Search NASA⌕ Search

SEARCH · Search NASA

Results for “day of launch processes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Mammalian development in space

Life on Earth, and thus the reproductive and ontogenetic processes of all extant species and their ancestors, evolved under the constant influence of the Earth's l g gravitational field. These considerations raise important questions about the ability of mammals to reproduce and develop in space. In this chapter, I review the current state of our knowledge of spaceflight effects on developing mammals. Recent studies are revealing the first insights into how the space environment affects critical phases of mammalian reproduction and development, viz., those events surrounding fertilization, embryogenesis, pregnancy, birth, postnatal maturation and parental care. This review emphasizes fetal and early postnatal life, the developmental epochs for which the greatest amounts of mammalian spaceflight data have been amassed. The maternal-offspring system, the coordinated aggregate of mother and young comprising mammalian development, is of primary importance during these early, formative developmental phases. The existing research supports the view that biologically meaningful interactions between mothers and offspring are changed in the weightlessness of space. These changes may, in turn, cloud interpretations of spaceflight effects on developing offspring. Whereas studies of mid-pregnant rats in space have been extraordinarily successful, studies of young rat litters launched at 9 days of postnatal age or earlier, have been encumbered with problems related to the design of in-flight caging and compromised maternal-offspring interactions. Possibilities for mammalian birth in space, an event that has not yet transpired, are considered. In the aggregate, the results indicate a strong need for new studies of mammalian reproduction and development in space. Habitat development and systematic ground-based testing are important prerequisites to future research with young postnatal rodents in space. Together, the findings support the view that the environment within which young mammals develop, comprised of its mother and siblings, is of paramount importance in interpreting spaceflight effects.

Review↗

Using Optically Stimulated Electron Emission as an Inspection Method to Monitor Surface Contamination

During redesign of the Space Shuttle reusable solid rocket motor (RSRM), NASA amended the contract with ATK Launch Systems (then Morton Thiokol Inc.) with Change Order 966 to implement a contamination control and cleanliness verification method. The change order required: (1) A quantitative inspection method (2) A written record of actual contamination levels versus a known reject level (3) A method that is more sensitive than existing methods of visual and black light inspection. Black light inspection is only useful for inspection of contaminants that fluoresce near the 365 nm spectral line and is not useful for inspection of most silicones that will not produce strong fluorescence. Black light inspection conducted by a qualified inspector under controlled light is capable of detecting Conoco HD-2 grease in gross amounts and is very subjective due to operator sensitivity. Optically stimulated electron emission (OSEE), developed at the Materials and Process Laboratory at Marshall Space Flight Center (MSFC), was selected to satisfy Change Order 966. OSEE offers several important advantages over existing laboratory methods with similar sensitivity, e.g., spectroscopy and nonvolatile residue sampling, which provide turn around time, real time capability, and full coverage inspection capability. Laboratory methods require sample gathering and in-lab analysis, which sometimes takes several days to get results. This is not practical in a production environment. In addition, these methods do not offer full coverage inspection of the large components

Lingbloom, Mike S.↗

Rapid Biochemical Analysis on the International Space Station (ISS): Preparing for Human Exploration of the Moon and Mars

