Search NASA⌕ Search

SEARCH · Search NASA

Results for “electrical interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Processing and Prolonged 500 C Testing of 4H-SiC JFET Integrated Circuits with Two Levels of Metal Interconnect

Complex integrated circuit (IC) chips rely on more than one level of interconnect metallization for routing of electrical power and signals. This work reports the processing and testing of 4H-SiC junction field effect transistor (JFET) prototype ICs with two levels of metal interconnect capable of prolonged operation at 500 C. Packaged functional circuits including 3-and 11-stage ring oscillators, a 4-bit digital to analog converter, and a 4-bit address decoder and random access memory cell have been demonstrated at 500 C. A 3-stage oscillator functioned for over 3000 hours at 500 C in air ambient.

Silicon Carbide↗

Processing and Prolonged 500 C Testing of 4H-SiC JFET Integrated Circuits with Two Levels of Metal Interconnect

Complex integrated circuit (IC) chips rely on more than one level of interconnect metallization for routing of electrical power and signals. This work reports the processing and testing of 4H-SiC junction field effect transistor (JFET) prototype IC's with two levels of metal interconnect capable of prolonged operation at 500 C. Packaged functional circuits including 3- and 11-stage ring oscillators, a 4-bit digital to analog converter, and a 4-bit address decoder and random access memory cell have been demonstrated at 500 C. A 3-stage oscillator functioned for over 3000 hours at 500 C in air ambient. Improved reproducibility remains to be accomplished.

JFET↗

Fuel cell electrode interconnect contact material encapsulation and method

A fuel cell stack includes a plurality of fuel cell cassettes each including a fuel cell with an anode and a cathode. Each fuel cell cassette also includes an electrode interconnect adjacent to the anode or the cathode for providing electrical communication between an adjacent fuel cell cassette and the anode or the cathode. The interconnect includes a plurality of electrode interconnect protrusions defining a flow passage along the anode or the cathode for communicating oxidant or fuel to the anode or the cathode. An electrically conductive material is disposed between at least one of the electrode interconnect protrusions and the anode or the cathode in order to provide a stable electrical contact between the electrode interconnect and the anode or cathode. An encapsulating arrangement segregates the electrically conductive material from the flow passage thereby, preventing volatilization of the electrically conductive material in use of the fuel cell stack.

30 DIRECT ENERGY CONVERSION↗

Inverter Testing for Verification of Hawaiian Electric Rule 14H

As utilities increasingly require inverters to perform grid-supportive functions, it is challenging to ensure that those functions are properly configured in the field. This paper presents details of inverter testing related to Hawaiian Electric's latest rule 14H interconnection requirements to validate that field installation procedures result in the intended advanced inverter behavior. The latest Volt-VAR, Volt-Watt, and frequency-Watt curves in Hawaiian Electric's Source Requirement Document (SRD) V1.1 for UL 1741 Supplement A were tested for two inverter manufacturers used in the utility territory. Both inverters were found to be largely compliant, though several discrepancies were identified and reported to the manufacturers. The results are presented and discussed here.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hiilangaay Hydroelectric Project – Final Report

The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

13 HYDRO ENERGY↗

Inverter Testing for Verification of Hawaiian Electric Rule 14H: Preprint

As utilities increasingly require inverters perform grid-supportive functions, it is challenging to ensure that those functions are properly configured in the field. This paper details inverter testing carried related to Hawaiian Electric's latest rule 14H interconnection requirements to validate that field installation procedures result in the intended advanced inverter behavior. The latest Volt-VAR, Volt-Watt, and frequency-Watt curves in Hawaiian Electric's Source Requirement Document (SRD) V1.1 for UL 1741 Supplement A were tested for two inverter manufacturers used in the utility territory. Both inverters were found to be largely compliant, though several discrepancies were identified and reported to the manufacturers to be addressed. The results are presented and discussed here.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical Stability of a Novel Refractory Sealing Glass in a Dual Environment for Solid Oxide Fuel Cell Applications

A novel refractory alkaline-earth silicate (Sr-Ca-Y-B-Si) sealing glass was developed for solid oxide fuel cell (SOFC) applications. The glass was sealed between two metallic interconnect plates and tested for electrical stability at elevated temperatures and duel environments under DC loading. The isothermal aging results showed very stable electrical resistivity with values 5-9 orders of magnititudes higher than typical SOFC function materials at 850 degrees C for ~700 hr. For comparison, the state-of-the-art sealing glass (G18, Ba-Ca-Al-B-Si) was also evaluated in a similar condition and showed less stable in accelerated tests at 830 degrees C for ~100 hr. Interfacial microstruicture was characterized and possible reactions were discussed.

