of two engines. The certification cycle is made up of 10 tests and 5000 seconds.

Weesner, Ronald G.↗

Control and Non-Payload Communications Generation 1 Prototype Radio Flight Test Report

Unmanned aircraft (UA) represent a new capability that will provide a variety of services in the Government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized because of the lack of a common understanding of what is required to safely operate Unmanned Aircraft Systems in the National Airspace System (UAS in the NAS). The desire and ability to fly UA is of increasing urgency. The application of UA to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UA to the NAS. Existing Federal Aviation Regulations, procedures, and technologies do not allow routine UA access to the NAS. Access to the NAS is hampered by challenges such as the lack of an onboard pilot to see and avoid other aircraft; the ability of a single pilot or operator to control multiple UA; the reliance on command and control (C2) links; the altitudes, speeds, and duration at which the aircraft fly; and the wide variation in UA size and performance. NASA is working with other Government agencies to provide solutions that reduce technical barriers and make access to the NAS routine. This goal will be accomplished through system-level integration of key concepts, technologies, or procedures and through demonstrations of these integrated capabilities in an operationally relevant environment. This project provides an opportunity to transition the acquired empirical data and knowledge to the Federal Aviation Administration and other stakeholders to help them define the requirements for routine UA access to the NAS.Radio communications channels for UA are currently managed through exceptions and use either Department of Defense frequencies for line-of-sight (LOS) and satellite-based communications links, low-power LOS links in amateur bands, or unlicensed Industrial/Scientific/Medical (ISM) frequencies. None of these frequency bands are designated for safety and regularity of flight. Only recently has radiofrequency (RF) spectrum been allocated by the International Telecommunications Union specifically for commercial UA C2, LOS communication (L-Band: 960 to 1164 MHz, and C-Band: 5030 to 5091 MHz). The safe and efficient integration of UA into the NAS requires the use of protected RF spectrum allocations and a new data communications system that is both secure and scalable to accommodate the potential growth of these new aircraft. Data communications for UA-referred to as control and non-payload communications (CNPC)-will be used to exchange information between a UA and a ground station (GS) to ensure safe, reliable, and effective UA flight operation. The focus of this effort is on validating and allocating new RF spectrum and data link communications to enable civil UA integration into the NAS. Through a cost-sharing cooperative agreement with Rockwell Collins, Inc., the NASA Glenn Research Center is exploring and performing the necessary development steps to realize a prototype UA CNPC system. These activities include investigating signal waveforms and access techniques, developing representative CNPC radio hardware, and executing relevant testing and validation activities. There is no intent to manufacture the CNPC end product, rather the goals are to study, demonstrate, and validate a typical CNPC system that will allow safe and efficient communications within the L-Band and C-Band spectrum allocations. The system is addressing initial "seed" requirements from RTCA, Inc., Special Committee 203 (SC-203) and is on a path to Federal Aviation Administration certification. This report provides results from the flight testing campaign of the Rockwell Collins Generation 1 prototype radio, referred hereafter as the "radio." The radio sets operate within the 960- to 977-MHz frequency band with both air and ground radios using identical hardware. Flight tests involved one aircraft and one GS. Results include discussion of aircraft flight paths and associated radio performance.

Shalkhauser, Kurt A.↗

Component Characterization of an eVTOL Reference Model for Crashworthiness Studies

Researchers at the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) have conducted a series of structural component and seat level tests to improve finite element model (FEM) characterization of a representative vertical take-off and landing (eVTOL) test article developed by NASA. A full-scale dynamic test was conducted on the representative eVTOL test article in November of 2022. The test article represented a high wing, six passenger eVTOL design concept and is referred to as the lift plus cruise (LPC) test article. The full-scale test identified limitations in the analytical models used to predict aircraft structural response, in particular the composite material models did not effectively capture brittle failure of the structure which were measured during dynamic loading. To better understand the mechanism behind the composite material failure mechanisms observed and to improve the FEM, intact sample specimens of the composite airframe structure were recovered from the test article post-test and used in material characterization testing. In addition, the seat configurations used in the LPC test article were further studied using isolated seat and anthropomorphic test device (ATD) drop tower testing. Dynamic compression tests and three-point bend tests, conducted at varied impact speeds, were performed on the recovered frame section specimens. Additional testing was conducted to characterize the material properties of the forming foam, which remained in the frames after fabrication. These tests were used to improve characterization of the damage and failure parameters of the composite material model used in the FE model of the LPC test article. Seat level tests were conducted on the seats used in the LPC test article using acceleration pulses inclusive of current general aviation and rotorcraft certification load levels as well as conditions representative of those measured at the seat base during the LPC test. The structural material models and seat environment models of the LPC test article FEM were calibrated using the generated component test data. The updates made to these models were then integrated into the LPC FEM and simulated in the full-scale test condition. Results demonstrated the effectiveness of component testing to improve predictive capability of composite aerospace structural models within the crash and dynamic loading environments. Demonstration of the LPC FEM response across an accumulation of coupon, component, seat environment, and full-scale test levels provides confidence in the predictive capability of this model for future use in the study of occupant safety within eVTOL relevant crash environments.