The Lab-on-a-Chip Application Development - Portable Test System, known as LOCAD-PTS, was launched to the International Space Station (ISS) aboard Space Shuttle Discovery (STS-116) on December 9th,2006. Since that time, it has remained onboard ISS and has been operated by the crew on 10 separate occasions LOCAD-PTS is a handheld device for rapid biochemical analysis; it consists of a spectrophotometer, a series of interchangeable cartridges, a pipette and several clean/sterilized swabbing kits to obtain samples from ISS surfaces. Sampling, quantitative analysis and data retrieval is performed onboard, therefore reducing the need to return samples to Earth. Less than 20 minutes are required from sampling to data, significantly faster than existing culture-based methods on ISS, which require 3-5 days. Different cartridges are available for the detection of different target molecules (simply by changing the formulation within each cartridge), thereby maximizing the benefit and applications addressed by a single instrument. Initial tests on ISS have focused on the detection of the bact.erial macromolecule endotoxin, a component of bacterial cell walls. LOCAD-PTS detects endotoxin with a cartridge that contains a formulation known as Limulus Amebocyte Lysate (LAL) assay. LAL is derived from blood of the horseshoe crab, Limulus polyphemus, and detects enodotoxin with an enzyme cascade that triggers generation Of a yellow colored dye, p-nitroanaline. The more p-nitroanaline product, the more endotoxin is in the original sample. To enable quantitative analysis, the absorbance of this color is measured by LOCAD-PTS through a 395 nm filter and compared with an internal calibration curve, to provide a reading on the LED display that ranges from 0.05 Endotoxin Units (EU)/ml to 5 EU/ml. Several surface sites were analyzed within ISS between March 2007 and February 2008, including multiple locations in the US Laboratory Destiny, Node 1 Unity, AMock, and Service Module Zvezda. The goals of this initial study were to i) test the cleanliness of reagents/supplies on orbit, ii) test the crew's ability to collect and process a sample in microgravity without contamination, iii) demonstrate nominal function of the LOCAD-PTS, and iv) provide a general survey of endotoxin within the ISS. The surface sites varied greatly in terms of their frequency-of-use and material texture/composition; from relatively smooth aluminum, to fabric, to the room temperature vulcanizing (RTV) rubber of a Extravehicular Mobility Unit (EMU) spacesuit. Results showed that: i) the swabbing kits and reagents remained clean on orbit, ii) the crew could collect and process a sample without contamination, and iii) the LOCAD-PTS functioned nominally in > 99% of the 55 tests completed. We will present detailed results of the survey of endotoxin on ISS surfaces. These results and technology are important in the near-term - by providing an extra tool in the toolbox for ISS microbial monitoring. They are also important in the longer term as valuable preparation for human exploration of the Moon and Mars. One of the proposed science goals for the human exploration of Mars will be to detect and characterize any indigenous biological molecules that may exist on the Martian surface. To achieve that goal, the crew must have the technology available onboard to differentiate indigenous biology from any terrestrial biological material brought to Mars by the spacecraft and crew (termed 'forward contamination'). The LAL assay is already one of the official methods used by NASA's planetary protection program to certify cleanliness of interplanetary robotic spacecraft prior to launch; and therefore endotoxin is a good marker of forward contamination (as well as other microbial molecules detectable with LOCAD-PTS e.g. box-1, 3-glucan and lipoteichoic acid). Furthermore, the distribution and abundance of these molecules on the ISS provides a good indicator of what to expect on the Crew Exploratioehicle Orion, the lunar lander Antares, and future crewed spacecraft destined for Mars. In addition, technology such as LOCAD-PTS has been proposed to help evaluate forward contamination during lunar surface operations by the crew, as preparation for the human exploration of Mars.

Maule, J.↗

Surface Landing Site Weather Analysis for Constellation Program

Weather information is an important asset for NASA's Constellation Program in developing the next generation space transportation system to fly to the International Space Station, the Moon and, eventually, to Mars. Weather conditions can affect vehicle safety and performance during multiple mission phases ranging from pre-launch ground processing to landing and recovery operations, including all potential abort scenarios. Meteorological analysis is an important contributor, not only to the development and verification of system design requirements but also to mission planning and active ground operations. Of particular interest are the surface atmospheric conditions at both nominal and abort landing sites for the manned Orion capsule. Weather parameters such as wind, rain, and fog all play critical roles in the safe landing of the vehicle and subsequent crew and vehicle recovery. The Marshall Space Flight Center Natural Environments Branch has been tasked by the Constellation Program with defining the natural environments at potential landing zones. Climatological time series of operational surface weather observations are used to calculate probabilities of occurrence of various sets of hypothetical vehicle constraint thresholds, Data are available for numerous geographical locations such that statistical analysis can be performed for single sites as well as multiple-site network configurations. Results provide statistical descriptions of how often certain weather conditions are observed at the site(s) and the percentage that specified criteria thresholds are matched or exceeded. Outputs are tabulated by month and hour of day to show both seasonal and diurnal variation. This paper will describe the methodology used for data collection and quality control, detail the types of analyses performed, and provide a sample of the results that can be obtained,