30 DIRECT ENERGY CONVERSION↗

Energy Resilient Recovery in Puerto Rico: Hurricane Maria Recovery Support

This report covers microgrids as a special application of distributed energy resources (DERs) in Puerto Rico. This is one of a series of reports describing the U.S. Department of Energy (DOE) multi-laboratory efforts undertaken. To ensure the sustainable, long-term recovery of Puerto Rico's electric power grid from hurricanes Maria and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, DOE convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. In Phase 1 of the multi-laboratory effort to support Puerto Rico's recovery, the National Renewable Energy Laboratory (NREL) provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected, renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliability, safety, or security (https://www.nrel.gov/docs/fy19osti/73848.pdf). In Phase 2, NREL published a report focused on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico (https://www.nrel.gov/docs/fy21osti/77127.pdf). This report familiarized the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provided considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers 1547-2018 interconnection standard. Additionally, the report identified ways to improve the physical resiliency of installed DERs. This task describes how distributed energy systems may participate in and contribute to improving the resiliency of Puerto Rico's energy infrastructure in the future. This report presents an analysis of the Puerto Rico grid to illustrate the possible different microgrid and minigrid scenarios. The capability to form sustained microgrids and minigrids has the potential to provide a high level of resiliency during disturbances on the grid. DERs, on the other hand, have the capability to aid in the microgrid operation by providing grid support as well as grid-forming functionality. Other tasks in Phase 3 include voltage regulation in distribution networks using DERs and transmission-and-distribution co-simulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical and Optical Performance Characteristics of 0.74-eV p/n InGaAs Monolithic Interconnected Modules

There has been a traditional trade-off in thermophotovoltaic (TPV) energy conversion development between system efficiency and power density. This trade-off originates from the use of front surface spectral controls such as selective emitters and various types of filters. A monolithic interconnected module (MIM) structure has been developed which allows for both high power densities and high system efficiencies. The MIM device consists of many individual indium gallium arsenide (InGaAs) cells series-connected on a single semi-insulating indium phosphide (InP) substrate. The MIM is exposed to the entire emitter output, thereby maximizing output power density. An infrared (IR) reflector placed on the rear surface of the substrate returns the unused portion of the emitter output spectrum back to the emitter for recycling, thereby providing for high system efficiencies. Initial MIM development has focused on a 1 sq cm device consisting of eight (8) series interconnected cells. MIM devices, produced from 0.74-eV InGaAs, have demonstrated V(sub oc) = 3.2 volts, J(sub sc) = 70 mA/sq cm, and a fill factor of 66% under flashlamp testing. Infrared (IR) reflectance measurements (greater than 2 micron) of these devices indicate a reflectivity of greater than 82%. MIM devices produced from 0.55-eV InGaAs have also been demonstrated. In addition, conventional p/n InGaAs devices with record efficiencies (11.7% AM0) have been demonstrated.

Wilt, David M.↗

The effect of concentrator field layout on the EE-1 small community solar power system

The point-focusing distributed receiver (PFDR) concept is employed by a number of solar thermal power systems currently under development. One type of PFDR system which shows particular promise incorporates distributed energy generation. According to this concept each parabolic dish collector is a self-contained power generation module, and a conventional electrical system is used to interconnect the modules. The concept is thus modular, and any number of power modules can be combined to achieve the required plant size. Given the benefits of mass production, it appears that this type of system can produce electricity at lower cost than is projected for conventional (fossil) power systems over the next decade. An employment of organic Rankine cycle heat engines is considered.

Pons, R. L.↗

Assessing Opportunities and Challenges for Streamlining Interconnection Processes

As part of the Minnesota Solar Pathways project, funded in part by the Department of Energy’s Solar Energy Technologies Office, Electric Power Research Institute conducted a survey of existing utility interconnection practices and evaluated opportunities for streamlining them. The report highlights opportunities for electric utilities to improve transparency and automate administrative processes with options to fit the level of interconnections that utilities are experiencing.

14 SOLAR ENERGY↗

MN Solar Pathways: Enhanced Hosting Capacity Analysis

As part of the Minnesota Solar Pathways project, funded in part by the Department of Energy’s Solar Energy Technologies Office, Smarter Grid Solutions (SGS) completed an evaluation of emerging technologies as non-wires alternatives to integrate solar PV. SGS evaluated stand-alone smart inverters, centrally coordinated smart inverters, thermal load shifting, energy storage, and a combined technology scenario to compare and contrast the benefits at four distribution feeders. The analysis showed that there is not a “one size fits all” answer to increasing hosting capacity beyond a feeder’s static limit, since each feeder faces different constraints.

