Search NASA⌕ Search

SEARCH · Search NASA

Results for “equipment reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

EXTRACTING HUMAN RELIABILITY FINDINGS FROM HUMAN FACTORS STUDIES IN THE HUMAN SYSTEMS SIMULATION LABORATORY

Modernization of U.S. nuclear power plants (NPPs) is widespread, with most plants currently replacing and transitioning equipment, control systems, and human system interfaces (HSI)s from analog to digital displays. This conversion remedies the obsolescence of analog parts along with needs for increased intuitiveness of design, safety, and capabilities. The Human Factors and Reliability team at Idaho National Laboratory (INL) carried out twelve control room modernization studies in the newly designed Human Systems Simulation Laboratory (HSSL) over nine years. The HSSL was constructed as a testbed for evaluating human factors techniques and performance measures, HSI frameworks, and cutting-edge operational concepts in NPPs. Installing a full-scope training simulator enabled direct design and evaluation work on the same instrumentation and control (I&C) and HSIs located at U.S. plants. The subsequent addition of glass top bays afforded crews opportunities to implement operations via the simulator using full-scale representations of their home NPP. Additionally, functional HSI prototypes were created, providing an environment for operator-in-the-loop benchmark studies. The HSSL has assisted in upgrades of six commercial NPP control rooms and served as an invaluable proving ground for new NPP operations technology. Human reliability analysis (HRA) was not originally the focus of the studies; however, data relating to HRA such as type and frequency of human errors can be extracted from the studies. INL is currently extracting data from the HSSL study reports to apprise how information gathered from simulation, HSI, and other related studies can create a broad look across different data sources to help inform HRA methods.

99 GENERAL AND MISCELLANEOUS↗

Relaxations of the steady optimal gas flow problem for a non-Ideal gas

Natural gas ranks second in U.S. primary energy consumption. Because most production sites are remote, gas must be transported through pipeline networks equipped with compressors, valves, and other components. For both economic efficiency and system reliability, it is desirable to operate these networks optimally. The governing physics across pipeline components entails nonlinear, non-convex equality and inequality constraints, and the most general steady-flow operations problem is a Mixed-Integer Nonlinear Program (MINLP).This work focuses on one such steady-flow problem-the Optimal Gas Flow (OGF) for a natural gas pipeline network-which minimizes production cost subject to the steady-flow physics. For day-to-day operations, the ability to quickly compute a globally optimal solution and a strong lower bound for varying demand profiles is crucial. A promising strategy is to build tight relaxations of the OGF’s nonlinear constraints. However, many nonlinearities arising from non-ideal equations of state either lack relaxations or have relaxations that do not scale to realistic network sizes. We address this gap by combining recent advances in polyhedral relaxations for univariate functions to construct tight, computationally efficient relaxations of the OGF with a non-ideal equation of state. These relaxations solve within seconds on a standard laptop. In conclusion, we demonstrate their quality through extensive numerical experiments on very large-scale test networks from the literature and find that the proposed approach proves optimality in 92% of tested instances.

03 NATURAL GAS↗

MSFC Skylab airlock module, volume 2

System design and performance of the Skylab Airlock Module and Payload Shroud are presented for the communication and caution and warning systems. Crew station and storage, crew trainers, experiments, ground support equipment, and system support activities are also reviewed. Other areas documented include the reliability and safety programs, test philosophy, engineering project management, and mission operations support.

Source record↗

Integral Glass Encapsulation for Solar Arrays

Work reported was performed during the period from August 1977 to December 1978. The program objective was to continue the development of electrostatic bonding (ESB) as an encapsulation technique for terrestrial cells. Economic analyses shows that this process can be a cost-effective method of producing reliable, long lifetime solar modules. When considered in sufficient volume, both material and equipment costs are competitive with conventional encapsulation systems. In addition, the possibility of integrating cell fabrication into the encapsulation process, as in the case of the preformed cell contacts discussed in this report, offers the potential of significant overall systems cost reduction.