Altino, Karen M.↗

NASA's Soil Moisture Active and Passive (SMAP) Mission

The Soil Moisture Active-Passive (SMAP) Mission is one of the first Earth observation satellites being formulated by NASA in response to the 2007 National Research Council s Decadal Survey. SMAP will make global measurements of soil moisture at the Earth's land surface and its freeze-thaw state. These measurements will allow significantly improved estimates of water, energy and carbon transfers between the land and atmosphere. Soil moisture measurements are also of great importance in assessing flooding and monitoring drought. Knowledge gained from SMAP observations can help mitigate these natural hazards, resulting in potentially great economic and social benefits. SMAP observations of soil moisture and freeze/thaw timing over the boreal latitudes will also reduce a major uncertainty in quantifying the global carbon balance and help to resolve an apparent missing carbon sink over land. The SMAP mission concept will utilize an L-band radar and radiometer sharing a rotating 6-meter mesh reflector antenna flying in a 680 km polar orbit with an 8-day exact ground track repeat aboard a 3-axis stabilized spacecraft to provide high-resolution and high-accuracy global maps of soil moisture and freeze/thaw state every two to three days. In addition, the SMAP project will use these surface observations with advanced modeling and data assimilation to provide estimates of deeper root-zone soil moisture and net ecosystem exchange of carbon. SMAP recently completed its Phase A Mission Concept Study Phase for NASA and transitioned into Phase B (Formulation and Detailed Design). A number of significant accomplishments occurred during this initial phase of mission development. The SMAP project held several open meetings to solicit community feedback on possible science algorithms, prepared preliminary draft Algorithm Theoretical Basis Documents (ATBDs) for each mission science product, and established a prototype algorithm testbed to enable testing and evaluation of the performance of candidate algorithms. SMAP conducted an Applications Workshop in September 2009 to coordinate with potential application users interested in the mission data. A draft Applications Plan describing the Project s planned outreach to potential applications users has been prepared and will be updated during Phase B. SMAP made a significant evaluation of the potential terrestrial radio frequency interference (RFI) source environment and established radiometer and radar flight hardware and ground processing mitigation approaches. SMAP finalized its science orbit and orbit injection approach to optimize launch mass and prepared launch and commissioning scenarios and timeline. A science data communications approach was developed to maximize available science data volume to improve science margins while maintaining moderately short data product latencies to support many potential applications using existing ground assets and with minimum impact to the flight system. SMAP developed rigid multi-body and flexible body dynamics and control models and system designs for the 6-meter rotating instrument reflector-boom assembly (RBA) and flight system to confirm pointing and control performance, and devised strategies to efficiently implement on-orbit balancing if needed. Industry partners were selected for the spin mechanism assembly (SMA) and RBA. Preliminary designs for the radar and radiometer were initiated, including constructing breadboards of key assemblies.

Kellogg, Kent↗

Mars Pathfinder mission operations concepts

The Mars Pathfinder Project plans a December 1996 launch of a single spacecraft. After jettisoning a cruise stage, an entry body containing a lander and microrover will directly enter the Mars atmosphere and parachute to a hard landing near the sub-solar latitude of 15 degrees North in July 1997. Primary surface operations last for 30 days. Cost estimates for Pathfinder ground systems development and operations are not only lower in absolute dollars, but also are a lower percentage of total project costs than in past planetary missions. Operations teams will be smaller and fewer than typical flight projects. Operations scenarios have been developed early in the project and are being used to guide operations implementation and flight system design. Recovery of key engineering data from entry, descent, and landing is a top mission priority. These data will be recorded for playback after landing. Real-time tracking of a modified carrier signal through this phase can provide important insight into the spacecraft performance during entry, descent, and landing in the event recorded data is never recovered. Surface scenarios are dominated by microrover activity and lander imaging during 7 hours of the Mars day from 0700 to 1400 local solar time. Efficient uplink and downlink processes have been designed to command the lander and microrover each Mars day.

Sturms, Francis M., Jr.↗

Results of the Updated NASA Kennedy Space Center 50-MHz Doppler Radar Wind Profiler Operational Acceptance Test