Craswhorthiness↗

Component Characterization of an eVTOL Reference Model for Crashworthiness Studies

Researchers at the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) have conducted a series of structural component and seat level tests to improve finite element model (FEM) characterization of a representative vertical take-off and landing (eVTOL) test article developed by NASA. A full-scale dynamic test was conducted on the representative eVTOL test article in November of 2022. The test article represented a high wing, six passenger eVTOL design concept and is referred to as the lift plus cruise (LPC) test article. The full-scale test identified limitations in the analytical models used to predict aircraft structural response, in particular the composite material models did not effectively capture brittle failure of the structure which were measured during dynamic loading. To better understand the mechanism behind the composite material failure mechanisms observed and to improve the FEM, intact sample specimens of the composite airframe structure were recovered from the test article post-test and used in material characterization testing. In addition, the seat configurations used in the LPC test article were further studied using isolated seat and anthropomorphic test device (ATD) drop tower testing. Dynamic compression tests and three-point bend tests, conducted at varied impact speeds, were performed on the recovered frame section specimens. Additional testing was conducted to characterize the material properties of the forming foam, which remained in the frames after fabrication. These tests were used to improve characterization of the damage and failure parameters of the composite material model used in the FE model of the LPC test article. Seat level tests were conducted on the seats used in the LPC test article using acceleration pulses inclusive of current general aviation and rotorcraft certification load levels as well as conditions representative of those measured at the seat base during the LPC test. The structural material models and seat environment models of the LPC test article FEM were calibrated using the generated component test data. The updates made to these models were then integrated into the LPC FEM and simulated in the full-scale test condition. Results demonstrated the effectiveness of component testing to improve predictive capability of composite aerospace structural models within the crash and dynamic loading environments. Demonstration of the LPC FEM response across an accumulation of coupon, component, seat environment, and full-scale test levels provides confidence in the predictive capability of this model for future use in the study of occupant safety within eVTOL relevant crash environments.

Craswhorthiness↗

Certification Guidelines For Crewed Inflatable Softgoods Structures

To help guide NASA and industry in the development and certification of crewed softgoods structures, this document details the fundamental testing, data, and documents recommended for the evaluation of a softgoods inflatable designed for crewed occupation in a space environment. This is not a requirements document but supports NASA-imposed standards used for certification. This document is intended to support and guide the development of programmatic requirements to demonstrate a design has followed a systematic and comprehensive design, fabrication, and test program.

softgoods↗

Report on the test set-up for the structural testing of the Airmass Sunburst Ultralight Aircraft

This report reviews the test set-up and procedure for the structural testing of the Airmass Sunburst Ultralight Aircraft. In general aviation today, there is a growing need for more stringent design criteria for ultralight aircraft. Unlike most general aviation aircraft, the ultralight lacks sufficient design criteria and more importantly it lacks sufficient certification enforcement. The Airmass Sunburst ultralight that is currently being tested is responsible for over a dozen deaths. It is believed that had there been a more stringent criteria and certification process, this might have been prevented. Our attempt is to show that the failing loads of the aircraft in question are so far below that of the current design criteria, that the laws need to be changed.

Zimmerman, William↗

Psychoacoustic Test to Determine Sound Quality Metric Indicators of Rotorcraft Noise Annoyance

Noise certification metrics such as Effective Perceived Noise Level and Sound Exposure Level are used to ensure that helicopters meet regulations, but these metrics may not be good indicators of annoyance since noise complaints against helicopters persist. Sound quality (SQ) metrics, specifically fluctuation strength, tonality, impulsiveness, roughness, and sharpness, are explored to determine their relationship with annoyance. A psychoacoustic test was conducted at the NASA Langley Research Center Exterior Effects Room to assess annoyance to helicopter-like sounds over a range of SQ metric values. The amplitude, phase, and frequency of the AS350 helicopter main and tail rotor blade passage signal harmonics were manipulated to produce 105 unique helicopter-like sounds with prescribed values of SQ metrics. All sounds were set to roughly the same loudness level. These sounds were played to 40 subjects who rated each sound for annoyance. Analyses given in this paper point to which SQ metrics are important to the helicopter noise annoyance response.

Krishnamurthy, Siddhartha↗

Acoustic Emission Methods for the Health Evaluation of Integrated Pressure Components

At the request of the Pressure Systems Senior Discipline Expert, to overcome the access and detectable flaw size limitations of other nondestructive evaluation (NDE) methods for integrated components, a technique akin to seismology was advanced to perceive the earliest signs of cracking in titanium components before they escalate into serious issues. In this project we achieved a landmark in Acoustic Emission (AE) testing with the first NASA Probability of Detection (POD) study. This is an important first step to the certification of the AE method for flight components and was based on the testing of notched panels. By working closely with industry allies and employing approved methods from the boiler and pressure vessel sector, we not only met but surpassed all POD benchmarks with our test and acceptance criteria. In experiments involving solution heat-treated and aged 6Al-4V-Ti alloy tested with broadband sensors, we recorded a 96% success rate, with zero false positives reported. Our research shows that in some cases, AE testing can locate smaller cracks than other NDE methods. An industry tool for scaling results to full pressure vessels is highlighted. However, before applying our findings to NASA components, tests to validate the transfer functions are advised.

acoustic↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