Younger, P. R.↗

The case for Mars: Concept development for a Mars research station

A program to establish a permanent scientific research base on Mars is described. A Mars base as the much needed long-term focus for the space program is presented. A permanent base was chosen rather than the more conventional concept of a series of individual missions to different sites because the permanent base offers much greater scientific return plus greater crew safety and the potential for eventual growth into a settlement. The Mars base will strive for self-sufficiency and autonomy from Earth. Martian resources will be used to provide life support materials and consumables. The Martian atmosphere will provide a convenient source of volatiles: CO2, N2, and water. Rocket propellant (for returning vehicles), fuels, breathable air, and fertilizers will be manufactured from Mars air. Food will be grown on Mars using Martian materials as plant nutrients. A permanent human presence will be maintained on Mars beginning with the first manned landing via a strategy of crew overlap. This permanent presence will ensure safety and reliability of systems through continuous tending, maintenance, and expansion of the base's equipment and systems. A permanent base will allow the development of a substantial facility on Mars for the same cost (in terms of Earth departure mass) as a series of temporary camps. A base equipped with surface rovers, airplanes, and the ability to manufacture consumables and return propellant will allow far more extensive planetary exploration over a given period of years than would approaches featuring a series of short exploration missions such as the Apollo Moon program.

Welch, S. M.↗

The case for Mars concept

The Case for Mars workshops conducted in 1984 dealt with a program to establish a permanent scientific research base at Mars. The participants, viewed a Mars base as the much needed long-term focus for the space program. A permanent base was chosen rather than the more conventional concept of a series of individual missions to different sites became the permanent base offers much greater scientific return plus greater crew safety and the potential for growth into a true colony. This paper summarizes the results of the workshops. The Mars base will strive for self-sufficiency and autonomy from Earth. Martian resources will be used to provide life support materials and consumables. The Martian atmosphere will provide a convenient source of volatiles: C0 2 , N 2 , and water. Rocket propellant, fuels for surface and air vehicles and possibly power plants, breathable air, and fertilizers will be manufactured from the Mars atmosphere. Food will be grown on Mars using Martian regolith as a growth substrate. A permanent human presence will be maintained on Mars beginning with the first manned landing via a strategy of crew overlap. This permanent presence will ensure safety and reliability of systems through continuous tending, maintenance, and expansion of the base's equipment and systems. A permanent base will allow the development of a substantial facility on Mars for the same cost (in terms of Earth departure mass) as a series of temporary camps. A base equipped with surface rovers, airplanes, and the ability to manufacture consumables and propellant will provide far more extensive planetary exploration over a given period of years than would an Apollo-style approach.

J R French↗

NASA 60 GHz intersatellite communication link definition study. Addendum A: Mixed baseband and IF signals

As part of a definition study for a 60 GHz intersatellite communications link system (ICLS), baseline design concepts for a channelized crosslink were identified. The crosslink would allow communications between geostationary satellites of the planned Tracking and Data Acquisition System (TDAS) and would accommodate a mixture of frequency translation coherent links (bent pipe links) and baseband-in/baseband-out links (mod/demod links). A 60 GHz communication system was developed for sizing and analyzing the crosslink. For the coherent links this system translates incoming signals directly up to the 60 GHz band; trunks the signals across from one satellite to a second satellite at 60 GHz then down converts to the proper frequency for re-transmission from the second satellite without converting to any intermediate frequencies. For the baseband-in/baseband-out links the baseband data is modulated on to the 60 GHz carrier at the transmitting satellite and demodulated at the receiving satellite. The frequency plan, equipment diagrams, and link calculations are presented along with results from sizing and reliability analyses.

Source record↗

Manned testing in a simulated space environment

A view of the facility and operational requirements involved in performing a manned thermal vacuum test is presented. The requirements fall into two major categories. The first category deals with placing the suited crewmen in a hazardous environment and assuring their safety. The second category deals with the constraints and special requirements involved with a suited crewman operating flight hardware in a 1-G environment. Design areas that deal with man rating a chamber, including fire suppression, emergency repress, emergency power, backups, reliable instrumentation and data systems, communications, television monitoring, biomedical monitoring, material compatibilities, and equipment supporting the Extravehicular Mobility Unit (EMU) are discussed. The operational issues that are peculiar to manned testing such as test rules, test procedures, test protocol, emergency drills, availability of hyperbaric facilities, test team training and certification engineering concerns for a safe mechanical and instrumentation buildup, hazard analysis, and Failure Modes and Effects Analysis are discussed. The constraints and special requirements involved with a suited crewman operating flight hardware in a 1-G environment are addressed.

Fender, Donna L.↗

Improving Communications Systems

The Space Shuttle has many communications systems which are used throughout a typical mission. Given that the radio spectrum has become increasingly congested, the ability to hear extremely weak signals requires greater receiver sensitivity. Dryden Flight Research Center approached Angle Linear, a manufacturer of linear radio frequency products and peripherals for communications, to solve the problem. The solution was a receiving preamplifier specially crafted for NASA. Communications with the Space Shuttle are now more reliable,with Dryden being able to also support local missions without purchasing additional equipment. The work has carried over into the Mir Space Station communication support effort and is under evaluation by other NASA centers. The company's preamplifier line was greatly expanded to cover a broader range of frequencies, providing the same sensational improvement to other areas of communication including business, government, trucking, land mobile, cellular and broadcast.