We present here the methodology and results of the Operational Acceptance Test (OAT) performed on the new Kennedy Space Center (KSC) 50-MHz Doppler Radar Wind Profiler (DRWP). On day-of-launch (DOL), space launch vehicle operators have used data from the DRWP to invalidate winds in prelaunch loads and trajectory assessments due to the DRWP's capability to quickly identify changes in the wind profile within a rapidly-changing wind environment. The previous DRWP has been replaced with a completely new system, which needs to undergo certification testing before being accepted for use in range operations. The new DRWP replaces the previous three-beam system made of coaxial cables and a copper wire ground plane with a four-beam system that uses Yagi antennae with enhanced beam steering capability. In addition, the new system contains updated user interface software while maintaining the same general capability as the previous system. The new DRWP continues to use the Median Filter First Guess (MFFG) algorithm to generate a wind profile from Doppler spectra at each range gate. DeTect (2015) contains further details on the upgrade. The OAT is a short-term test designed so that end users can utilize the new DRWP in a similar manner to the previous DRWP during mission operations at the Eastern Range in the midst of a long-term certification process. This paper describes the Marshall Space Flight Center Natural Environments Branch's (MSFC NE's) analyses to verify the quality and accuracy of the DRWP's meteorological data output as compared to the previous DRWP. Ultimately, each launch vehicle program has the responsibility to certify the system for their own use.

Barbre', Robert E., Jr.↗

Application of statistical distribution theory to launch-on-time for space construction logistic support

The ability to launch-on-time and to send payloads into space has progressed dramatically since the days of the earliest missile and space programs. Causes for delay during launch, i.e., unplanned 'holds', are attributable to several sources: weather, range activities, vehicle conditions, human performance, etc. Recent developments in space program, particularly the need for highly reliable logistic support of space construction and the subsequent planned operation of space stations, large unmanned space structures, lunar and Mars bases, and the necessity of providing 'guaranteed' commercial launches have placed increased emphasis on understanding and mastering every aspect of launch vehicle operations. The Center of Space Construction has acquired historical launch vehicle data and is applying these data to the analysis of space launch vehicle logistic support of space construction. This analysis will include development of a better understanding of launch-on-time capability and simulation of required support systems for vehicle assembly and launch which are necessary to support national space program construction schedules. In this paper, the author presents actual launch data on unscheduled 'hold' distributions of various launch vehicles. The data have been supplied by industrial associate companies of the Center for Space Construction. The paper seeks to determine suitable probability models which describe these historical data and that can be used for several purposes such as: inputs to broader simulations of launch vehicle logistic space construction support processes and the determination of which launch operations sources cause the majority of the unscheduled 'holds', and hence to suggest changes which might improve launch-on-time. In particular, the paper investigates the ability of a compound distribution probability model to fit actual data, versus alternative models, and recommends the most productive avenues for future statistical work.

Morgenthaler, George W.↗

CHANGO: A Software Tool for Boost Stage Guidance of the Space Launch System Exploration Mission 1

The Day of Launch Initiation Load Update (DOLILU) System is the means by which the Space Launch System (SLS) Vehicle trajectory is designed, verified, and uploaded on the Day of Launch (DOL) in order to ensure a safe flight. Launch vehicles are designed to fly down a narrow angle of attack and sideslip angle corridor in order to keep them within structural load limits. The angle of attack and sideslip angle response to the launch vehicle experiences can vary significantly based upon the winds experienced on the DOL. SLS Boost Stage flight employs an open-loop guidance scheme through Solid Rocket Booster (SRB) separation. In the SLS open-loop scheme, the vehicle will fly a prescribed set of attitudes as a function of the change in altitude since launch. This set of reference attitude values and corresponding altitude reference independent values are designed with ground software using winds measured on the DOL with the goal of minimizing angle of attack and sideslip angle, thereby minimizing related ascent integrated vehicle structural loads. The table of Boost Stage attitude commands as a function of altitude gained since launch is called the chi table. A software tool called CHANGO (Chi Angle Optimizer) designs the Boost Stage chi table which is uploaded to the vehicle’s flight computer and used during ascent by the flight software (FSW). The wind and atmospheric conditions are measured prior to launch and pre-processed to become input to the CHANGO software along with a set of parameters developed in advance of the DOL. CHANGO’s target set consists of the heading and altitude rate at SRB separation determined well before launch by the Program to Optimize Simulated Trajectories (POST). CHANGO consists of a simplified three degree-of-freedom (3-DOF) simulation representing the SLS launch configuration. In general, the launch azimuth is strongly correlated with the heading at SRB separation, and the initial pitchover rate is strongly correlated with the altitude rate at SRB separation. CHANGO uses an adaptation of Powell’s method to vary the initial pitchover rate and launch azimuth to solve a 2-dimentional minimization problem. CHANGO’s trajectory simulation is phase-based, with flight events separating the phases. Each flight phase has different attitude alignment logic. CHANGO’s 3-DOF simulation starts when the vehicle’s thrust-to-weight ratio equals one, and ends at a pre-calculated SRB separation time.