14 SOLAR ENERGY↗

Packaging Technology Developed for High-Temperature Silicon Carbide Microsystems

High-temperature electronics and sensors are necessary for harsh-environment space and aeronautical applications, such as sensors and electronics for space missions to the inner solar system, sensors for in situ combustion and emission monitoring, and electronics for combustion control for aeronautical and automotive engines. However, these devices cannot be used until they can be packaged in appropriate forms for specific applications. Suitable packaging technology for operation temperatures up to 500 C and beyond is not commercially available. Thus, the development of a systematic high-temperature packaging technology for SiC-based microsystems is essential for both in situ testing and commercializing high-temperature SiC sensors and electronics. In response to these needs, researchers at Glenn innovatively designed, fabricated, and assembled a new prototype electronic package for high-temperature electronic microsystems using ceramic substrates (aluminum nitride and aluminum oxide) and gold (Au) thick-film metallization. Packaging components include a ceramic packaging frame, thick-film metallization-based interconnection system, and a low electrical resistance SiC die-attachment scheme. Both the materials and fabrication process of the basic packaging components have been tested with an in-house-fabricated SiC semiconductor test chip in an oxidizing environment at temperatures from room temperature to 500 C for more than 1000 hr. These test results set lifetime records for both high-temperature electronic packaging and high-temperature electronic device testing. As required, the thick-film-based interconnection system demonstrated low (2.5 times of the room-temperature resistance of the Au conductor) and stable (decreased 3 percent in 1500 hr of continuous testing) electrical resistance at 500 C in an oxidizing environment. Also as required, the electrical isolation impedance between printed wires that were not electrically joined by a wire bond remained high (greater than 0.4 GW) at 500 C in air. The attached SiC diode demonstrated low (less than 3.8 W/mm2) and relatively consistent dynamic resistance from room temperature to 500 C. These results indicate that the prototype package and the compatible die-attach scheme meet the initial design standards for high-temperature, low-power, and long-term operation. This technology will be further developed and evaluated, especially with more mechanical tests of each packaging element for operation at higher temperatures and longer lifetimes.

Chen, Liang-Yu↗

Evolving Competitive Markets in SAPP: Leveraging Competitive Wholesale Electricity Markets to Drive Renewable Generation Capacity in the Southern African Power Pool (SAPP)

The SADC region has significant natural resource potential to increase renewable energy generation, improve electricity reliability, and support economic development. This research finds an apparent lack of confidence from electricity infrastructure investors in SAPP wholesale electricity markets, which increases risk perception and lowers the likelihood of capital deployment. With respect to free market fundamentals, competitive market obstacles and renewable energy development obstacles are characterized. Stakeholders identified the top obstacles to well-functioning competitive markets as insufficient transmission infrastructure for interconnection and regional movement of electricity, dominance of national single-buyer markets, and lack of or weak nation-state regulatory frameworks. Stakeholders prioritized the top three obstacles for renewable energy development as a lack of viable commercial arrangements for variable renewable energy (VRE) balancing, lack of functional and consistent nation-level regulations, and higher project costs related to reliance on imported equipment. With respect to potential solution options, stakeholders prioritized the development of new cost allocation and finance methods to facilitate new transmission expansion, training to educate new or potential new market entrants on SAPP processes, as well as modeling and analysis of regional SAPP participation benefits disaggregated to the nation-state level. From these perspectives, this research identified strategy options for consideration including transitioning SAPP to a regional transmission operator (RTO) for operation and planning of cross-border transmission facilities and market administration, shifting operations of SAPP member transmission systems to Independent System Operators (ISOs), establishing a regional regulatory authority and enhancing market data transparency. Implementing these reforms is expected to be challenging, but not insurmountable, given the domestic political, legal, and jurisdictional complexities of the SADC region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cybersecurity Risk Profiles for Distributed Energy Resource Management Systems

Managing the digitalization of increasingly diversity energy resources is a complex challenge for energy systems planners and managers. As the penetration of solar photovoltaics (PV) and other distributed renewable energy resources (DERs) expands, distributed energy resource management systems (DERMS) will play an increasingly important role in managing, monitoring, and controlling DERs as electric systems before more distributed, interconnected, and networked. However, the cybersecurity implications of DERMS deployments are not well understood today. A lack of understanding around the cybersecurity implications of DERMS deployments and variability in the security posture of DERMS vendors, owners, and operators could introduce new security risks to evolving electric power systems. This paper describes cybersecurity attack scenarios on DERMS, identifies related cybersecurity standards and guidelines, reviews the security features of state-of-the-art DERMS solutions, and offers cybersecurity guidance for DERMS vendors, owners, and operators to protect DERMS' unique capabilities. Standardizing cybersecurity requirements for DERMS could help improve the security of DERMS integrations and improve innovations that are more secure by design. The cybersecurity guidance found in this paper is intended to offer a unified approach and lay the foundation for future standardization of DERMS cybersecurity to reduce risk to the solar industry and other renewable energy stakeholders when integrating these technologies with electric power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MN Solar Pathways: Assessing Opportunities and Challenges for Streamlining Interconnection Processes

As part of the Minnesota Solar Pathways project, funded in part by the Department of Energy’s Solar Energy Technologies Office, Electric Power Research Institute conducted a survey of existing utility interconnection practices and evaluated opportunities for streamlining them. The report highlights opportunities for electric utilities to improve transparency and automate administrative processes with options to fit the level of interconnections that utilities are experiencing.

14 SOLAR ENERGY↗

Coal Fleet Transition: Retirement Impacts in the Eastern Interconnection

This report examines the impact of announced retirements on the mix of available generating capacity, prices, resource availability, and air emissions in the Eastern Interconnection. The report uses a security constrained economic dispatch (SCED) model - Ventyx's PROMOD IV 11.1 - of the bulk electric system (BES) to model the interconnection.

01 COAL, LIGNITE, AND PEAT↗