Source record↗

Employing Fracture Statistics to Track Cell Reliability Through Module Fabrication

In this work we demonstrate how fracture statistics may be employed to track cell reliability through module fabrication steps. We were able to detect how cell cutting equipment could reduce cell fracture strain by 25 % as well as increase its variability. A smaller reduction was found to result from the ribbon soldering operation, and all cells measured were weaker when strained in an orientation perpendicular to the gridlines. Cell fracture measurements were found to be consistent with the number of cracked cells experienced in full sized modules exposed to mechanical loading. A structural mechanics model was created to elucidate how the requisite fracture strain is developed in a cell encapsulated within a PV module and demonstrates that this strain decreases more than 50 % from its center to edge when placed within the inner loading span of four-point flexure. The associated implications on the apparent cell strength is examined with an effective volume treatment.

14 SOLAR ENERGY↗

Electrical, Electronic, and Electromechanical (EEE) parts management and control requirements for NASA space flight programs

This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications, 'Reliability Program Requirements for Aeronautical and Space System Contractors,' NHB 5300.4(1A-l); 'Maintainability Program Requirements for Space Systems,' NHB 5300.4(1E); and 'Quality Program Provisions for Aeronautical and Space System Contractors,' NHB 5300.4(1B).

Source record↗

Ultrasonic Inspection

Automation Industries Inc. has had more than $2 million in contracts to produce innovative equipment for the Apollo program. When Marshall Space Flight Center sought a fast nondestructive way to inspect butt welds in aluminum alloys for spacecraft, the company developed a reliable ultrasonic device using multiple transducers called "delta manipulators" which detect lack of weld penetration not readily seen in radiograph automation. Industry soon adapted the ultrasonic equipment to a unique rail inspection device that saves countless man hours. Device is contained in self propelled railroad cars produced and operated by the company to check old track welds for deterioration.

Source record↗

Reliability inputs to Mariner 9 data explosion

This paper describes the prelaunch and post-launch reliability functions which contributed to the success of the Mariner 9 spacecraft. Examples are included to illustrate how each reliability activity was a vital part of each phase of the project. Prelaunch reliability functions included: (1) establishing, negotiating, and monitoring system and subsystem requirements, (2) participating in spacecraft system and subsystem design/hardware reviews, (3) monitoring preparation of failure mode effects and criticality analyses (FMECA), (4) establishing and managing a problem failure reporting (PFR) system for the spacecraft and its support equipment, (5) monitoring electronic parts activities, and (6) participating in spacecraft reviews. Particular emphasis is placed on mission operations reliability assurance activities, which included: (1) spacecraft problem/failure reporting, (2) managing an integrating failure reporting system which covered all mission operations activities, (3) real-time analysis of spacecraft anomalies, and (4) risk assessment.

Macgregor, D. S.↗

Reliability history of the Apollo guidance computer

The Apollo guidance computer was designed to provide the computation necessary for guidance, navigation and control of the command module and the lunar landing module of the Apollo spacecraft. The computer was designed using the technology of the early 1960's and the production was completed by 1969. During the development, production, and operational phase of the program, the computer has accumulated a very interesting history which is valuable for evaluating the technology, production methods, system integration, and the reliability of the hardware. The operational experience in the Apollo guidance systems includes 17 computers which flew missions and another 26 flight type computers which are still in various phases of prelaunch activity including storage, system checkout, prelaunch spacecraft checkout, etc. These computers were manufactured and maintained under very strict quality control procedures with requirements for reporting and analyzing all indications of failure. Probably no other computer or electronic equipment with equivalent complexity has been as well documented and monitored. Since it has demonstrated a unique reliability history, it is important to evaluate the techniques and methods which have contributed to the high reliability of this computer.