Ahmad, Naeem↗

Improving the Automatic Inversion of Digital ISIS-2 Ionogram Reflection Traces into Topside Vertical Electron-Density Profiles

The topside-sounders on the four satellites of the International Satellites for Ionospheric Studies (ISIS) program were designed as analog systems. The resulting ionograms were displayed on 35-mm film for analysis by visual inspection. Each of these satellites, launched between 1962 and 1971, produced data for 10 to 20 years. A number of the original telemetry tapes from this large data set have been converted directly into digital records. Software, known as the TOPside Ionogram Scalar with True-height (TOPIST) algorithm has been produced that enables the automatic inversion of ISIS-2 ionogram reflection traces into topside vertical electron-density profiles Ne(h). More than million digital Alouette/ISIS topside ionograms have been produced and over 300,000 are from ISIS 2. Many of these ISIS-2 ionograms correspond to a passive mode of operation for the detection of natural radio emissions and thus do not contain ionospheric reflection traces. TOPIST, however, is not able to produce Ne(h) profiles from all of the ISIS-2 ionograms with reflection traces because some of them did not contain frequency information. This information was missing due to difficulties encountered during the analog-to-digital conversion process in the detection of the ionogram frame-sync pulse and/or the frequency markers. Of the many digital topside ionograms that TOPIST was able to process, over 200 were found where direct comparisons could be made with Ne(h) profiles that were produced by manual scaling in the early days of the ISIS program. While many of these comparisons indicated excellent agreement (<10% average difference over the entire profile) there were also many cases with large differences (more than a factor of two). Here we will report on two approaches to improve the automatic inversion process: (1) improve the quality of the digital ionogram database by remedying the missing frequency-information problem when possible, and (2) using the above-mentioned comparisons as teaching examples of how to improve the original TOPIST software.

Benson, R. F.↗

The DYNAMO Orbiter Project: High Resolution Mapping of Gravity/Magnetic Fields and In Situ Investigation of Mars Atmospheric Escape

Dynamo is a small Mars orbiter planned to be launched in 2005 or 2007, in the frame of the NASA/CNES Mars exploration program. It is aimed at improving gravity and magnetic field resolution, in order to better understand the magnetic, geologic and thermal history of Mars, and at characterizing current atmospheric escape, which is still poorly constrained. These objectives are achieved by using a low periapsis orbit, similar to the one used by the Mars Global Surveyor spacecraft during its aerobraking phases. The proposed periapsis altitude for Dynamo of 120-130 km, coupled with the global distribution of periapses to be obtained during one Martian year of operation, through about 5000 low passes, will produce a magnetic/gravity field data set with approximately five times the spatial resolution of MGS. Low periapsis provides a unique opportunity to investigate the chemical and dynamical properties of the deep ionosphere, thermosphere, and the interaction between the atmosphere and the solar wind, therefore atmospheric escape, which may have played a crucial role in removing atmosphere, and water, from the planet. There is much room for debate on the importance of current atmosphere escape processes in the evolution of the Martian atmosphere, as early "exotic" processes including hydrodynamic escape and impact erosion are traditionally invoked to explain the apparent sparse inventory of present-day volatiles. Yet, the combination of low surface gravity and the absence of a substantial internally generated magnetic field have undeniable effects on what we observe today. In addition to the current losses in the forms of Jeans and photochemical escape of neutrals, there are solar wind interaction-related erosion mechanisms because the upper atmosphere is directly exposed to the solar wind. The solar wind related loss rates, while now comparable to those of a modest comet, nonetheless occur continuously, with the intriguing possibility of important cumulative and/or enhanced effects over the several billion years of the solar system's life. If the detailed history of the Martian internal field could be traced back, and the current escape processes could be understood well enough to model the expected stronger losses under early Sun conditions, one could go a long way toward constraining this part of the mysterious history of Mars' atmosphere.

Smrekar, S.↗

Heading Toward Launch with the Integrated Multi-Satellite Retrievals for GPM (IMERG)

The Day-l algorithm for computing combined precipitation estimates in GPM is the Integrated Multi-satellitE Retrievals for GPM (IMERG). We plan for the period of record to encompass both the TRMM and GPM eras, and the coverage to extend to fully global as experience is gained in the difficult high-latitude environment. IMERG is being developed as a unified U.S. algorithm that takes advantage of strengths in the three groups that are contributing expertise: 1) the TRMM Multi-satellite Precipitation Analysis (TMPA), which addresses inter-satellite calibration of precipitation estimates and monthly scale combination of satellite and gauge analyses; 2) the CPC Morphing algorithm with Kalman Filtering (KF-CMORPH), which provides quality-weighted time interpolation of precipitation patterns following cloud motion; and 3) the Precipitation Estimation from Remotely Sensed Information using Artificial Neural Networks using a Cloud Classification System (PERSIANN-CCS), which provides a neural-network-based scheme for generating microwave-calibrated precipitation estimates from geosynchronous infrared brightness temperatures. In this talk we summarize the major building blocks and important design issues driven by user needs and practical data issues. One concept being pioneered by the IMERG team is that the code system should produce estimates for the same time period but at different latencies to support the requirements of different groups of users. Another user requirement is that all these runs must be reprocessed as new IMERG versions are introduced. IMERG's status at meeting time will be summarized, and the processing scenario in the transition from TRMM to GPM will be laid out. Initially, IMERG will be run with TRMM-based calibration, and then a conversion to a GPM-based calibration will be employed after the GPM sensor products are validated. A complete reprocessing will be computed, which will complete the transition from TMPA.

Huffman, George J.↗

Evaluation of Thermo-Mechanical Stability of COTS Dual-Axis MEMS Accelerometers for Space Applications

Microelectromechanical systems in MEMS is one of the fastest growing technologies in microelectronics, and is of great interest for military and aerospace applications. Accelerometers are the earliest and most developed representatives of MEMS. First demonstrated in 1979, micromachined accelerometers were used in automobile industry for air bag crash- sensing applications since 1990. In 1999, N4EMS accelerometers were used in NASA-JPL Mars Microprobe. The most developed accelerometers for airbag crash- sensing are rated for a full range of +/- 50 G. The range of sensitivity for accelerometers required for military or aerospace applications is much larger, varying from 20,000 G (to measure acceleration during gun and ballistic munition launches), and to 10(exp -6) G, when used as guidance sensors (to measure attitude and position of a spacecraft). The presence of moving parts on the surface of chip is specific to MEMS, and particularly, to accelerometers. This characteristic brings new reliability issues to micromachined accelerometers, including cyclic fatigue cracking of polysilicon cantilevers and springs, mechanical stresses that are caused by packaging and contamination in the internal cavity of the package. Studies of fatigue cracks initiation and growth in polysilicon showed that the fatigue damage may influence MEMS device performance, and the presence of water vapor significantly enhances crack initiation and growth. Environmentally induced failures, particularly, failures due to thermal cycling and mechanical shock are considered as one of major reliability concerns in MEMS. These environmental conditions are also critical for space applications of the parts. For example, the Mars pathfinder mission had experienced 80 mechanical shock events during the pyrotechnic separation processes.

Sharma, Ashok K.↗

Launch Order, Launch Separation, and Loiter in the Constellation 1 1/2-Launch Solution

The NASA Constellation Program (CxP) is developing a two-element Earth-to-Orbit launch system to enable human exploration of the Moon. The first element, Ares I, is a human-rated system that consists of a first stage based on the Space Shuttle Program's solid rocket booster (SRB) and an upper stage that consists of a four-crew Orion capsule, a service module, and a Launch Escape System. The second element, Ares V, is a Saturn V-plus category launch system that consists of the core stage with a cluster of six RS-68B engines and augmented with two 5.5-segment SRBs, a Saturn-derived J-2X engine powering an Earth Departure Stage (EDS), and the lunar-lander vehicle payload, Altair. Initial plans called for the Ares V to be launched first, followed the next day by the Ares I. After the EDS performs the final portion of ascent and subsequent orbit circularization, the Orion spacecraft then performs a rendezvous and docks with the EDS and its Altair payload. Following checkout, the integrated stack loiters in low Earth orbit (LEO) until the appropriate Trans-Lunar Injection (TLI) window opportunity opens, at which time the EDS propels the integrated Orion Altair to the Moon. Successful completion of this 1 1/2-launch solution carries risks related to both the orbital lifetime of the assets and the probability of achieving the launch of the second vehicle within the orbital lifetime of the first. These risks, which are significant in terms of overall system design choices and probability of mission success, dictated a thorough reevaluation of the launch strategy, including the order of vehicle launch and the planned time period between launches. The goal of the effort described in this paper was to select a launch strategy that would result in the greatest possible expected system performance, while accounting for launch risks and the cost of increased orbital lifetime. Discrete Event Simulation (DES) model of the launch strategies was created to determine the probability of a second launch not occurring in a timely fashion (i.e., before the assets waiting in LEO expire). An overview of the launch strategy evaluation process is presented, along with results of specific cases that were analyzed. A high-level comparison of options is then presented, along with the conclusion derived from the analysis.