Hall, E. C.↗

Electric Vehicle Supply Equipment (EVSE) Site Assessment Report for the U.S. Army Corps of Engineers Chena Site Near Fairbanks, Alaska

This report presents an analysis of the requirements for charging station installation and electric vehicle operation at the US Army Corps of Engineers - Chena Site, located in a cold weather climate in the Fairbanks North Star Borough, AK. The report includes findings from a site visit, and a detailed electric vehicle (EV) charging site plan with cost estimates. Cost for three 50-ampere pedestal chargers located on the edge of the existing parking lot is estimated at $\$$53,100, and the cost of three 80-ampere chargers is estimated at $\$$89,400. The authors did not assess the cost of a heated garage. The USACE Chena site reaches extreme cold temperatures of -40 Degrees Celsius (-40 Degrees Fahrenheit) and below in a typical winter, often for days on end. Considerations of operating EVs as well as electrical vehicle supply equipment (EVSE) at this site can be applicable to other cold or extremely cold locations. Interviews with EV users in cold climates and a literature review indicated that EVs operate well but have significantly decreased range compared to 21 Degrees Celsius (70 Degrees Fahrenheit) operations. Some strategies such as prewarming the vehicle while it is plugged in and using heated seats and steering wheel instead of cabin heat, can improve cold weather performance. Storing the EV in a garage would mean the battery and cabin are automatically preheated, the battery would not age as rapidly as when the vehicle is stored outside, and problems with charging the vehicle are less likely. Lowest temperate-rated Electric Vehicle Supply Equipment (EVSE), as electric vehicle chargers are known as, are rated to -40 Degrees Celsius (-40 Degrees Fahrenheit), and sometimes malfunction. No EVSE is rated to the temperatures that USACE Chena site experienced for more than a week in winter 2023-4, of -50 Degrees Celsius (-45 Degrees Fahrenheit) and which are typical for the area. If reliability is a must, entities may want to consider a heated garage to minimize potential problems with charging equipment. There is a companion technical report to this titled "Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska" that examines the data on EV and EVSE cold-weather functionality in more detail. (Esparza, Truffer Moudra, and Hodge 2024).

33 ADVANCED PROPULSION SYSTEMS↗

Recommended Actions to Improve Adapter Safety

With the rapid advancement and acceleration in the electric vehicle (EV) industry within the United States, major automakers and EV charging companies are increasingly adopting the North American Charging Standard (NACS) connector style, now officially known as J3400. This shift is expected to enhance charging infrastructure, providing a better customer experience by making it easier for all EV drivers to access a wider network of direct-current (DC) fast chargers (DCFCs). However, the adoption of the J3400 standard presents challenges for many EVs already on the roads and some currently coming off production lines that are equipped with the Combined Charging System (CCS) connector, which this report will refer to as the North American standard, CCS1. These vehicles will need adapters to use new or existing J3400 infrastructure. During this transition, several issues have emerged. Firstly, there is a need to standardize the new connector type to ensure it is interoperable, safe, and reliable. Second, existing CCS EV drivers need a way to access the J3400 network, which will require electric vehicle supply equipment (EVSE) or sites with both connector types, driver-provided adapters to physically convert from CCS to J3400, or EVSE with retained adapters designed for use with the EVSE. Third, adapter standards will need to be written to specify how they will be designed and what evaluations will be needed to ensure safe and reliable performance. To address these challenges, adapters that support different types of charging connectors will be essential. These adapters will play a crucial role in supporting the transition and ensuring continued service for legacy EVs with CCS inlets as the J3400 standard becomes the predominant one in the United States. Consequently, the National Charging Experience (ChargeX) Consortium has investigated and performed a teardown analysis on the different adapter versions on the market. The aim is to create a failure mode and effects analysis (FMEA) on what are expected to be the most common adapter types used in this transition. In order to support this work, we executed an FMEA exercise with the main goal of identifying gaps in the existing adapters' performance and conformance to the most common safety requirements of high-power and high-voltage devices. This effort focused on adapters provided by the driver, as these may present the highest safety and reliability risks. The recommendations made here apply to both retained and driver-provided adapters.

25 ENERGY STORAGE↗

Optimization models for integrated biorefinery operations

Variations of physical and chemical characteristics of biomass lead to an uneven flow of biomass in a biorefinery, which reduces equipment utilization and increases operational costs. Uncertainty of biomass supply and high processing costs increase the risk of investing in the US’s cellulosic biofuel industry. We propose a stochastic programming model to streamline processes within a biorefinery. A chance constraint models system’s reliability requirement that the reactor is operating at a high utilization rate given uncertain biomass moisture content, particle size distribution, and equipment failure. The model identifies operating conditions of equipment and inventory level to maintain a continuous flow of biomass to the reactor. Furthermore, the sample average approximation method approximates the chance constraint and a bisection search-based heuristic solves this approximation. A case study is developed using real-life data collected at Idaho National Laboratory’s biomass processing facility. An extensive computational analysis indicates that sequencing of biomass bales based on moisture level, increasing storage capacity, and managing particle size distribution, increases utilization of the reactor and reduces operational costs.

09 BIOMASS FUELS↗