Stromgren, Chel↗

The ALEXIS data processing package: An IDL based system

The Array of Low Energy X-ray Imaging Sensors (ALEXIS) experiment consists of a mini-satellite containing six wide angle EUV/ultrasoft x-ray telescopes. Its purpose is to map out the sky in three narrow (approximately 5 percent) bandpasses around 66, 71, and 93 eV. The 66 and 71 eV bandpasses are centered on intense Fe emission lines which are characteristic of million degree plasmas such as the one thought to produce the soft x-ray background. The 93 eV bandpass is not near any strong emission lines and is more sensitive to continuum sources. The mission will be launched on the Pegasus Air Launched Vehicle in the second half of 1992 into a 400-nautical-mile, high inclination orbit and will be controlled entirely from a small ground station located at Los Alamos. The project is a collaborative effort between Los Alamos National Laboratory, Sandia National Laboratory, and the University of California-Berkeley Space Sciences Laboratory. The six telescopes are arranged in three pairs. As the satellite spins twice a minute they scan the entire anti-solar hemisphere. Each f/1 telescope consists of a spherical, multilayer-coated mirror with a curved, microchannel plate detector located at the prime focus. The multilayer coatings determine the bandpasses of the telescopes. The field of view of each telescope is 30 degrees with a spatial resolution of 0.5 degree, limited by spherical aberration. The data processing requirements for ALEXIS are large. Each event is one of the six telescopes is telemetered to the ground with its time of arrival and position on the detector. This information must be folded with the aspect solution for the satellite to reconstruct the direction on the sky from which the photon came. Because of the way the six telescopes scan the sky, the effective exposure calculation is also very computationally intensive. ALEXIS may generate up to 100 megabytes of raw data per day, which are converted into a gigabyte per day of processed data. While the processing job for ALEXIS is sizable, the programming staff is small. To maximize programming efficiency, and to make the best use of tools available in the public domain, we chose IDL as our software development platform. IDL was used from the start of instrument development through flight. We use IDL as a top-level executive for the processing tasks (replacing Unix shell scripts), as a device independent graphics engine, as a database manager, and as a final data manipulator. IDL routines spawn special purpose C programs to perform detailed telemetry deconvolution and other specialized functions. We discuss the use of IDL and C within the processing and archiving strategy for the ALEXIS data anlaysis system as implemented on a SPARCstation platform. We also show results from our End-to-End software simulation capability as processed by our analysis codes.

Bloch, J. J.↗

Which Way is Up? Lessons Learned from Space Shuttle Sensorimotor Research

The Space Shuttle Program provided the opportunity to examine sensorimotor adaptation to space flight in unprecedented numbers of astronauts, including many over multiple missions. Space motion sickness (SMS) severity was highly variable across crewmembers. SMS generally lasted 2-3 days in-flight with approximately 1/3 of crewmembers experiencing moderate to severe symptoms, and decreased incidence in repeat flyers. While SMS has proven difficult to predict from susceptibility to terrestrial analogs, symptoms were alleviated by medications, restriction of early activities, maintaining familiar orientation with respect to the visual environment and maintaining contact cues. Adaptive changes were also reflected by the oculomotor and perceptual disturbances experienced early inflight and by the perceptual and motor coordination problems experienced during re-entry and landing. According to crew self-reports, systematic head movements performed during reentry, as long as paced within one's threshold for motion tolerance, facilitated the early readaptation process. The Shuttle provided early postflight crew access to document the initial performance decrements and time course of recovery. These early postflight measurements were critical to inform the program of risks associated with extending the duration of Shuttle missions. Neurological postflight deficits were documented using a standardized subjective rating by flight surgeons. Computerized dynamic posturography was also implemented as a quantitative means of assessing sensorimotor function to support crew return-to-duty assessments. Towards the end of the Shuttle Program, more emphasis has been placed on mapping physiological changes to functional performance. Future commercial flights will benefit from pre-mission training including exposures to launch and entry G transitions and sensorimotor adaptability assessments. While SMS medication usage will continue to be refined, non-pharmacological countermeasures (e.g., sensory aids) will have both space and Earth-based applications. Early postflight field tests are recommended to provide the evidence base for best practices for future commercial flight programs. Learning Objective: Overview of the Space Shuttle Program regarding adaptive changes in sensorimotor function, including what was learned from research, what was implemented for medical operations, and what is recommended for commercial flights.

Wood, S. J.↗

First Look at Landsat-7 Mission Performance: Technical and Operational Results to Date

A primary goal of the current Landsat-7 mission, launched on April 15, 1999, is to acquire and refresh on a seasonal basis, calibrated ata sets of multispectral digital imagery of the landmass of the Earth The Enhanced Thematic Mapper Plus (ETM+) imager flown on Landsat-7 provides ground spatial resolutions in the panchromatic, reflective and emissive bands of 15, 30 and 60 meters, respectively, for a nominal scene 183 km wide by 170 km long. This mission not only builds on the invaluable 27-year continuous archive of thematic images of the Earth provided by previous Landsat satellites, it also inaugurates a new era of robust data acquisition with an emphasis on global change science. The newly developed Long Term Acquisition Plan (LTAP) is being used to optimize the systematic collection of data from all parts of the globe, populating the U.S.-held archive at the USGS EROS Data Center (EDC) with over 90,000 Landsat scene per year . An additional 73,000 Images are expected to be acquired each year by several international ground stations, for a total downlink of Landsat7 data in excess of 100 terabytes per year. Nearly 20,000 scan of Landsat-7 ETM+ data have already been acquired in the first 100 days of the mission. Early results derived from assessments of the ETM+ instrument, the spacecraft, and the ground processing systems indicate that the image quality is outstanding, clearly the best ever provided by any Landsat mission. Sensor radiometric background stability after the first 100 days in orbit is approximately 0.1 percent. Stability of the Full Aperture Solar Calibrator is approximately 0.3 percent, and mid-scale per pixel noise is approximately 0.6 percent. A ground processing system has been implemented at EDC which is capable of capturing, processing and archiving 250 Landsat scenes 9 per day, and delivering 100 scene products to seems each day. The cost of a systematically-processed Level 1 product has been dropped dramatically to $600, end there is no longer any copyright protection an the data. The net result is that the use of Landsat ETM+ data is expected to grow dramatically, and this growth is expected to benefit all facets of the land remote sensing community.

Williams, Darrel L.↗

Seeker 1.0: Prototype Robotic Free Flying Inspector Mission Overview

Seeker 1.0 is a prototype free flying robot that will one day be capable of inspecting human-rated spacecraft. Building off previous free flyer experience, this technology will eventually improve safety of human spacecraft by offering a variety of inspection capabilities for both routine and emergency scenarios providing increased capability and safety over current inspection methods. Seeker 1.0 is capable of 6 degree of freedom flight via a cold gas propulsion system and can operate up to 1 hour via a semi-autonomous guidance, navigation, and control system. The prototype spacecraft is capable of capturing still images at a variety of resolutions up to 13 MP. The initial test flight utilizes a command and data relay box called Kenobi. Kenobi is a derivative of the Seeker design and will communicate between Cygnus and Seeker and store data for post-mission downlink. Seeker and Kenobi have launched inside a NanoRacks External CubeSat Deployer (NRCSD-E) attached to the NG-11 Cygnus ISS resupply vehicle and will operate after Cygnus departs ISS and moves to a safe altitude. Operations will last approximately 30 minutes and will consist of basic vehicle maneuvers while capturing high-resolution still images. With any remaining time and propellant, Seeker will demonstrate additional safety capabilities and maneuvers required for operations around a crewed spacecraft. The Seeker project utilized the Class IE process that allows for streamlined flight hardware development and increased mission risk tolerance.

Spacecraft Inspection↗